A steel structure tool-type anchor point and installation and removal method thereof

By designing tool-type anchor points of steel structures, using the separation and connection structure of steel structure boxes and bolts, combined with soil filling, the waste and safety hazards of concrete anchor points in temporary buildings are solved, and the reusable anchor points are realized. Environmentally friendly installation and removal.

CN111519531BActive Publication Date: 2024-12-27TONGJI UNIV ARCHITECTURAL DESIGN INST GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010479665.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-29
Publication Date
2024-12-27
Estimated Expiration
2040-05-29

AI Technical Summary

Technical Problem

During temporary construction or construction site construction, existing concrete anchor points have problems such as waste, non-reusability, environmental damage and safety hazards, especially in the installation of agricultural land.

Method used

A tool-type anchor point of steel structure is designed, using a steel structure box with the top opening, which is installed and removed through separate connection structure between bolts and the chip base plate, combined with soil filling, to ensure that the structure is subject to reliable stress and environmentally friendly.

Benefits of technology

It realizes the reusable utilization of anchor points, avoids environmental damage, reliable structural stress, and simplifies the installation and dismantling process, reducing safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111519531B_ABST
    Figure CN111519531B_ABST
Patent Text Reader

Abstract

The present invention relates to a steel structure tool type anchor point and an installation and removal method thereof, the anchor point comprises a steel structure box with a top opening design, the box wall of the steel structure box comprises a first side plate arranged on the left and right and a second side plate arranged on the front and back, the box bottom of the steel structure box comprises an upper split bottom plate and a lower split bottom plate thereunder, one side of the upper split bottom plate and one side of the lower split bottom plate are detachably connected to each other by bolts, the other side of the upper split bottom plate and the other side of the lower split bottom plate are respectively movably connected to the first side plates arranged on the left and right, one end of the bolt passes through the upper split bottom plate and the lower split bottom plate in sequence, the other end of the bolt is rotatably connected to the upper surface side plate located at the top of the steel structure box, the top of the steel structure box is also provided with a main beam, and an ear plate for connecting a pull anchor structure is installed on the main beam. Compared with the prior art, the steel structure tool type anchor point proposed by the present invention does not damage the environment, has reliable structural force, is easy to install and remove, and has the advantages of being reusable and economical.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building structure foundations, and in particular to a steel structure tool-type anchor point and an installation and removal method thereof. Background Art

[0002] Anchor structures are often used in temporary buildings or construction sites. Temporary anchor points are a major problem faced by anchor structures. Currently, concrete anchor points are often used as temporary anchor points. However, temporary anchor points only need to be used once. If concrete anchor points are used, it will not only cause a large waste and cannot be reused, but also require a certain amount of time for maintenance, causing certain damage to the environment and bringing certain economic losses.

[0003] When it comes to occupying agricultural land around buildings, the installation of temporary concrete anchor points is subject to greater restrictions, and the structural form of temporary anchor points is often not standardized, which can easily lead to safety hazards. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a steel structure tool anchor point and its installation and removal method, so as to achieve the purpose of not damaging the environment, being reusable and having reliable structural force.

[0005] The objective of the present invention can be achieved through the following technical scheme: a steel structure tool-type anchor point, comprising a steel structure box with a top opening design, the box wall of the steel structure box comprising a first side panel arranged on the left and right and a second side panel arranged on the front and back, the box bottom of the steel structure box comprising an upper split bottom panel and a lower split bottom panel thereunder, one side of the upper split bottom panel and one side of the lower split bottom panel being detachably connected to each other by bolts, the other side of the upper split bottom panel and the other side of the lower split bottom panel being movably connected to the first side panels arranged on the left and right respectively, one end of the bolt passes through the upper split bottom panel and the lower split bottom panel in turn, the other end of the bolt is rotatably connected to the upper surface side panel located at the top of the steel structure box, a main beam is also arranged on the top of the steel structure box, and an ear plate for connecting a pull anchor structure is installed on the main beam.

[0006] Furthermore, the bolt comprises a screw rod, one end of which passes through the upper split bottom plate and the lower split bottom plate in sequence, and the other end of the screw rod is provided with a thread and is rotatably connected to the upper surface side plate through a nut.

[0007] Furthermore, one end of the screw rod for connecting the upper and lower split bottom plates is provided with a square end block, and one side of the upper and lower split bottom plates detachably connected to each other is provided with a first square hole for passing the square end block.

