Well track control system of deep double-communication horizontal well

Through technical means such as wellbore trajectory design and planning module, the uncertainty of tool in the control of the wellbore trajectory of deep double-connected horizontal wells has been solved, and the precise control and guidance of the wellbore trajectory is realized, and the improvement of the improvement of the wellbore trajectory is achieved. mining efficiency.

CN118933705AInactive Publication Date: 2024-11-12HENAN ZHONGYUAN CHEM

Patent Information

Application Number
CN202411275131.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, there is uncertainty in the tool inclination capability and differences in formation characteristics of the wellbore trajectory control of deep double-connected horizontal wells, which leads to the difficulty of precise control and guidance of the wellbore and reduces the mining efficiency.

Method used

Adopt the wellbore trajectory design and planning module, the wellbore measurement and monitoring module, the data acquisition module, the data processing module, the trajectory guidance and adjustment module and the remote monitoring module. Through real-time data acquisition and processing, the wellbore trajectory is optimized and the wellbore trajectory is improved. Controlled accuracy.

Benefits of technology

The prediction accuracy of tool slope is improved, the precise control and guidance of the wellbore trajectory is achieved, and the expected geological and engineering goals are achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933705A_ABST
    Figure CN118933705A_ABST
Patent Text Reader

Abstract

The invention discloses a borehole trajectory control system for a deep double-communication horizontal well. The borehole trajectory control system comprises a borehole trajectory designing and planning module, a borehole measuring and monitoring module, a data collecting module, a data processing module, a trajectory guiding and adjusting module and a remote monitoring module. The borehole trajectory designing and planning module is used for planning and optimizing a complex trajectory of a borehole in a to-be-detected area so as to connect a plurality of horizontal borehole paths; the borehole measuring and monitoring module is used for measuring and monitoring the orientation, the inclination angle and the direction of a borehole in a to-be-measured area in real time; the data acquisition module is used for acquiring geological data and acquisition data of a to-be-measured area; the data processing module is used for processing the geological data and the acquisition data of the to-be-measured area to obtain the processed geological data and the acquisition data; the track guiding and adjusting module is used for guiding and adjusting the well track according to the processed geological data and the collected data; and the remote monitoring module is used for remotely accessing and monitoring well site operation, adjusting and optimizing the well track.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of energy mining, and in particular relates to a wellbore trajectory control system for a deep double-connected horizontal well. Background Art

[0002] A dual-connected horizontal well is a special type of horizontal well. Its main feature is that the wellbore design allows salt, alkali, oil, gas or water to enter and leave from two or more different horizontal wellbore paths. This design has important application significance in salt, alkali, oil and gas mining and coal resource development, especially when it is necessary to increase production capacity or optimize resource recovery. The advantages of dual-connected horizontal wells include: Increased production capacity: Dual-connected horizontal wells can extract deep resources from different horizontal wellbore paths, effectively increasing the production capacity and recovery rate of the well, especially for resources with poor deep interlayer development. This is very important for the economic benefits of natural alkali and salt resources, and can increase overall production while reducing the number of drillings. Resource optimization: In the development of natural alkali and salt, by designing dual-connected wells, the resources in the geological reservoir can be better developed and utilized, and waste and resource loss in the mining process can be reduced. Engineering complexity: Designing and drilling dual-connected horizontal wells is usually more complex than single horizontal wells. It requires precise wellbore trajectory control, advanced steering technology and precision drilling operations to ensure the connection of each wellbore path and normal production operation. Geological adaptability: Dual-connected horizontal wells are suitable for various geological conditions, but are particularly suitable for situations where multiple layers or formation characteristics are uneven and need to be controlled and managed. It can maximize the use of various resources in geological reservoirs. The design and control of dual-connected horizontal wells involve the application of multiple technologies and tools, including but not limited to: Wellbore trajectory design and optimization: Use advanced computer-aided design (CAD) and geological modeling software to plan complex trajectories that can effectively connect multiple horizontal wellbore paths. Steering tools and technologies: Use high-precision measuring while drilling (MWD) and logging while drilling (LWD) systems, as well as guidance tools such as geomagnetic azimuth gauges, to measure the azimuth, inclination and direction of the wellbore in real time to ensure the accuracy and stability of the wellbore trajectory. Real-time data acquisition and processing: Collect real-time geological and engineering data, including formation characteristics, lithology changes, etc., through sensors for decision support and adjustment of wellbore trajectory. Remote monitoring and support: Use remote monitoring systems to monitor and support well site operations in real time, and adjust and optimize wellbore trajectories in a timely manner. The content of borehole trajectory control includes: optimizing drilling tool combination, optimizing drilling parameters, using advanced downhole tools and instruments, using computers to detect and predict borehole trajectories, using the azimuth drift law of formations, avoiding complex downhole situations, etc. The technical difficulties in the existing technology are: uncertainty in tool deflection ability, different blocks and different formations have very different tool deflection abilities; high requirements for target areas for deep mining, and increased uncertainty in the vertical depth of the target layer; after measuring system information, it is difficult to predict the bottom of the well. In short, it is difficult to accurately control and guide the wellbore, which reduces the efficiency of mining. Summary of the invention

