Park asset monitoring method and system based on intelligent operation and maintenance platform

Through the integrated adjustment and risk analysis model of the intelligent operation and maintenance platform, combined with multiple sensor data, the asset management problems of large parks are solved, accurate monitoring and risk prediction of park assets are achieved, and the risk of asset loss is reduced.

CN118521156BActive Publication Date: 2024-11-22广州市易纬电子有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410648737.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2024-11-22
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

The existing intelligent operation and maintenance platform is difficult to achieve real-time monitoring and effective management when managing assets in large parks, resulting in an increase in the risk of asset loss, especially during park construction.

Method used

Obtain park monitoring information through an intelligent operation and maintenance platform, integrate asset equipment monitoring information, use risk analysis models to predict asset risks, and combine multiple sensor data to compensate data to improve data integration and monitoring accuracy.

Benefits of technology

It realizes reliable and accurate monitoring of park assets, reduces the risk of asset loss, and improves operation and maintenance management efficiency and data integration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118521156B_ABST
    Figure CN118521156B_ABST
Patent Text Reader

Abstract

The present application relates to a park asset monitoring method and system based on an intelligent operation and maintenance platform, the method comprising obtaining park monitoring information, the park monitoring information comprising asset equipment monitoring information and park operation and maintenance monitoring information; based on the park operation and maintenance monitoring information, integrating and adjusting the asset equipment monitoring information to obtain integrated asset equipment monitoring information; dividing the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset-related monitoring information; obtaining park construction project information, inputting the asset-related monitoring information and the park construction project information into a preset risk analysis model, obtaining asset risk information based on the risk analysis model; and providing an alarm reminder based on the asset risk information. The present application has the effect of strengthening the monitoring and management of park assets.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent operation and maintenance platforms, and in particular to a park asset monitoring method and system based on an intelligent operation and maintenance platform. Background Art

[0002] At present, with the development of information technology, the traditional operation and maintenance management model can no longer meet the development requirements of enterprises in the Internet era. In order to ensure the sustainable development of enterprises in the Internet era and break the drawbacks of the traditional operation and maintenance management model, it is necessary to establish a new operation and maintenance management model based on technologies such as "cloud computing", "big data" and "artificial intelligence". Therefore, the intelligent operation and maintenance platform organically combines the traditional operation and maintenance management model with new generation information technologies such as cloud computing, big data and the Internet of Things, and integrates digital monitoring systems, access control management systems, fire alarm systems, and data center asset management systems, thereby improving the production and operation efficiency of the park, improving the park's information level and innovation capabilities, and enabling the park to respond quickly to market changes and efficiently integrate resources.

[0003] In the related technologies, the data center asset management system in the intelligent operation and maintenance platform provides functions such as multi-condition advanced search and rapid location of equipment, integrates scattered management information and automatic statistics functions, optimizes the efficiency of information interaction, and makes equipment assets traceable and maintained through centralized asset management of projects to avoid asset loss. However, in the face of large-scale parks with many enterprises and complex situations, the data center asset management system in the related technologies is difficult to manage and monitor the assets and equipment in the park as a whole, which can easily lead to delayed asset monitoring or directly cause asset losses in the park. In addition, when upgrading and renovating the park, more assets and more personnel need to be introduced due to the need to carry out construction projects in the park, further increasing the risk of asset losses in the park. Summary of the invention

[0004] In order to strengthen the monitoring and management of park assets, the present application provides a park asset monitoring method and system based on an intelligent operation and maintenance platform.

[0005] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:

[0006] A park asset monitoring method based on an intelligent operation and maintenance platform, the park asset monitoring method based on the intelligent operation and maintenance platform comprising:

[0007] Obtaining park monitoring information, wherein the park monitoring information includes asset equipment monitoring information and park operation and maintenance monitoring information;

[0008] Based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain integrated asset equipment monitoring information;

[0009] Dividing the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset-related monitoring information;

[0010] Acquire park construction project information, input the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model;

[0011] An alarm reminder is issued based on the asset risk information.

[0012] By adopting the above technical solutions, the assets in the park using the intelligent operation and maintenance platform are generally immovable industrial equipment assets, and can also include some movable industrial equipment assets. The park operation and maintenance management personnel can customize the asset scope in the park, that is, which equipment or objects in the park are included in the park's assets. In addition, there are multiple different types of sensors installed in the park using the intelligent operation and maintenance platform, and different systems have different sensors. The sensors corresponding to the data center asset management system may include equipment operation status monitoring sensors, surveillance video equipment, and indoor environment sensors, etc. However, because the sensor equipment corresponding to the data center asset management system may have different communication protocols, the intelligent operation and maintenance platform connects intelligent devices with different communication protocols. When asset data is managed centrally, some data may not be accurately converted or transmitted due to factors such as differences between protocols during the actual data transmission and analysis process, thereby reducing data integration. Therefore, the sensor data of the corresponding data center asset management system is compensated by the operation and maintenance data of other systems in the park to improve data integration, thereby improving the accuracy and reliability of asset monitoring. In addition, in order to strengthen the monitoring of park assets, in addition to using the sensor data of the corresponding data center asset management system, it is also possible to combine the sensor data of the entire park and use risk analysis model risk prediction to further strengthen the monitoring and management of park assets, thereby achieving effective, reliable and accurate asset monitoring of park assets.

[0013] In a preferred example, the present application may be further configured as follows: based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain the integrated asset equipment monitoring information, specifically including:

[0014] Inputting the asset equipment monitoring information into an information integration analysis model, and obtaining information integration based on the information integration analysis model;

[0015] According to the information integration level, the asset equipment monitoring information is integrated and adjusted using the park operation and maintenance monitoring information to obtain integrated asset equipment monitoring information.

