Remote online calibration method and system for hierarchical customer electric energy meters based on edge computing

Through the remote online calibration method of hierarchical customer electric energy meters based on edge computing, the problem of difficulty in unifying the operating status errors and calibration standards of electric energy meters is solved, real-time accurate evaluation and error monitoring of electric energy meters are achieved, and the verification efficiency and accuracy are improved. properties, simplifying the verification work.

CN118483647BActive Publication Date: 2024-10-22STATE GRID HUBEI ELECTRIC POWER CO LTD WUHAN POWER SUPPLY CO +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410946369.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-22
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

In the existing technology, electric energy meters have different operating status errors due to different customers' electricity consumption behaviors, and different customers have different requirements for error accuracy. This makes it difficult to unify the calibration standards and manage the calibration data for energy meter maintenance personnel of power supply companies. There is a huge problem. The problem of poor timeliness of data transmission in power arrays.

Method used

A remote online verification method for hierarchical customer electric energy meters based on edge computing is used to collect historical power consumption data by accessing the power supply database, build a customer hierarchical decision-making model, analyze power consumption behavior, and extract electric energy meter operating data for real-time evaluation and error monitoring. Utilize distributed transmission and storage processing technology to execute the energy meter error verification algorithm.

Benefits of technology

It achieves real-time accurate evaluation and error monitoring of electric energy meters, improves verification efficiency and accuracy, reduces data transmission delay and bandwidth pressure, ensures the accuracy and fairness of electric energy measurement, and simplifies the verification workflow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118483647B_ABST
    Figure CN118483647B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of electric energy meter calibration technology, and in particular to a remote online calibration method and system for graded customer electric energy meters based on edge computing, the specific method comprising: collecting historical electricity consumption data of customers in the power supply area; analyzing the electricity consumption behavior of customers and completing the electricity consumption grading processing of customers; real-time evaluation of the operating status of the electric energy meter; distributed transmission and storage processing of the extracted data through the edge data computing and storage center; real-time aggregation of the analysis results of each edge transmission node, and execution of the corresponding electric energy meter error calibration algorithm according to the aggregated results. The present invention solves the problem in the prior art that different customers have different requirements for the error accuracy of electric energy meters, which makes it difficult for power supply companies' electric energy meter maintenance personnel to unify calibration standards and manage calibration data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric energy meter calibration, and in particular to a remote online calibration method and system for hierarchical customer electric energy meters based on edge computing. Background Art

[0002] The energy meter is an important device for measuring electricity consumption. The existence and accumulation of operating errors in the energy meter will lead to metering disputes between customers and power supply units, affecting the power supply order and customer satisfaction. Regular calibration can ensure the accuracy of the energy meter and prevent inaccurate measurement caused by errors.

[0003] According to the circuit component characteristics of the energy meter, when the load on the client side fluctuates greatly, the energy meter is prone to be unable to adapt to the load change in time, and there is a problem of increased operating error of the energy meter; at the same time, factors such as ambient temperature and humidity will cause the drift of the circuit component parameters of the energy meter, thereby increasing the randomness of the operating error of the energy meter; faced with huge energy meter error data and complicated energy meter calibration work, how to achieve fast and effective remote calibration of the energy meter is a common problem.

[0004] In the existing disclosed invention technology, for example, the patent with application publication number CN112557997A discloses a mesh electric energy sensor system and an error verification method that are convenient for error verification. The mesh electric energy sensor system includes: a multi-level 1-input n-output electric energy array, each level of the 1-input n-output electric energy array includes a total electric energy sensor meter located on the incoming line side and n electric energy sensor sub-meters located on the outgoing line side, and a total electric energy sensor meter located on the incoming line side and n electric energy sensor sub-meters located on the outgoing line side constitute a relative energy conservation relationship; for two adjacent levels of 1-input n-output electric energy arrays, the electric energy sensor sub-meter located on the outgoing line side in the upper level 1-input n-output electric energy array is the total electric energy sensor meter located on the incoming line side of the lower level 1-input n-output electric energy array.

[0005] The above patent adopts a multi-level 1-input n-output electric energy array structure, which increases the manufacturing cost and maintenance cost of the system. The transmission timeliness of the huge electric energy array data is poor, which is not conducive to promotion and application in large-scale deployment, and has the problems described in the background technology. Summary of the invention

[0006] The technical problem to be solved by the present invention is that in the prior art, the real-time operating status errors of the electric energy meters are often different due to the different electricity consumption behaviors of the customers. At the same time, different customers have different requirements for the error accuracy of the electric energy meters, which makes it difficult for the power supply company's electric energy meter maintenance personnel to unify the calibration standards and manage the calibration data. A remote online calibration method and system for hierarchical customer electric energy meters based on edge computing are proposed.

