A method for predicting soil deformation caused by shield construction with small curvature in saturated soil considering multiple factors
Through the construction method of small curvature shield of saturated soil that comprehensively considers multiple factors, the soil deformation is accurately predicted, and the problem of large calculation results in the existing technology is solved, and the risk assessment and prediction reference for small curvature tunnel engineering is provided, with engineering applications value.
Patent Information
- Application Number
- CN202010788422.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-07
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2040-08-07
AI Technical Summary
When calculating soil deformation caused by shield construction with small curvature curve, the results are larger than the actual measured value, and many factors cannot be considered effectively, such as the cutting board soil extrusion effect, shield shell friction force, shield end grouting pressure The unevenness and soil softening effect lead to inaccurate calculation results.
A method for predicting soil deformation caused by small curvature shield construction with multiple factors is proposed. Through integral processing, shield shell force, cutter plate soil extrusion effect, shield shell friction, shield end grouting pressure and soil loss, etc. The total deformation of the soil is calculated comprehensively to provide more accurate vertical deformation prediction.
This method can accurately predict the soil layer agglomeration caused by the construction of small curvature shields, make up for the defects of the existing technology, is suitable for working conditions under spatial curved surface loads, and provides a risk assessment and prediction reference for small curvature tunnel projects. , has engineering application value.
Smart Images

Figure CN111931372B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering, and relates to a method for predicting vertical deformation of soil caused by shield construction of saturated soil with small curvature under consideration of various construction factors. Background Art
[0002] With the rapid development of urban subway tunnel construction, shield construction safety has received more and more attention and importance. Due to site conditions or building (structure) constraints, the construction of subway lines will inevitably have small curvature curve tunnels. The disturbance of the shield to the soil during the construction process of small curvature curve excavation is more significant than that of straight line excavation, which is mainly reflected in the following aspects: (1) The different strokes and thrusts of the jacks in each section during the curve advancement process result in uneven distribution of additional thrust on the excavation surface. (2) The inner and outer shield shells of the line squeeze the soil, resulting in differences in frictional resistance between the shield shell and the surrounding soil, and the frictional resistance on the inner side of the line increases sharply. (3) The cutter head on the inner side of the line over-excavates the soil to a large extent, resulting in an increase in the shield tail gap.
[0003] At present, the calculation of soil deformation caused by construction loads is mostly based on Mindlin solution, assuming that the soil is a single-phase medium, and is mostly applied to the linear tunnel model. When studying the influence of various construction loads on the linear tunnel, the soil squeezing effect of the cutter head on the soil in front during shield excavation, the slurry spreading effect during the shield tail grouting process, the soil softening effect caused by the friction between the shield shell and the soft soil, and the unevenness of the shield tail grouting pressure are often ignored, resulting in the results being larger than the measured values. In addition, there has never been a study on the displacement solution of soil deformation caused by small curvature curve shield construction considering the two-phase medium of water-bearing strata. Therefore, it is necessary to correct the calculation formula of soil deformation caused by shield construction in linear tunnels, and on this basis, seek a suitable calculation model and effective calculation method to predict the influence of various construction loads on soil deformation in small curvature curve shield construction. Summary of the invention
[0004] The purpose of the embodiment of the present invention is to provide a method for predicting soil deformation caused by small-curvature shield construction in saturated soil taking into account multiple factors, so as to solve the problem that the results calculated by the existing calculation method are larger than the measured values.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] The present invention provides a method for predicting soil deformation caused by shield construction with small curvature in saturated soil taking into account multiple factors, comprising:
[0007] The initial solution of the vertical deformation of the saturated soil caused by the concentrated force inside the soil is integrated to obtain the vertical deformation of the soil caused by the distributed force on the shield action surface.
[0008] Considering the soil squeezing effect of the cutterhead, the soil deformation caused by the additional thrust of each zone of the curved shield propulsion system is obtained;
[0009] Considering the difference in friction between the inner and outer sides of the curved shield, the spread of slurry at the shield tail, and the softening characteristics of the soil, the deformation of the soil caused by the friction of the shield is obtained.
[0010] Considering the uneven distribution of shield tail grouting pressure along the shield tail gap, the shield tail grouting pressure causes soil deformation.
[0011] Considering the elliptical non-radial movement of the soil during the advancement of the curved shield and the extra over-excavation inside the line, the soil loss caused the soil deformation;
[0012] By integrating the vertical deformation of soil caused by various factors, the total deformation of soil caused by small-curvature shield construction in saturated soil is obtained.
[0013] Furthermore, the initial solution of the vertical deformation of the soil caused by the concentrated force inside the saturated soil is integrated to obtain the vertical deformation of the soil caused by the distributed force on the shield action surface, which specifically includes:
[0014] Based on the initial solution of the deformation of any position of the soil body when the concentrated force acts inside the semi-infinite space saturated soil, after coordinate transformation, the vertical deformation formulas of the soil body under the vertical and horizontal concentrated forces are obtained respectively:
[0015]
[0016]
[0017] Where: μ zv is the soil displacement in the z direction under the action of vertical force; μ zh is the soil displacement in the z direction under the action of horizontal force; F1 is the vertical concentrated force; F2 is the horizontal concentrated force; h is the vertical distance between the force and the free surface; π is the circumference; G is the shear elastic modulus.