[0016] By adopting the above technical solution, before making integrated adjustments to the asset equipment monitoring information, it is necessary to first determine the integration degree of the asset equipment monitoring information. The integrated judgment of the asset equipment monitoring information includes judgments from multiple different angles, for example, judging the degree to which the data collected by the sensor can be integrated and managed, that is, in the data center asset management system, the corresponding monitoring data of sensors including temperature sensors, humidity sensors, light sensors and smoke sensors are used to collect indoor temperature, humidity, light intensity and smoke concentration data. If the data collected by these sensors can be effectively integrated together to form a comprehensive data stream, the environmental conditions of a certain device can be fully understood through this data stream, and corresponding control decisions can be made accordingly, such as adjusting the air conditioning temperature, turning on the humidifier or lighting equipment, etc. Therefore, the proportion of sensor monitoring data corresponding to the same asset equipment that is integrated to determine the status parameters of the asset equipment can be used as the integration degree of the asset equipment monitoring information. Based on this, the integration level of asset equipment monitoring information is determined through an integrated analysis model, and then the asset equipment monitoring information is integrated and adjusted using the park operation and maintenance monitoring information according to the integration level of the asset equipment monitoring information. For example, the park operation and maintenance monitoring information representing the sensor monitoring data of other systems is added to the data stream used to determine the status parameters of the asset equipment, so that the judgment of the status parameters of the asset equipment is more accurate, ensuring effective and reliable monitoring of the park assets and equipment. After obtaining highly integrated monitoring information based on the data stream used to determine the status parameters of the asset equipment and determining the type of monitoring data missing in the data stream, if highly accurate and reliable monitoring of the park assets and equipment is to be achieved, it is also possible to determine, based on the monitoring data of the sensors in each park, which asset equipment status parameters each sensor monitoring data is suitable for, thereby further enriching the data stream used to determine the status parameters of the asset equipment, thereby further improving the reliability of monitoring and management of park assets.

[0017] In a preferred example, the present application may be further configured as follows: the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain asset-related monitoring information, specifically including:

[0018] Based on the preset asset equipment correlation relationship, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain several groups of related monitoring information;

[0019] The several groups of related monitoring information are correlated to obtain asset-related monitoring information.

[0020] By adopting the above technical solution, after the integrated asset equipment monitoring information is obtained, the integrated asset equipment monitoring information includes highly integrated monitoring information obtained by judging the type of monitoring data missing in the data stream based on the data stream used to judge the status parameters of the asset equipment, and sensor monitoring data suitable for judging the status parameters of the asset equipment based on the monitoring data of the sensors in each park. Therefore, the integrated asset equipment monitoring information covers all monitoring data types that can be used to judge the status parameters of the asset equipment. Some monitoring data may seem to be not directly related to the safety of the asset equipment, but after multiple layers of association, such monitoring data can be used to judge the status parameters of the asset equipment, and the asset equipment correlation refers to the correlation used to judge each type of sensor monitoring data in judging the status parameters of the asset equipment. Therefore, by dividing the integrated asset equipment monitoring information through the asset equipment correlation and then performing correlation association, the status parameters of the asset equipment can be directly judged according to the associated asset-related monitoring information, thereby achieving a more comprehensive and accurate judgment of the status parameters of the asset equipment.

[0021] In a preferred example, the present application may be further configured as follows: the acquisition of park construction project information, inputting the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtaining asset risk information based on the risk analysis model, specifically includes:

[0022] Obtaining park construction project information, and obtaining new equipment information and project plan information based on the park construction project information;

[0023] Inputting the newly added equipment information into the integrated analysis model to obtain the newly added equipment-related monitoring information;

[0024] The asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information are input into a preset risk analysis model, and asset risk information is obtained based on the risk analysis model.

[0025] By adopting the above technical solution, when the construction project starts in the park, a large number of assets and equipment different from the original assets and equipment in the park and construction workers will enter the site. For the park's asset and equipment management, these newly added assets and equipment are also the park's assets and equipment when they are operating in the park. Therefore, these assets and equipment also need to be supervised and managed. However, since these assets and equipment are only temporarily and accidentally parked in the park, and the integrated supervision of these assets and equipment through the Unicom communication protocol requires updating the data center asset management system of the intelligent operation and maintenance platform and establishing communication between these assets and equipment and the intelligent operation and maintenance platform. Later, when the construction project is completed, these assets and equipment need to be deleted from the intelligent operation and maintenance platform. Therefore, for The supervision of these new assets and equipment should adopt a simpler method that is different from that of the original assets and equipment in the park. Based on this, the new equipment information is input into the integrated analysis model. The integrated analysis model analyzes the new equipment information and determines the parameter type used to determine the status parameters of the new assets and equipment from the perspective of the asset equipment location and asset equipment purpose represented by the new equipment information, thereby obtaining the new equipment-related monitoring information. Based on this, the asset-related monitoring information, the new equipment-related monitoring information and the project plan information are input into the preset risk analysis model. Through the risk prediction function of the risk analysis model, the monitoring management and risk analysis of the original assets and equipment and the new assets and equipment in the park are realized, and the monitoring and management of the park's assets are further strengthened.

[0026] In a preferred example, the present application may be further configured as follows: the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information are input into a preset risk analysis model, and asset risk information is obtained based on the risk analysis model, specifically including:

[0027] Inputting the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtaining park equipment control information based on the risk analysis model;

[0028] Control feedback information is acquired based on the park equipment control information, and asset risk information is acquired based on the risk analysis model and the control feedback information.

[0029] By adopting the above technical solution, the park equipment control information refers to the control information that determines the status parameters of the asset equipment by controlling the changes in the operating parameters of the asset equipment. For example, when there is a conflicting relationship between the park's video surveillance equipment and the monitoring of the corresponding park asset equipment due to a blind spot, the monitoring range of the video surveillance equipment is changed to achieve the monitoring of the park's asset equipment. Or, when there is a conflicting relationship between the park's video surveillance equipment and the monitoring of the corresponding park asset equipment due to a blind spot, if the monitoring range of the video surveillance equipment cannot be changed, other video surveillance equipment can be called to achieve the monitoring of the park's asset equipment. Therefore, through the risk analysis model, the missing parameter data for the comprehensive monitoring of the status parameters of the asset equipment is judged, and then through the analysis of the park construction project information and the asset-related monitoring information, it is judged that the called sensor equipment or monitoring equipment can be used, and then the park equipment control information is generated. After the park equipment control information is generated, the corresponding equipment is controlled based on the park equipment control information, and the missing parameter data for the comprehensive monitoring of the status parameters of the asset equipment is supplemented according to the obtained control feedback information, so as to achieve comprehensive and accurate monitoring of the park's assets and equipment.

[0030] In a preferred example, the present application can be further configured as follows: the risk analysis model is generated by:

[0031] Obtain historical park monitoring information, historical construction project information, and historical risk accident information;

[0032] A preset park learning model is trained based on the historical park monitoring information, the historical construction project information and the historical risk accident information to obtain a risk analysis model.

[0033] By adopting the above technical solution, the risk analysis model is used to determine the loss risk of assets and equipment in the current park, including risk analysis of asset loss and risk analysis of asset damage caused by failure. Therefore, the training samples of the risk analysis model include historical park monitoring information, historical inspection project information and historical risk accident information, among which the historical risk accident information includes accident information of asset loss and accident information of asset damage caused by failure. The historical park monitoring information includes monitoring information of asset operation status and monitoring information for asset safety. Through historical park monitoring information, historical construction project information and historical risk accident information, the preset park learning model is trained for risk assessment of asset loss and damage to generate a risk analysis model.

