A complete set of equipment and construction process for construction of split gate pier

Through the combination device of asphalt fir formwork, limit support and tie rod, the problem of the difficulty of installing the formwork and the non-coupling of the center line of the water-stop copper sheet in the construction of the seam gate pier is solved, and the synchronous construction and efficient construction of the seam gate pier is achieved. Pouring saves construction period and labor costs.

CN112482322BActive Publication Date: 2025-01-14HUNAN BESTALL DREDGING
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011431105.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-07
Publication Date
2025-01-14
Estimated Expiration
2040-12-07

AI Technical Summary

Technical Problem

It is difficult to install the formwork during the construction of the seam gate pier, and the center line of the water stop copper sheet does not overlap with the center line of the structural seam, resulting in low installation accuracy and single-sided construction leads to waste of labor and construction period.

Method used

Using a combination device of asphalt fir template, limit support and a pull rod, the asphalt fir template is inserted into the copper nose of the water stop copper sheet, and the positioning and fixing device ensures that the center line of the water stop copper sheet coincides with the center line of the structural seam, and Through the synchronous construction process on both sides, the precise installation of the formwork and the construction period are achieved.

Benefits of technology

The installation accuracy of the water-stop copper plate is improved, and the construction of the two sides of the seam-dividing gate pier is achieved, which saves labor and construction period, shortens construction time and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112482322B_ABST
    Figure CN112482322B_ABST
Patent Text Reader

Abstract

The present invention provides a complete set of equipment and a construction process for a split gate pier. The complete set of equipment comprises a steel formwork, an asphalt fir formwork, a tie rod and a limit support. The complete set of equipment for the construction of the split gate pier is used to change the original single-sided construction of the split gate pier into synchronous construction on both sides of the split gate pier. An asphalt fir board with a certain rigidity and strength is selected as a filling material for the structural seam of the split gate pier, which can serve as a formwork, and is positioned and installed and fixed in conjunction with the limit support and the tie rod. This not only solves the problem of difficulty in installing a flat steel formwork at the split seam during single-sided construction of the split gate pier, improves the installation accuracy of a water-stop copper sheet, ensures that the center line of the copper nose part of the water-stop copper sheet can coincide with the center line of the structural seam, but also realizes the construction goals of "synchronous construction, simultaneous pouring" and reaching the top together for the split gate pier, effectively shortens the time required for the construction of the split gate pier, and saves construction period and labor costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gate pier construction, and in particular to a complete set of equipment and a construction process for a split gate pier. Background Art

[0002] See also Figure 1 and Figure 2 The gate chamber is the main structure of the sluice gate, which is composed of the gate bottom plate, gate piers, gate gates, opening and closing machinery, etc. There are two common design forms for the structural joints of the sluice project: ① gate pier joints; ② gate bottom plate joints. Among them, the gate pier joints are a more commonly used design scheme because they can ensure the integrity of the gate hole structure and avoid gate leakage caused by uneven settlement of the gate piers. In addition, the existing construction method of the split gate pier is to first construct the gate pier on one side of the split gate pier, and then construct the gate pier on the other side after the construction of one side is completed. Not only does it cause the template and scaffolding installation to be repeated, resulting in a waste of manpower and construction period, but the embedded steel bars of the unconstructed side gate pier need to be temporarily bent before the steel template can be installed, which is difficult to install, and the copper nose of the water-stop copper sheet set at the joint will conflict with the steel template, causing the center line of the copper nose of the water-stop copper sheet to be unable to coincide with the center line of the gate pier structural joint; therefore, the industry is in urgent need of a set of equipment and construction technology for the construction of split gate piers. Summary of the invention

[0003] The purpose of the present invention is to provide a complete set of equipment and construction process for the construction of split gate piers, so as to solve the problems of difficulty in template installation, misalignment of the center line of the water-stop copper sheet and the center line of the structural seam, and waste of labor and construction period during the construction of split gate piers.

[0004] The present invention provides a complete set of equipment for constructing a split gate pier, comprising: a steel formwork, an asphalt fir formwork, a tie rod and a limit support; the tie rod is connected to the vertical main reinforcement pre-buried in the split gate pier, the tie rod is used to fix the steel formwork arranged on the peripheral side of the split gate pier, the asphalt fir formwork is arranged at the split of the split gate pier, and limit supports are respectively arranged on both sides of the asphalt fir formwork, and the limit supports are used to fix the asphalt fir formwork.

