Rapid replacement system and method for ballastless track bed of subway operation line
Through the joint removal of concrete and sunroof construction methods by water grinding drilling rig and pneumatic pick, the problem of low efficiency of replacement of ballastless roadbeds on subway operation lines is solved, and efficient and rapid concrete breaking and roadbed replacement is achieved, ensuring the safety of subway lines and passengers. Convenience of travel.
Patent Information
- Application Number
- CN202410966276.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The ballastless beds on the subway operating lines wear and age after long-term use, resulting in inefficient construction efficiency and difficulty in efficient replacement within a limited time of sunroof, affecting the safety of train operations and passenger travel.
The method of combining water grinding drilling rig and pneumatic pick to break concrete is used, and through the construction of the skylight point, the complex concrete removal and replacement of the roadbed is broken into multiple clear processes, combining the mobile base and processing mechanism to improve construction efficiency and quality.
It greatly improves construction efficiency, shortens working time, ensures construction quality and safety, reduces the impact on subway operation time, and improves the safety and reliability of subway lines.
Smart Images

Figure CN118880679A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of subways, and in particular relates to a rapid replacement system and method for ballastless track beds of subway operating lines. Background Art
[0002] With the continuous development and expansion of urban rail transit systems, the safety and operational efficiency of subway lines have become key indicators for measuring the performance of subway systems. Among them, ballastless trackbed, as the core component of subway track structure, bears the heavy pressure of train operation and directly affects the stability and safety of trains. However, due to the particularity of subway line operation, its maintenance and replacement work faces many challenges.
[0003] First, the window time of subway operating lines is very limited. The window time refers to the period of time when subway trains stop running to allow maintenance and inspection personnel to carry out operations. As an important part of urban public transportation, subways are often in operation for a very long time, leaving a relatively short time window for maintenance and replacement work. Therefore, how to efficiently complete the removal and replacement of roadbed concrete within the limited window time has become an urgent problem to be solved.
[0004] Secondly, the roadbed concrete may be worn out and aged during long-term use; these problems will not only affect the stability and durability of the roadbed, but may also pose a threat to the safe operation of trains; therefore, timely detection and replacement of aged roadbed concrete is crucial to ensure the safe operation of subway lines;
[0005] However, the traditional method of removing and replacing the roadbed concrete often adopts a single construction tool, such as using only a water drill or a pneumatic pick for the operation; this method has many disadvantages; on the one hand, the construction efficiency of a single tool is relatively low, which is difficult to meet the demand for high-efficiency construction of subway operating lines; within the limited skylight time, the traditional construction method may not be able to complete enough work, resulting in the maintenance and replacement work cannot be completed in time; on the other hand, the construction method of a single tool may cause the operation time to be too long, which increases the impact on the subway operation time and brings inconvenience to passengers. Summary of the invention
[0006] The present invention provides a system and method for quickly replacing ballastless track beds of subway operating lines, aiming to solve the problem that traditional track bed concrete removal and replacement methods often use a single construction tool. This method has the problems of low construction efficiency and long operation time, and is difficult to meet the needs of subway operating lines for high-efficiency and high-quality construction. In addition, traditional construction methods may also cause a significant impact on subway operating hours, causing inconvenience to passengers.
[0007] The present invention is implemented as follows: a rapid replacement system for ballastless track bed of subway operation line, comprising a track bed body; steel rails symmetrically arranged on both sides of the track bed body; a plurality of bases arranged on the two steel rails, the bases and the steel rails being slidably matched; a plurality of first threaded holes for communication are provided on the plurality of bases and the steel rails, and a first fastening bolt is threadedly matched with the corresponding plurality of first threaded holes; a group of transverse channel steels is arranged between every two opposite bases; a same movable base is arranged between every two adjacent transverse channel steels, and the movable base and the transverse channel steel are slidably matched;
[0008] A processing mechanism is arranged on a plurality of the mobile bases; wherein the processing mechanism comprises: a column arranged on the mobile base, the column and the mobile base are rotatably matched; an inclined rod arranged beside the column, one end of the inclined rod is connected to the mobile base, and the other end of the inclined rod is connected to the column; a guide groove is provided on the other side of the column away from the inclined rod; and a water-grinding drill rig slides on the outside of the guide groove.