[0034] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0035] A park asset monitoring system based on an intelligent operation and maintenance platform, the park asset monitoring system based on the intelligent operation and maintenance platform comprising:

[0036] An information acquisition module is used to acquire park monitoring information, wherein the park monitoring information includes asset equipment monitoring information and park operation and maintenance monitoring information;

[0037] An integrated adjustment module, used to perform integrated adjustment on the asset equipment monitoring information based on the park operation and maintenance monitoring information to obtain integrated asset equipment monitoring information;

[0038] An associated division module, used to divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset associated monitoring information;

[0039] A risk analysis module, used to obtain park construction project information, input the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model;

[0040] The alarm reminder module is used to issue an alarm reminder based on the asset risk information.

[0041] Optionally, the integrated adjustment module includes:

[0042] An integration analysis submodule, used for inputting the asset equipment monitoring information into an information integration analysis model, and obtaining information integration based on the information integration analysis model;

[0043] The integrated adjustment submodule is used to perform integrated adjustment on the asset equipment monitoring information using the park operation and maintenance monitoring information according to the information integration level to obtain integrated asset equipment monitoring information.

[0044] In the third aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0045] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned park asset monitoring method based on the intelligent operation and maintenance platform are implemented.

[0046] In a fourth aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:

[0047] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned park asset monitoring method based on an intelligent operation and maintenance platform.

[0048] In summary, the present application includes at least one of the following beneficial technical effects:

[0049] 1. The assets in the park using the intelligent operation and maintenance platform are generally immovable industrial equipment assets, and can also include some movable industrial equipment assets. The park operation and maintenance managers can customize the asset scope in the park, that is, which equipment or objects in the park are included in the park's assets. In addition, there are multiple different types of sensors installed in the park using the intelligent operation and maintenance platform, and different systems have different sensors. The sensors corresponding to the data center asset management system may include equipment operation status monitoring sensors, surveillance video equipment, and indoor environment sensors, etc. However, because the sensor devices corresponding to the data center asset management system may have different communication protocols, the intelligent operation and maintenance platform connects intelligent devices with different communication protocols to centralize asset data. When managing data, due to factors such as differences between protocols during the actual data transmission and analysis process, some data may not be accurately converted or transmitted, thereby reducing the integration of data. Therefore, the operation and maintenance data of other systems in the park are used to compensate the sensor data of the corresponding data center asset management system to improve data integration, thereby improving the accuracy and reliability of asset monitoring. In addition, in order to strengthen the monitoring of park assets, in addition to using the sensor data of the corresponding data center asset management system, it is also possible to combine the sensor data of the entire park and use the risk prediction of the risk analysis model to further strengthen the monitoring and management of park assets, thereby achieving effective, reliable and accurate asset monitoring of park assets.

[0050] 2. Before making integrated adjustments to the asset equipment monitoring information, we must first determine the integration level of the asset equipment monitoring information. The integrated judgment of the asset equipment monitoring information includes judgments from multiple different angles, for example, judging the degree to which the data collected by the sensor can be integrated and managed. That is, in the data center asset management system, the corresponding monitoring data of sensors such as temperature sensors, humidity sensors, light sensors and smoke sensors are used to collect indoor temperature, humidity, light intensity and smoke concentration data. If the data collected by these sensors can be effectively integrated to form a comprehensive data stream, this data stream can be used to fully understand the environmental conditions of a certain device and make corresponding control decisions accordingly, such as adjusting the air-conditioning temperature, turning on a humidifier or lighting equipment, etc. Therefore, the proportion of sensor monitoring data corresponding to the same asset equipment that is integrated to determine the status parameters of the asset equipment can be used as the integration level of the asset equipment monitoring information. Based on this, the The integration degree of asset equipment monitoring information is judged through the integrated analysis model, and then the asset equipment monitoring information is integratedly adjusted using the park operation and maintenance monitoring information according to the integration degree of the asset equipment monitoring information. For example, the park operation and maintenance monitoring information representing the sensor monitoring data of other systems is added to the data stream used to judge the status parameters of the asset equipment, so that the judgment of the status parameters of the asset equipment is more accurate, and the effective and reliable monitoring of the park assets and equipment is guaranteed. After obtaining the highly integrated monitoring information based on the data stream used to judge the status parameters of the asset equipment, the type of monitoring data missing in the data stream is judged. If highly accurate and reliable monitoring of the park assets and equipment is to be achieved, it is also possible to judge from the monitoring data of the sensors in each park which asset equipment each type of sensor monitoring data is suitable for judging the status parameters of, thereby further enriching the data stream used to judge the status parameters of the asset equipment, thereby further improving the reliability of monitoring and management of park assets;

[0051] 3. After the integrated asset equipment monitoring information is obtained, the integrated asset equipment monitoring information includes highly integrated monitoring information obtained by judging the type of monitoring data missing from the data stream based on the data stream used to judge the status parameters of the asset equipment, and sensor monitoring data suitable for judging the status parameters of the asset equipment based on the monitoring data of the sensors in each park. Therefore, the integrated asset equipment monitoring information covers all monitoring data types that can be used to judge the status parameters of the asset equipment. Some monitoring data may not seem to be directly related to the safety of the asset equipment, but after multiple layers of association, such monitoring data can be used to judge the status parameters of the asset equipment, and the asset equipment correlation refers to the correlation used to judge each type of sensor monitoring data in judging the status parameters of the asset equipment. Therefore, by dividing the integrated asset equipment monitoring information through the asset equipment correlation and then performing correlation association, the status parameters of the asset equipment can be directly judged according to the associated asset-related monitoring information, thereby achieving a more comprehensive and accurate judgment of the status parameters of the asset equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a flow chart of an implementation of a park asset monitoring method based on an intelligent operation and maintenance platform in an embodiment of the present application;

[0053] Figure 2 It is a flowchart for implementing S20 of the park asset monitoring method based on the intelligent operation and maintenance platform in the embodiment of the present application;

[0054] Figure 3 It is a flowchart for implementing S30 of the park asset monitoring method based on the intelligent operation and maintenance platform in the embodiment of the present application;

[0055] Figure 4 It is a flowchart for implementing S40 of the park asset monitoring method based on the intelligent operation and maintenance platform in the embodiment of the present application;

[0056] Figure 5 It is a flowchart for implementing S43 of the park asset monitoring method based on the intelligent operation and maintenance platform in the embodiment of the present application;

[0057] Figure 6 is a flow chart for realizing a method for generating a risk analysis model in an embodiment of the present application;

[0058] Figure 7 It is a principle block diagram of a park asset monitoring system based on an intelligent operation and maintenance platform in an embodiment of the present application;

[0059] Figure 8 It is a diagram of the internal structure of a computer device in an embodiment of the present application. DETAILED DESCRIPTION

[0060] The following is combined with Figure 1-8 This application is described in further detail.