[0003] In order to solve the above technical problems, the present invention proposes a wellbore trajectory control system for deep double-connected horizontal wells to achieve precise control and guidance of the wellbore to achieve the expected geological and engineering goals.

[0004] To achieve the above-mentioned object, the present invention provides a wellbore trajectory control system for a deep double-connected horizontal well, comprising: a wellbore trajectory design and planning module, a wellbore measurement and monitoring module, a data acquisition module, a data processing module, a trajectory guidance and adjustment module and a remote monitoring module;

[0005] The wellbore trajectory design and planning module is used to plan and optimize the complex trajectory of the wellbore in the area to be tested to connect multiple horizontal wellbore paths;

[0006] The wellbore measurement and monitoring module is used to measure and monitor the azimuth, inclination and direction of the wellbore in the area to be measured in real time;

[0007] The data acquisition module is used to obtain geological data and acquisition data of the area to be tested;

[0008] The data processing module is used to process the geological data and the collected data of the area to be measured to obtain the processed geological data and the collected data;

[0009] The trajectory guidance and adjustment module is used to guide and adjust the wellbore trajectory according to the processed geological data and acquisition data;

[0010] The remote monitoring module is used to connect with each module, remotely access and monitor well site operations, and adjust and optimize wellbore trajectory in real time.

[0011] Optionally, the geological data includes formation volume density data, formation pressure, pore pressure, formation pore pressure gradient value and formation rock pressure gradient value; the acquired data includes shear wave time difference data and longitudinal wave time difference data.

[0012] Optionally, the wellbore trajectory design and planning module includes a geological data analysis unit, a target layer determination unit and a wellbore path design unit;

[0013] The geological data analysis unit is used to analyze the geological data to determine the nature and characteristics of the strata and possible geological risks;

[0014] The target layer determination unit is used to determine the target layer of the wellbore;

[0015] The wellbore path design unit is used to design a specific path of the wellbore by using computer-aided design software.

[0016] Optionally, the wellbore measurement and monitoring module includes a wellbore measurement unit and a wellbore monitoring unit;

[0017] The wellbore measurement unit is used to measure the azimuth, inclination and direction of the wellbore in the area to be measured in real time;

[0018] The wellbore monitoring unit is used to monitor the azimuth, inclination and direction of the wellbore in the test area in real time.

[0019] Optionally, the data acquisition module includes a data acquisition unit and a data transmission unit;

[0020] The data acquisition unit is used to acquire geological data and acquisition data of the area to be measured;

[0021] The data transmission unit is used to transmit the geological data and acquisition data of the area to be measured to the data processing module.

[0022] Optionally, the data processing module includes a data receiving unit and a data analyzing unit;

[0023] The data receiving unit is used to receive the geological data and acquisition data of the area to be measured;

[0024] The data analysis unit is used to analyze the received geological data and acquisition data of the area to be measured to obtain processed geological data and acquisition data.

[0025] Optionally, the trajectory guidance and adjustment module includes an elastic hardness unit, a risk index unit, a position determination unit and a control drilling unit;

[0026] The elasticity and hardness unit is used to determine the rock elasticity and rock strength of the current formation based on the processed geological data and the acquired data;

[0027] The risk index unit is used to determine the risk index of collapse of the current formation according to the rock elasticity and the rock strength;

[0028] The position determination unit is used to determine the well section position of the current formation through the detection distance of the geosteering measurement equipment;

[0029] The control drilling unit is used to adjust the drilling direction of the drill bit according to the well section position when the risk index is greater than a preset value.

