A connection device for LNG tank truck and LNG tank truck pipeline

By installing a safety valve on the dry quick connector male head of the LNG tanker, the problem of automatic connection and pipeline overpressure that cannot be achieved with the traditional flange connection method is solved, and the automatic loading, unloading and safe connection of the LNG tanker are realized, improving Improve transformation efficiency and safety.

CN114623303BActive Publication Date: 2024-10-15SHANGHAI MICROPOWERS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210175545.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-24
Publication Date
2024-10-15
Estimated Expiration
2042-02-24

AI Technical Summary

Technical Problem

The flange connection method of the traditional LNG tanker cannot realize the automatic connection of the loading and unloading arms, and after loading and unloading, a closed space may be formed between the dry joint and the stop valve at the end of the tanker, causing the expansion of the cryogenic liquid and causing pipeline overpressure. Security risks.

Method used

A safety valve is installed on the male dry quick connector of the LNG tanker to avoid overpressure in the pipeline caused by the gasification of the residual liquid when the dry connector and the end stop valve of the tanker are closed, and is directly connected to the safety valve through a threaded connection. , avoid on-site drilling and welding modifications, improve modification efficiency and reduce costs.

Benefits of technology

It realizes automated loading and unloading and intelligent connection of LNG tank trucks, reduces the risk of misoperation, improves transformation efficiency and safety, and is also suitable for intelligent and quick-connector loading solutions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114623303B_ABST
    Figure CN114623303B_ABST
Patent Text Reader

Abstract

The present invention discloses a connection device for an LNG tank truck and an LNG tank truck pipeline, the connection device comprises: a dry quick connector male head, the dry quick connector male head comprises a connection section, a flange and a cavity, one end of the connection section is fixedly connected to the flange, the end of the connection section away from the flange is used for adapting and connecting with a dry quick connector female head, the flange is used to connect with the LNG tank truck, the cavity passes through the connection section and the flange along the axial direction of the connection section, and the side wall of the flange is provided with a mounting hole; a safety valve is adapted to be arranged on the mounting hole, and the safety valve is sealed and connected with the cavity. In the present invention, by providing a safety valve on the dry quick connector male head, the safety risk caused by overpressure of the dry connector and the tank truck terminal pipeline after loading and unloading is avoided in the automated loading process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of LNG, and further to a connecting device for an LNG tank truck and an LNG tank truck pipeline. Background Art

[0002] LNG (Liquefied Natural Gas) is a safe, clean and efficient energy source that is favored by all countries. With the rapid development of my country's LNG industry, the traditional pipeline transportation mode is not enough to meet the needs of a large number of small and medium-sized users. LNG tank trucks have been used as the main transportation tool by all receiving stations to make up for the shortcomings of pipeline transportation mode due to their strong flexibility and economy. Loading and unloading arms, as intermediate equipment for loading and unloading tank trucks, play a decisive role in the loading and unloading speed of tank trucks.

[0003] At present, the connection between the loading and unloading arm (or cryogenic hose) and the tank truck is mainly achieved manually during the loading and unloading of LNG tank trucks. With the improvement of the industry level, the field of LNG loading has begun to develop in the direction of automation and intelligence. The use of automated and intelligent methods for loading is the development trend of LNG tank truck loading in the future. Tank trucks generally use standard container flanges as the connection interface with the LNG loading and unloading arm (or cryogenic hose), but the traditional flange connection method cannot realize the automated connection of the loading and unloading arm. Therefore, how to improve the technical defects existing in the connection method of LNG tank trucks in the prior art has always been a problem that ordinary technicians in this field need to solve urgently. Summary of the invention

[0004] In view of the above technical problems, the purpose of the present invention is to provide a connection device and an LNG tanker pipeline for an LNG tanker. By setting a safety valve on the male head of the dry quick connector, the safety risks caused by overpressure of the dry connector and the end pipeline of the tanker after loading and unloading can be avoided during the automated loading process.

[0005] In order to achieve the above object, the present invention provides a connection device for an LNG tank truck, comprising:

[0006] A dry quick connector male head, the dry quick connector male head comprising a connecting section, a flange and a cavity, one end of the connecting section is fixedly connected to the flange, the end of the connecting section away from the flange is used for adapting and connecting with a dry quick connector female head, the flange is used for connecting to an LNG tank truck, the cavity passes through the connecting section and the flange along the axial direction of the connecting section, and a mounting hole is provided on the side wall of the flange;

[0007] A safety valve is adapted to be arranged on the mounting hole, and the safety valve is sealed and connected to the cavity.