[0018] Furthermore, considering the soil squeezing effect of the cutterhead, the soil deformation caused by the additional thrust of each partition of the curved shield propulsion system is obtained, including:
[0019] Take the area of any microelement in the shield excavation surface as dA1=rdrdθ1, and the concentrated force on any unit of the excavation surface is: dF1=qrdrdθ1,
[0020] Where: A1, r, θ1 are the unit area, radius, and angle of the excavation surface, respectively, and the units are mm 2 , mm, °; F1, q are the concentrated force on any unit of the excavation surface and the additional positive thrust on the unit area of the excavation surface, respectively, unit: kPa;
[0021] After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained:
[0022]
[0023] Considering the soil squeezing effect of the cutterhead on the soil in front of the excavation face during shield tunneling, a more reasonable calculation formula for the additional thrust of the cutterhead is obtained:
[0024]
[0025] Where: μ is Poisson's ratio; E u is the undrained elastic modulus of the soil, unit: MPa; ν is the shield tunneling speed, unit: cm / min; ξ is the cutterhead opening rate, unit: %; D is the cutterhead diameter, unit: m; k is the number of closed parts of the cutterhead; w is the cutterhead speed, unit: r / min; Δp′ is the extrusion pressure generated by the cutterhead cutting into the soil, unit: kPa.
[0026] Since the additional thrust of the cutterhead in each zone of the curved shield line is different, the integration between the zones is adopted, and the vertical deformation expression of the soil under the action of uneven front additional thrust on the shield excavation face during the curved shield excavation process is obtained:
[0027]
[0028] in:
[0029]
[0030]
[0031] Where: μ z-q is the vertical deformation of the soil caused by the additional thrust of the cut, unit: m; z0 is the buried depth of the tunnel axis, unit: m; R s is the tunnel radius, unit: m; q1 is the additional thrust of the upper and lower partitions of the cutterhead, unit: kPa; q2 and q3 are the additional thrust of the right and left partitions of the cutterhead, unit: kPa.
[0032] Furthermore, considering the difference in friction between the inner and outer sides of the curved shield, the spread of slurry at the shield tail, and the softening characteristics of the soil, the deformation of the soil caused by the friction of the shield is obtained, including:
[0033] Since the shield machine is a cylindrical rigid body, take any micro-unit dA2 = R s dsdθ2, depth of force point h=z0-R s sinθ2, the concentrated force on any unit area of the soil around the shield shell dF2 = fRsdsdθ2;
[0034] Where: A2, r, θ2 are the area, radius, and angle of any unit of the shield, respectively, in mm 2, mm, °; F2, f are the concentrated force on any unit of the shield circumference and the friction force per unit area of the excavation surface, respectively, unit: kPa;
[0035] After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained:
[0036]
[0037] Considering the mutual movement between the rigid surface of the shield and the saturated soft soil, the soil will soften, and the friction between the shield and the soil in the soft soil area is obtained:
[0038] f=β s σ θ tanδ′
[0039] in:
[0040]
[0041] Where: f is the friction force of the shield, unit: kPa; is the radial normal stress acting on the shield, which can be obtained from the vertical and horizontal earth pressures σ acting on the shield at the position θ2 v , σ h The solution is: kN / m 2 ; σ 轴 is the vertical earth pressure at the shield axis, unit: kN / m 2 ; K0 is the lateral static earth pressure coefficient; γ is the soil weight, the unit symbol is kN / m 3 ;δ′ is the cross-sectional friction angle between the shield and the surrounding soil, unit:°;β s is the residual friction resistance of pile-soil interface τ sr and the limiting lateral friction τ su The ratio of
[0042] Taking into account the slurry spreading during the curved shield construction, the softening effect of the soil caused by the interaction between the rigid surface of the shield and the soft soil, and the unequal friction between the inner and outer shields of the line, the expression of the vertical deformation of the soil caused by the friction of the shield is obtained:
[0043]
[0044] in:
[0045]
[0046]
[0047] Where: μ z-fis the vertical deformation of soil caused by the friction of the shield, unit: m; λ1 and λ2 are the friction reduction coefficients on the inner and outer sides of the line respectively; L is the total length of the shield, unit: m; f1 and f2 are the friction on the inner and outer sides of the shield respectively.