[0008] Furthermore, the length of the square end block is L and the width is W, the length of the first square hole is L1 and the width is W1, wherein L<L1 and W<W1 and W1<L.

[0009] Furthermore, a screw top flat head on which a rotary wrench can be mounted is provided at the top of the screw. By mounting the rotary wrench on the screw top flat head, the screw can be rotated, thereby driving the square end block to rotate.

[0010] Furthermore, a second square hole for passing the square end block is formed on the upper surface side plate.

[0011] Furthermore, the width of the second square hole is smaller than the diameter of the nut.

[0012] Furthermore, the upper split bottom plate and the lower split bottom plate are connected to the first side plates arranged on the left and right through hinges respectively.

[0013] Furthermore, the upper surface side plate is located between the two first side plates.

[0014] Furthermore, the main beam is located between the two first side plates, and both ends of the main beam are located in the middle of the two first side plates.

[0015] A method for installing and removing a tool-type anchor point of a steel structure comprises the following steps:

[0016] S1. Place the steel structure box including the first side plate, the second side plate, the upper segmented bottom plate, the lower segmented bottom plate, the upper surface side plate and the main beam on the site or bury it in the site;

[0017] S2, insert a bolt with a screw flat head on the top, a thread on the upper end of the screw, and a square end block on the bottom of the screw into the upper surface side plate, and make the square end block pass through the upper split bottom plate and the lower split bottom plate in turn;

[0018] S3. Insert a wrench onto the flat head of the screw and rotate the wrench 90° to drive the square end block at the bottom of the screw to rotate 90° so that the square end block is stuck and fits the bottom of the lower split bottom plate;

[0019] S4. Insert the nut from the flat head of the screw into the upper end of the screw and tighten the nut to fix the bolt;

[0020] S5. Fill the steel structure box with soil until it is full, and backfill the soil around the steel structure box. Finally, connect the cable of the anchor structure to the ear plate on the main beam, thus completing the installation of the tool anchor point of the steel structure.

[0021] T1. Unscrew the nut from the upper end of the screw, then insert a wrench into the flat head of the screw, rotate the wrench 90°, and drive the square end block at the bottom of the screw to rotate 90°, so that the square end block is no longer stuck and fits the bottom of the lower split bottom plate;

[0022] T2. Take out the entire bolt from the lower split bottom plate, upper split bottom plate, and upper surface side plate in turn;

[0023] T3. Remove the cable from the ear plate and lift the ear plate with a hoist. Under the action of gravity, the upper and lower split bottom plates will flip downwards to allow the soil in the steel structure box to flow out, thus completing the removal of the tool anchor point of the steel structure.

[0024] Compared with the prior art, the present invention has the following advantages:

[0025] 1. The present invention adopts a steel structure box combined with earth filling to effectively resist the cable force of the anchor structure. The structure is reliable in force and can play the role of an anchor point without causing damage to the environment and is not restricted by the installation environment.

[0026] 2. The present invention utilizes a bolt with a screw top flat head on the top and a square end block on the bottom. By rotating the bolt, the upper and lower divided bottom plates at the bottom of the steel structure box can be detachably connected. When the anchor point is removed, the soil in the steel structure box can quickly flow out naturally. This not only has the advantage of convenient dismantling, but also ensures the reusability of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic elevation diagram of the installation effect of the tool-type anchor point of the steel structure in the embodiment;

[0028] Figure 2 It is a schematic diagram of the upper surface of the installation effect of the tool-type anchor point of the steel structure in the embodiment;

[0029] Figure 3 It is a schematic diagram of the lower surface of the installation effect of the steel structure tool anchor point in the embodiment;

[0030] Figure 4 This is a schematic diagram of the bolt elevation at 0°;

[0031] Figure 5 This is a schematic diagram of the bolt elevation rotated 90°;

[0032] Figure 6 It is a plan view of the flat head of the screw;

[0033] Explanation of markings in the figure: 1. main beam, 2. first side plate, 3. ear plate, 401. first square hole, 402. second square hole, 5. bolt, 6. flat head of screw rod, 7. square end block, 8. screw rod, 9. wrench, 10. wrench socket, 11. wrench handle, 12. hinge, 13. second side plate, 14. upper surface side plate, 15. upper split bottom plate, 16. lower split bottom plate, 17. filling port, 18. nut. DETAILED DESCRIPTION

[0034] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0035] Example

[0036] like Figure 1 to Figure 3 As shown, a steel structure tool-type anchor point comprises a steel structure box with a filling port 17 arranged on the top, a main beam 1 is arranged on the top of the steel structure box, and an ear plate 3 for connecting the anchor structure is installed on the main beam 1. The box wall of the steel structure box is composed of first side plates 2 arranged on the left and right and second side plates 13 arranged on the front and back. The main beam 1 is located between the two first side plates 2, and both ends of the main beam 1 are located in the middle of the two first side plates 2.