[0008] In some embodiments, it further comprises:

[0009] A dry quick connector female head, one end of which is adapted and sealed to be connected to an end of the connecting section away from the flange, and the other end of which is used to be connected to an external pipeline.

[0010] In some embodiments, the dry quick connector male head is a standard dry quick connector male head, and the dry quick connector female head is a standard dry quick connector female head adapted to the dry quick connector male head.

[0011] In some embodiments, the connection end of the safety valve is provided with an external thread, the inner wall of the mounting hole is provided with an internal thread, and the safety valve is adapted to be mounted on the mounting hole.

[0012] In some embodiments, the safety valve is a low-temperature safety valve, the connecting end of the safety valve is provided with an NPT external thread, and the inner wall of the mounting hole is provided with an NPT internal thread.

[0013] According to another aspect of the present invention, the present invention further provides an LNG tanker pipeline for connecting to a tanker storage tank, comprising any one of the above-mentioned connecting devices for LNG tankers, and further comprising:

[0014] A gas phase pipe, one end of which is connected to the tank truck storage tank, and the other end of which is adaptively connected to the first flange;

[0015] A liquid supply pipe, one end of which is connected to the tank of the tank truck, and the other end of which is adaptively connected to the second flange;

[0016] A pressurized liquid phase pipe, one end of which is connected to the tank truck storage tank, and the other end of which is adaptively connected to the third flange.

[0017] In some embodiments, it further comprises:

[0018] Vent pipe;

[0019] The first safety valve provided on the first flange is connected to the vent pipe;

[0020] The second safety valve provided on the second flange is connected to the vent pipe;

[0021] The third safety valve arranged on the third flange is communicated with the vent pipe.

[0022] In some embodiments, it further comprises:

[0023] A stop valve, wherein the inlet end of the stop valve is connected to the first safety valve, the second safety valve, and the third safety valve respectively, and the outlet end of the stop valve is connected to the vent pipe.

[0024] In some embodiments, it further comprises:

[0025] a first manual stop valve, one end of which is connected to the gas phase pipe, and the other end of which is connected to the vent pipe through the first stop valve;

[0026] a second manual stop valve, one end of which is connected to the liquid supply pipe, and the other end of which is connected to the vent pipe through the second stop valve;

[0027] A third manual stop valve, one end of the third manual stop valve is connected to the pressurized liquid phase pipe, and the other end of the third manual stop valve is connected to the pressurized liquid phase pipe through the third stop valve.

[0028] In some embodiments, it further comprises:

[0029] a first emergency shut-off valve, one end of which is connected to the gas phase pipe, and the other end of which is connected to the first manual shut-off valve;

[0030] a second emergency shut-off valve, one end of the second emergency shut-off valve being connected to the liquid supply pipe, and the other end of the second emergency shut-off valve being connected to the second manual shut-off valve;

[0031] A third emergency shut-off valve, one end of which is connected to the pressurized liquid phase pipe, and the other end of which is connected to the third manual shut-off valve.

[0032] Compared with the prior art, the connection device for LNG tank truck and LNG tank truck pipeline provided by the present invention have the following beneficial effects:

[0033] 1. The connection device for LNG tank trucks provided by the present invention cannot realize the automatic connection of loading and unloading arms due to the traditional flange connection method. The emergence of dry cryogenic quick connectors makes it possible to automate LNG loading and unloading. If the dry cryogenic quick connector is directly connected to the LNG tank truck, a closed space is formed between the dry connector and the end stop valve of the tank truck after loading and unloading. The expansion of the residual cryogenic liquid may cause overpressure in this connected section of the pipeline. Although a manual vent valve can be set on the LNG tank truck, there is the possibility of misoperation or forgetting to operate, which poses a certain risk. By setting a dry quick connector male head on the LNG tank truck, connection guarantee is provided for the intelligent loading and unloading of LNG tank trucks. A safety valve is set between the dry quick connector male head and the end stop valve of the LNG tank truck to avoid overpressure in this section of the pipeline due to gasification of residual liquid when both ends are closed.

[0034] 2. In the connection device for LNG tank trucks provided by the present invention, the safety valve can be directly connected to the male head of the dry quick connector through the threaded hole, avoiding on-site pipeline drilling and welding modification, improving the modification efficiency of existing tank trucks and saving costs.