[0007] In order to achieve the above object, the technical solution of the remote online calibration method of hierarchical customer electric energy meters based on edge computing of the present invention includes the following steps:

[0008] S1: Access the power supply database of the power supply company over the years and collect the historical power consumption data of customers in the power supply area;

[0009] S2: Build a customer classification decision model based on the historical electricity consumption data of electricity users, analyze the electricity consumption behavior of electricity users and complete the electricity consumption classification processing of electricity users;

[0010] S3: extracting the electric energy meter operation data of customers at each electricity consumption level, and importing the electric energy meter operation data into the operation error evaluation strategy to conduct real-time evaluation of the operation status of the electric energy meter;

[0011] S4: extracting the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and performing distributed transmission and storage processing on the extracted data through the edge data computing and storage center;

[0012] S5: Summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error verification algorithm according to the summary results.

[0013] Specifically, in S1, the historical electricity consumption data of the electricity user includes: electricity consumption data, electricity consumption time data, and abnormal electricity consumption behavior mark data;

[0014] In the Data collection unit time The power consumption data is ;

[0015] The electricity usage time data is , ;in, For customers in Data collection unit time The number of power interruptions recorded by the energy meter; and are the time points of the i-th and i+1-th power interruptions respectively;

[0016] The abnormal power consumption behavior mark data includes abnormal power fluctuation ratio , , among which, the customer's power load data is monitored in real time. When the load power fluctuation difference of the energy meter is greater than the power fluctuation threshold When the power consumption is abnormal, the current period is marked as abnormal power consumption behavior; For customers in Data collection unit time The total number of times the load power of the energy meter is marked as abnormal power consumption behavior; and are the maximum load power and the minimum load power during the period marked as abnormal power consumption behavior; The duration of the period marked as abnormal electricity usage behavior.

[0017] Specifically, S2 includes the following specific steps:

[0018] S21: Extract the historical electricity consumption data of electricity users, process missing values, outliers and data cleaning preprocessing for the historical electricity consumption data, and import the historical electricity consumption data into the standardization strategy for data standardization; the standardized historical electricity consumption data set is , where the standardization strategy is: ;in, and are the data before and after standardization, express Any one of; is the data mean of the historical electricity consumption data before standardization; They are respectively the maximum value data and the minimum value data in the historical electricity consumption data before standardization;

[0019] S22: constructing a customer classification decision model based on the historical electricity consumption data of the electricity user, and selecting the electricity consumption data in the standardized historical electricity consumption data set as the main classification feature to classify the historical electricity consumption data into the main decision data;

[0020] S23: recursively dividing the remaining historical electricity consumption data into hierarchical sub-decision data;

[0021] S24: Analyze the electricity consumption behavior of electricity users based on the fusion of S22-S23 and complete the electricity consumption classification processing of electricity users.

[0022] Specifically, the customer grading decision model includes: ID3 (Iterative Dichotomiser 3) customer grading decision model, C4.5 customer grading decision model and CART (Classification and Regression Trees) customer grading decision model.

[0023] Specifically, the S22 further includes the following specific steps:

[0024] S221: Calculate the Manhattan distance between the actual division result and the ideal division result of the hierarchical main decision data, and form a Manhattan distance sequence;

[0025] S222: Connect the data point set in the Manhattan distance sequence into a geometric function curve, and collect the derivative data set of the geometric function curve in real time; wherein the calculation strategy of the derivative data is as follows: ,in, Indicates that when the standardized historical electricity consumption data set D The derivative data obtained when grading the main features; The next data collection unit time Historical electricity consumption data of customers within the They are Corresponding customer grading decision-making related factors of different data collection units;

[0026] S223: Extract the derivative data set of the geometric function curve,

[0027] When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into different clusters, the hierarchical main decision data division is stopped and the hierarchical sub-decision data division is started;

[0028] When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into the same cluster, and the hierarchical main decision data division is continued;

[0029] in, Draw boundaries for your data.

[0030] Specifically, the customer clusters include: high-level customer level, middle-level customer level, low-level customer level and basic customer level.

[0031] Specifically, S3 includes the following specific steps:

[0032] S31: Monitor and extract the electric energy load data of the electric energy meters of customers of each electricity consumption level, wherein the electric energy load data includes:

[0033] Real-time power grid supply data set , Electric energy data set of the electric energy meter input interface , Customer actual power consumption data set ;

[0034] in, Indicates the real-time power supply data of the power grid during the nth monitoring period;

[0035] Represents the electric energy data of the electric energy meter input interface in the nth monitoring period;

[0036] Indicates the actual power consumption data of the customer in the nth monitoring period;

[0037] S32: Calculate the relative load offset according to S31 , wherein the relative load offset The specific calculation strategy is as follows:

[0038] ;

[0039] in, ;

[0040] They are the transmission loss coefficient of the power grid and the operation loss coefficient of the electric energy meter respectively;

[0041] S33: Extracting real-time operating environment data of electric energy meters of customers of each electricity consumption level, the electric energy load data includes: ambient temperature data set , Environmental humidity dataset , Energy consumption fluctuation dataset and fluctuation response duration dataset ;

