A foundation treatment method for increasing the natural frequency of the foundation of a large ultra-high-speed centrifuge

By implementing cast piles and backfill concrete on the basis of a large ultra-high-speed centrifuge, setting up reserved steel bar connections, combined with soft soil cushion treatment, the problem of low self-vibration frequency of the centrifuge foundation is solved, and the self-vibration frequency and reduction are achieved. cost effect.

CN114438989BActive Publication Date: 2024-12-03POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011202131.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-02
Publication Date
2024-12-03
Estimated Expiration
2040-11-02

AI Technical Summary

Technical Problem

The self-vibration frequency of the infrastructure of large ultra-high-speed centrifuges is low, which makes it easy to cause resonance failures during operation. In the prior art, the strength of improving concrete itself is limited, and the boundary constraint effect is good but the cost is high, and the processing range is large and economical. unreasonable.

Method used

By implementing cast-injected piles to bedrock layer on a large ultra-high-speed centrifuge, backfill concrete and set up reserved steel bar connections, combined with a soft soil cushion layer, the parametric vibration quality of the concrete is reduced, and the boundary strength of the foundation is improved, thereby increasing the self-vibration frequency.

Benefits of technology

It effectively improves the self-vibration frequency of the foundation of large ultra-high-speed centrifuges, prevents faults due to resonance, and reduces the foundation processing range, reduces costs, and significantly improves the power characteristics of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114438989B_ABST
    Figure CN114438989B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of infrastructure technology, and in particular, relates to a foundation treatment method for improving the natural frequency of a large ultra-high-speed centrifuge foundation. The method for improving the natural frequency of a large ultra-high-speed centrifuge foundation provided by the present invention comprises the following steps: (1) excavating a foundation pit to the top of the bedrock, (2) backfilling C15 concrete to the bearing layer elevation, (3) setting exposed steel bars on the top of the C15 concrete and backfilling a soft soil cushion layer, and (4) pouring a large ultra-high-speed centrifuge foundation on top of the soft soil cushion layer. The present invention can improve the natural frequency of a large ultra-high-speed centrifuge foundation, and prevent the main engine vibration of the centrifuge during operation from being close to the natural frequency of the foundation and causing resonance and damage to the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of geotechnical engineering, and in particular to a foundation treatment method for improving the natural vibration frequency of a large ultra-high-speed centrifuge foundation. Background Art

[0002] Large ultra-high-speed centrifuges are mostly used for scientific research and have an important strategic position in scientific research. They are an indispensable experimental means for studying the large-scale temporal and spatial evolution of rock and soil bodies and deep earth materials and accelerating the separation of materials. Large ultra-high-speed centrifuges have very high requirements for the natural frequency of the foundation structure. Generally, the centrifuge operating frequency and the natural frequency are required to be more than 30% off, and the centrifuge operating frequency range basically covers most of the low-frequency bands. Therefore, how to improve the natural frequency of the foundation structure of large ultra-high-speed centrifuges has become the most important issue in the construction process.

[0003] There are two main ways to increase the natural frequency of concrete structures: (1) improving the strength of the concrete structure itself, including increasing the concrete material grade and optimizing the layout of the slab, beam and column in the concrete structure; (2) strengthening the boundary constraints of the concrete structure, that is, improving the strength of the rock and soil around and at the bottom of the concrete structure. A large amount of engineering practice experience shows that improving the structural strength of the concrete itself has limited effect on the natural frequency of the concrete structure and it is difficult to achieve the ideal effect, while strengthening the boundary constraints has a better effect. For the soil around the concrete structure, although high-pressure jet grouting piles can be used to treat it, the effect is not obvious if the treatment range is small, and the cost is too high if the treatment range is large. Therefore, foundation treatment of the bottom rock and soil is the most reasonable solution to increase the natural frequency of the concrete structure.

[0004] Based on the above situation, the present invention proposes a foundation treatment method for improving the natural frequency of the foundation of a large ultra-high-speed centrifuge, which can effectively solve the above problems. Summary of the invention

[0005] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a foundation treatment method for improving the natural frequency of the foundation of a large ultra-high-speed centrifuge. The parametric mass of the backfill concrete is reduced by a soft soil cushion layer, and the bottom boundary strength of the foundation is improved by connecting the steel bars between the foundation of the large ultra-high-speed centrifuge and the backfill concrete, thereby increasing the natural frequency of the foundation and preventing the centrifuge from malfunctioning due to resonance during operation.