[0035] 3. The LNG tanker pipeline provided by the present invention is provided with a dry quick connector male head at the pressurized liquid phase port, the liquid supply port and the gas phase port, so as to realize the quick connection of the three interfaces. The safety valves on the dry quick connector male heads at the pressurized liquid phase port, the liquid supply port and the gas phase port are connected in parallel to the vent pipeline with a smaller diameter, with low modification cost and high efficiency. A manual stop valve is provided on the safety valve aggregation pipeline. When the safety valve is damaged and leaks internally, the valve is closed first. After the filling is completed, the damaged safety valve is replaced at an appropriate time. This structure is not only suitable for intelligent loading, but also suitable for manual connection schemes using quick connectors for loading. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present invention.

[0037] Figure 1 It is a structural schematic diagram of a connection device for an LNG tanker according to a preferred embodiment of the present invention;

[0038] Figure 2 It is a schematic flow diagram of the LNG tanker pipeline according to a preferred embodiment of the present invention.

[0039] Description of Figure Numbers:

[0040] Dry quick connector male head 1, connecting section 2, flange 3, cavity 4, mounting hole 5, tank truck storage tank 6, gas phase pipe 7, liquid supply pipe 8, pressurized liquid phase pipe 9, vent pipe 10, first flange 11, first safety valve 12, second flange 13, second safety valve 14, third flange 15, third safety valve 16, stop valve 17, first manual stop valve 18, first stop valve 19, second manual stop valve 20, second stop valve 21, third manual stop valve 22, third stop valve 23, first emergency shut-off valve 24, second emergency shut-off valve 25, third emergency shut-off valve 26. DETAILED DESCRIPTION

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.

[0042] In order to simplify the drawings, only the parts related to the invention are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".

[0043] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0044] In this document, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0045] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0046] In one embodiment, the reference specification Figure 1The present invention provides a connection device for an LNG tanker, comprising: a dry quick connector male 1 and a safety valve. LNG is the abbreviation of liquefied natural gas, and a liquefied natural gas transport vehicle is referred to as an LNG tanker. The dry quick connector male 1 comprises a connecting section 2, a flange 3 and a cavity 4, the right end of the connecting section 2 is fixedly connected to the flange 3, the left end of the connecting section 2 is used for adapting and connecting with the dry quick connector female, the flange 3 is used for connecting with the LNG tanker, the cavity 4 passes through the connecting section 2 and the flange 3 along the axial direction of the connecting section 2, and a mounting hole 5 is provided on the side wall of the flange 3. The safety valve is adapted to be arranged on the mounting hole 5, and the safety valve is sealed and connected with the cavity 4. Among them, the safety valve can be a low-temperature safety valve, the connecting end of the safety valve is provided with an external thread, the inner wall of the mounting hole 5 is provided with an internal thread, and the safety valve is adapted to be installed on the mounting hole 5. For example: the connecting end of the safety valve is provided with an NPT external thread, and the inner wall of the mounting hole 5 is provided with an NPT internal thread.

[0047] In this embodiment, due to the traditional flange connection method, it is impossible to realize the automated connection of the loading and unloading arm. The emergence of the dry cryogenic quick connector makes the automation of LNG loading and unloading possible. If the dry cryogenic quick connector is directly connected to the LNG tank truck, a closed space is formed between the dry connector and the stop valve at the end of the tank truck after loading and unloading. The expansion of the residual cryogenic liquid may cause overpressure in this connected section of the pipeline. Although a manual vent valve can be set on the LNG tank truck, there is a possibility of misoperation and forgetting to operate, which poses a certain risk. By setting a dry quick connector male head 1 on the LNG tank truck, a connection guarantee is provided for the intelligent loading and unloading of LNG tank trucks. A safety valve is set between the dry quick connector male head 1 and the stop valve at the end of the LNG tank truck to avoid overpressure in this section of the pipeline due to gasification of residual liquid when both ends are closed. The safety valve can be directly connected to the dry quick connector male head 1 through a threaded hole, avoiding on-site pipeline drilling and welding modifications, improving the modification efficiency of existing tank trucks, and saving costs at the same time.

[0048] In one embodiment, the reference specification Figure 1The present invention provides a connection device for an LNG tank truck, comprising: a dry quick connector male 1, a safety valve and a dry quick connector female. The dry quick connector male 1 comprises a connecting section 2, a flange 3 and a cavity 4. The right end of the connecting section 2 is fixedly connected to the flange 3, and the left end of the connecting section 2 is adaptably connected to the dry quick connector female. The flange 3 is used to connect to the LNG tank truck. The cavity 4 passes through the connecting section 2 and the flange 3 along the axial direction of the connecting section 2. A mounting hole 5 is provided on the side wall of the flange 3. The safety valve is adaptably arranged on the mounting hole 5, and the safety valve is sealed and connected to the cavity 4. The other end of the dry quick connector female is used to connect to an external pipeline, and the external pipeline can be connected to an LNG filling station. Among them, the dry quick connector male 1 is a standard dry quick connector male, and the dry quick connector female is a standard dry quick connector female adapted to the dry quick connector male 1.