[0005] Furthermore, the asphalt fir wood formwork is inserted at the center line of the structural joint, and a water-stop copper sheet is also provided at the joint. The asphalt fir wood formwork is inserted into the copper nose of the water-stop copper sheet, so that the center line of the water-stop copper sheet coincides with the center line of the structural joint, thereby improving the installation accuracy of the water-stop copper sheet.

[0006] Furthermore, the asphalt fir wood formwork comprises a plurality of asphalt fir wood boards, and a whole piece of asphalt fir wood formwork formed by splicing the plurality of asphalt fir wood boards is arranged at the joint of the gate pier.

[0007] Furthermore, the limiting support member includes a fixing device and a positioning device; the positioning device is arranged at the bottom of the structural joint for fixing the bottom of the asphalt fir formwork; the fixing device is arranged at the connecting part of two adjacent asphalt fir boards in the asphalt fir formwork for fixing the connecting part of the asphalt fir boards.

[0008] Furthermore, the positioning device includes a positioning rod and a first connecting rod, the positioning rod is arranged at the end of the first connecting rod, and the positioning rod is vertically connected to the first connecting rod; the positioning device relies on the first connecting rod to connect the vertical main reinforcement embedded in the gate pier joint, and relies on the positioning rod to support the asphalt fir board to achieve clamping and fixing of the asphalt fir board; the fixing device includes a fixing rod and a second connecting rod, the fixing rod is arranged at the end of the second connecting rod, and the positioning rod is vertically connected to the second connecting rod; the fixing device relies on the second connecting rod to connect the vertical main reinforcement embedded in the gate pier joint, and relies on the fixing rod to support the connecting part of the asphalt fir board to achieve clamping and fixing of the asphalt fir board.

[0009] Furthermore, a plurality of tie rods are provided between the steel formwork and the vertical main reinforcement, the plurality of tie rods are arranged at intervals along the height direction and the length direction of the structural joint, the tie rods are vertically connected to the vertical main reinforcement, and the tie rods are arranged transversely through the asphalt fir formwork to further support and fix the asphalt fir formwork.

[0010] Furthermore, two adjacent asphalt fir boards in the asphalt fir template are connected by a fixing piece, and preferably the fixing piece is a limiting sleeve.

[0011] Furthermore, the vertical main reinforcements on both sides of the gate pier joint are provided with tension reinforcements, which are used for binding and fixing the vertical main reinforcements on both sides.

[0012] The present invention also provides a split gate pier construction process, including the above-mentioned split gate pier construction complete set of equipment, the split gate pier includes pier one and pier two arranged in the split, and the piers one and two on both sides of the split are synchronously constructed and cast at the same time.

[0013] Furthermore, Pier 1 and Pier 2 of the split gate pier are composed of multiple layers of pier bodies. Each layer of pier bodies of Pier 1 and Pier 2 from bottom to top is constructed and cast simultaneously. After the casting of the pier body of this layer is completed and the pier body is formed and stabilized, scaffolding is built, and a new set of equipment for the construction of the split gate pier is laid and installed, and the casting of the new layer of pier body is carried out until the casting of all the pier bodies of Pier 1 and Pier 2 is completed.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] The present invention discloses a complete set of equipment and a construction process for a split gate pier. The complete set of equipment is used to change the original single-side construction of the split gate pier into simultaneous construction on both sides of the split gate pier. An asphalt fir board with certain rigidity and strength is selected as a filling material for the structural seam of the split gate pier, which can serve as a template. The asphalt fir template cooperates with a limiting support and a pair of pull rods for positioning and fixing the template. This not only solves the problem of difficulty in installing the template at the split seam during single-side construction of the split gate pier, but also satisfies the "simultaneous construction and simultaneous pouring" of the split gate pier, and achieves the goal of simultaneous construction on both sides of the split gate pier, which saves labor costs and avoids waste of labor and construction period. In addition, since the asphalt fir board is easy to cut, the asphalt fir board can be inserted into the copper nose of the water-stop copper sheet, ensuring that the center line of the copper nose part of the water-stop copper sheet can coincide with the center line of the structural seam, thereby improving the installation accuracy of the water-stop copper sheet.