[0030] Optionally, the drilling method comprises the following steps:

[0031] Design the wellbore trajectory of dual-connected horizontal wells based on the geological information of the area to be tested and the geological information of the target layer;

[0032] Build dual-connected horizontal well drilling equipment, adjust the drilling direction of the drill bit in real time, and control the drill bit to drill according to the wellbore trajectory of the dual-connected horizontal well.

[0033] Optionally, the well section positions include vertical wells, directional well sections and horizontal well sections.

[0034] Optionally, the remote monitoring module includes a remote access unit and a remote control unit;

[0035] The remote access unit is used for operators and engineers to access historical data through remote connection, conduct retrospective analysis and generate reports;

[0036] The remote control unit is used by the operator and the engineer to control and adjust the wellbore trajectory according to the remote monitoring situation.

[0037] Technical effect of the invention: The invention discloses a wellbore trajectory control system for deep dual-connected horizontal wells, which improves the prediction accuracy of tool inclination rate, accurately detects the depth of deep layers, provides reliable data for wellbore trajectory control, makes predictions of drilled wells and wells to be drilled, improves the wellbore trajectory control accuracy, realizes precise control and guidance of the wellbore, so as to achieve the expected geological and engineering goals. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0039] Figure 1 The present invention is a flowchart of a wellbore trajectory control system for a deep dual-connected horizontal well according to an embodiment of the present invention. DETAILED DESCRIPTION

[0040] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0041] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0042] like Figure 1 As shown, in this embodiment, a wellbore trajectory control system for a deep double-connected horizontal well is provided, including: a wellbore trajectory design and planning module, a wellbore measurement and monitoring module, a data acquisition module, a data processing module, a trajectory guidance and adjustment module and a remote monitoring module;

[0043] Wellbore trajectory design and planning module, used to plan and optimize the complex trajectory of wells in the area to be tested to connect multiple horizontal wellbore paths;

[0044] Wellbore measurement and monitoring module, used to measure and monitor the azimuth, inclination and direction of the wellbore in the area to be measured in real time;

[0045] The data acquisition module is used to obtain geological data and acquisition data of the area to be tested; the geological data includes formation volume density data, formation pressure, pore pressure, formation pore pressure gradient value and formation rock pressure gradient value; the acquisition data includes shear wave time difference data and longitudinal wave time difference data;

[0046] A data processing module is used to process the geological data and acquisition data of the area to be measured and obtain the processed geological data and acquisition data;

[0047] The trajectory guidance and adjustment module is used to guide and adjust the wellbore trajectory according to the processed geological data and acquisition data;

[0048] The remote monitoring module is used to connect with various modules, remotely access and monitor well site operations, and adjust and optimize wellbore trajectory in real time.

[0049] The borehole trajectory design and planning module includes a geological data analysis unit, a target layer determination unit and a borehole path design unit; the geological data analysis unit is used to analyze geological data to determine the nature and characteristics of the stratum and possible geological risks; the target layer determination unit is used to determine the target layer of the borehole; the borehole path design unit is used to design the specific path of the borehole through computer-aided design software. The borehole measurement and monitoring module includes a borehole measurement unit and a borehole monitoring unit; the borehole measurement unit is used to measure the azimuth, inclination and direction of the borehole in the test area in real time; the borehole monitoring unit is used to monitor the azimuth, inclination and direction of the borehole in the test area in real time.

[0050] The data acquisition module includes a data acquisition unit and a data transmission unit; the data acquisition unit is used to acquire the geological data and acquisition data of the area to be tested; the data transmission unit is used to transmit the geological data and acquisition data of the area to be tested to the data processing module. The data processing module includes a data receiving unit and a data analysis unit; the data receiving unit is used to receive the geological data and acquisition data of the area to be tested; the data analysis unit is used to analyze the received geological data and acquisition data of the area to be tested to obtain the processed geological data and acquisition data. Specifically, the data receiving and preprocessing unit is responsible for receiving the original data stream from the data acquisition system and performing preliminary preprocessing and filtering. The preprocessing may include the timestamp marking of the data, the verification and error correction of the data to ensure the accuracy and integrity of the data. The data storage and management unit is responsible for storing the preprocessed data in an appropriate data storage device, such as a database or a file system. These data usually need to be organized in a time series or other related structured manner for subsequent query, analysis and retrieval. The real-time data processing and analysis unit is responsible for processing and analyzing the real-time data stream. These processing and analysis involve tasks such as calculating the real-time values ​​of wellbore parameters, implementing real-time alarms and anomaly detection, and performing real-time data conversion. These processes usually need to be completed in a very short time to support real-time monitoring and decision-making. Offline data processing and analysis unit: used for in-depth analysis of historical data, trend analysis, pattern recognition, and predictive modeling. These analyses involve the use of machine learning algorithms, statistical analysis methods, or professional domain knowledge to mine hidden information and correlations in the data. Data security and protection unit: responsible for data encryption, access control, backup and recovery, and data integrity assurance to ensure that data is not subject to unauthorized access and damage. User interface and report generation unit: used to display processed data results to users, generate visual reports and charts, and provide interactive query and analysis tools so that users can easily access and understand the processed data.