[0042] in, The ambient temperature data of the electric energy meter in the nth monitoring period;

[0043] The humidity data of the environment where the electric energy meter is located in the nth monitoring period;

[0044] is the energy consumption difference between the n-1th monitoring period and the nth monitoring period;

[0045] is the fluctuation response duration of the n-1th monitoring period and the nth monitoring period;

[0046] S34: Calculate the delayed response offset according to S32 , wherein the delayed response bias The specific calculation strategy is as follows:

[0047] ;

[0048] in, They are the environmental temperature influence factor and the environmental humidity influence factor respectively;

[0049] S35: extracting the relative load deviation and the delayed response deviation, and importing them into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter.

[0050] Specifically, in S35, the operation error assessment strategy specifically includes:

[0051] ;

[0052] in, It is the operating error value of the electric energy meter in the nth monitoring period.

[0053] Specifically, in S4, the distributed transmission and storage processing of the extracted data by the edge data computing and storage center includes:

[0054] S41: extracting the electric energy meter operation error data of customers of each power consumption level obtained by real-time evaluation and substituting it into the data transmission energy consumption formula, and calculating the data transmission energy consumption of the electric energy meter operation error data in each power consumption level; wherein the data transmission energy consumption in each edge computing line is the sum of the data transmission bandwidth utilization rate and the data delay momentum;

[0055] S42: deploying a neural network algorithm model in the data transmission line of the advanced customer to predict in real time the operation error of the electric energy meter of the advanced customer in the next monitoring period;

[0056] S43: Clean the operation error data of the electric energy meter after edge calculation, and transmit it to the edge transmission node for data analysis and storage;

[0057] S44: Arrange the data transmission energy consumption data of the operation error data of the electric energy meters in each power consumption level in the edge transmission node in descending order, and transmit the operation error data of the electric energy meters in each power consumption level and the predicted operation error of the electric energy meters of high-level customers in the next monitoring period to the central server of the power supply company in proportion.

[0058] Specifically, the data transmission ratio of the advanced customer level is 100%; the data transmission ratio of the intermediate customer level is 50%; the data transmission ratio of the low customer level is 30%; and the data transmission ratio of the basic customer level is 10%.

[0059] Specifically, S5 includes the following specific steps:

[0060] S51: Summarize the analysis results of each edge transmission node in real time;

[0061] S52: Execute the corresponding electric energy meter error verification algorithm according to the summary result, extract all historical operation error data related to the customer's electric energy meter from the data storage library of the power supply company's central server, and form a historical operation error data set; calculate the data mean of the historical operation error data in the historical operation error data set in real time.

[0062] S53: The data average of the real-time operation error and the historical operation error data obtained in S51 is Perform difference comparison;

[0063] when When the customer's electric energy meter is detected, the customer's electric energy meter is automatically remotely checked for errors online, and the verification effect is repeated during the next monitoring period.

[0064] when When the real-time operation error data obtained by the aggregation is iteratively updated to the historical operation error data set, step S54 is executed at the same time;

[0065] The repeated verification process of the verification effect includes: comparing the operation error data of the electric energy meter in the next monitoring period Is it lower than the mean of the historical running error data after iterative update? , when the comparison result is less than, the online verification effect is verified to be qualified; otherwise, the power supply company needs to give priority to on-site verification work according to the classification level of the customer;

[0066] S54: extract the data in the historical operation error data set after iterative update, and perform cumulative summation on all historical operation error data. Compare the difference with the maximum error tolerance value of the customer's electric energy meter;

[0067] When the cumulative running error When the error is greater than or equal to the maximum error tolerance of the electric energy meter, the power supply company shall give priority to on-site calibration work according to the customer's classification level;

[0068] When the cumulative running error When it is less than the maximum error tolerance value of the electric energy meter, the process returns to step S53 to perform the electric energy meter operation error monitoring in the next monitoring period.

[0069] In addition, the hierarchical customer electric energy meter remote online verification system based on edge computing of the present invention includes the following modules:

[0070] Historical electricity consumption data collection module, customer classification module, electric energy meter operation status evaluation module, edge data calculation and transmission module, electric energy meter error verification module;

[0071] The historical electricity consumption data collection module is used to access the power supply database of the power supply company over the years and collect the historical electricity consumption data of the electricity users in the power supply area;

[0072] The customer classification module constructs a customer classification decision model based on the historical electricity consumption data of electricity users, analyzes the electricity consumption behavior of electricity users and completes the electricity consumption classification processing of electricity users;

[0073] The electric energy meter operation status evaluation module is used to extract the electric energy meter operation data of customers of each electricity consumption level, and import the electric energy meter operation data into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter;

[0074] The edge data calculation and transmission module is used to extract the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and perform distributed transmission and storage processing on the extracted data through the edge data calculation and storage center;

[0075] The electric energy meter error checking module is used to summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error checking algorithm according to the summary results.