[0009] Preferably, a locking structure is provided in the column, and the locking structure comprises: a screw rod rotating in the column; a connecting block is threadedly fitted on the screw rod, and the connecting block is slidably fitted with the inner wall of the column; the connecting block extends to the outer side of the column and is connected to the water-grinding drill.
[0010] Preferably, the locking structure further comprises: a driving cylinder arranged at the top of the column; the output end of the driving cylinder is fixedly connected to the end key of the screw rod.
[0011] Preferably, a plurality of second threaded holes are formed through the transverse channel steel and the movable base, and the inner threads of two corresponding second threaded holes are matched with the same second fastening bolt.
[0012] Preferably, different numbers of water-grinding drills are arranged on a plurality of the mobile bases in a certain order, including combinations of two and three.
[0013] Preferably, the diameter of the drill bit of the water-mill drilling rig is 16.8 cm, the center distance of the drill bits of the same group of water-mill drilling rigs is 38 cm, and the effective width of the center concrete removed by a plurality of water-mill drilling rigs when working is 93 cm.
[0014] Preferably, the oblique rod comprises an inner rod and an outer rod, the outer rod is sleeved on the outer side of the inner rod and slidably cooperates with the inner rod, wherein the outer rod is rotationally cooperated with the movable base, and the inner rod is rotationally cooperated with the column.
[0015] Preferably, a plurality of third threaded holes are formed through the inner rod and the outer rod, and the inner threads of two corresponding third threaded holes are matched with the same third fastening bolt.
[0016] The present invention also provides a method for quickly replacing a ballastless track bed for a subway operating line, comprising:
[0017] Construction step 1: Chiseling out the center concrete:
[0018] First, the first set of water-grinding drills (2 units) were started to drill. After drilling into three sets of roadbeds, the second set of water-grinding drills (3 units) were started to chisel out the remaining concrete in the center of the road. Workers used pneumatic picks to remove the remaining concrete after the water-grinding drills had chiseled out.
[0019] Construction step 2: Removal of concrete under the track and installation of temporary sleepers:
[0020] Select a fastener and start to remove the concrete underneath it; use a water-grinding drill (2+2 units) to remove the concrete every five times, and workers use pneumatic picks to clean up the remaining parts; after removing the concrete under the rail, use temporary fasteners to fix the rails on temporary sleepers;
[0021] Construction step three: Formwork erection and permanent roadbed pouring:
[0022] Removal of temporary sleepers: Remove the temporary sleepers and fasteners installed the day before; set up new ballast formwork; pour permanent ballast concrete and reserve steel bars holes at the four corners; install permanent fasteners before the concrete solidifies;
[0023] Construction step 4: U-shaped steel bar implantation and concrete curing:
[0024] Insert U-shaped steel bars into the reserved steel bar holes; use anchoring glue to firmly connect the U-shaped steel bars to the roadbed concrete; wait for the concrete to completely solidify;
[0025] Construction step five: track fine-tuning:
[0026] After the concrete reaches the specified strength, the geometric dimensions and stability of the track are checked; Track fine-tuning: The track is fine-tuned according to the inspection results to ensure the smoothness and safety of the track.
[0027] Compared with the prior art, the embodiments of the present application have the following beneficial effects:
[0028] First, the present invention greatly improves the construction efficiency by adopting a method of combining a water-mill drill and a pneumatic pick to break concrete. The water-mill drill first drills and takes cores, and then the pneumatic pick quickly cleans the remaining concrete. This combination reduces the limitations of a single tool during construction and achieves efficient and rapid concrete breaking.
[0029] Second: The present invention decomposes the complex roadbed concrete removal and replacement work into five clear processes through the skylight point construction method, and reasonably distributes them to different skylight points. This not only avoids long-term, high-intensity continuous operations, but also ensures that each process can receive full attention and meticulous construction, thereby ensuring construction quality and efficiency.