[0051] The trajectory guidance and adjustment module includes an elastic hardness unit, a risk index unit, a position determination unit and a control drilling unit; the elastic hardness unit is used to determine the rock elasticity and rock strength of the current formation according to the processed geological data and the collected data; the risk index unit is used to determine the risk index of collapse of the current formation according to the rock elasticity and rock strength; the position determination unit is used to determine the well section position of the current formation through the detection distance of the geological guidance measurement equipment; the well section position includes vertical well, directional well section and horizontal well section; the control drilling unit is used to adjust the drilling direction of the drill bit according to the well section position when the risk index is greater than the preset value. A further drilling method includes the following steps: designing a double-connected horizontal well bore trajectory based on the geological information of the area to be measured and the geological information of the target layer; building a double-connected horizontal well drilling equipment, adjusting the drilling direction of the drill bit in real time, and controlling the drill bit to drill according to the double-connected horizontal well bore trajectory. When the well section is a vertical well and a directional well section, the construction method includes determining the distance between the initial position of the drill bit and the old hole position in the well section, controlling the resistance value of the drill bit to not exceed the set threshold, determining the drilling time of the drill bit, and controlling the drill bit to perform directional drilling. When the well section is a horizontal well section, the construction method includes determining the well inclination and azimuth position of the wellbore, controlling the drilling fluid return speed value, determining the stationary time of the drill bit in the well section, and controlling the drill bit to perform directional drilling.

[0052] The remote monitoring module includes a remote access unit and a remote control unit; the remote access unit is used by operators and engineers to access historical data through remote connections, conduct retrospective analysis and generate reports; the remote control unit is used by operators and engineers to control and adjust the wellbore trajectory according to the remote monitoring situation. It also includes: Data transmission and reception module: responsible for receiving real-time data streams from downhole measurement equipment (such as inclinometers, direction sensors, etc.) and ground control centers. Data transmission can be carried out through wireless communication (such as satellite communication, wireless network) or wired communication (such as optical fiber, cable). Data parsing and processing module: The received data needs to be parsed and processed to convert it into a format that can be used for monitoring and analysis. This includes data decoding, verification and error correction to ensure the integrity and accuracy of the data. Real-time monitoring and display module: responsible for displaying the processed data on the operator's monitoring interface, usually in the form of a graphical interface. These interfaces include wellbore trajectory maps, sensor measurement data, operation instructions and real-time alarm information. Alarm and exception handling module: used to monitor abnormal conditions in the data stream and trigger corresponding alarms. Threshold-based alarms, such as measurement values ​​that exceed the preset range, or alarms for system failures and communication interruptions. Data storage and remote access module: responsible for storing historical data in a reliable database and supporting remote access and retrieval. Operators and engineers access historical data through secure remote connections for retrospective analysis and report generation. Security and authority control module: as it involves remote control and monitoring of important equipment, this ensures that only authorized personnel can access the system and perform operations to prevent unauthorized access and operation.

[0053] The wellbore trajectory control technologies in the specific examples include:

[0054] 1. Directional selection of inclined well section

[0055] There are five types of initial deflection methods, namely, downhole motor and elbow orientation, jet method, whipstock method, curved guide tube orientation, and inclined drilling rig orientation. This deflection drilling tool combination uses the elbow to generate an elastic torque in the lower drill bit, forcing the downhole power drill to drive the drill bit to cut sideways, so that the new wellbore drilled deviates from the original wellbore axis, achieving the purpose of directional deflection or twisting azimuth. The deflection capacity of the deflection drilling tool is mainly related to the bend angle of the elbow and the length of the power drill. The larger the bend angle of the elbow, the shorter the length of the power drill and the higher the deflection rate. The bend angle of the elbow should be selected according to the size of the wellbore, the specifications of the downhole power drill and the required deflection rate. The bend angle of the commonly used elbow on site is 1.5 to 2.25 degrees, generally not more than 2.5 degrees. The model of the downhole power drill used in the deflection drilling tool combination should be selected according to the depth of the deflection section or the twisting section. For well sections within 2000 meters, turbodrills or ordinary screw drills are generally used. For deep-layer strike deflection or twisting, high-temperature resistant multi-head screw drills should be used. There are four directional methods according to the type of inclinometer:

[0056] 1. Single point orientation

[0057] This method is only applicable to the case where the inclination point is shallow, usually the well depth is less than 1000 meters. Because when the inclination point is deep, the reverse torque angle is difficult to control and the directional drilling time is longer. The construction process is as follows: (1) Lower the directional inclination drilling tool to the inclination point. (2) Single-point inclination measurement, measure the well inclination angle, azimuth angle, and elbow tool surface at the inclination position; (3) While taking inclination photos, print the drill pipe and the drill pipe, and project the mark of the wellhead drill pipe on the outer edge of the turntable surface as a reference point; (4) Adjust the tool surface (the adjusted tool surface is: designed azimuth angle + reverse torque angle). Lock the turntable and start drilling; (5) Directional drilling. Perform a single-point inclination measurement every 2 to 4 single roots, and correct the reverse torque error in time according to the measured well inclination angle and azimuth angle, and adjust the tool surface; (6) When the well inclination angle reaches 8 to 10 degrees and the azimuth is appropriate, start drilling, replace the inclination drilling tool, and use the turntable to drill.

[0058] 2. Ground Recording Gyro (SRO) Orientation

[0059] SRO orientation is required for directional drilling in an environment with magnetic interference. This instrument can transmit downhole data to the ground processing system through a cable and display or print it out by computer until the tool face is adjusted to the predetermined position and the instrument is pulled out. The construction process is as follows: (1) Select a reference object. The reference object should be a fixed target that is easy to observe and is about 40 meters away from the well; (2) Preheat the gyro for at least 15 minutes. Only when it works normally can it be lowered into the well; (3) Aim at the reference object and adjust the initial gyro reading; (4) Connect the probe, connect the gyro outer tube, aim at the reference object again, and initialize the probe and computer; (5) Go down to the well for measurement and perform drift inspection according to regulations; (6) Pull out the instrument and sit it at the wellhead, aim at the reference object again and record the gyro reading; (7) Correct the gyro drift and determine the measurement accuracy; (8) Directional drilling.

[0060] 3. Wired SST Direction

[0061] After the inclination drilling tool is lowered to the bottom of the well, the pump is turned on for about half an hour, and then the bypass head or circulation joint is connected. The downhole instrument assembly of the inclinometer is lowered into the drill pipe so that the notch of the directional shoe sits on the directional key. When directional inclination is being drilled, the well inclination, azimuth and tool face of the actual wellbore can be directly read from the ground instrument. The driller and directional well engineer must always track the predetermined tool face direction and keep the wellbore trajectory drilled in the predetermined direction.

[0062] 4. Measurement While Drilling (MWD) Direction

[0063] The MWD downhole instrument assembly is installed in the non-magnetic drill collar of the lower drilling tool assembly. Before going downhole, the working mode and transmission speed must be adjusted, and the offset value must be accurately measured and input into the computer. The borehole parameters measured by the instrument downhole are transmitted to the ground through drilling fluid pulses. After the information is processed on the ground, it can be quickly transmitted to the drilling platform. MWD can not only be used for directional deflection, but also for continuous measurement in rotary drilling. It is an advanced measuring instrument.