[0048] Furthermore, considering the uneven distribution of the shield tail grouting pressure along the shield tail gap, the soil deformation caused by the shield tail grouting pressure is obtained, which specifically includes:
[0049] Take any micro-unit area of the shield tail grouting surface dA3 = R s dsdθ3, depth of force point h=z0-R s sinθ3, concentrated force per unit area of shield tail grouting surface dF3=pR s dsdθ3, which is decomposed into the horizontal force dF h =pR s cosθ3dsdθ3 and vertical force dF z =pR s sinθ3dsdθ3. It has been verified that the influence of horizontal force on the vertical deformation of soil is much smaller than that of vertical force on the vertical deformation of soil. Therefore, only the vertical component of shield tail grouting is considered; where: A3, r, θ3 are the area, radius and angle of any unit of the shield tail grouting surface, and the unit symbols are mm respectively. 2 , mm, °; F3, p are the concentrated force on any unit of the shield tail grouting surface and the grouting pressure per unit area of the grouting surface, respectively, and the unit symbol is: kPa;
[0050] After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained:
[0051]
[0052] Considering the non-uniformity of shield tail grouting, the grouting process can be regarded as a Newtonian fluid diffusion model. The actual grouting pressure is affected by factors such as segment radius, shield tail gap, and slurry deadweight. The calculation formula for the grouting pressure distribution along the shield tail gap is obtained:
[0053]
[0054] Where: p0 is the direct grouting pressure of the grouting hole, the unit symbol is: MPa; ± is the grouting direction, the upward filling is "-", and the downward filling is "+"; A' is the Newtonian fluid coefficient; q' is the slurry flow rate, the unit symbol is m 3 / s; μ(t) is the viscosity coefficient of the slurry, unit: Pa·s; α0 is the angle between the grouting hole and the x-axis;
[0055] Taking into account the unevenness of shield tail grouting, the expression of the vertical deformation of soil caused by shield tail grouting pressure is obtained by integrating the grouting area:
[0056]
[0057] in:
[0058]
[0059]
[0060] Where: μ z-pz is the vertical deformation of the soil caused by the grouting pressure at the shield tail, unit: m; m is the length of a single ring of the shield segment, unit: m; p z1 、p z2 、p z3 They are the grouting pressures on the right, upper and lower sides of the shield tail grouting surface, unit: kPa.
[0061] Furthermore, considering the elliptical non-radial movement of the soil during the curved shield tunneling process and the additional over-excavation inside the line, the soil loss caused the soil deformation, which specifically includes:
[0062] During the construction of the curved section, the cutterhead will over-excavate the soil, causing a certain gap between the shield and the surrounding soil layer, so the soil layer will move into the gap and cause stratum loss;
[0063] In the actual construction process of small curvature shield, the shield excavation causes soil loss, which makes the soil move toward the center of the tunnel in an elliptical non-radial mode, and the formation loss is mainly reflected in the stage when the pipe segment is out of the way and the grouting has not yet solidified. That is, it is believed that the formation loss is mainly concentrated at the tail of the shield, and the curved shield will produce a certain amount of additional over-excavation on the inner side of the line.
[0064] Considering the elliptical non-uniform radial soil movement, the vertical deformation expression of soil caused by soil loss at the shield tail is obtained:
[0065]
[0066] in:
[0067]
[0068] Where: V loss is the ground loss per unit length of the tunnel, unit: m 3 ·m -1 ; L is the shield length of the shield machine, unit: m; g is the soil loss parameter; G p is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; w is the construction influencing factor; α is the parameter after considering the influence of grouting filling;
[0069] The extra over-excavation inside the curved shield line is δ, and the equivalent soil loss parameter g' of the curved shield construction corrected by the straight shield construction is:
[0070] g'=g+δ
[0071]
[0072] The expression of vertical deformation of strata caused by soil loss during saturated soil curved shield construction is obtained:
[0073]
[0074] Where: R is the radius of the curved shield line, unit: m; R s is the radius of the excavated tunnel, unit: m; L is the shield length, unit: m; δ is the additional over-excavation measured inside the line, symbol: m.
[0075] Furthermore, the total soil deformation caused by curved shield construction in saturated soil is obtained by integrating the vertical deformation of soil caused by various factors, including:
[0076] The surface deformation caused by the comprehensive curved shield tunneling construction takes into account the four main influencing factors of the additional thrust of the excavation face, the friction of the shield shell, the grouting pressure at the shield tail, and the stratum loss. The total deformation of the soil caused by the small curvature shield construction is obtained:
[0077] μ z =μ z-q +μ z-f +μ z-pz +S zf .
[0078] According to the above technical scheme, the present invention has the following technical effects:
[0079] In order to solve the problem of vertical deformation of soil caused by small curvature shield construction in saturated soil and provide theoretical support for future on-site construction and research of similar projects, the present invention considers the movement characteristics of curved tunnels that are different from those of straight tunnels, and proposes a calculation method for vertical deformation of soil caused by additional thrust on the front of the excavation face, friction between the shield shell and the soil, additional grouting pressure at the shield tail, and soil loss factors. This method can more accurately predict the heave and subsidence of soil caused by small curvature curved shield construction in saturated soil.
[0080] Compared with the prior art, the present invention combines existing curved tunnel engineering cases, considers the movement characteristics of curved tunnels that are different from those of straight tunnels, and makes a reasonable prediction of soil deformation caused by shield construction of saturated soil with small curvature, making up for the defects and deficiencies in deformation prediction of shield construction of solid-liquid multiphase medium soil layers, and is suitable for working conditions where the load action area is a spatial curved surface. Using the prediction method described in the present invention, the friction of the shield surface on the surrounding soil, the additional thrust of the cutterhead on the front soil, the additional pressure of the shield tail grouting, and the vertical deformation of the surrounding strata caused by soil loss can be predicted more accurately, providing a reference for risk prediction and evaluation of small curvature tunnel engineering. In addition, this invention is simple and easy to understand, and is convenient for promotion in similar non-straight tunnel construction conditions, and has great engineering application value.