[0016] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0018] Figure 1 It is a structural diagram of the split gate pier;

[0019] Figure 2 It is a schematic diagram of the installation position of the water-stop copper sheet and steel formwork of the existing complete set of equipment for the construction of split gate piers;

[0020] Figure 3 This is a structural schematic diagram of a complete set of equipment for constructing a split gate pier according to this embodiment;

[0021] Figure 4 yes Figure 3 A schematic diagram of the structure of the fixing device;

[0022] Figure 5 yes Figure 3 A schematic diagram of the structure of the positioning device;

[0023] Figure 6 It is a schematic diagram of the installation position of the water-stop copper sheet and the asphalt fir board of the device of the present application;

[0024] Among them, 1. Pier 1, 2. Pier 2, 3. Vertical main reinforcement, 4. Tie rods, 5. Asphalt fir board, 6. Steel formwork, 7. First connecting rod, 8. Positioning device, 9. Fixing device, 10. Limit sleeve, 11. Water-stop copper sheet, 12. Pier body, 13. Structural joint, 14. Tie rods, 15. Positioning rods, 16. Fixing rods, 17. Second connecting rod, 18. Center line. DETAILED DESCRIPTION

[0025] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0026] See also Figures 3 to 6 The present invention provides a complete set of equipment for constructing a split gate pier, comprising: a steel template 6, an asphalt fir template, a tie rod 4 and a limiting support; the tie rod is connected to the vertical main reinforcement 3 pre-buried in the split gate pier, and the tie rod is used to fix the steel template arranged on the peripheral side of the split gate pier, and the asphalt fir template is arranged at the split gate pier (structural joint), located at the center line of the structural joint 13; a water-stop copper sheet 11 is also arranged in the structural joint 13, and limiting supports are respectively arranged on both sides of the asphalt fir template, and the limiting supports are used to fix the asphalt fir template, and at the same time, the asphalt fir template is easy to cut, and the asphalt fir template can be directly inserted into the copper nose of the water-stop copper sheet to ensure that the center line of the water-stop copper sheet coincides with the center line 18 of the structural joint, thereby improving the installation accuracy of the water-stop copper sheet.

[0027] The pre-embedded vertical main reinforcement 3 of the split gate pier is located inside the erected steel formwork. A plurality of tie rods 4 are provided between the steel formwork and the vertical main reinforcement. The tie rods are all made of steel bars. The plurality of tie rods are arranged at intervals along the height direction and the length direction of the structural joint. The spacing between two adjacent tie rods in the same direction does not exceed 60 cm. The tie rods and the vertical main reinforcement are vertically connected, and the two are connected by welding; the ends of the tie rods are connected to the steel formwork to fix the steel formwork.

[0028] The asphalt fir wood formwork set at the joint of the split gate pier structure is a whole asphalt fir wood formwork composed of multiple asphalt fir boards spliced ​​together. A fixing piece is provided between two adjacent asphalt fir boards. The fixing piece adopts a limiting sleeve 10. The connecting ends of the two adjacent asphalt fir boards are respectively inserted into the limiting sleeves to realize the limited splicing of the two asphalt fir boards.

[0029] At the same time, a limiting support is provided between the vertical main reinforcement arranged at the joint and the asphalt fir formwork, and the limiting support includes a plurality of positioning devices 8 and a plurality of fixing devices 9; the positioning device is arranged at the bottom of the structural joint, and the plurality of positioning devices are arranged at intervals along the bottom of the asphalt fir formwork, which are used to fix the bottom of the asphalt fir formwork, and the bottom of the positioning device is connected to the bottom plate of the gate chamber; the specific positioning method of the positioning device includes: the positioning device 8 includes a positioning rod 15 and a first connecting rod 7, the positioning rod is arranged at the end of the first connecting rod, and the positioning rod is vertically connected to the first connecting rod; the positioning device relies on the first connecting rod to connect the vertical main reinforcement embedded at the joint of the gate pier, relies on the positioning rod to support the asphalt fir board, realizes the clamping and fixation of the asphalt fir board, and at the same time the bottom of the positioning steel is connected to the bottom plate of the gate chamber. The fixing device is arranged at the connection part of two adjacent asphalt fir boards in the asphalt fir formwork, and is used to fix the connection part of the asphalt fir boards; the specific fixing method of the fixing device includes: the fixing device 9 includes a fixing rod 16 and a second connecting rod 17, the fixing rod is arranged at the end of the second connecting rod, and the positioning rod is vertically connected to the second connecting rod; the fixing device relies on the second connecting rod to connect the vertical main reinforcement pre-buried at the gate pier joint, and relies on the fixing rod to support the connection part of the asphalt fir board to achieve the clamping and fixing of the connection part of the asphalt fir board. The positioning rod, the fixing rod and the connecting rod of the positioning device and the fixing device are all made of the relatively short steel bars remaining in the process of steel bar cutting. The connecting rods of the two are respectively welded to the middle sections of the positioning rod and the fixing rod, and the other end of the connecting rod is welded to the vertical main reinforcement. In addition, the vertical main reinforcements on both sides of the gate pier joint are tied with tie bars 14 for fixing, so as to enhance the stability of the vertical main reinforcements on both sides and prevent the main reinforcements from deforming, which affects the positioning, fixing and installation of the asphalt fir formwork.