[0064] 2. Rotary table drilling to increase the deflection section

[0065] The inclination increasing drilling tool combination is: drill bit + near-bit stabilizer + non-magnetic drill collar + drill collar + stabilizer + drill collar + stabilizer + drill collar + drilling jar + weighted drill pipe + drill pipe. Construction precautions: 1. Drill according to the designed drilling parameters and feed the drill evenly to make the wellbore curvature change smoothly. 2. Measure every 25 to 50 meters of drilling and draw graphs at any time to grasp the changing trends of well inclination and azimuth. If the inclination increasing rate cannot meet the design requirements, timely measures should be taken: (1) Adjust the drilling pressure to change the inclination increasing rate. Increasing the drilling pressure can increase the inclination increasing rate, while reducing the drilling pressure will reduce the inclination increasing rate. (2) Replace the drilling tool combination and change the distance between the near-bit stabilizer and the adjacent stabilizer. The range of change is 10 to 30 meters. The shorter the distance, the lower the slope increase rate, and the longer the distance, the higher the slope increase rate; (3) Change the rigidity of the drill collar between the near-bit stabilizer and the adjacent stabilizer. The higher the rigidity, the lower the slope increase rate; the lower the rigidity, the higher the slope increase rate. (4) The distance between the bottom of the drill bit and the middle of the wing of the near-bit stabilizer is 0.7 to 1.2 meters. 3. If the slope increase rate is slightly lower than the design value, use the forced slope increase method. (l) After connecting a single root, turn on the pump to the designed displacement and slowly increase the pressure to about 75% of the designed drilling pressure; (2) Turn the turntable to the designed speed and gradually increase the drilling pressure to the maximum allowable drilling pressure; (3) After drilling a single root, stop the turntable immediately, the drilling pressure does not return to zero, and lift the drill bit. (4) When reaming, do not reame the last 2 meters or so of the bottom of the well. When using the forced inclination increase method, you should pay attention to the following: first, the torque of the current drilling turntable should not be too large; second, when starting the turntable, the drilling pressure should be maintained at a predetermined value; third, the quality of all components of the entire downhole drilling tool should be qualified; fourth, this special method can only achieve a slight increase in effect.

[0066] 3. Steady-inclination well section

[0067] The combination of the stable inclination drilling tool is: drill bit + near-bit stabilizer + short drill collar + stabilizer + non-magnetic drill collar + stabilizer + drill collar + keyway breaker + flexible joint + jar + weighted drill pipe. Construction measures: 1. After the inclination or increase of inclination is completed, when the first stable inclination drilling tool is lowered, it is necessary to slowly drill from the inclination point. Especially in the case of soft formations and high inclination rates, it is easy to encounter resistance and may produce new wells. It is necessary to pay attention to the following: (1) When encountering resistance during drilling, move the drilling tool 3 to 5 times and do not "crush" the drilling tool; (2) Turn on the pump and slowly lower it 2 to 3 times. (3) About 1.5 meters above the resistance point, rotate the turntable at medium and high speed (80 to 90 rpm) and lower it quickly. The drilling pressure should not exceed 98 kN (10 tons); (4) After passing the resistance point, move the drilling tool up and down 1 to 2 times and continue drilling. 2. When drilling in formations with severe azimuth right drift, use a stabilizer with "super long wings" (same drill bit assembly) to stabilize the azimuth. PDC drill bits can also be used to take advantage of the characteristic of PDC drill bits with a tendency to drift left in azimuth. 3. Summarize the natural increase or decrease inclination characteristics of the same formation and reasonably select a stable inclination drill bit assembly. 4. Measure inclination, with the maximum measurement interval not exceeding 100 meters. The measurement interval for key sections of special wells should be about 30 meters. Draw vertical profiles and horizontal projections in a timely manner to keep track of the actual drilling wellbore trajectory at any time.

[0068] 4. Downslope Section

[0069] Commonly used down-drilling tool combination drill bit + short drill collar + stabilizer + non-magnetic drill collar + stabilizer + drill collar + keyway breaker + flexible joint + jar + weighted drill pipe + drill pipe.

[0070] 5. Twist the direction

[0071] In terms of drilling tool assembly, the main influence on azimuth drift is the first 30 to 60 meters of drilling tool assembly. Stabilizers can stabilize azimuth drift. The more stabilizers there are, the less change there will be in the overall trend of azimuth drift. In other words, for the stable inclination drilling tool assembly, due to the large number of stabilizers, the azimuth drift trend does not change much, while for the increasing and decreasing inclination drilling tool assembly, the azimuth drift trend may change.

[0072] The present invention provides a computer-readable storage medium, which includes a stored computer program; wherein, when the computer program is running, it controls the device where the computer-readable storage medium is located to execute the wellbore trajectory control system of the deep dual-connected horizontal well described in any of the above embodiments.

[0073] The present invention provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements the wellbore trajectory control system of the deep dual-connected horizontal well described in any of the above embodiments.