[0081] According to the prediction method of the present invention, different parameters can be selected according to the on-site construction conditions before actual construction to simulate the surface settlement that may be caused by small curvature shield tunneling under different construction excavation parameters or different working conditions. The parameters that need to be determined include the thrust of the jacks in each partition of the excavation surface, the physical property parameters of the soil layer passed through (Poisson's ratio, elastic modulus, and static earth pressure coefficient of the soil), the buried depth of the shield axis, the radius of the curved shield route, the radius of the excavated tunnel, the shield radius, the shield excavation speed, the shield tail grouting pressure, etc.
[0082] In actual construction, if the construction heave and settlement exceeds the allowable value, there will be hidden dangers to the safety of the tunnel itself and the surrounding environment. Therefore, before construction, the surface deformation calculation method provided by the present invention can be referred to, combined with the corresponding engineering parameters for prediction, and the surface deformation during the construction of the project can be calculated. If the surface heave and settlement exceeds the allowable value, the relevant construction parameters are adjusted in time for trial calculation. If the construction conditions are poor and severely restricted, pre-reinforcement measures can be taken in advance for the soil and buildings (structures) within the affected area to ensure the safety of tunnel construction and operation and the surrounding environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0084] Figure 1 This is a flow chart of a method for predicting soil deformation caused by shield construction with small curvature in saturated soil taking into account multiple factors according to an embodiment of the present invention;
[0085] Figure 2 The curved shield tunneling mechanics model adopted by the embodiment of the present invention;
[0086] Figure 3 The additional thrust partition model of the excavation face adopted in the embodiment of the present invention;
[0087] Figure 4 The shield friction force partition model used in the embodiment of the present invention;
[0088] Figure 5 It is the additional pressure zoning model of the shield tail grouting adopted in the embodiment of the present invention;
[0089] Figure 6 This is the tunnel soil movement model adopted by the embodiment of the present invention. DETAILED DESCRIPTION
[0090] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0091] Example:
[0092] Figure 1 The present invention provides a flowchart of a method for predicting soil deformation caused by shield construction of saturated soil with small curvature taking into account multiple factors in an embodiment of the present invention; the present invention provides a method for predicting soil deformation caused by shield construction of saturated soil with small curvature taking into account multiple factors, comprising the following steps:
[0093] Step S101, integrating the initial solution of the vertical deformation of the soil caused by the concentrated force acting inside the saturated soil to obtain the vertical deformation of the soil caused by the distributed force on the shield action surface;
[0094] Specifically, the factors affecting soil deformation during curved shield construction are first determined. The present invention takes into account the additional thrust on the front of the shield excavation face, the friction resistance between the shield shell and the cutterhead, the additional pressure of the shield tail grouting, and the soil loss. The parameters that need to be determined include the thrust of each partition of the jack, the grouting pressure of the shield tail, the elastic modulus of the soil, the tunnel burial depth, the shield excavation speed, the shield diameter, and the cutterhead rotation speed.
[0095] See also Figure 2 , which is a diagram of the mechanical model of shield tunneling in the present invention. First, a three-dimensional rectangular coordinate system is established, in which the origin, x-axis, and y-axis are all located on the ground surface, and the z-axis is vertically downward. In the figure, x is the lateral horizontal distance from the calculation point to the central axis of the shield, unit: mm; y is the horizontal distance from the calculation point to the excavation surface, unit: mm; z is the vertical distance from the central axis of the shield to the ground surface, unit: mm. f is the friction between the shield shell and the soil, unit: kPa; q is the additional thrust of the incision, unit: kPa; p is the additional pressure of synchronous grouting, unit: kPa; R sis the shield radius, unit: m; the excavation face of the shield machine is located in the plane of x0z (y=0), and the shield machine excavates in the direction parallel to the y-axis.
[0096] According to the line planning design drawing, the line layout and position of the curved shield tunnel are determined, and the soil layer parameters, shield machine parameters, and shield excavation parameters of the excavation area are obtained. The present invention is mainly aimed at predicting the deformation of saturated soil layers. The selected embodiment is mainly based on soft clay with high water content. Soil samples are extracted for indoor mechanical experiments to determine the physical and mechanical parameters such as the elastic modulus of the soil. Before the specific calculation formula is implemented, the initial solution of the deformation of the soil at any position when the concentrated force acts on the saturated soil in the semi-infinite space is used. After coordinate transformation, the vertical deformation formulas of the soil under the action of the vertical and horizontal concentrated forces are obtained respectively:
[0097]
[0098]
[0099] Where: μ zv is the soil displacement in the z direction under the action of vertical force; μ zh is the soil displacement in the z direction under the action of horizontal force; F1 is the vertical concentrated force; F2 is the horizontal concentrated force; h is the vertical distance between the force and the free surface; π is the circumference; G is the shear elastic modulus.