[0076] Specifically, the electric energy meter error checking module includes: an analysis result summary unit, a summary result reading unit, an electric energy meter verification algorithm library, an electric energy meter verification algorithm selection unit, a verification effect return transmission unit and a verification effect repeated verification unit.

[0077] Compared with the prior art, the technical effects of the present invention are as follows:

[0078] 1. The present invention collects historical electricity consumption data and electricity meter operation data, evaluates the operation status of the electricity meter in real time, and promptly discovers potential error problems, which helps to improve the accuracy of electricity metering.

[0079] 2. The present invention constructs a customer classification decision model to classify electricity users, so that the error monitoring and verification of electric energy meters can be more targeted, thereby improving the efficiency and accuracy of the verification.

[0080] 3. The present invention adopts distributed transmission and storage processing technology, which can quickly and effectively process a large amount of electric energy meter operation error data, thereby improving the efficiency and reliability of data processing.

[0081] 4. The present invention utilizes edge computing technology to perform data analysis and processing at edge transmission nodes, which can reduce data transmission delays and bandwidth pressure, and improve the real-time performance and response speed of the system.

[0082] 5. The present invention executes the corresponding electric energy meter error verification algorithm according to the summary results, can timely discover the error problem of the electric energy meter, and take corresponding measures to correct it, thereby ensuring the accuracy and fairness of electric energy metering. At the same time, it simplifies the work of electric energy meter verification staff, saving manpower, material and financial resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0083] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0084] Figure 1 It is a flow chart of a remote online calibration method for hierarchical customer electric energy meters based on edge computing of the present invention;

[0085] Figure 2 It is a structural schematic diagram of the remote online verification system of the hierarchical customer electric energy meter based on edge computing of the present invention;

[0086] Figure 3 The present invention is a schematic diagram of grading electricity consumption of electricity users by constructing a customer grading decision model. DETAILED DESCRIPTION

[0087] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0088] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0089] Embodiment 1:

[0090] like Figure 1 , 3 As shown, the remote online verification method of the hierarchical customer electric energy meter based on edge computing in the embodiment of the present invention is as follows: Figure 1 As shown, the specific steps are as follows:

[0091] Take a quartz processing enterprise with an annual power consumption of 4 to 5 million kWh as an example. The electric energy meter in the factory is monitored in real time and remotely verified online. The specific steps are as follows:

[0092] S1: Access the power supply database of the power supply company over the years and collect the historical power consumption data of customers in the power supply area;

[0093] In S1, the historical electricity consumption data of the electricity user includes: electricity consumption data, electricity consumption time data, and abnormal electricity consumption behavior mark data;

[0094] In the Data collection unit time The power consumption data is ;

[0095] The electricity usage time data is , ;in, For customers in Data collection unit time The number of power interruptions recorded by the energy meter; and are the time points of the i-th and i+1-th power interruptions respectively;

[0096] The abnormal power consumption behavior mark data includes abnormal power fluctuation ratio , , among which, the customer's power load data is monitored in real time. When the load power fluctuation difference of the energy meter is greater than the power fluctuation threshold When the power consumption is abnormal, the current period is marked as abnormal power consumption behavior; For customers in Data collection unit time The total number of times the load power of the energy meter is marked as abnormal power consumption behavior; and are the maximum load power and the minimum load power during the period marked as abnormal power consumption behavior; The duration of the period marked as abnormal electricity usage behavior.

[0097] In this embodiment, the historical electricity consumption data of the quartz processing enterprise includes: , electricity usage time data and abnormal electricity usage behavior labeling data .

[0098] S2: Build a customer classification decision model based on the historical electricity consumption data of electricity users, analyze the electricity consumption behavior of electricity users and complete the electricity consumption classification processing of electricity users;

[0099] S2 includes the following specific steps:

[0100] S21: Extract the historical electricity consumption data of electricity users, process missing values, outliers and data cleaning preprocessing for the historical electricity consumption data, and import the historical electricity consumption data into the standardization strategy for data standardization; the standardized historical electricity consumption data set is , where the standardization strategy is: ;in, and are the data before and after standardization, express Any one of; is the data mean of the historical electricity consumption data before standardization; They are respectively the maximum value data and the minimum value data in the historical electricity consumption data before standardization;

[0101] S22: constructing a customer classification decision model based on the historical electricity consumption data of the electricity user, and selecting the electricity consumption data in the standardized historical electricity consumption data set as the main classification feature to classify the historical electricity consumption data into the main decision data;

[0102] S23: recursively dividing the remaining historical electricity consumption data into hierarchical sub-decision data;

[0103] S24: Analyze the electricity consumption behavior of electricity users based on the fusion of S22-S23 and complete the electricity consumption classification processing of electricity users.

[0104] Exemplarily, in this embodiment, the customer grading decision model is a C4.5 customer grading decision model.