[0049] According to another aspect of the present invention, Figure 2 On the basis of the above embodiments, the present invention further provides an LNG tanker pipeline for connecting to a tanker storage tank 6, comprising: a gas phase pipe 7, a liquid supply pipe 8, a tanker storage tank 6 and a vent pipe 10. The tanker storage tank 6 is used to store LNG, one end of the gas phase pipe 7 is connected to the tanker storage tank 6, the other end of the gas phase pipe 7 is adapted to be connected to a first flange 11, and a first safety valve 12 provided on the first flange 11 is connected to the vent pipe 10. One end of the liquid supply pipe 8 is connected to the tanker storage tank 6, the other end of the liquid supply pipe 8 is adapted to be connected to a second flange 13, and a second safety valve 14 provided on the second flange 13 is connected to the vent pipe 10. One end of the pressurized liquid phase pipe 9 is connected to the tanker storage tank 6, the other end of the pressurized liquid phase pipe 9 is adapted to be connected to a third flange 15, and a third safety valve 16 provided on the third flange 15 is connected to the vent pipe 10. The vent pipe 10 can be set to a small diameter, for example, the diameter of the vent pipe 10 is DN8, DN10, DN12, etc.

[0050] In this embodiment, a dry quick connector male head 1 is provided on each of the pressurized liquid phase pipe 9, the liquid supply pipe 8 and the gas phase pipe 7, so that the three interfaces can be quickly connected. The safety valves on the dry quick connector male heads 1 at the pressurized liquid phase pipe 9, the liquid supply pipe 8 and the gas phase pipe 7 are connected in parallel to the vent pipe 10 with a smaller diameter, so that the modification cost is low and the efficiency is high.

[0051] It should be pointed out that the first flange 11, the second flange 13, and the third flange 15 have the same structure as the flange 3 in the above embodiment, and the first safety valve 12, the second safety valve 14, and the third safety valve 16 have the same structure as the safety valve in the above embodiment, and the connection method of the two is also the same. The different naming here is only to distinguish them for different pipelines.

[0052] In one embodiment, the reference specification Figure 2On the basis of the above embodiments, the present invention provides an LNG tanker pipeline, further comprising: a stop valve 17, a first manual stop valve 18, a second manual stop valve 20 and a third manual stop valve 22. The inlet end of the stop valve 17 is connected to the first safety valve 12, the second safety valve 14 and the third safety valve 16 respectively, and the outlet end of the stop valve 17 is connected to the vent pipe 10. One end of the first manual stop valve 18 is connected to the gas phase pipe 7, and the other end of the first manual stop valve 18 is connected to the vent pipe 10 through the first stop valve 19. One end of the second manual stop valve 20 is connected to the liquid supply pipe 8, and the other end of the second manual stop valve 20 is connected to the vent pipe 10 through the second stop valve 21. One end of the third manual stop valve 22 is connected to the pressurized liquid phase pipe 9, and the other end of the third manual stop valve 22 is connected to the pressurized liquid phase pipe 9 through the third stop valve 23.

[0053] In this embodiment, when the pipeline connecting the tank truck and the outside world is over-pressured, the pressure can be quickly released through the safety valve. A manual stop valve is set on the safety valve collection pipeline. When the safety valve is damaged and leaks, the valve is closed first. After the current filling is completed, the damaged safety valve is replaced at an appropriate time. The safety valve is set to avoid the stop valve and the manual stop valve being closed at the same time, and the operator forgets to empty the pipeline, which causes overpressure caused by thermal expansion of the residual medium in the pipeline between the stop valve and the manual stop valve. The first flange 11, the second flange 13, and the third flange 15 can be directly flange-connected to the LNG tank truck and directly threaded to the safety valve. The construction process is simple and the cost is low. This structure is not only suitable for intelligent loading, but also suitable for manual connection solutions using quick connectors for loading.