[0100] The shield surface is a closed curved space. The distributed force on the spatial surface is integrated. Combined with the construction characteristics of straight tunnels and curved tunnels, the surface deformation solution caused by the small curvature curved shield construction in saturated soil is obtained.
[0101] Step S102, considering the soil squeezing effect of the cutterhead, obtaining the soil deformation caused by the additional thrust of each partition of the curved shield propulsion system;
[0102] Specifically, see Figure 3 The jack propulsion system is divided into four zones: upper, lower, left and right. The angles of each zone are 60°, 90°, 120° and 90° respectively. Taking left turn as an example, the additional thrusts of the upper and lower zone cutter discs are the same and evenly distributed, both are q1. The additional thrust of the right zone cutter disc is greater than that of the left, which are q2 and q3 respectively.
[0103] Considering the uneven additional thrust generated by the shield machine propulsion system partitions on the soil in front of the excavation face during curved shield construction, the additional thrust of each partition is integrated separately. At the same time, the soil squeezing effect of the cutterhead on the soil is considered to obtain the formula for the vertical deformation of the soil caused by the additional thrust on the front of the cutterhead.
[0104] Taking the area of any infinitesimal element in the shield excavation surface as dA1=rdrdθ1, we can obtain the concentrated force dF1=qrdrdθ1 acting on any unit of the excavation surface.
[0105] Considering the extrusion effect of the cutterhead on the soil in front of the excavation face during shield tunneling, and performing coordinate transformation, a more reasonable calculation formula for the additional thrust of the cutterhead is obtained:
[0106]
[0107] According to the actual construction conditions, the parameters that need to be obtained include: Poisson's ratio μ, for soft soil under undrained conditions, the Poisson's ratio μ is 0.5; the undrained elastic modulus of the soil E u , take E in soft soil u =(2.5~3.5)E s0.1-0.2 , E s0.1-0.2 is the compression modulus; shield tunneling speed ν, in cm / min; cutterhead opening rate ξ; cutterhead diameter D, in m; number of closed parts of the cutterhead k; cutterhead speed w, in r / min; the extrusion pressure Δp′ generated by the cutterhead cutting into the soil, generally taken as 10~25, in kPa.
[0108] The additional thrust of the cutterhead in each zone of the curved shield line is different, and the integration between the zones is adopted. The vertical deformation expression of the soil under the action of uneven front additional thrust on the shield excavation face during the curved shield excavation process can be obtained:
[0109]
[0110] in:
[0111]
[0112]
[0113] Step S103, considering the difference in friction between the inner and outer sides of the curved shield shell, the spread of slurry at the shield tail, and the softening characteristics of the soil, the deformation of the soil caused by the friction of the shield shell is obtained;
[0114] Specifically, see Figure 4 The shield squeezes the soil more seriously on the inner side of the turning section. Assuming that the friction between the shield and the soil is bounded by the center line of the tunnel, the friction between the inner and outer shields and the soil is evenly distributed, which are f1 and f2 respectively.
[0115] Considering that during the shield tunneling process, synchronous grouting will cause a certain range of slurry spread at the shield tail, the friction between the shield and the soil will be weakened in the slurry spread area, so the friction in this area needs to be reduced. The inner and outer sides of the curved shield line have different squeezing effects on the soil. The inner side of the line produces a large over-excavation of the surrounding soil, causing the shield tail gap to increase. At this time, the length of slurry spread inside the line is greater than that on the outside, and it is also greater than that of a linear shield. According to engineering experience, the slurry spread length of a linear shield is generally about 2.2m to the shield tail. For a curved shield, due to the extremely large over-excavation on the inner side, the slurry spread to the shield tail is taken as 2.4m, and the outer side is taken as 2m. Taking into account the shield shell-soil interaction effect, for saturated soil layers, the softening effect of the soil also needs to be considered during shield tunneling.
[0116] Since the shield machine is a cylindrical rigid body, take any micro-unit dA2 = R s dsdθ2, depth of force point h=z0-R s sinθ2, the concentrated force on any unit area of the soil around the shield shell dF2 = fRsdsdθ2;
[0117] Considering the mutual movement between the rigid surface of the shield and the saturated soft soil, the soil will soften, and the friction between the shield and the soil in the soft soil area is obtained:
[0118] f=β s σ θ tanδ′
[0119] in:
[0120]
[0121] The determination of the friction force f of the shield requires the following parameters: the vertical earth pressure σ at the axis of the shield 轴 , unit is kN / m 2 ; Radial normal stress acting on the shield The vertical and horizontal earth pressures σ acting on the shield at the position θ can be v , σ h The solution is kN / m 2 ; Lateral static earth pressure coefficient K0; Soil weight γ, unit is kN / m 3 ; The cross-sectional friction angle δ′ between the shield and the surrounding soil can be obtained through the interface shear test, and the interface friction angle between clay and smooth steel is 6.5°~9°; β s is the residual friction resistance of pile-soil interface τ sr and the limiting lateral friction τ su The ratio of β is obtained by actual measurement. s =0.83~0.97.