[0006] In order to solve the above technical problems, the present invention is implemented by the following technical solutions:

[0007] A foundation treatment method for increasing the natural vibration frequency of a large ultra-high-speed centrifuge foundation comprises the following steps:

[0008] S1. According to geological exploration data, select appropriate bedrock and bearing layer, implement cast-in-place piles into the bedrock layer along the boundary of the equipment foundation range, and excavate the foundation pit through the bearing layer to the top of the bedrock. Temporary support structures are arranged in time during the foundation pit excavation process;

[0009] S2. Use cast-in-place scheme to backfill concrete to the bearing layer elevation, vibrate the concrete during pouring, and cast temporary support structure together to improve concrete strength;

[0010] S3. Set reserved steel bars on the top of the concrete, and after the concrete strength reaches its design strength, backfill the soft soil cushion layer;

[0011] S4. Pour the equipment foundation on the top of the soft soil cushion;

[0012] S5. After pouring is completed, the large ultra-high-speed centrifuge equipment is installed into the equipment foundation.

[0013] Preferably, in step S1, medium-weathered rock or high-quality strongly weathered rock is used as the bedrock of the equipment foundation, and the gravel soil layer or the strongly weathered rock layer is used as the bearing layer of the equipment foundation.

[0014] Preferably, in step S2, structural steel bars need to be arranged in the concrete; a mechanical vibration device with a vibration frequency of 50 Hz or more should be used to vibrate the concrete, and the vibration time should be controlled within 30 seconds.

[0015] More preferably, water is passed through the casting chamber to cool the concrete every 1 m in elevation to prevent temperature cracks.

[0016] More preferably, the strength of the concrete is C15.

[0017] Preferably, in step S3, the reserved length of the connecting steel bars is not less than 0.5 times the thickness of the equipment foundation bottom plate, the connecting steel bars are bent at both ends, the elbows are not less than 5 cm, the spacing between the connecting steel bars is not more than 40 cm, and the soft soil cushion layer uses well-graded uniform soil with a thickness of not less than 50 cm.

[0018] Preferably, in step S4, when pouring the concrete of the equipment foundation bottom plate, a laser leveling machine should be used for leveling, and the error should be controlled within 1 mm.

[0019] Preferably, the temporary supporting structure is a steel cross brace, and the height difference between the steel cross braces does not exceed 5m.

[0020] Preferably, the length of the cast-in-place pile extending into the bedrock is not less than 3 m.

[0021] Preferably, a plurality of equipment rooms are spaced apart in the equipment foundation.

[0022] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0023] The parametric mass of the backfill concrete is reduced by using a soft soil cushion layer, and the bottom boundary strength of the foundation is improved by reserving a steel bar connection between the large ultra-high-speed centrifuge foundation and the backfill concrete, thereby increasing the natural vibration frequency of the foundation and preventing the centrifuge from malfunctioning due to resonance during operation.

[0024] The bored piles are placed in the bedrock layer, and the embedded bored piles have a good restraining effect on the concrete foundation of the large ultra-high-speed centrifuge. And only the limited range of the foundation (bearing layer, bedrock) of the equipment foundation is processed, which directly improves the dynamic characteristics of the equipment foundation and greatly reduces the scope of foundation processing, with obvious economic advantages. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the cross-sectional structure of the present invention;

[0026] Figure 2 for Figure 1 Schematic diagram of the cross-sectional structure along the AA direction;

[0027] Figure 3 It is a schematic structural diagram of the connection between concrete and equipment foundation of the present invention.

[0028] Figure numerals: 1-bedrock; 2-bearing layer; 3-cast-in-place piles; 4-concrete; 5-soft soil cushion; 6-equipment room; 7-equipment foundation, 8-large ultra-high-speed centrifuge equipment, 9-connecting steel bars. DETAILED DESCRIPTION

[0029] In order to enable those skilled in the art to better understand the technical solution of the present invention, the preferred implementation scheme of the present invention is described below in conjunction with specific examples. However, it should be understood that the drawings are only used for exemplary illustration and cannot be understood as limiting this patent.

[0030] like Figures 1 to 3 As shown, the present invention provides a foundation treatment method for increasing the natural frequency of the foundation of a large ultra-high-speed centrifuge, comprising the following steps:

[0031] 1. Excavation of foundation pit through the bearing layer to the top of bedrock:

[0032] According to the geological exploration data, medium-weathered rock or highly weathered rock of good quality is selected as the bedrock 1 of the equipment foundation 7, and a gravel soil layer or a highly weathered rock layer is selected as the bearing layer 2 of the equipment foundation 7. Cast-in-place piles 3 are implemented along the boundary of the equipment foundation 7 to a depth of no less than 3m into the bedrock layer, and a foundation pit is excavated through the bearing layer 2 to the top of the bedrock 1. Steel cross braces are arranged in time during the foundation pit excavation process, and the height difference between the steel cross braces does not exceed 5m.

[0033] 2. Backfill C15 concrete to the bearing layer elevation:

[0034] Use cast-in-place scheme to backfill C15 concrete 4 to the elevation of bearing layer 2, and arrange structural steel bars in C15 concrete 4. During the pouring process, C15 concrete 4 is vibrated. The concrete should be vibrated by mechanical vibration equipment with a vibration frequency of more than 50 Hz. The vibration time is controlled within 30 seconds, and steel cross braces are cast together to improve the strength of C15 concrete 4.