[0061] In one embodiment, if Figure 1 As shown, the present application discloses a park asset monitoring method based on an intelligent operation and maintenance platform, which specifically includes the following steps:

[0062] S10: Obtaining park monitoring information, which includes asset equipment monitoring information and park operation and maintenance monitoring information.

[0063] In this embodiment, the park asset monitoring method based on the intelligent operation and maintenance platform is applied to the intelligent operation and maintenance platform, and the intelligent operation and maintenance platform is applied to an industrial park, such as an Internet of Things industrial park. There are various buildings and equipment built in the industrial park, and there are various sensor devices and monitoring devices installed in the industrial park. Each sensor device and monitoring device establishes a communication channel with the intelligent operation and maintenance platform, so that the monitoring data of each sensor device and monitoring device can be transmitted to the intelligent operation and maintenance platform in real time. In addition, the Internet of Things Industrial Park contains a variety of facilities and equipment, and the operation and maintenance staff of the Internet of Things Industrial Park can customize the facilities and equipment as assets. For example, the facilities and equipment defined as assets in the Internet of Things Industrial Park include factory buildings and production line equipment designed specifically for enterprises to produce Internet of Things-related products, data processing and analysis equipment including computer room equipment, communication network equipment including repeaters, combiners and duplexers, safety protection equipment including fire rescue facilities, video security monitoring equipment, and access control and entrance and exit control equipment, logistics and warehousing facilities, as well as power, lighting, HVAC, heat and cold sources, water supply and drainage systems, elevators and other equipment in buildings such as exhibition centers and experience halls, conference and training centers, R&D buildings and office buildings. In addition, some greening facilities and environmental resources in the park can also be defined as asset equipment. The sensor equipment and monitoring equipment installed in the Internet of Things Industrial Park include temperature sensors for monitoring the ambient temperature and asset equipment temperature of the industrial park, humidity sensors for monitoring the air humidity of the industrial park, light sensors for intelligent lighting systems, air quality sensors for monitoring the air quality in the park, vibration sensors for monitoring the vibration of machinery and equipment, current / voltage sensors for monitoring the current and voltage of equipment, pressure sensors for monitoring pressure changes in liquid or gas pipelines, video surveillance systems, intrusion detection sensors including infrared sensors and microwave sensors for detecting illegal intruders, smoke sensors, flow sensors for monitoring water pipes and gas pipelines, etc., level sensors for monitoring the liquid level of liquid storage tanks or pools, RFID tags and readers for scenarios such as asset management and personnel positioning, and sensors for detecting specific gases such as ammonia or methane, specific gas detection sensors, etc. Various asset facilities and sensor equipment are used in different systems in the industrial park, such as digital monitoring systems, access control management systems, fire alarm systems, and data center asset management systems. Since various systems in the building operate independently, the IBMS (Intelligent Building Management System) integration system is used to connect intelligent devices with different communication protocols to achieve information sharing and collaborative work between different systems, thus forming an intelligent operation and maintenance platform.

[0064] Park monitoring information refers to the monitoring data of various sensor devices and monitoring equipment. Asset equipment monitoring information refers to the monitoring data of asset equipment. Park operation and maintenance monitoring information refers to the monitoring data of the park environment and other equipment.

[0065] Specifically, during the production and operation of the park, various sensor devices and monitoring devices maintain stable operation at the same time, and monitoring data of various sensor devices and monitoring devices are obtained, namely, park monitoring information. The park monitoring information includes asset equipment monitoring information and park operation and maintenance monitoring information. The asset equipment monitoring information refers to the monitoring data of asset equipment, and the park operation and maintenance monitoring information refers to the monitoring data of the park environment and other equipment.

[0066] S20: Based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain the integrated asset equipment monitoring information.

[0067] In this embodiment, the integrated asset equipment monitoring information refers to monitoring data that has been adjusted through integrated processing.

[0068] Specifically, different systems have different sensors. The sensors corresponding to the data center asset management system may include equipment operation status monitoring sensors, surveillance video equipment, and indoor environment sensors, etc. However, because the sensor devices corresponding to the data center asset management system may have different communication protocols, and the intelligent operation and maintenance platform centrally monitors the data for management through intelligent devices with different communication protocols, due to factors such as differences between protocols during the actual data transmission and analysis process, some data may not be accurately converted or transmitted, thereby reducing the integration of the data. In this embodiment, the integration of the monitoring data refers to the degree to which the monitoring data can be effectively integrated, converted, and uniformly managed. For example,

[0069] Different communication protocols may use different data formats. Some protocols use binary format, while others use text format (such as XML, JSON, etc.). In addition, even for the same data type, different protocols may have different representation methods. Therefore, it may cause garbled data, data loss or parsing errors during the conversion process. For example, one protocol may represent temperature data as an integer, while another protocol may use floating point numbers. If the appropriate format conversion is not performed, it may lead to data interpretation errors;

[0070] The transmission rates of different communication protocols may vary greatly. For example, some protocols are designed for high-speed data transmission, such as Ethernet or fiber optic communication, while others may be designed for low-speed or low-power scenarios, such as ZigBee or Bluetooth. The difference in transmission speed may cause data delay or loss during transmission;

[0071] In addition, different synchronization methods determine the coordination mechanism of data sending and receiving. For example, synchronous communication protocols (such as SPI and I2C) require the sending and receiving devices to be strictly synchronized under the control of the clock signal, while asynchronous communication protocols (such as UART and CAN) allow the sender and receiver to operate independently, and use the start and end signals to mark the start and end of the data. If the platform needs to integrate devices with different synchronization methods, it needs to deal with complex clock synchronization and data alignment issues. Therefore, asynchronous communication may cause data packets to be out of order or overlapped, while synchronous communication may cause data loss or errors due to clock drift or deviation;

[0072] Therefore, the integration of monitoring data is judged from aspects such as data format, transmission rate and synchronization method, and then the asset equipment monitoring information is integrated and adjusted based on the park operation and maintenance monitoring information. For example, for the equipment temperature monitoring data of a certain asset equipment with low integration in data format and data inaccuracy, the temperature at the location of the equipment temperature monitoring data can be judged based on multiple ambient temperature monitoring data close to the asset equipment, and the equipment temperature monitoring data can be adjusted; for the equipment temperature monitoring data of a certain asset equipment with low integration in transmission rate and data delay, the temperature of the asset equipment can be judged and the equipment temperature monitoring data can be generated based on multiple ambient temperature monitoring data close to the asset equipment to compensate for the delayed or lost equipment temperature monitoring data; for the equipment temperature monitoring data of a certain asset equipment with low integration in synchronization method and data disorder or overlap, the arrangement order of the equipment temperature monitoring data can be adjusted based on multiple ambient temperature monitoring data close to the asset equipment; in this way, integrated asset equipment monitoring information with higher integration that has been adjusted is obtained.