[0105] The S22 further includes the following specific steps:

[0106] S221: Calculate the Manhattan distance between the actual division result and the ideal division result of the hierarchical main decision data, and form a Manhattan distance sequence;

[0107] S222: Connect the data point set in the Manhattan distance sequence into a geometric function curve, and collect the derivative data set of the geometric function curve in real time; wherein the calculation strategy of the derivative data is as follows: ,in, Indicates that when the standardized historical electricity consumption data set D The derivative data obtained when grading the main features; The next data collection unit time Historical electricity consumption data of customers within the They are Corresponding customer grading decision-making related factors of different data collection units;

[0108] S223: Extract the derivative data set of the geometric function curve,

[0109] When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into different clusters, the hierarchical main decision data division is stopped and the hierarchical sub-decision data division is started;

[0110] When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into the same cluster, and the hierarchical main decision data division is continued;

[0111] in, Draw boundaries for your data.

[0112] like Figure 3 As shown, exemplary, in this embodiment, when When used as the hierarchical main feature for hierarchical main decision data division, the remaining data As a first-class hierarchical sub-feature, it is used to divide the first-class hierarchical sub-decision data. The remaining data It automatically becomes a two-class classification sub-feature for dividing the two-class classification sub-decision data.

[0113] Preferably, the customer clusters include: high-level customer level, middle-level customer level, low-level customer level and basic customer level.

[0114] In this embodiment, the quartz processing enterprise is classified as a high-level customer through the customer classification decision model.

[0115] S3: extracting the electric energy meter operation data of customers at each electricity consumption level, and importing the electric energy meter operation data into the operation error evaluation strategy to conduct real-time evaluation of the operation status of the electric energy meter;

[0116] S3 includes the following specific steps:

[0117] S31: Monitor and extract the electric energy load data of the electric energy meters of customers of each electricity consumption level, wherein the electric energy load data includes:

[0118] Real-time power grid supply data set , Electric energy data set of the electric energy meter input interface , Customer actual power consumption data set ;

[0119] in, Indicates the real-time power supply data of the power grid during the nth monitoring period;

[0120] Represents the electric energy data of the electric energy meter input interface in the nth monitoring period;

[0121] Indicates the actual power consumption data of the customer in the nth monitoring period;

[0122] S32: Calculate the relative load offset according to S31 , wherein the relative load offset The specific calculation strategy is as follows:

[0123] ;

[0124] in, ;

[0125] They are the transmission loss coefficient of the power grid and the operation loss coefficient of the electric energy meter respectively;

[0126] Preferably, ;

[0127] In this embodiment, a relative load offset is provided. The specific calculation method is:

[0128] ;

[0129] S33: Extracting real-time operating environment data of electric energy meters of customers of each electricity consumption level, the electric energy load data includes: ambient temperature data set , Environmental humidity dataset , Energy consumption fluctuation dataset and fluctuation response duration dataset ;

[0130] in, The ambient temperature data of the electric energy meter in the nth monitoring period;

[0131] The humidity data of the environment where the electric energy meter is located in the nth monitoring period;

[0132] is the energy consumption difference between the n-1th monitoring period and the nth monitoring period;

[0133] is the fluctuation response duration of the n-1th monitoring period and the nth monitoring period;

[0134] S34: Calculate the delayed response offset according to S32 , wherein the delayed response bias The specific calculation strategy is as follows:

[0135] ;

[0136] in, They are the environmental temperature influence factor and the environmental humidity influence factor respectively;

[0137] S35: extracting the relative load deviation and the delayed response deviation, and importing them into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter.

[0138] In S35, the operation error assessment strategy specifically includes:

[0139] ;

[0140] in, It is the operating error value of the electric energy meter in the nth monitoring period.

[0141] S4: extracting the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and performing distributed transmission and storage processing on the extracted data through the edge data computing and storage center;

[0142] In S4, the distributed transmission and storage processing of the extracted data by the edge data computing and storage center includes:

[0143] S41: extracting the electric energy meter operation error data of customers of each power consumption level obtained by real-time evaluation and substituting it into the data transmission energy consumption formula, and calculating the data transmission energy consumption of the electric energy meter operation error data in each power consumption level; wherein the data transmission energy consumption in each edge computing line is the sum of the data transmission bandwidth utilization rate and the data delay momentum;

[0144] S42: deploying a neural network algorithm model in the data transmission line of the advanced customer to predict in real time the operation error of the electric energy meter of the advanced customer in the next monitoring period;

[0145] S43: Clean the operation error data of the electric energy meter after edge calculation, and transmit it to the edge transmission node for data analysis and storage;

[0146] S44: Arrange the data transmission energy consumption data of the operation error data of the electric energy meters in each power consumption level in the edge transmission node in descending order, and transmit the operation error data of the electric energy meters in each power consumption level and the predicted operation error of the electric energy meters of high-level customers in the next monitoring period to the central server of the power supply company in proportion.