[0030] Third: Since the construction work is carefully allocated to different skylight points, the impact of construction on the subway operation time can be minimized to the greatest extent, which is of great significance for ensuring the normal operation of the subway line and reducing the inconvenience of passengers' travel. At the same time, this method can also achieve timely replacement and maintenance of the roadbed concrete without affecting the normal operation of the subway, thereby improving the safety and reliability of the subway line. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a three-dimensional structural schematic diagram of the present invention;
[0032] Figure 2 It is a schematic diagram of the structure of the mobile base of the present invention;
[0033] Figure 3 It is a schematic diagram of the position structure of the base and the transverse channel steel of the present invention;
[0034] Figure 4 It is a three-dimensional structural schematic diagram of the present invention;
[0035] Figure 5 It is a three-dimensional structural schematic diagram of the present invention;
[0036] Figure 6 It is a schematic diagram of the structure of the ballast body and rail positions of the present invention;
[0037] Figure 7 It is a schematic diagram of the structure of the ballast body and rail positions of the present invention;
[0038] Figure 8 It is a schematic diagram of the column structure of the present invention;
[0039] Fig. 9 It is a schematic diagram of the oblique rod structure of the present invention;
[0040] Fig.10 It is a schematic diagram of the process of the present invention;
[0041] In the figure: 1. ballast body; 2. rails; 3. base; 4. transverse channel steel; 5. first fastening bolt; 6. third fastening bolt; 7. movable base; 8. column; 9. diagonal rod; 10. guide groove; 11. water-grinding drill; 12. screw rod; 13. connecting block; 14. driving cylinder; 15. second fastening bolt; 16. inner rod; 17. outer rod. DETAILED DESCRIPTION
[0042] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by technicians in the technical field of this application; the terms used in the specification of the application herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of this application or the above-mentioned drawings are used to distinguish different objects, not to describe a specific order.
[0043] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0044] The embodiment of the present invention provides a rapid replacement system for ballastless track bed of a subway operation line, such as Figure 1-10 As shown, it includes a ballast body 1; steel rails 2 symmetrically arranged on both sides of the ballast body 1; a plurality of bases 3 arranged on the two steel rails 2, and the bases 3 are slidably matched with the rails 2; a plurality of first threaded holes for communication are opened on the plurality of bases 3 and the rails 2, and the corresponding plurality of first threaded holes are internally threaded with first fastening bolts 5; a group of transverse channel steels 4 are arranged between every two opposite bases 3; a same movable base 7 is arranged between every two adjacent transverse channel steels 4, and the movable base 7 is slidably matched with the transverse channel steel 4; a processing mechanism arranged on the plurality of movable bases 7; wherein the processing mechanism comprises: a column 8 arranged on the movable base 7, and the column 8 is rotatably matched with the movable base 7; an inclined rod 9 arranged beside the column 8, one end of the inclined rod 9 is connected to the movable base 7, and the other end of the inclined rod 9 is connected to the column 8; a guide groove 10 is opened on the other side of the column 8 away from the inclined rod 9; a water-grinding drill 11 sliding on the outside of the guide groove 10.
[0045] It should be noted that since the traditional roadbed concrete removal and replacement method often uses a single construction tool, this method has problems such as low construction efficiency and long operation time, and it is difficult to meet the needs of subway operating lines for high-efficiency and high-quality construction. In addition, the traditional construction method may also cause a significant impact on the subway operating hours, causing inconvenience to passengers. This solution adopts a method of combining a water-grinding drill 11 with a pneumatic pick to break up concrete, and combines it with a skylight point construction method. This method can greatly improve construction efficiency, shorten operation time, and ensure construction quality and safety. By reasonably planning and allocating skylight time, the complex roadbed concrete removal and replacement work is decomposed into multiple clear processes, and finely allocated to different skylight points, which can minimize the impact on subway operating hours and ensure the safety and reliability of subway lines.
[0046] Specifically, in this embodiment, the present solution mainly includes a roadbed body 1; the roadbed body 1 is the basic structure of the subway track and bears the weight of the entire track system; the base 3 is symmetrically arranged on the rails 2 on both sides of the roadbed body 1, and slides with the rails 2 to ensure stable support and fixation of subsequent structures;
[0047] When the ballastless track needs to be quickly replaced or repaired, first ensure that all system components are in the correct position and are firmly connected through fastening measures to ensure the stability and safety of the operation; then, accurately adjust the position of the base 3 on the rail 2 and use the first fastening bolts 5 to fasten it to ensure that the base 3 is stable and tightly fitted on the rail 2;
[0048] Subsequently, the mobile base 7 slides horizontally along the transverse channel steel 4 to accurately and quickly locate the specific position where construction is required; on the mobile base 7, the column 8 is used as a supporting structure of the processing mechanism and is connected to the water-grinding drill 11 through the guide groove 10; the water-grinding drill 11 can slide horizontally along the guide groove 10 to achieve height adjustment, ensuring that it can accurately reach the position to be constructed;
[0049] Once the water-grinding drill 11 reaches the designated position, the equipment can be started to cut, crush or perform other necessary construction operations on the ballast bed body 1; after the construction is completed, the processing mechanism is quickly moved to the next construction position by the mobile base 7, and the above steps are repeated until the replacement or maintenance of the entire ballastless ballast bed is completed;
[0050] It is worth mentioning that, in order to meet different working requirements, the column 8 can be designed to rotate with the mobile base 7, so that it can be tilted to a suitable angle as needed, further improving the convenience and flexibility of operation.