[0073] S30: Divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset-related monitoring information.

[0074] In this embodiment, the asset-related monitoring information refers to information used to associate the park operation and maintenance monitoring information with the integrated asset equipment monitoring information for associated monitoring.

[0075] Specifically, in order to strengthen the monitoring of park assets, in addition to using the sensor data of the corresponding data center asset management system, it is also possible to combine the sensor data of the entire park. For example, through the monitoring data of the park network quality in the park operation and maintenance monitoring information and the monitoring data of the data transmission volume of the intelligent operation and maintenance platform, analysis is performed. If it is judged that the park network quality has abnormal fluctuations or abnormal network quality declines, and the data transmission volume of the intelligent operation and maintenance platform has abnormally decreased, and the monitoring data of the asset equipment has abnormally increased or decreased, it can be judged that the sensor or monitoring device monitoring the asset equipment has an abnormality. The object monitored by the monitoring device includes the information for binding the monitoring data of the park network quality, the monitoring data of the data transmission volume of the intelligent operation and maintenance platform, and the monitoring data of the asset equipment. Therefore, through the preset association binding information, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided and associated, so as to obtain information used to associate the park operation and maintenance monitoring information with the integrated asset equipment monitoring information for associated monitoring, that is, asset associated monitoring information.

[0076] S40: Obtain park construction project information, input asset-related monitoring information and park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model.

[0077] In this embodiment, the park construction project information refers to the project plan information of the construction project currently being carried out in the park. The risk analysis model refers to a model used to determine the loss risk of assets and equipment. The asset risk information refers to the risk level of asset equipment loss.

[0078] Specifically, when a construction project is being carried out in the park or in the preparation period for the construction of the construction project, the park construction project information is obtained, that is, the project plan information of the construction project currently being carried out in the park, wherein the park construction project information includes the equipment used for the project construction, the project construction personnel information and the project construction plan information, etc. The asset-related monitoring information and the park construction project information are input into a preset risk analysis model, which risk analysis model refers to a model for judging the loss risk of assets and equipment. In this embodiment, the risk analysis model is also used to analyze the park construction project information, that is, based on the equipment used for the project construction represented by the park construction project information, determine which equipment is the asset equipment that needs to be monitored, and, based on the project construction personnel information and the project construction plan information, determine the loss risk of assets and equipment brought about by such construction projects. For example, based on the equipment list used for the project construction, determine the assets and equipment. The assets and equipment generally include equipment that has a significant impact on the construction progress, quality and safety, such as cranes, earth-moving machinery and concrete mixers, etc. According to the characteristics and usage of these assets and equipment The scenario can determine the specific monitoring content and monitoring methods. For example, for cranes, their lifting weight, lifting height, working time and other parameters can be monitored to ensure their safe operation; for earth-moving machinery, their digging depth and driving speed can be monitored. In addition, these equipment can be positioned, fuel consumption and noise monitored to grasp the operating status and working environment of the equipment in real time. Since the intelligent operation and maintenance platform cannot access all the monitoring data of the assets and equipment brought by these construction projects, the monitoring data of various sensors and monitoring equipment in the park represented by the asset-related monitoring information can be used to determine the monitoring data that can be used to replace the monitoring of the assets and equipment brought by the construction projects. For example, the positioning data of these assets and equipment can be replaced by video surveillance data in the park. In addition, according to the information of the construction personnel skills and operating experience of the construction personnel represented in the project construction personnel information, and the complexity of the construction environment and the possible safety hazards to the assets and equipment based on the project construction plan information, the loss risk of the assets and equipment brought by such construction projects can be determined.

[0079] Based on the asset-related monitoring information, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are associated for associated monitoring. The loss risk of the original assets and equipment is judged through the risk analysis model. Because the risk analysis model includes the associated monitoring thresholds for the park operation and maintenance monitoring information and the integrated asset equipment monitoring information, information representing the loss risk of the original assets and equipment in the park and the loss risk of the assets and equipment brought by the construction projects, namely, asset risk information, is obtained.

[0080] S50: Issue an alarm reminder based on the asset risk information.

[0081] Specifically, after obtaining the asset risk information, the asset equipment currently at risk of loss is determined based on the comparison between the loss risk level of each asset equipment indicated by the asset risk information and a preset risk threshold, and an alarm reminder is issued based on the asset equipment currently at risk of loss.

[0082] In one embodiment, if Figure 2 As shown, in step S20, based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain the integrated asset equipment monitoring information, which specifically includes:

[0083] S21: Input the asset equipment monitoring information into the information integration analysis model, and obtain the information integration degree based on the information integration analysis model.

[0084] In this embodiment, the integrated analysis model refers to a model used to analyze data integration. Information integration refers to the integration of asset equipment monitoring information.

[0085] Specifically, before making integrated adjustments to the asset equipment monitoring information, it is necessary to first determine the integration level of the asset equipment monitoring information. The integration judgment of the asset equipment monitoring information includes judgments from multiple different angles, for example, judging the degree to which the data collected by the sensor can be integrated and managed, that is, in the data center asset management system, the corresponding monitoring data of sensors including temperature sensors, humidity sensors, light sensors and smoke sensors are used to collect indoor temperature, humidity, light intensity and smoke concentration data. If the data collected by these sensors can be effectively integrated together to form a comprehensive data stream, the environmental conditions of a certain device can be fully understood through this data stream, and corresponding control decisions can be made accordingly, such as adjusting the air conditioning temperature, turning on a humidifier or lighting equipment, etc. Therefore, the proportion of sensor monitoring data corresponding to the same asset equipment that is integrated to determine the status parameters of the asset equipment can be used as the integration level of the asset equipment monitoring information. Based on this, the asset equipment monitoring information is input into the information integration analysis model, and the integration level of the asset equipment monitoring information is determined based on the information integration analysis model used to analyze the data integration level, and the information integration level is obtained.

[0086] S22: Based on the degree of information integration, the asset equipment monitoring information is integrated and adjusted using the park operation and maintenance monitoring information to obtain the integrated asset equipment monitoring information.