[0147] Specifically, the data transmission ratio of the advanced customer level is 100%; the data transmission ratio of the intermediate customer level is 50%; the data transmission ratio of the low customer level is 30%; and the data transmission ratio of the basic customer level is 10%.

[0148] In this embodiment, the quartz processing factory belongs to the advanced customer level, and the corresponding data transmission ratio is 100%.

[0149] S5: Summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error verification algorithm according to the summary results.

[0150] S5 includes the following specific steps:

[0151] S51: Summarize the analysis results of each edge transmission node in real time;

[0152] S52: Execute the corresponding electric energy meter error verification algorithm according to the summary result, extract all historical operation error data related to the customer's electric energy meter from the data storage library of the power supply company's central server, and form a historical operation error data set; calculate the data mean of the historical operation error data in the historical operation error data set in real time.

[0153] S53: The data average of the real-time operation error and the historical operation error data obtained in S51 is Perform difference comparison;

[0154] when When the customer's electric energy meter is detected, the customer's electric energy meter is automatically remotely checked for errors online, and the verification effect is repeated during the next monitoring period.

[0155] when When the real-time operation error data obtained by the aggregation is iteratively updated to the historical operation error data set, step S54 is executed at the same time;

[0156] The repeated verification process of the verification effect includes: comparing the operation error data of the electric energy meter in the next monitoring period Is it lower than the mean of the historical running error data after iterative update? , when the comparison result is less than, the online verification effect is verified to be qualified; otherwise, the power supply company needs to give priority to on-site verification work according to the classification level of the customer;

[0157] S54: extract the data in the historical operation error data set after iterative update, and perform cumulative summation on all historical operation error data. Compare the difference with the maximum error tolerance value of the customer's electric energy meter;

[0158] When the cumulative running error When the error is greater than or equal to the maximum error tolerance of the electric energy meter, the power supply company shall give priority to on-site calibration work according to the customer's classification level;

[0159] When the cumulative running error When it is less than the maximum error tolerance value of the electric energy meter, return to step S53 to perform the electric energy meter operation error monitoring in the next monitoring period;

[0160] Preferably, in this embodiment, the maximum error tolerance value of the customer's electric energy meter is preset by those skilled in the art according to the actual operation requirements of the electric energy meter.

[0161] Embodiment 2:

[0162] The remote online verification system of the hierarchical customer electric energy meter based on edge computing in the embodiment of the present invention is as follows: Figure 2As shown, it includes the following modules:

[0163] Historical electricity consumption data collection module, customer classification module, electric energy meter operation status evaluation module, edge data calculation and transmission module, electric energy meter error verification module;

[0164] The historical electricity consumption data collection module is used to access the power supply database of the power supply company over the years and collect the historical electricity consumption data of the electricity users in the power supply area;

[0165] The customer classification module constructs a customer classification decision model based on the historical electricity consumption data of electricity users, analyzes the electricity consumption behavior of electricity users and completes the electricity consumption classification processing of electricity users;

[0166] The electric energy meter operation status evaluation module is used to extract the electric energy meter operation data of customers of each electricity consumption level, and import the electric energy meter operation data into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter;

[0167] The edge data calculation and transmission module is used to extract the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and perform distributed transmission and storage processing on the extracted data through the edge data calculation and storage center;

[0168] The electric energy meter error checking module is used to summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error checking algorithm according to the summary results.

[0169] The electric energy meter error checking module comprises: an analysis result summary unit, a summary result reading unit, an electric energy meter verification algorithm library, an electric energy meter verification algorithm selection unit, a verification effect return transmission unit and a verification effect repeated verification unit.

[0170] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0171] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.

[0172] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0173] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only one, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0174] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0175] In summary, compared with the prior art, the technical effects of the present invention are as follows:

[0176] 1. The present invention collects historical electricity consumption data and electricity meter operation data, evaluates the operation status of the electricity meter in real time, and promptly discovers potential error problems, which helps to improve the accuracy of electricity metering.

[0177] 2. The present invention constructs a customer classification decision model to classify electricity users, so that the error monitoring and verification of electric energy meters can be more targeted, thereby improving the efficiency and accuracy of the verification.

[0178] 3. The present invention adopts distributed transmission and storage processing technology, which can quickly and effectively process a large amount of electric energy meter operation error data, thereby improving the efficiency and reliability of data processing.

[0179] 4. The present invention utilizes edge computing technology to perform data analysis and processing at edge transmission nodes, which can reduce data transmission delays and bandwidth pressure, and improve the real-time performance and response speed of the system.

[0180] 5. The present invention executes the corresponding electric energy meter error verification algorithm according to the summary results, can timely discover the error problem of the electric energy meter, and take corresponding measures to correct it, thereby ensuring the accuracy and fairness of electric energy metering. At the same time, it simplifies the work of electric energy meter verification staff, saving manpower, material and financial resources.