[0051] In a further preferred embodiment of the present invention, Figure 8As shown, a locking structure is provided in the column 8, and the locking structure includes: a screw rod 12 rotating in the column 8; a connecting block 13 is threadedly engaged on the screw rod 12, and the connecting block 13 is slidably engaged with the inner wall of the column 8; the connecting block 13 extends to the outer side of the column 8 and is connected to the water-grinding drill 11.
[0052] In this embodiment, when the screw rod 12 rotates, it will drive the connecting block 13 to move synchronously. Since there is a sliding fit between the connecting block 13 and the column 8, this fit plays a guiding role, thereby ensuring that the connecting block 13 can stably drive the water-grinding drill 11 to adjust the height.
[0053] In a further preferred embodiment of the present invention, Figure 8 As shown, the locking structure further includes: a driving cylinder 14 disposed at the top of the column 8 ; the output end of the driving cylinder 14 is fixedly connected to the end key of the screw rod 12 .
[0054] In this embodiment, the driving cylinder 14 is used to drive the rotational movement of the screw rod 12 .
[0055] In a further preferred embodiment of the present invention, Figure 1-5 As shown, a plurality of second threaded holes are formed through the transverse channel steel 4 and the movable base 7 , and the inner threads of two corresponding second threaded holes are matched with the same second fastening bolt 15 .
[0056] In this embodiment, when it is necessary to fix the mobile base 7 to a specific position, the staff will select the corresponding two second threaded holes and screw the second fastening bolts 15 into the two holes. Due to the threaded fit of the bolts and the holes, when the bolts are tightened, they will firmly connect the mobile base 7 with the transverse channel steel 4. This connection method is simple and effective, which can ensure that the mobile base 7 will not be displaced or shaken when it is under working load. In this way, the staff can accurately adjust the position of the mobile base 7 and quickly fix it, thereby ensuring that subsequent water-grinding drilling rig 11 operations can be carried out accurately and stably.
[0057] In a further preferred embodiment of the present invention, Figure 1-5 As shown, different numbers of water-grinding drills 11 are arranged on the plurality of mobile bases 7 in a certain order, including combinations of two and three.
[0058] In this embodiment, when drilling or coring operations are required, the mobile base 7 will be moved to a designated position. According to the specific needs of the operation, the staff can start a corresponding number of water-grinding drills 11, which perform drilling, coring and other operations through their respective power systems and mechanical structures.
[0059] In a further preferred embodiment of the present invention, Figure 1-5 As shown, the diameter of the drill bit of the water-mill drill rig 11 is 16.8 cm, the center distance of the drill bits of the same group of water-mill drill rigs 11 is 38 cm, and the effective width of the concrete removed from the center of the road when several water-mill drill rigs 11 are working is 93 cm.
[0060] In this embodiment, the diameter of the drill bit of the grinding drill determines the size of the hole that can be processed. The appropriate drill bit spacing can ensure that the drill bits will not interfere with each other during the processing process, and can also maximize the use of the working space and improve work efficiency. When several water grinding drills 11 work at the same time, the effective chiseling width of the center concrete is 93cm, which is determined by the diameter of the drill bit and the drill bit spacing. The effective chiseling width can ensure that a large amount of concrete can be removed in a short time, improving construction efficiency.
[0061] In a further preferred embodiment of the present invention, Fig. 9 As shown, the inclined rod 9 includes an inner rod 16 and an outer rod 17, wherein the outer rod 17 is sleeved on the outer side of the inner rod 16 and slidably cooperates with the inner rod 16, wherein the outer rod 17 is rotationally cooperated with the movable base 7, and the inner rod 16 is rotationally cooperated with the column 8.