[0087] Specifically, according to the proportion of sensor monitoring data of each asset device represented by the degree of integration of the asset device monitoring information, which is integrated to determine the status parameters of the asset device, for the sensor monitoring data of the asset device whose proportion is lower than a preset integration ratio threshold, the asset device monitoring information is integrated and adjusted using the park operation and maintenance monitoring information. For example, based on the data stream used to determine the status parameters of the asset device, the amount and type of monitoring data missing from the data stream are determined, and the park operation and maintenance monitoring information representing the sensor monitoring data of other systems corresponding to the amount of monitoring data missing from the data stream and the corresponding data type are added to the data stream of the asset device used to determine the status parameters of the asset device, thereby making the determination of the status parameters of the asset device more accurate and ensuring effective and reliable monitoring of the park's assets and equipment.

[0088] Furthermore, based on the data stream used to determine the status parameters of asset equipment, after determining the amount of monitoring data missing from the data stream and the corresponding data type, it is also possible to determine, based on the monitoring data of the sensors in each park, which asset equipment status parameters each sensor monitoring data is suitable for determining, and add the sensor monitoring data suitable for determining the status parameters of asset equipment to the data stream for determining the status parameters of the asset equipment of the corresponding asset equipment, thereby further enriching the data stream used to determine the status parameters of the asset equipment.

[0089] In one embodiment, if Figure 3 As shown, in step S30, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain asset-related monitoring information, which specifically includes:

[0090] S31: Based on the preset asset equipment correlation relationship, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain several groups of related monitoring information.

[0091] In this embodiment, the asset equipment correlation refers to information used to determine the correlation of each type of sensor monitoring data in determining the status parameters of the asset equipment. The related monitoring information refers to grouping information of the park operation and maintenance monitoring information and the integrated asset equipment monitoring information with correlation.

[0092] Specifically, after obtaining the integrated asset equipment monitoring information, because the integrated asset equipment monitoring information includes judging the type of monitoring data missing from the data stream based on the data stream used to judge the status parameters of the asset equipment, and judging the sensor monitoring data suitable for judging the status parameters of the asset equipment based on the monitoring data of the sensors in each park, the integrated asset equipment monitoring information covers all monitoring data types corresponding to each asset equipment that can be used to judge the status parameters of the asset equipment. Among these monitoring data types, some monitoring data may seem to have no direct association with the safety of the asset equipment, but through multi-layer association, such monitoring data can be used to judge the status parameters of the asset equipment. For example, for light intensity data, the light intensity does not seem to have a direct relationship with the safety of the equipment. However, through A step of analysis determines that when the light intensity is insufficient, the workers' operating efficiency decreases and the error rate increases. Since the workers' operating efficiency decreases and the error rate increases, the equipment is improperly used or excessively worn, and the equipment failure rate may increase accordingly. Therefore, the monitoring data of the equipment operating parameters will also correspond to abnormalities; therefore, the preset asset equipment correlation relationship is extracted, and the preset asset equipment correlation relationship includes the correlation information between the above-mentioned light intensity monitoring data and the monitoring data of the equipment operating parameters, that is, the preset asset equipment correlation relationship refers to the information used to determine the correlation of each type of sensor monitoring data in determining the status parameters of the asset equipment. According to the preset asset equipment correlation relationship, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain several groups of related monitoring information.

[0093] S32: Correlation is performed on several groups of related monitoring information to obtain asset-related monitoring information.

[0094] Specifically, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information in several groups of related monitoring information are correlated to obtain asset-related monitoring information, so that after obtaining the corresponding park operation and maintenance monitoring information and integrated asset equipment monitoring information, risk analysis can be performed based on the correlation represented by the asset-related monitoring information.

[0095] It should be noted that the preset asset equipment correlation relationship can be obtained based on the risk analysis model.

[0096] In one embodiment, if Figure 4 As shown, in step S40, the park construction project information is obtained, the asset-related monitoring information and the park construction project information are input into a preset risk analysis model, and the asset risk information is obtained based on the risk analysis model, specifically including:

[0097] S41: Obtain the park construction project information, and obtain the newly added equipment information and project plan information based on the park construction project information.

[0098] In this embodiment, the newly added equipment information refers to the equipment information used for project construction. The project plan information refers to the project construction personnel information and project construction plan information.

[0099] Specifically, when construction work of a construction project begins in the park, a large number of assets and equipment that are different from the original assets and equipment in the park, as well as construction workers, will enter the site. For the park's asset and equipment management, these newly added assets and equipment also belong to the park's assets and equipment when they are operating in the park. Therefore, these assets and equipment also need to be supervised and managed. However, since these assets and equipment are only temporarily and accidentally stationed in the park, and integrated supervision of these assets and equipment through the Unicom communication protocol requires updating the data center asset management system of the intelligent operation and maintenance platform and establishing communication between these assets and equipment and the intelligent operation and maintenance platform. Later, when the construction project is completed, these assets and equipment need to be deleted from the intelligent operation and maintenance platform. Therefore, the supervision of these newly added assets and equipment should adopt a simpler method that is different from the original assets and equipment in the park. Therefore, the park construction project information is obtained, and according to the park construction project information, the park construction project information is divided into newly added equipment information and project plan information. The newly added equipment information refers to the equipment information used for project construction, and the project plan information refers to the project construction personnel information and project construction plan information.

[0100] S42: Input the newly added device information into the integrated analysis model to obtain the newly added device-related monitoring information.

[0101] In this embodiment, the newly added equipment-related monitoring information refers to the associated monitoring information for the newly added asset equipment.

[0102] Specifically, the newly added equipment information is input into the integrated analysis model. In addition to being used to analyze the data integration degree, the integrated analysis model is also used to determine all monitoring data types that can be integrated into the asset equipment to determine the status parameters of the asset equipment. Based on this, the newly added equipment information is input into the information integrated analysis model. Based on the information integrated analysis model, according to the location of the newly added asset equipment and the purpose of the newly added asset equipment represented by the newly added equipment information, it is determined which monitoring data types in the asset-related monitoring information can be used to determine the status parameters of the newly added asset equipment, so as to obtain the newly added equipment-related monitoring information, wherein the newly added equipment-related monitoring information includes the monitoring data types of the asset equipment brought by these construction projects that can be accessed by the intelligent operation and maintenance platform, as well as the corresponding monitoring data types in the asset-related monitoring information.

[0103] S43: Inputting the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtaining the asset risk information based on the risk analysis model.

[0104] Specifically, the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information are input into a preset risk analysis model, and the loss risk of the original assets and equipment and the newly added assets and equipment in the park are assessed based on the risk analysis model to obtain asset risk information.

[0105] In one embodiment, if Figure 5 As shown, in step S43, the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information are input into a preset risk analysis model, and asset risk information is obtained based on the risk analysis model, specifically including:

[0106] S431: Input asset-related monitoring information, newly added equipment-related monitoring information and project plan information into a preset risk analysis model, and obtain park equipment control information based on the risk analysis model.