[0037] The bottom of the steel structure box includes an upper split bottom plate 15 and a lower split bottom plate 16 thereunder. One side of the upper split bottom plate 15 and one side of the lower split bottom plate 16 are detachably connected to each other through bolts 5 at both ends. The other side of the upper split bottom plate 15 and the other side of the lower split bottom plate 16 are movably connected to the first side plates 2 arranged on the left and right through hinges 12, respectively.

[0038] One end of the bolt 5 passes through the upper partition bottom plate 15 and the lower partition bottom plate 16 in sequence, and the other end of the bolt 5 is rotatably connected to the upper surface side plate 14 located on the top of the steel structure box, and the upper surface side plate 14 is located between the two first side plates 2.

[0039] Specifically, Figures 4 to 6 As shown, the bolt 5 includes a screw rod 8, one end of which is provided with a square end block 7, which passes through the upper split bottom plate 15 and the lower split bottom plate 16 in sequence, the other end of the screw rod 8 is provided with a thread, and is rotatably connected to the upper surface side plate 14 through a nut 18, and the top of the other end of the screw rod 8 is also provided with a screw top flat head 6 on which a rotating wrench 9 can be mounted, and the wrench socket 10 is inserted into the screw top flat head 6, and the wrench handle 11 is turned to rotate the screw rod 8, thereby driving the square end block 7 to rotate. Correspondingly, a first square hole 401 for passing the square end block 7 is provided on one side of the upper split bottom plate 15 and the lower split bottom plate 16 which are detachably connected to each other, and a second square hole 402 for passing the square end block 7 is provided on the upper surface side plate 14. If the length of the square end block 7 is L and the width is W, and the length of the first square hole 401 is L1 and the width is W1, then L<L1 and W<W1 and W1<L, and the width of the second square hole 402 is smaller than the diameter of the nut 18, thereby ensuring that the bolt 5 can be fixedly installed on the upper surface side plate 14, the upper split bottom plate 15 and the lower split bottom plate 16 in turn.

[0040] When applying the above steel structure tool anchor point, it is mainly divided into the installation process (S1~S5) and the removal process (T1~T3):

[0041] S1. Place the steel structure box including the first side plate, the second side plate, the upper segmented bottom plate, the lower segmented bottom plate, the upper surface side plate and the main beam on the site or bury it in the site;

[0042] S2, insert a bolt with a screw flat head on the top, a thread on the upper end of the screw, and a square end block on the bottom of the screw into the upper surface side plate, and make the square end block pass through the upper split bottom plate and the lower split bottom plate in turn;

[0043] S3. Insert a wrench onto the flat head of the screw and rotate the wrench 90° to drive the square end block at the bottom of the screw to rotate 90° so that the square end block is stuck and fits the bottom of the lower split bottom plate;

[0044] S4. Insert the nut from the flat head of the screw into the upper end of the screw and tighten the nut to fix the bolt;

[0045] S5. Fill the steel structure box with soil until it is full, and backfill the soil around the steel structure box. Finally, connect the cable of the anchor structure to the ear plate on the main beam, thus completing the installation of the tool anchor point of the steel structure.

[0046] T1. Unscrew the nut from the upper end of the screw, then insert a wrench into the flat head of the screw, rotate the wrench 90°, and drive the square end block at the bottom of the screw to rotate 90°, so that the square end block is no longer stuck and fits the bottom of the lower split bottom plate;

[0047] T2. Take out the entire bolt from the lower split bottom plate, upper split bottom plate, and upper surface side plate in turn;

[0048] T3. Remove the cable from the ear plate and lift the ear plate with a hoist. Under the action of gravity, the upper and lower split bottom plates will flip downwards to allow the soil in the steel structure box to flow out, thus completing the removal of the tool anchor point of the steel structure.