[0062] In this embodiment, by adjusting the position of the inner rod 16 inside the outer rod 17, the effective length of the diagonal rod 9 can be changed, thereby achieving support for the column 8 or adjusting the support height and angle. When the inner rod 16 moves outward relative to the outer rod 17, the length of the diagonal rod 9 increases, and the support height provided also increases accordingly; conversely, when the inner rod 16 moves inward relative to the outer rod 17, the length of the diagonal rod 9 decreases, and the support height also decreases accordingly. This adjustment method enables the diagonal rod 9 to adapt to support requirements of different heights and angles, thereby enhancing the flexibility and adaptability of the structure.
[0063] In a further preferred embodiment of the present invention, Fig. 9 As shown, a plurality of third threaded holes are formed through the inner rod 16 and the outer rod 17 , and the inner threads of two corresponding third threaded holes are matched with the same third fastening bolt 6 .
[0064] In this embodiment, the third fastening bolt 6 can also provide a certain locking force to ensure that the inner rod 16 and the outer rod 17 maintain a stably connected state during the operation of the diagonal rod 9. This locking force can effectively prevent the diagonal rod 9 from loosening or deforming when subjected to external force, thereby improving the bearing capacity and service life of the diagonal rod 9.
[0065] The present invention also provides a method for quickly replacing a ballastless track bed for a subway operating line, comprising:
[0066] Construction step 1: Chiseling out the center concrete:
[0067] First, the first group of water-grinding drills 11 (2 units) are started to drill, and after drilling into three groups of roadbeds, the second group of water-grinding drills 11 (3 units) are started to chisel out the remaining road center concrete; workers use pneumatic picks to remove the remaining concrete after the water-grinding drills 11 have chiseled out;
[0068] Construction step 2: Removal of concrete under the track and installation of temporary sleepers:
[0069] Select a fastener and start to chisel away the concrete underneath it; use a method of chiseling one every five times, use a water-grinding drill 11 (2+2 units) to chisel away the concrete, and workers use a pneumatic pick to clean up the remaining parts; after chiseling away the concrete under the rail, use a temporary fastener to fix the rail 2 on the temporary sleeper;
[0070] Construction step three: Formwork erection and permanent roadbed pouring:
[0071] Removal of temporary sleepers: Remove the temporary sleepers and fasteners installed the day before; set up new ballast formwork; pour permanent ballast concrete and reserve steel bars holes at the four corners; install permanent fasteners before the concrete solidifies;
[0072] Construction step 4: U-shaped steel bar implantation and concrete curing:
[0073] Insert U-shaped steel bars into the reserved steel bar holes; use anchoring glue to firmly connect the U-shaped steel bars to the roadbed concrete; wait for the concrete to completely solidify;
[0074] Construction step five: track fine-tuning:
[0075] After the concrete reaches the specified strength, the geometric dimensions and stability of the track are checked; Track fine-tuning: The track is fine-tuned according to the inspection results to ensure the smoothness and safety of the track.
[0076] It should be noted that, for the above-mentioned embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described order of actions, because according to the present invention, some steps may be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0077] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are merely schematic, such as the division of the above-mentioned units. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between devices or units can be in the form of telecommunication or other forms.
[0078] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0079] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the scope of protection of the invention. Obviously, the described embodiments are only some embodiments of the present invention, rather than all embodiments. Based on these embodiments, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in this field can still combine, add, delete or make other adjustments to the features in the various embodiments of the present invention according to the circumstances without conflict, without making creative work, so as to obtain different other technical solutions that do not deviate from the concept of the present invention in essence, and these technical solutions also belong to the scope of protection of the present invention.
Claims
1. A rapid replacement system for ballastless track bed of subway operation lines, characterized in that: include: Track bed body; Steel rails symmetrically arranged on both sides of the ballast body; A plurality of bases provided on the two rails, wherein the bases are slidably matched with the rails; A plurality of first threaded holes for communication are provided on the plurality of bases and the rails, and the corresponding plurality of first threaded holes have internal threads matched with first fastening bolts; A set of transverse channel steels is arranged between each two opposite bases; A same movable base is provided between every two adjacent transverse channel steels, and the movable base and the transverse channel steels are in sliding fit; A processing mechanism disposed on the plurality of movable bases; Wherein, the processing mechanism comprises: A column disposed on the mobile base, the column being rotatably matched with the mobile base; An inclined rod is arranged beside the column, one end of the inclined rod is connected to the movable base, and the other end of the inclined rod is connected to the column; A guide groove is provided on the other side of the column away from the inclined rod; A water-grinding drill slides on the outside of the guide groove.