[0107] In this embodiment, the park equipment control information refers to control information for determining the status parameters of the asset equipment by controlling the changes in the operating parameters of the asset equipment.

[0108] Specifically, asset-related monitoring information refers to information used to associate park operation and maintenance monitoring information with integrated asset equipment monitoring information for associated monitoring. However, for sensor equipment and monitoring equipment that are not originally used to monitor asset equipment, the park operation and maintenance monitoring information corresponding to these sensor equipment and monitoring equipment may not be the required monitoring data. Therefore, based on the risk analysis model, the missing monitoring data for the comprehensive monitoring of the status parameters of the asset equipment is determined, and then through the analysis of the park construction project information and the asset-related monitoring information, the sensor equipment or monitoring equipment that can monitor and obtain the missing monitoring data and can be used or called is determined, and then the park equipment control information is generated, that is, the control information of the status parameters of the asset equipment is determined by controlling the change of the operating parameters of the asset equipment. For example, when the video surveillance equipment of the park and the corresponding monitoring of the park asset equipment have a contradictory relationship in the field of vision blind spot, the monitoring range of the video surveillance equipment is changed to achieve the monitoring of the park asset equipment; or when the video surveillance equipment of the park and the corresponding monitoring of the park asset equipment have a contradictory relationship in the field of vision blind spot, if the monitoring range of the video surveillance equipment cannot be changed, other video surveillance equipment can be called to achieve the monitoring of the park asset equipment.

[0109] S432: Obtain control feedback information based on the park equipment control information, and obtain asset risk information based on the risk analysis model and the control feedback information.

[0110] Specifically, the operating parameter changes of the corresponding sensor equipment or monitoring equipment are controlled based on the park equipment control information to obtain the monitoring data of the sensor equipment or monitoring equipment with changed operating parameters, that is, the control feedback information. The corresponding park operation and maintenance monitoring information is replaced by the control feedback information to obtain the complete and required park operation and maintenance monitoring information and integrated asset equipment monitoring information, and then the asset risk information is obtained based on the risk analysis model.

[0111] In one embodiment, if Figure 6 As shown, the risk analysis model is generated in the following way:

[0112] S01: Obtain historical park monitoring information, historical construction project information and historical risk accident information.

[0113] Specifically, historical park monitoring information, historical construction project information and historical risk accident information are obtained, among which historical park monitoring information refers to the monitoring data of all sensor equipment and monitoring equipment in the park in the past, and historical construction project information refers to the project information of construction projects carried out in the park in the past. Historical risk accident information refers to the accident-related information of asset equipment loss in the past.

[0114] S02: Train a preset park learning model based on historical park monitoring information, historical construction project information, and historical risk accident information to obtain a risk analysis model.

[0115] Specifically, the risk analysis model is used to determine the loss risk of assets and equipment within the current park, including risk analysis of asset loss and risk analysis of asset damage caused by failure. Therefore, the training samples of the risk analysis model include historical park monitoring information, historical inspection project information and historical risk accident information, among which the historical risk accident information includes accident information of asset loss and accident information of asset damage caused by failure. The historical park monitoring information includes monitoring information on the operating status of assets and equipment and monitoring information for the safety of assets and equipment. Through the historical park monitoring information, historical construction project information and historical risk accident information, the preset park learning model is trained for risk assessment of asset loss and damage to generate a risk analysis model.

[0116] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0117] In one embodiment, a park asset monitoring system based on an intelligent operation and maintenance platform is provided, and the park asset monitoring system based on the intelligent operation and maintenance platform corresponds one-to-one to the park asset monitoring method based on the intelligent operation and maintenance platform in the above embodiment. Figure 7 As shown in the figure, the park asset monitoring system based on the intelligent operation and maintenance platform includes information acquisition module, integrated adjustment module, association classification module, risk analysis module and alarm reminder module. The detailed description of each functional module is as follows:

[0118] The information acquisition module is used to obtain the park monitoring information, which includes asset equipment monitoring information and park operation and maintenance monitoring information;

[0119] The integrated adjustment module is used to perform integrated adjustment on the asset equipment monitoring information based on the park operation and maintenance monitoring information to obtain the integrated asset equipment monitoring information;

[0120] The association division module is used to divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset association monitoring information;

[0121] The risk analysis module is used to obtain the park construction project information, input the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtain the asset risk information based on the risk analysis model;

[0122] The alarm reminder module is used to issue alarm reminders based on asset risk information.

[0123] Optional, integrated adjustment modules include:

[0124] The integration analysis submodule is used to input the asset equipment monitoring information into the information integration analysis model, and obtain the information integration degree based on the information integration analysis model;

[0125] The integrated adjustment submodule is used to perform integrated adjustment on the asset equipment monitoring information using the park operation and maintenance monitoring information according to the information integration level, so as to obtain the integrated asset equipment monitoring information.

[0126] Optionally, the association partitioning module includes:

[0127] The related division submodule is used to divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information based on the preset asset equipment correlation relationship to obtain several groups of related monitoring information;

[0128] The association submodule is used to associate several groups of related monitoring information to obtain asset-related monitoring information.

[0129] Optional risk analysis modules include:

[0130] The project information acquisition submodule is used to obtain the park construction project information, and obtain the newly added equipment information and project plan information based on the park construction project information;

[0131] A new equipment analysis submodule is added to input the new equipment information into the integrated analysis model to obtain the new equipment related monitoring information;

[0132] The risk analysis submodule is used to input asset-related monitoring information, new equipment-related monitoring information and project plan information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model.

[0133] Optional, risk analysis submodules include:

[0134] The control analysis unit is used to input the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtain the park equipment control information based on the risk analysis model;

[0135] The control feedback analysis unit is used to obtain control feedback information based on the park equipment control information, and obtain asset risk information based on the risk analysis model and the control feedback information.

[0136] Optionally, the park asset monitoring system based on the intelligent operation and maintenance platform also includes:

[0137] The historical information acquisition module is used to obtain historical park monitoring information, historical construction project information and historical risk accident information;

[0138] The model generation module is used to train the preset park learning model based on historical park monitoring information, historical construction project information and historical risk accident information to obtain a risk analysis model.

[0139] For the specific limitations of the park asset monitoring system based on the intelligent operation and maintenance platform, please refer to the limitations of the park asset monitoring method based on the intelligent operation and maintenance platform above, which will not be repeated here. Each module in the above-mentioned park asset monitoring system based on the intelligent operation and maintenance platform can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0140] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store asset equipment monitoring information, park operation and maintenance monitoring information, integrated asset equipment monitoring information, asset-related monitoring information and asset risk information. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a park asset monitoring method based on an intelligent operation and maintenance platform is implemented.