Claims

1. A method for installing and removing a tool-type anchor point of a steel structure, characterized in that: The steel structure tool anchor point comprises a steel structure box with a top opening design, the box wall of the steel structure box comprises a first side plate (2) arranged on the left and right and a second side plate (13) arranged on the front and back, the box bottom of the steel structure box comprises an upper split bottom plate (15) and a lower split bottom plate (16) thereunder, one side of the upper split bottom plate (15) and one side of the lower split bottom plate (16) are detachably connected to each other by bolts (5), the other side of the upper split bottom plate (15) and the other side of the lower split bottom plate (16) are respectively movably connected to the first side plates (2) arranged on the left and right, one end of the bolt (5) passes through the upper split bottom plate (15) and the lower split bottom plate (16) in sequence, the other end of the bolt (5) is rotatably connected to the upper surface side plate (14) located on the top of the steel structure box, the top of the steel structure box is also provided with a main beam (1), and an ear plate (3) for connecting a pull anchor structure is installed on the main beam (1); The bolt (5) comprises a screw rod (8), one end of which passes through the upper split bottom plate (15) and the lower split bottom plate (16) in sequence, the other end of which is provided with a thread and is rotatably connected to the upper surface side plate (14) through a nut (18), one end of which is used to connect the upper split bottom plate (15) and the lower split bottom plate (16) is provided with a square end block (7), and a first square hole (401) for passing the square end block (7) is provided on one side of the upper split bottom plate (15) and the lower split bottom plate (16) which are detachably connected to each other, and the top of the screw rod (8) having one end with a thread is provided with a screw rod top flat head (6) on which a rotary wrench (9) can be mounted, and the screw rod (8) can be rotated by mounting the rotary wrench (9) on the screw rod top flat head (6), thereby driving the square end block (7) to rotate; The installation and removal method of the above steel structure tool anchor point comprises the following steps: S1. Placing a steel structure box including a first side plate (2), a second side plate (13), an upper segmented bottom plate (15), a lower segmented bottom plate (16), an upper surface side plate (14) and a main beam (1) on a site or burying them in the site; S2, inserting a bolt (5) having a screw top flat head (6) at the top, a screw (8) having a thread at the upper end, and a square end block (7) at the bottom of the screw (8) into the upper surface side plate (14), and passing the square end block (7) through the upper split bottom plate (15) and the lower split bottom plate (16) in sequence; S3, insert a spanner (9) onto the flat head (6) of the screw, rotate the spanner (9) 90°, drive the square end block (7) at the bottom of the screw (8) to rotate 90°, so that the square end block (7) is stuck and fits the bottom of the lower split bottom plate (16); S4. Insert the nut (18) from the flat head (6) of the screw into the upper end of the screw (8), and tighten the nut (18) to fix the bolt (5); S5, fill the steel structure box with soil until it is full, and backfill the soil around the steel structure box, and finally connect the cable of the anchor structure to the ear plate (3) on the main beam (1), thus completing the installation of the steel structure tool anchor point; T1. Unscrew the nut (18) from the upper end of the screw (8), then insert the wrench (9) onto the flat head (6) at the top of the screw, rotate the wrench (9) 90°, and drive the square end block (7) at the bottom of the screw (8) to rotate 90°, so that the square end block (7) is no longer stuck to the bottom of the lower split bottom plate (16); T2, remove the entire bolt (5) from the lower split bottom plate (16), the upper split bottom plate (15), and the upper surface side plate (14) in sequence; T3. Remove the cable from the ear plate (3), lift the ear plate (3) with a sling, and under the action of gravity, the upper and lower sub-plates (15, 16) turn down to allow the soil in the steel structure box to flow out, thus completing the removal of the tool anchor point of the steel structure.

2. The method for installing and removing a tool-type anchor point for a steel structure according to claim 1, characterized in that: The length of the square end block (7) is L and the width is W, and the length of the first square hole (401) is L1 and the width is W1, wherein L<L1 and W<W1 and W1<L.

3. The method for installing and removing a tool-type anchor point for a steel structure according to claim 1, characterized in that: The upper surface side plate (14) is provided with a second square hole (402) for passing the square end block (7).

4. The method for installing and removing a tool-type anchor point for a steel structure according to claim 3, characterized in that: The width of the second square hole (402) is smaller than the diameter of the nut (18).

5. The method for installing and removing a tool-type anchor point for a steel structure according to claim 1, characterized in that: The upper split bottom plate (15) and the lower split bottom plate (16) are respectively connected to the first side plates (2) arranged on the left and right through hinges (12).

6. The method for installing and removing a tool-type anchor point for a steel structure according to claim 1, characterized in that: The upper surface side plate (14) is located between the two first side plates (2), the main beam (1) is located between the two first side plates (2), and both ends of the main beam (1) are located in the middle of the two first side plates (2).