2. A rapid replacement system for ballastless track bed of a subway operating line according to claim 1, characterized in that: A locking structure is provided in the column, and the locking structure comprises: A screw rod rotating in the column; The threaded rod is provided with a connecting block, and the connecting block is slidably matched with the inner wall of the column; The connecting block extends to the outer side of the column and is connected to the water-grinding drilling machine.
3. A rapid replacement system for ballastless track bed of a subway operating line according to claim 2, characterized in that: The locking structure further comprises: A driving cylinder disposed at the top of the column; The output end of the driving cylinder is fixedly connected with the end key of the screw rod.
4. A rapid replacement system for ballastless track bed of a subway operating line according to claim 1, characterized in that: A plurality of second threaded holes are formed through the transverse channel steel and the movable base, and the inner threads of two corresponding second threaded holes are matched with the same second fastening bolt.
5. A rapid replacement system for ballastless track bed of a subway operating line according to claim 4, characterized in that: Different numbers of water-grinding drills are arranged on the mobile bases in a certain order, including combinations of two and three.
6. A rapid replacement system for ballastless track bed of a subway operating line according to claim 5, characterized in that: The diameter of the drill bit of the water-mill drilling rig is 16.8 cm, and the center distance of the drill bits of the same group of water-mill drilling rigs is 38 cm. When several of the water-mill drilling rigs are working, the effective width of the center concrete removed is 93 cm.
7. A rapid replacement system for ballastless track bed of subway operating lines according to claim 1, characterized in that: The oblique rod comprises an inner rod and an outer rod, wherein the outer rod is sleeved on the outer side of the inner rod and slidably matched with the inner rod, wherein the outer rod is rotationally matched with the movable base, and the inner rod is rotationally matched with the column.
8. A rapid replacement system for ballastless track bed of a subway operating line according to claim 7, characterized in that: A plurality of third threaded holes are formed through the inner rod and the outer rod, and the inner threads of two corresponding third threaded holes are matched with the same third fastening bolt.
9. A method for quickly replacing ballastless track bed for subway operation lines, characterized in that: include: Construction step 1: Chiseling out the center concrete: First, the first set of water-grinding drills (2 units) were started to drill. After drilling into three sets of roadbeds, the second set of water-grinding drills (3 units) were started to chisel out the remaining concrete in the center of the road. Workers used pneumatic picks to remove the remaining concrete after the water-grinding drills had chiseled out. Construction step 2: Removal of concrete under the track and installation of temporary sleepers: Select a fastener and start to remove the concrete underneath it; use a water-grinding drill (2+2 units) to remove the concrete every five times, and workers use pneumatic picks to clean up the remaining parts; after removing the concrete under the rail, use temporary fasteners to fix the rails on temporary sleepers; Construction step three: Formwork erection and permanent roadbed pouring: Removal of temporary sleepers: Remove the temporary sleepers and fasteners installed the day before; set up new ballast formwork; pour permanent ballast concrete and reserve steel bars holes at the four corners; install permanent fasteners before the concrete solidifies; Construction step 4: U-shaped steel bar implantation and concrete curing: Insert U-shaped steel bars into the reserved steel bar holes; use anchoring glue to firmly connect the U-shaped steel bars to the roadbed concrete; wait for the concrete to completely solidify; Construction step five: track fine-tuning: After the concrete reaches the specified strength, the geometric dimensions and stability of the track are checked; Track fine-tuning: The track is fine-tuned according to the inspection results to ensure the smoothness and safety of the track.
Citation Information
Patent Citations
Small high speed ballastless track drilling device
CN103866661A
Embedded rigidity anchor rod pile, counter-force balance equipment and method and technical schedule of counter-force balance
CN107489176A
Quick maintenance method for double-block ballastless track
CN111827022A
Automatic equipment for drilling and bolt planting of railway ballast bed
CN115821663A
Water mill gang drill for replacing ballastless track bed of railway
CN118223347A
Cited By
Expansion joint cutting and cleaning integrated system for slab ballastless track bed
CN120250409A
A system for cutting and cleaning expansion joints for slab track bed
CN120250409B