[0122] Taking into account the slurry spreading during the curved shield construction, the softening effect of the soil caused by the interaction between the rigid surface of the shield and the soft soil, and the unequal friction between the inner and outer shields of the line, the expression of the vertical deformation of the soil caused by the friction of the shield is obtained through coordinate transformation:
[0123]
[0124] in:
[0125]
[0126]
[0127] Step S104, considering the uneven distribution of the shield tail grouting pressure along the shield tail gap, obtaining the soil deformation caused by the shield tail grouting pressure;
[0128] Specifically, the process of filling the gap at the shield tail with grouting is regarded as a Newtonian fluid diffusion model. The grouting pressure diffuses to the surrounding areas. Affected by the gravity of the slurry itself, the radius of the segment, the gap at the shield tail, and other factors, the actual grouting pressure is unevenly distributed along the shield tail. Figure 5 The grouting holes are located on the two straight lines of 45° and 135° on the shield tail grouting surface, that is, the grouting area is divided into 4 blocks, and the grouting of the left and right areas is equal, both of which are p z1 The grouting pressures in the upper and lower regions are p z2 、p z3 .
[0129] Take any micro-unit area of the shield tail grouting surface dA3 = R s dsdθ3, depth of force point h=z0-R s sinθ3, concentrated force per unit area of shield tail grouting surface dF3=pR s dsdθ3, which is decomposed into the horizontal force dF h =pR s cosθ3dsdθ3 and vertical force dF z =pR s sinθ3dsdθ3. It has been verified that the influence of horizontal force on the vertical deformation of soil is much smaller than that of vertical force on the vertical deformation of soil. Therefore, the present invention only considers the effect of the vertical component of shield tail grouting.
[0130] Considering the non-uniformity of shield tail grouting, the grouting process can be regarded as a Newtonian fluid diffusion model. The actual grouting pressure is affected by factors such as segment radius, shield tail gap, and slurry deadweight. The calculation formula for the grouting pressure distribution along the shield tail gap is obtained:
[0131]
[0132] The parameters that need to be obtained in combination with the specific project include: the direct grouting pressure p0 of the grouting hole, with the unit symbol of MPa; ± is the grouting direction, with "-" for upward filling and "+" for downward filling. When filling upward, the slurry gravity has a decompression effect on the grouting pressure, and when filling downward, the slurry gravity has a pressurization effect on the grouting pressure, which is in line with the actual project; Newtonian fluid coefficient A'; slurry flow rate q', with the unit symbol of m 3 / s; slurry viscosity coefficient μ(t), unit: Pa·s, Newtonian fluid takes the value of 0.005Pa·s; α0 is the angle between the grouting hole and the x-axis;
[0133] Taking into account the unevenness of shield tail grouting, the expression of the vertical deformation of soil caused by shield tail grouting pressure is obtained by integrating the grouting area:
[0134]
[0135] in:
[0136]
[0137]
[0138] Step S105 , considering the elliptical non-radial movement of the soil during the curved shield tunneling process and the additional over-excavation inside the line, the soil loss causes soil deformation.
[0139] Specifically, during the construction of the curved section, the cutterhead will over-excavate the soil, causing a certain gap to form between the shield and the surrounding soil layers. As a result, the soil layers will move into the gaps and cause stratum losses.
[0140] The present invention believes that the influence of soil loss on the stratum is that the soil moves toward the center of the tunnel in an elliptical non-radial mode, and the stratum loss is mainly reflected in the stage when the pipe segment is out of the way and the grouting has not yet solidified. That is, it is believed that the stratum loss is mainly concentrated at the shield tail, and the curved shield will produce a certain amount of additional over-excavation on the inner side of the line. Figure 6 .
[0141] Considering the elliptical non-uniform radial soil movement, the vertical deformation expression of soil caused by soil loss at the shield tail is obtained:
[0142]
[0143] in:
[0144]
[0145] Where V loss is the ground loss per unit length of the tunnel, unit: m 3 ·m -1 ; L is the shield length of the shield machine, unit: m; g is the soil loss parameter; Gp is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; w is the construction influencing factor; α is the parameter after considering the influence of grouting filling. For clay, α=0.116(z0 / 2R s )-0.042.
[0146] The extra over-excavation on the inner side of the curved shield line is δ. Therefore, the equivalent soil loss parameter g' of the curved shield construction corrected by the straight shield construction is:
[0147] g'=g+δ
[0148] According to the geometric position relationship between the shield machine and the excavated tunnel during curved shield construction, the space required for curved shield construction, i.e., the over-excavation amount inside the curved shield line, is obtained:
[0149]
[0150] Where R is the radius of the curved shield line, in meters; R s is the radius of the tunnel excavation, in meters; L is the shield length, in meters. The formula takes into account the turning point achieved by the shield machine's articulated device. The shield length at the actual turning point is half of the shield length.
[0151] It is necessary to ensure that the center of the actual excavated tunnel falls on the coordinate origin, so the coordinate system needs to be translated along the x-axis with a translation distance of 0.5δ. Please refer to Figure 6 , the expression of vertical deformation of strata caused by soil loss during saturated soil curved shield construction is obtained:
[0152]
[0153] Step S106, the vertical deformation of the soil caused by various factors is comprehensively considered to obtain the total deformation of the soil caused by the curved shield construction in saturated soil.