[0181] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A remote online calibration method for hierarchical customer electric energy meters based on edge computing, characterized in that: The method comprises the following specific steps: S1: Access the power supply database of the power supply company over the years and collect the historical power consumption data of customers in the power supply area; S2: Build a customer classification decision model based on the historical electricity consumption data of electricity users, analyze the electricity consumption behavior of electricity users and complete the electricity consumption classification processing of electricity users; S3: extracting the electric energy meter operation data of customers at each electricity consumption level, and importing the electric energy meter operation data into the operation error evaluation strategy to conduct real-time evaluation of the operation status of the electric energy meter; S4: extracting the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and performing distributed transmission and storage processing on the extracted data through the edge data computing and storage center; S5: Summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error verification algorithm according to the summary results; S3 includes the following specific steps: S31: Monitor and extract the electric energy load data of the electric energy meters of customers of each electricity consumption level, wherein the electric energy load data includes: Real-time power grid supply data set , Electric energy data set of the electric energy meter input interface , Customer actual power consumption data set ; in, Indicates the real-time power supply data of the power grid during the nth monitoring period; Represents the electric energy data of the electric energy meter input interface in the nth monitoring period; Indicates the actual power consumption data of the customer in the nth monitoring period; S32: Calculate the relative load offset according to S31 , wherein the relative load offset The specific calculation strategy is as follows: ; in, ; They are the transmission loss coefficient of the power grid and the operation loss coefficient of the electric energy meter respectively; S33: Extracting real-time operating environment data of electric energy meters of customers of each electricity consumption level, the electric energy load data includes: ambient temperature data set , Environmental humidity dataset , Energy consumption fluctuation dataset and fluctuation response duration dataset ; in, The ambient temperature data of the electric energy meter in the nth monitoring period; The humidity data of the environment where the electric energy meter is located in the nth monitoring period; is the energy consumption difference between the n-1th monitoring period and the nth monitoring period; is the difference in the duration of fluctuation response between the n-1th monitoring period and the nth monitoring period; S34: Calculate the delayed response offset according to S32 , wherein the delayed response bias The specific calculation strategy is as follows: ; in, They are the environmental temperature influence factor and the environmental humidity influence factor respectively; S35: extracting the relative load deviation and the delayed response deviation, and importing them into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter.

2. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 1 is characterized in that: In S1, the historical electricity consumption data of the electricity user includes: electricity consumption data, electricity consumption time data, and abnormal electricity consumption behavior mark data; In the Data collection unit time The power consumption data is ; The electricity usage time data is , ;in, For customers in Data collection unit time The number of power interruptions recorded by the energy meter; and are the time points of the i-th and i+1-th power interruptions respectively; The abnormal power consumption behavior mark data includes abnormal power fluctuation ratio , , among which, the customer's power load data is monitored in real time. When the load power fluctuation difference of the energy meter is greater than the power fluctuation threshold When the power consumption is abnormal, the current period is marked as abnormal power consumption behavior; For customers in Data collection unit time The total number of times the load power of the energy meter is marked as abnormal power consumption behavior; and are the maximum load power and the minimum load power during the period marked as abnormal power consumption behavior; The duration of the period marked as abnormal electricity usage behavior.

3. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 2 is characterized in that: S2 includes the following specific steps: S21: extracting the historical electricity consumption data of electricity users, pre-processing the historical electricity consumption data, and importing the historical electricity consumption data into the standardization strategy for data standardization; the standardized historical electricity consumption data set is , where the standardization strategy is: ;in, and are the data before and after standardization, express Any of the following: is the data mean of the historical electricity consumption data before standardization; They are respectively the maximum value data and the minimum value data in the historical electricity consumption data before standardization; S22: constructing a customer classification decision model based on the historical electricity consumption data of the electricity user, and selecting the electricity consumption data in the standardized historical electricity consumption data set as the main classification feature to classify the historical electricity consumption data into the main decision data; S23: recursively dividing the remaining historical electricity consumption data into hierarchical sub-decision data; S24: Analyze the electricity consumption behavior of electricity users based on the fusion of S22-S23 and complete the electricity consumption classification processing of electricity users.

4. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 3 is characterized in that: The S22 further includes the following specific steps: S221: Calculate the Manhattan distance between the actual division result and the ideal division result of the hierarchical main decision data, and form a Manhattan distance sequence; S222: Connect the data point set in the Manhattan distance sequence into a geometric function curve, and collect the derivative data set of the geometric function curve in real time; wherein the calculation strategy of the derivative data is as follows: ,in, Indicates that when the standardized historical electricity consumption data set D The derivative data obtained when grading the main features; The next data collection unit time Historical electricity consumption data of customers within the They are Corresponding customer grading decision-making related factors of different data collection units; S223: Extract the derivative data set of the geometric function curve, When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into different clusters, the hierarchical main decision data division is stopped and the hierarchical sub-decision data division is started; When the derivative data When , the historical electricity consumption data collected by the cth and c+1th data collection units are divided into the same cluster, and the hierarchical main decision data division is continued; in, Draw boundaries for your data.

5. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 1 is characterized in that: In S35, the operation error assessment strategy specifically includes: ; in, It is the operating error value of the electric energy meter in the nth monitoring period.

6. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 5 is characterized in that: In S4, the distributed transmission and storage processing of the extracted data by the edge data computing and storage center includes: S41: extract the electric energy meter operation error data of customers of each power consumption level obtained by real-time evaluation and substitute it into the data transmission energy consumption formula, and calculate the data transmission energy consumption of the electric energy meter operation error data in each power consumption level respectively; wherein the data transmission energy consumption in each edge computing line is the sum of the data transmission bandwidth utilization rate and the data delay momentum; S42: deploying a neural network algorithm model in the data transmission line of the advanced customer to predict in real time the operation error of the electric energy meter of the advanced customer in the next monitoring period; S43: Clean the operation error data of the electric energy meter after edge calculation, and transmit it to the edge transmission node for data analysis and storage; S44: Arrange the data transmission energy consumption data of the operation error data of the electric energy meters in each power consumption level in the edge transmission node in descending order, and transmit the operation error data of the electric energy meters in each power consumption level and the predicted operation error of the electric energy meters of high-level customers in the next monitoring period to the central server of the power supply company in proportion.

7. The remote online verification method for hierarchical customer electric energy meters based on edge computing according to claim 6 is characterized in that: S5 includes the following specific steps: S51: Summarize the analysis results of each edge transmission node in real time; S52: Execute the corresponding electric energy meter error verification algorithm according to the summary result, extract all historical operation error data related to the customer's electric energy meter from the data storage library of the power supply company's central server, and form a historical operation error data set; calculate the data mean of the historical operation error data in the historical operation error data set in real time. ; S53: The data average of the real-time operation error and the historical operation error data obtained in S51 is Perform difference comparison; when When the customer's electric energy meter is detected, the customer's electric energy meter is automatically remotely checked for errors online, and the verification effect is repeated during the next monitoring period. when When the real-time operation error data obtained by the aggregation is iteratively updated to the historical operation error data set, step S54 is executed at the same time; The repeated verification process of the verification effect includes: comparing the operation error data of the electric energy meter in the next monitoring period Is it lower than the mean of the historical running error data after iterative update? , when the comparison result is less than, the online verification effect is verified to be qualified; otherwise, the power supply company needs to give priority to on-site verification work according to the classification level of the customer; S54: extract the data in the historical operation error data set after iterative update, and perform cumulative summation on all historical operation error data. Compare the difference with the maximum error tolerance value of the customer's electric energy meter; When the cumulative running error When the error is greater than or equal to the maximum error tolerance of the electric energy meter, the power supply company shall give priority to on-site calibration work according to the customer's classification level; When the cumulative running error When it is less than the maximum error tolerance value of the electric energy meter, return to step S53 to perform the electric energy meter operation error monitoring in the next monitoring period.

8. A remote online calibration system for hierarchical customer electric energy meters based on edge computing, which is implemented based on the remote online calibration method for hierarchical customer electric energy meters based on edge computing as described in any one of claims 1 to 7, characterized in that: The system includes the following modules: Historical electricity consumption data collection module, customer classification module, electric energy meter operation status evaluation module, edge data calculation and transmission module, electric energy meter error verification module; The historical electricity consumption data collection module is used to access the power supply database of the power supply company over the years and collect the historical electricity consumption data of the electricity users in the power supply area; The customer classification module constructs a customer classification decision model based on the historical electricity consumption data of electricity users, analyzes the electricity consumption behavior of electricity users and completes the electricity consumption classification processing of electricity users; The electric energy meter operation status evaluation module is used to extract the electric energy meter operation data of customers of each electricity consumption level, and import the electric energy meter operation data into the operation error evaluation strategy to perform real-time evaluation on the operation status of the electric energy meter; The edge data calculation and transmission module is used to extract the electric energy meter error monitoring point data obtained by real-time evaluation and the historical electricity consumption data of the electricity users corresponding to the electric energy meter, and perform distributed transmission and storage processing on the extracted data through the edge data calculation and storage center; The electric energy meter error checking module is used to summarize the analysis results of each edge transmission node in real time, and execute the corresponding electric energy meter error checking algorithm according to the summary results.

9. The hierarchical customer electric energy meter remote online verification system based on edge computing according to claim 8 is characterized in that: The electric energy meter error checking module comprises: an analysis result summary unit, a summary result reading unit, an electric energy meter verification algorithm library, an electric energy meter verification algorithm selection unit, a verification effect return transmission unit and a verification effect repeated verification unit.

Citation Information

Cited By

  • Electronic electric energy meter intelligent data processing system and method based on remote communication

    CN121188040A

  • An electronic electric energy meter intelligent data processing system and method based on remote communication

    CN121188040B