[0030] There are multiple through holes on the asphalt fir formwork, and the positions and diameters of the through holes match the tie rods. The tie rods cross the through holes of the asphalt fir formwork to further support and fix the asphalt fir formwork; at the same time, the asphalt fir formwork is clamped and fixed by the limit support, which effectively prevents the asphalt fir formwork from offset and ensures the positioning and installation accuracy of the asphalt fir formwork. In addition, the asphalt fir formwork adopts a splicing structure, and multiple asphalt fir boards are positioned and installed one by one, which is easy to install and has high positioning accuracy, avoiding the problem that the volume and area of ​​a single asphalt fir board are too large, making it difficult to transport and hoist and install, and the problem that the volume and area of ​​a single asphalt fir board are large, resulting in difficult to control the positioning accuracy of the installation.

[0031] The present invention also provides a split gate pier construction process, including the above-mentioned split gate pier construction complete set device, the split gate pier includes a pier 1 and a pier 2 set in the split; during the split gate pier construction process, the piers 1 and 2 on both sides of the split are synchronously constructed and cast at the same time, specifically including: building a scaffold, laying and installing the split gate pier construction complete set device and casting the split gate pier. The specific implementation is as follows:

[0032] Pier 1 and Pier 2 on both sides of the split gate pier are divided into multi-layer pier bodies 12 according to the overall height of the split gate pier under construction. In this embodiment, Pier 1 and Pier 2 are divided into four layers of pier bodies, and the four layers of pier bodies are synchronously constructed from the bottom layer to the top layer, and cast at the same time; that is, each layer of pier body is constructed according to the same construction process, starting from the first layer of the split gate pier, scaffolding is built around the first layer of pier bodies of Pier 1 and Pier 2 of the split gate pier, steel bar production and installation (cutting and making the steel bars required for the complete set of split gate pier construction equipment, including limit support parts, tie rods and vertical main bars, etc.), water-stop copper sheet installation, asphalt fir board installation and fixation, steel formwork installation and fixation, and the first layer of pier bodies of Pier 1 and Pier 2 are cast at the same time; after the first layer of pier body construction is completed and the forming and stable strength reaches the standard, the second layer of pier body construction is carried out according to the above process until the top layer of pier body casting of Pier 1 and Pier 2 is completed. The strength standard is based on the strength requirements of the pier body design, and the existing industry strength requirement standards can be specifically referred to.

[0033] When pouring each layer of piers 1 and 2 at the same time, the two sides of piers 1 and 2 are poured alternately. 30cm thick concrete is laid on one side, and then 50cm thick concrete is laid on the other side. The height difference of concrete on both sides of the joint does not exceed 30cm; until the pouring of the pier body of this layer is completed. By limiting the height difference of concrete pouring on both sides of piers 1 and 2 and adopting the method of alternate pouring, it is ensured that the asphalt fir board will not bend, which not only ensures the stability of the pouring of the split gate pier, but also improves the construction efficiency of the split gate pier.