[0154] Specifically, based on the above steps S101-S105, the surface deformation caused by shield tunneling construction takes into account the four main influencing factors of additional thrust of the excavation face, friction of the shield shell, grouting pressure of the shield tail and stratum loss, and the total surface deformation caused by the shield construction of the small curvature curve is obtained:
[0155] μ z =μ z-q +μ z-f +μ z-pz +S zf
[0156] Compared with the prior art, the present invention fully considers the influence of construction factors such as the soil squeezing effect of the shield cutter head on the soil in front, the slurry spreading effect of the shield tail, the softening effect of the soil caused by the friction between the shield shell and the soil, and the uneven grouting pressure, and combines the movement characteristics of the small curvature curve shield to propose a calculation formula for the vertical deformation of the ground surface caused by the additional thrust of the shield, the friction of the shield shell, the grouting pressure of the shield tail and the loss of the soil, so as to more accurately predict the deformation of the soil caused by the small curvature shield construction in saturated soil. The prediction method provided by the present invention has the advantages of comprehensive consideration of factors, easy selection of corresponding parameters, more convenient calculation and closer to actual engineering, etc., which has a preventive and guiding role in the engineering, and provides a theoretical basis for the study of the impact of small radius curve shield construction on the surrounding environment.
[0157] The above-mentioned embodiments only express the basic principles and implementation methods of the present invention, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for predicting soil deformation caused by shield construction with small curvature in saturated soil considering multiple factors, characterized in that: include: The initial solution of the vertical deformation of the saturated soil caused by the concentrated force inside the soil is integrated to obtain the vertical deformation of the soil caused by the distributed force on the shield action surface. Considering the soil squeezing effect of the cutterhead, the soil deformation caused by the additional thrust of each zone of the curved shield propulsion system is obtained; Considering the difference in friction between the inner and outer sides of the curved shield, the spread of slurry at the shield tail, and the softening characteristics of the soil, the deformation of the soil caused by the friction of the shield is obtained. Considering the uneven distribution of shield tail grouting pressure along the shield tail gap, the shield tail grouting pressure causes soil deformation. Considering the elliptical non-radial movement of the soil during the advancement of the curved shield and the extra over-excavation inside the line, the soil loss caused the soil deformation; The total soil deformation caused by small curvature shield construction in saturated soil is obtained by integrating the vertical deformation of soil caused by various factors. Among them, the initial solution of the vertical deformation of the soil caused by the concentrated force inside the saturated soil is integrated to obtain the vertical deformation of the soil caused by the distributed force on the shield action surface, which specifically includes: Based on the initial solution of the deformation of any position of the soil body when the concentrated force acts inside the semi-infinite space saturated soil, after coordinate transformation, the vertical deformation formulas of the soil body under the vertical and horizontal concentrated forces are obtained respectively: , , Where: μ zv is the soil displacement in the z direction under the action of vertical force, unit: m; μ zh is the soil displacement in the z direction under the action of horizontal force, unit: m; F1 is the vertical concentrated force, unit: kPa; F2 is the horizontal concentrated force, unit: kPa; h is the vertical distance between the force and the free surface, unit: m; π is the circumference of the circle; G is the shear elastic modulus, unit: kPa, x is the horizontal distance from the calculation point to the central axis of the shield, y is the horizontal distance from the calculation point to the excavation surface, and z is the vertical distance from the central axis of the shield to the ground surface; Among them, considering the soil squeezing effect of the cutterhead, the soil deformation caused by the additional thrust of each partition of the curved shield propulsion system is obtained, including: Take the area of any microelement in the shield excavation surface , the concentrated force on any unit of the excavation surface is: , Where: A1, r, 1 are the unit area, radius and angle of the excavation surface, respectively, and the units are , mm, °; F1, q are the concentrated force on any unit of the excavation surface and the additional positive thrust on the unit area of the excavation surface, respectively, unit: kPa; After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained: , Considering the soil squeezing effect of the cutterhead on the soil in front of the excavation face during shield tunneling, the calculation formula for the additional thrust of the cutterhead is obtained: , Where: μ is Poisson's ratio; is the undrained elastic modulus of soil, unit: MPa; is the shield tunneling speed, unit: cm / min; is the cutter head opening rate, unit: %; D is the cutter head diameter, unit: m; The number of closed parts of the cutter disc; is the cutter head speed, unit: r / min; It is the extrusion pressure generated by the cutter head cutting into the soil, unit: kPa; Since the additional thrust of the cutterhead in each zone of the curved shield line is different, the integration between the zones is adopted, and the vertical deformation expression of the soil under the action of uneven front additional thrust on the shield excavation face during the curved shield excavation process is obtained: , in: , , Where: μ z-q is the vertical deformation of the soil caused by the additional thrust of the cut, unit: m; z0 is the buried depth of the tunnel axis, unit: m; R s is the radius of the tunnel, unit: m; q1 is the additional thrust of the