[0054] In one embodiment, the reference specification Figure 2 On the basis of the above embodiments, the present invention provides an LNG tanker pipeline, further comprising: a first emergency shut-off valve 24, a second emergency shut-off valve 25, and a third emergency shut-off valve 26. One end of the first emergency shut-off valve 24 is connected to the gas phase pipe 7, and the other end of the first emergency shut-off valve 24 is connected to the first manual shut-off valve 18. One end of the second emergency shut-off valve 25 is connected to the liquid supply pipe 8, and the other end of the second emergency shut-off valve 25 is connected to the second manual shut-off valve 20. One end of the third emergency shut-off valve 26 is connected to the pressurized liquid phase pipe 9, and the other end of the third emergency shut-off valve 26 is connected to the third manual shut-off valve 22. By respectively arranging emergency shut-off valves on the pressurized liquid phase pipe 9, the liquid supply pipe 8, and the gas phase pipe 7, the pipeline can be disconnected in time when encountering an emergency. This structure can not only reduce the cost and time of the modification of the existing tanker, but also take into account the use safety and loading and unloading efficiency of the LNG tanker.

[0055] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0056] It should be noted that the above embodiments can be freely combined as needed. The above are only preferred embodiments of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. An LNG tanker pipeline, used to connect to a tanker tank, It is characterized in that A connection device for an LNG tank truck is included, wherein the connection device for an LNG tank truck includes: A dry quick connector male head, the dry quick connector male head comprising a connecting section, a flange and a cavity, one end of the connecting section is fixedly connected to the flange, the end of the connecting section away from the flange is used for adapting and connecting with a dry quick connector female head, the flange is used for connecting to an LNG tank truck, the cavity passes through the connecting section and the flange along the axial direction of the connecting section, and a mounting hole is provided on the side wall of the flange; A safety valve is adapted to be arranged on the mounting hole, and the safety valve is sealed and communicated with the cavity; The LNG tanker pipeline also includes: A gas phase pipe, one end of which is connected to the tank truck storage tank, and the other end of which is adaptively connected to the first flange; A liquid supply pipe, one end of which is connected to the tank of the tank truck, and the other end of which is adaptively connected to the second flange; A pressurized liquid phase pipe, one end of which is connected to the tank truck storage tank, and the other end of which is adaptively connected to the third flange; A vent pipe, a first safety valve arranged on the first flange is connected to the vent pipe, a second safety valve arranged on the second flange is connected to the vent pipe, and a third safety valve arranged on the third flange is connected to the vent pipe.

2. The LNG tanker pipeline according to claim 1, It is characterized in that The connection device for the LNG tanker also includes: A dry quick connector female head, one end of which is adapted and sealed to be connected to an end of the connecting section away from the flange, and the other end of which is used to be connected to an external pipeline.

3. The LNG tanker pipeline according to claim 2, It is characterized in that The dry quick connector male head is a standard dry quick connector male head, and the dry quick connector female head is a standard dry quick connector female head adapted to the dry quick connector male head.

4. The LNG tanker pipeline according to claim 3, It is characterized in that The connecting end of the safety valve is provided with an external thread, the inner wall of the mounting hole is provided with an internal thread, and the safety valve is adapted to be mounted on the mounting hole.

5. The LNG tanker pipeline according to claim 4, It is characterized in that The safety valve is a low-temperature safety valve, the connecting end of the safety valve is provided with an NPT external thread, and the inner wall of the mounting hole is provided with an NPT internal thread.

6. The LNG tanker pipeline according to claim 1, It is characterized in that Also includes: A stop valve, wherein the inlet end of the stop valve is connected to the first safety valve, the second safety valve, and the third safety valve respectively, and the outlet end of the stop valve is connected to the vent pipe.

7. The LNG tanker pipeline according to claim 6, It is characterized in that Also includes: a first manual stop valve, one end of which is connected to the gas phase pipe, and the other end of which is connected to the vent pipe through the first stop valve; a second manual stop valve, one end of which is connected to the liquid supply pipe, and the other end of which is connected to the vent pipe through the second stop valve; A third manual stop valve, one end of the third manual stop valve is connected to the pressurized liquid phase pipe, and the other end of the third manual stop valve is connected to the pressurized liquid phase pipe through the third stop valve.

8. The LNG tanker pipeline according to claim 7, It is characterized in that Also includes: a first emergency shut-off valve, one end of which is connected to the gas phase pipe, and the other end of which is connected to the first manual shut-off valve; a second emergency shut-off valve, one end of the second emergency shut-off valve being connected to the liquid supply pipe, and the other end of the second emergency shut-off valve being connected to the second manual shut-off valve; A third emergency shut-off valve, one end of which is connected to the pressurized liquid phase pipe, and the other end of which is connected to the third manual shut-off valve.