[0074] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A wellbore trajectory control system for a deep double-connected horizontal well, characterized in that: include: Wellbore trajectory design and planning module, wellbore measurement and monitoring module, data acquisition module, data processing module, trajectory guidance and adjustment module and remote monitoring module; The wellbore trajectory design and planning module is used to plan and optimize the complex trajectory of the wellbore in the area to be tested to connect multiple horizontal wellbore paths; The wellbore measurement and monitoring module is used to measure and monitor the azimuth, inclination and direction of the wellbore in the area to be measured in real time; The data acquisition module is used to obtain geological data and acquisition data of the area to be tested; The data processing module is used to process the geological data and the collected data of the area to be measured to obtain the processed geological data and the collected data; The trajectory guidance and adjustment module is used to guide and adjust the wellbore trajectory according to the processed geological data and acquisition data; The remote monitoring module is used to connect with each module, remotely access and monitor well site operations, and adjust and optimize wellbore trajectory in real time.

2. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 1, characterized in that: The geological data include formation volume density data, formation pressure, pore pressure, formation pore pressure gradient value and formation rock pressure gradient value; the acquired data include shear wave time difference data and longitudinal wave time difference data.

3. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 1, characterized in that: The wellbore trajectory design and planning module includes a geological data analysis unit, a target layer determination unit and a wellbore path design unit; The geological data analysis unit is used to analyze the geological data to determine the nature and characteristics of the strata and possible geological risks; The target layer determination unit is used to determine the target layer of the wellbore; The wellbore path design unit is used to design a specific path of the wellbore by using computer-aided design software.

4. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 1, characterized in that: The wellbore measurement and monitoring module includes a wellbore measurement unit and a wellbore monitoring unit; The wellbore measurement unit is used to measure the azimuth, inclination and direction of the wellbore in the area to be measured in real time; The wellbore monitoring unit is used to monitor the azimuth, inclination and direction of the wellbore in the test area in real time.

5. The wellbore trajectory control system for a deep dual-connected horizontal well according to claim 1, characterized in that: The data acquisition module includes a data acquisition unit and a data transmission unit; The data acquisition unit is used to acquire geological data and acquisition data of the area to be measured; The data transmission unit is used to transmit the geological data and acquisition data of the area to be measured to the data processing module.

6. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 1, characterized in that: The data processing module includes a data receiving unit and a data analyzing unit; The data receiving unit is used to receive the geological data and acquisition data of the area to be measured; The data analysis unit is used to analyze the received geological data and acquisition data of the area to be measured to obtain processed geological data and acquisition data.

7. The wellbore trajectory control system for a deep dual-connected horizontal well according to claim 1, characterized in that: The trajectory guidance and adjustment module includes an elastic hardness unit, a risk index unit, a position determination unit and a control drilling unit; The elasticity and hardness unit is used to determine the rock elasticity and rock strength of the current formation based on the processed geological data and the acquired data; The risk index unit is used to determine the risk index of collapse of the current formation according to the rock elasticity and the rock strength; The position determination unit is used to determine the well section position of the current formation through the detection distance of the geosteering measurement equipment; The control drilling unit is used to adjust the drilling direction of the drill bit according to the well section position when the risk index is greater than a preset value.

8. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 7, characterized in that: The drilling method comprises the following steps: Design the wellbore trajectory of dual-connected horizontal wells based on the geological information of the area to be tested and the geological information of the target layer; Build dual-connected horizontal well drilling equipment, adjust the drilling direction of the drill bit in real time, and control the drill bit to drill according to the wellbore trajectory of the dual-connected horizontal well.

9. The wellbore trajectory control system for a deep double-connected horizontal well according to claim 7, characterized in that: The well section positions include vertical wells, directional well sections and horizontal well sections.

10. The wellbore trajectory control system for a deep dual-connected horizontal well according to claim 1, characterized in that: The remote monitoring module includes a remote access unit and a remote control unit; The remote access unit is used for operators and engineers to access historical data through remote connection, conduct retrospective analysis and generate reports; The remote control unit is used by the operator and the engineer to control and adjust the wellbore trajectory according to the remote monitoring situation.

Citation Information

Patent Citations

  • Magnetic short section used for measuring distance between adjacent wells by electromagnetic detection while drilling

    CN101713287A

  • Trona deep and thin layer multi-connected horizontal well borehole track control method

    CN107060642A

  • Shale oil horizontal well borehole trajectory control method

    CN113338921A

  • Maintaining bracket of instrument of logging while drilling

    CN201148864Y

Cited By

  • Omnibearing deviation prevention device for geological exploration and use method thereof

    CN121138720A