upper and lower partitions of the cutterhead, unit: kPa; q2 and q3 are the additional thrust of the right and left partitions of the cutterhead, unit: kPa; Among them, considering the difference in friction between the inner and outer sides of the curved shield shell, the spread of slurry at the shield tail, and the softening characteristics of the soil, the deformation of the soil caused by the friction of the shield shell is obtained, including: Since the shield machine is a cylindrical rigid body, take any micro-unit on the shield shell surface , depth of stress point , the concentrated force on any unit area of the soil around the shield ; Where: A2, r, 2 are the area, radius and angle of any unit of the shield, in units of , mm, °; F2 and f are the concentrated force on any unit of the shield shell circumference and the friction force per unit area of the excavation surface, respectively, unit: kPa; After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained: , Considering the mutual movement between the rigid surface of the shield and the saturated soft soil, the soil will soften, and the friction between the shield and the soil in the soft soil area is obtained: , in: , Where: f is the friction force of the shield, unit: kPa; is the radial normal stress acting on the shield, which can be obtained by Vertical and horizontal earth pressure at position 2 , The solution is: kN / m 2 ; is the vertical earth pressure at the shield axis, unit: kN / m 2 ; is the lateral static earth pressure coefficient; γ is the soil weight, the unit symbol is kN / m 3 ; is the cross-sectional friction angle between the shield and the surrounding soil, unit: °; is the residual friction resistance at the pile-soil interface and the limit lateral friction The ratio of Taking into account the slurry spreading during the curved shield construction, the softening effect of the soil caused by the interaction between the rigid surface of the shield and the soft soil, and the unequal friction between the inner and outer shields of the line, the expression of the vertical deformation of the soil caused by the friction of the shield is obtained: , in: , , Where: is the vertical deformation of soil caused by the friction of the shield, unit: m; , are the friction reduction coefficients on the inner and outer sides of the line, respectively; L is the total length of the shield, in m; f1 and f2 are the friction forces on the inner and outer sides of the shield, respectively; Among them, considering the uneven distribution of shield tail grouting pressure along the shield tail gap, the soil deformation caused by shield tail grouting pressure is obtained, including: Take any micro-unit area of the shield tail grouting surface , depth of stress point , the concentrated force on any unit area of the shield tail grouting surface , which is decomposed into the vertical force , only the vertical force of shield tail grouting is considered; Where: A3, r, 3 are the area, radius and angle of any unit on the shield tail grouting surface, and the unit symbols are , mm, °; F3, p are the concentrated force on any unit of the shield tail grouting surface and the grouting pressure per unit area of the grouting surface, respectively, and the unit symbol is: kPa; After coordinate transformation, the equivalent coordinates for substituting into the initial solution of displacement of semi-infinite saturated soil subjected to concentrated force are obtained: , Considering the non-uniformity of shield tail grouting, the grouting process can be regarded as a Newtonian fluid diffusion model, and the calculation formula for the grouting pressure distribution along the shield tail gap is obtained: , Where: is the direct grouting pressure of the grouting hole, the unit symbol is: MPa; is the grouting direction, with "-" for upward and "+" for downward; A' is the Newtonian fluid coefficient; q' is the slurry flow rate, with the unit symbol of m 3 / s; is the viscosity coefficient of slurry, unit: Pa·s; 0 is the angle between the grouting hole and the x-axis; Taking into account the unevenness of shield tail grouting, the expression of the vertical deformation of soil caused by shield tail grouting pressure is obtained by integrating the grouting area: , in: , , Where: is the vertical deformation of the soil caused by the grouting pressure at the shield tail, unit: m; m is the length of a single ring of the shield segment, unit: m; p z1 、p z2 、p z3 are the grouting pressures on the right, upper and lower sides of the shield tail grouting surface, respectively, unit: kPa; Among them, considering the elliptical non-radial movement of the soil during the curved shield advancement process and the additional over-excavation on the inner side of the line, the soil loss caused the soil deformation, which includes: Considering the elliptical non-uniform radial soil movement, the vertical deformation expression of soil caused by soil loss at the shield tail is obtained: , in: , Where: V loss is the ground loss per unit length of the tunnel, unit: m 3 ·m -1 ; L is the total length of the shield, unit: m; g1 is the soil loss parameter; G p is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; w1 is the construction influencing factor; α1 is the parameter after considering the influence of grouting filling; The additional over-excavation on the inner side of the curved shield line is , , Translate the coordinate system along the x-axis by a distance of 0.5 , the expression of vertical deformation of strata caused by soil loss during saturated soil curved shield construction is obtained: , Where: R is the radius of the curved shield line, unit: m; R s is the radius of the excavated tunnel, unit: m; is the extra over-excavation measured inside the line, symbol: m; L is the total length of the shield, unit: m; Among them, the total soil deformation caused by the small curvature shield construction in saturated soil is obtained by integrating the vertical deformation of the soil caused by various factors, including: The surface deformation caused by the comprehensive curved shield tunneling construction takes into account the four main influencing factors of the additional thrust of the excavation face, the friction of the shield shell, the grouting pressure at the shield tail and the stratum loss, and the total deformation of the soil caused by the small curvature shield construction is obtained: 。