[0141] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0142] Obtain park monitoring information, which includes asset equipment monitoring information and park operation and maintenance monitoring information;

[0143] Based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain the integrated asset equipment monitoring information;

[0144] Divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset-related monitoring information;

[0145] Obtain park construction project information, input asset-related monitoring information and park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model;

[0146] Issue alarm reminders based on asset risk information.

[0147] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0148] Obtain park monitoring information, which includes asset equipment monitoring information and park operation and maintenance monitoring information;

[0149] Based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain the integrated asset equipment monitoring information;

[0150] Divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset-related monitoring information;

[0151] Obtain park construction project information, input asset-related monitoring information and park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model;

[0152] Issue alarm reminders based on asset risk information.

[0153] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0154] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.

[0155] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A park asset monitoring method based on an intelligent operation and maintenance platform, characterized in that: The park asset monitoring method based on the intelligent operation and maintenance platform includes: Obtaining park monitoring information, wherein the park monitoring information includes asset equipment monitoring information and park operation and maintenance monitoring information; Based on the park operation and maintenance monitoring information, the asset equipment monitoring information is integrated and adjusted to obtain integrated asset equipment monitoring information, specifically including: Inputting the asset equipment monitoring information into an information integration analysis model, and obtaining the information integration degree based on the information integration analysis model, wherein the proportion of sensor monitoring data corresponding to the same asset equipment that is integrated to determine the state parameters of the asset equipment is used as the integration degree of the asset equipment monitoring information; According to the information integration degree, the asset equipment monitoring information is integratedly adjusted using the park operation and maintenance monitoring information to obtain integrated asset equipment monitoring information, wherein the sensor monitoring data of each asset equipment represented by the integration degree of the asset equipment monitoring information is integrated to determine the proportion of the state parameter of the asset equipment, and for the sensor monitoring data of the asset equipment whose proportion is lower than a preset integration ratio threshold, the asset equipment monitoring information is integratedly adjusted using the park operation and maintenance monitoring information; The park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain asset-related monitoring information, specifically including: Based on the preset asset equipment correlation relationship, the park operation and maintenance monitoring information and the integrated asset equipment monitoring information are divided to obtain a plurality of groups of related monitoring information, wherein the asset equipment correlation relationship refers to information used to determine the correlation of each type of sensor monitoring data in determining the state parameters of the asset equipment, and the related monitoring information refers to grouping information of the park operation and maintenance monitoring information and the integrated asset equipment monitoring information with correlation; Correlation-correlating the plurality of groups of related monitoring information to obtain asset-related monitoring information; Acquire park construction project information, input the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model, specifically including: Obtaining park construction project information, and obtaining new equipment information and project plan information based on the park construction project information; Inputting the newly added equipment information into the integrated analysis model to obtain the newly added equipment-related monitoring information; Inputting the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtaining asset risk information based on the risk analysis model; An alarm reminder is issued based on the asset risk information.

2. The park asset monitoring method based on the intelligent operation and maintenance platform according to claim 1 is characterized in that: The inputting the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtaining asset risk information based on the risk analysis model specifically includes: Inputting the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtaining park equipment control information based on the risk analysis model; Control feedback information is acquired based on the park equipment control information, and asset risk information is acquired based on the risk analysis model and the control feedback information.

3. The park asset monitoring method based on the intelligent operation and maintenance platform according to claim 1 is characterized in that: The risk analysis model is generated in the following way: Obtain historical park monitoring information, historical construction project information, and historical risk accident information; A preset park learning model is trained based on the historical park monitoring information, the historical construction project information and the historical risk accident information to obtain a risk analysis model.

4. A park asset monitoring system based on an intelligent operation and maintenance platform, characterized in that: The park asset monitoring system based on the intelligent operation and maintenance platform includes: An information acquisition module is used to acquire park monitoring information, wherein the park monitoring information includes asset equipment monitoring information and park operation and maintenance monitoring information; An integrated adjustment module is used to perform integrated adjustment on the asset equipment monitoring information based on the park operation and maintenance monitoring information to obtain integrated asset equipment monitoring information. The integrated adjustment module includes: An integration analysis submodule, for inputting the asset equipment monitoring information into an information integration analysis model, and obtaining information integration based on the information integration analysis model, wherein the proportion of sensor monitoring data corresponding to the same asset equipment that is integrated to determine the state parameters of the asset equipment is used as the integration degree of the asset equipment monitoring information; An integrated adjustment submodule is used to perform integrated adjustment on the asset equipment monitoring information according to the information integration level using the park operation and maintenance monitoring information to obtain integrated asset equipment monitoring information, wherein the sensor monitoring data of each asset equipment represented by the integration level of the asset equipment monitoring information is integrated to determine the proportion of the state parameter of the asset equipment, and for the sensor monitoring data of the asset equipment whose proportion is lower than a preset integration ratio threshold, the asset equipment monitoring information is integrated and adjusted using the park operation and maintenance monitoring information; The association division module is used to divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information to obtain asset association monitoring information. The association division module includes: A related division submodule is used to divide the park operation and maintenance monitoring information and the integrated asset equipment monitoring information based on the preset asset equipment correlation relationship to obtain several groups of related monitoring information, wherein the asset equipment correlation relationship refers to the information used to determine the correlation of each type of sensor monitoring data in determining the state parameters of the asset equipment, and the related monitoring information refers to the grouping information of the park operation and maintenance monitoring information and the integrated asset equipment monitoring information with correlation; The association submodule is used to associate several groups of related monitoring information to obtain asset-related monitoring information; The risk analysis module is used to obtain the park construction project information, input the asset-related monitoring information and the park construction project information into a preset risk analysis model, and obtain asset risk information based on the risk analysis model. The risk analysis module includes: The project information acquisition submodule is used to obtain the park construction project information, and obtain the newly added equipment information and project plan information based on the park construction project information; A new equipment analysis submodule is added to input the new equipment information into the integrated analysis model to obtain the new equipment related monitoring information; The risk analysis submodule is used to input the asset-related monitoring information, the newly added equipment-related monitoring information and the project plan information into a preset risk analysis model, and obtain the asset risk information based on the risk analysis model; The alarm reminder module is used to issue an alarm reminder based on the asset risk information.

5. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the park asset monitoring method based on the intelligent operation and maintenance platform as described in any one of claims 1 to 3 are implemented.

6. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, the steps of the park asset monitoring method based on the intelligent operation and maintenance platform as described in any one of claims 1 to 3 are implemented.