[0034] The present invention discloses a complete set of equipment and a construction process for a split gate pier. The complete set of equipment is used to change the original single-side construction of the split gate pier into simultaneous construction on both sides of the split gate pier. Asphalt fir boards with certain rigidity and strength are selected as filling materials for structural seams of the split gate pier, which can serve as templates. The asphalt fir templates are precisely positioned and fixedly installed in conjunction with limiting supports and tie rods. This not only solves the problem of difficulty in installing flat steel templates at the seams of single-side construction of the split gate pier, but also improves the installation accuracy of the water-stop copper sheet, ensuring that the center line of the copper nose part of the water-stop copper sheet can coincide with the center line of the structural seam, but also realizes the construction goals of "simultaneous construction, simultaneous pouring" and reaching the top together for the split gate pier, effectively shortens the time required for the construction of the split gate pier, saves construction period and labor costs, and saves at least 30% of construction period compared with the existing single-side split gate pier construction.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A construction process for a split gate pier, comprising a complete set of equipment for the construction of a split gate pier, wherein the split gate pier comprises a first pier and a second pier arranged in a split manner, and is characterized in that: Pier 1 and pier 2 on both sides of the joint are constructed and poured at the same time; The complete set of equipment for the construction of the split gate pier includes: a steel formwork, an asphalt fir formwork, a tie rod and a limit support; the tie rod is connected to the vertical main reinforcement of the split gate pier, and the tie rod is used to fix the steel formwork arranged on the side of the split gate pier, the asphalt fir formwork is arranged at the split of the split gate pier, and limit supports are respectively arranged on both sides of the asphalt fir formwork, and the limit supports are used to fix the asphalt fir formwork; The asphalt fir wood template is inserted at the center line of the structural joint. The structural joint is also provided with a water-stop copper sheet. The asphalt fir wood template is inserted into the copper nose of the water-stop copper sheet so that the center line of the water-stop copper sheet coincides with the center line of the structural joint, thereby improving the installation accuracy of the water-stop copper sheet. The asphalt fir wood template is provided with a plurality of through holes, and the positions and diameters of the through holes are matched with the tie rods. The limiting support member includes a fixing device and a positioning device; the positioning device is arranged at the bottom of the structural joint and is used to fix the bottom of the asphalt fir wood formwork; the fixing device is arranged at the connection part of two adjacent asphalt fir wood boards in the asphalt fir wood formwork and is used to fix the connection part of the asphalt fir wood boards; The positioning device includes a positioning rod and a first connecting rod, wherein the positioning rod is arranged at the end of the first connecting rod, and the positioning rod is vertically connected to the first connecting rod; the positioning device relies on the first connecting rod to connect the vertical main reinforcement pre-buried at the gate pier joint, and relies on the positioning rod to support the asphalt fir board to achieve the clamping and fixing of the asphalt fir board; The fixing device includes a fixing rod and a second connecting rod, the fixing positioning rod is arranged at the end of the second connecting rod, and the positioning rod is vertically connected to the second connecting rod; the fixing device relies on the second connecting rod to connect the vertical main reinforcement embedded in the gate pier joint, and relies on the fixing rod to support the connecting part of the asphalt fir board to achieve the clamping and fixation of the asphalt fir board.

2. A construction process for a split gate pier according to claim 1, characterized in that: The asphalt fir wood formwork comprises a plurality of asphalt fir boards. A whole piece of asphalt fir wood formwork formed by splicing the plurality of asphalt fir boards is arranged at the joints of the gate piers.

3. A construction process for a split gate pier according to claim 2, characterized in that: A plurality of tie rods are arranged between the steel formwork and the vertical main reinforcement. The plurality of tie rods are arranged at intervals along the height direction and the length direction of the structural joint. The tie rods are arranged across the asphalt fir wood formwork to further support and fix the asphalt fir wood formwork.

4. A construction process for a split gate pier according to claim 3, characterized in that: Two adjacent asphalt fir boards in the asphalt fir formwork are connected by fixing parts.

5. A construction process for a split gate pier according to claim 4, characterized in that: The vertical main reinforcements on both sides of the gate pier joints are provided with tension bars, which are used to tie and fix the vertical main reinforcements on both sides.

6. The construction process of the split gate pier according to claim 5 is characterized in that: Pier 1 and Pier 2 of the joint gate pier are composed of multiple layers of pier bodies. Each layer of pier bodies of Pier 1 and Pier 2 from bottom to top is constructed and cast at the same time. After the casting of the pier body of this layer is completed and the pier body is formed and stable, the scaffolding is built, and the complete set of construction equipment for the new layer of joint gate pier is laid and installed, and the new layer of pier body is cast until the casting of all the pier bodies of Pier 1 and Pier 2 is completed.