[0035] The temperature stress in the concrete needs to be considered during the pouring process, and water should be passed through the concrete to cool it down every 1m of elevation to prevent temperature cracks.

[0036] 3. Backfill soft soil cushion:

[0037] Reserved steel bars are set on the top of C15 concrete 4, and the length of reserved connecting steel bars 9 is not less than 0.5 times the thickness of the bottom plate of the equipment foundation 7. The connecting steel bars 9 are bent at both ends, and the elbows are not less than 5cm. The spacing between connecting steel bars 9 is not more than 40cm. After the pouring of C15 concrete 4 is completed, 28 days later, when the concrete strength reaches its designed strength, a soft soil cushion layer 5 is backfilled. The soft soil cushion layer 5 uses well-graded uniform soil with a thickness of not less than 50cm.

[0038] 4. Casting equipment foundation:

[0039] The equipment foundation 7 is poured on the top of the soft soil cushion layer 5. When pouring the concrete of the bottom plate of the equipment foundation 7, a laser leveling machine should be used for leveling, and the error should be controlled within 1mm. At the same time, pay attention to protecting the C15 concrete 4, and leave a spacer 6 in the equipment foundation 7.

[0040] During the concrete foundation pouring process, settlement observations are carried out every week, and the settlement observation accuracy is controlled within 1mm.

[0041] 5. Installation equipment:

[0042] After pouring is completed, when the concrete strength of the equipment foundation 7 reaches its designed strength, the large ultra-high-speed centrifuge equipment 8 is installed into the equipment foundation.

[0043] The present invention reduces the parametric mass of backfill concrete by using a soft soil cushion layer, and improves the bottom boundary strength of the foundation by reserving a steel bar connection between the foundation of a large ultra-high-speed centrifuge and the backfill concrete, thereby increasing the natural vibration frequency of the foundation and preventing the centrifuge from malfunctioning due to resonance during operation.

[0044] According to the description and drawings of the present invention, those skilled in the art can easily use the foundation treatment method of the present invention to increase the basic natural frequency of a large ultra-high-speed centrifuge, and can produce the positive effects recorded in the present invention.

[0045] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A foundation treatment method for increasing the natural frequency of a large ultra-high-speed centrifuge foundation, characterized in that: The steps include: S1. According to geological exploration data, select appropriate bedrock and bearing layer, implement cast-in-place piles into the bedrock layer along the boundary of the equipment foundation range, and excavate the foundation pit through the bearing layer to the top of the bedrock. Temporary support structures are arranged in time during the foundation pit excavation process; S2. Use cast-in-place solution to backfill concrete to the bearing layer elevation. During the pouring process, the concrete is vibrated and the temporary support structure is poured together to improve the concrete strength. Structural steel bars need to be arranged in the concrete. S3. Reserved connecting steel bars are set on the top of the concrete. After the concrete strength reaches its design strength, backfill the soft soil cushion layer. The length of the reserved connecting steel bars shall not be less than 0.5 times the thickness of the equipment foundation bottom plate. The connecting steel bars are bent at both ends with a bend of not less than 5cm. The spacing between the connecting steel bars shall not be greater than 40cm. The soft soil cushion layer shall use well-graded uniform soil with a thickness of not less than 50cm. S4. Pour the equipment foundation on the top of the soft soil cushion; S5. After pouring is completed, install the large ultra-high-speed centrifuge equipment into the equipment foundation; The parametric mass of the backfill concrete is reduced by a soft soil cushion layer, and the bottom boundary strength of the foundation is improved by connecting the steel bars between the large ultra-high-speed centrifuge foundation and the backfill concrete, thereby increasing the natural vibration frequency of the foundation and preventing the centrifuge from malfunctioning due to resonance during operation.

2. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: In step S1, medium-weathered rock or highly weathered rock of good quality is used as bedrock of the equipment foundation, and gravel soil layer or highly weathered rock layer is used as the bearing layer of the equipment foundation.

3. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: In step S2, the concrete should be vibrated by mechanical vibration equipment with a vibration frequency of 50 Hz or more, and the vibration time should be controlled within 30 seconds.

4. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 3, characterized in that: Water is passed through the pouring pit to cool the concrete down every 1m in elevation to prevent temperature cracks.

5. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1 or 3, characterized in that: The strength of the concrete is C15.

6. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: In step S4, when pouring the concrete of the equipment foundation slab, a laser leveling machine should be used for leveling, and the error should be controlled within 1 mm.

7. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: The temporary supporting structure is a steel cross brace, and the height difference between the steel cross braces does not exceed 5m.

8. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: The length of the bored pile extending into the bedrock is not less than 3m.

9. A method for foundation treatment for increasing the natural frequency of a large ultra-high speed centrifuge according to claim 1, characterized in that: A plurality of equipment rooms are spaced apart in the equipment foundation.