Intelligent supervision system for safety production standardization technology service process

By designing an intelligent supervision system for standardized technical service processes for production safety, collecting production data, generating feature matrix and predicting risk scores, the problems of high labor costs and low efficiency in production safety supervision are solved, automated supervision is realized, and regulatory efficiency is improved.

CN118941014APending Publication Date: 2024-11-12JSTI GRP (JIANGSU) SAFETY SCI RES INST CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410980391.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing enterprises have high labor costs and low efficiency in production safety supervision, making it difficult to comprehensively and timely supervise the production site, and there is a risk of regulatory omissions.

Method used

An intelligent supervision system for standardized technical service processes of production safety was designed, including data acquisition module, feature matrix generation module, risk score prediction module and early warning measure generation module. By collecting equipment data, generating feature matrix, predicting risk scores and generating early warning measures , realize automated supervision.

Benefits of technology

By comprehensively considering the correlation impact between production links and the time dimension changes of data, risk scores are predicted and early warning measures are generated, automated production safety supervision is achieved, labor costs are reduced, and supervision efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941014A_ABST
    Figure CN118941014A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of production supervision, and discloses an intelligent supervision system for a safety production standardization technology service process, and the system comprises a data collection module which is used for collecting the production data of M production links and N time points of a workshop; the feature matrix generation module is used for generating a feature matrix according to the production data; the risk score prediction module is used for inputting the feature matrix into a risk score model, and an output value represents a risk score of the workshop in a second preset time period G; the early warning measure generation module is used for generating an early warning measure according to the risk score of the workshop in the second preset time period G; according to the invention, the risk score is predicted by comprehensively considering the association influence between different production links in the workshop and the change of the production data of the different production links in the time dimension through the risk scoring model, and the early warning measures are generated according to the risk score to realize automatic safety production supervision, so that the labor cost is reduced, and the supervision efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production supervision, and more specifically, to an intelligent supervision system for a safety production standardization technical service process. Background Art

[0002] With the development of social economy and the expansion of the labor market, production safety issues in various industries, such as industry, mining, and construction, have become increasingly prominent. Existing enterprises mainly carry out production safety supervision through the following methods, including: 1. Establishing a special production safety supervision department to supervise, inspect and evaluate the internal production safety management of the enterprise; 2. Setting up multiple supervisors at the production site to supervise whether production is carried out in accordance with production safety standards; 3. Manual regular inspection and maintenance of production equipment and safety facilities.

[0003] However, the above method has high manpower costs, low efficiency, and the risk of regulatory omissions. For example, the production site is generally large in area and complex in environment, and it is difficult to conduct comprehensive and timely supervision solely relying on manpower. Summary of the invention

[0004] The present invention provides an intelligent supervision system for the standardized technical service process of production safety, which solves the technical problems of high manpower cost and low efficiency in production safety supervision in related technologies.

[0005] The present invention provides an intelligent supervision system for production safety standardization technical service process, including:

[0006] A data collection module, which is used to collect production data of M production links at N time points in the workshop according to a preset time interval t within a first preset time period T;

[0007] Production data includes: equipment temperature, equipment pressure, equipment vibration signal, equipment current, equipment voltage, on-site gas concentration and images;

[0008] The equipment vibration signal is represented by a time domain waveform, with the horizontal axis representing the time point and the vertical axis representing the amplitude, which is represented by acceleration;

[0009] A feature matrix generation module, which is used to pre-process the production data of M production links to generate a feature matrix;

[0010] The element in the i-th row and j-th column of the feature matrix represents the production data of the i-th production link at the j-th time point, 1≤i≤M, 1≤j≤N, N=T / t;

[0011] A risk score prediction module, which is used to input the feature matrix into the risk score model, and the output value represents the risk score of the workshop in the second preset time period G;

[0012] The risk score ranges from 0 to 10;

[0013] The early warning measure generation module is used to generate early warning measures according to the risk score of the workshop within the second preset time period G.

[0014] Furthermore, T, t, M, N and G are all custom parameters.

[0015] Furthermore, the production data of the M production links are preprocessed to generate a feature matrix, including the following steps:

[0016] Step S201, for missing values ​​in the production data, filling is performed by taking the average of the value at the previous time point and the value at the next time point;

[0017] Step S202, converting the time domain waveform representation of the device vibration signal into a frequency domain waveform representation by fast Fourier transform, wherein the horizontal axis of the frequency domain waveform represents the frequency, and the vertical axis represents the energy value, and the frequency domain waveform includes energy values ​​corresponding to K frequencies, where K is a custom parameter;

[0018] Step S203, the production data is normalized by the maximum and minimum normalization method, and the formula is as follows:

[0019]

[0020] Where 1≤v≤N, Norm v Represents the normalized production data, Ele v represents the production data corresponding to the vth time point, Ele max and Ele min Respectively represent the maximum and minimum values ​​of production data at all time points.

[0021] Further, the risk scoring model includes N hidden layers, each hidden layer includes M first units, expansion units, splicing units and second units;

[0022] The i-th first unit of the j-th hidden layer inputs the image of the production data of the i-th row and j-th column of the feature matrix and outputs a feature map;

[0023] The i-th expansion unit of the j-th hidden layer is used to expand the feature map output by the i-th first unit of the j-th hidden layer into a vector representation;

[0024] The i-th concatenation unit of the j-th hidden layer is used to concatenate the vector representation of the feature map output by the i-th expansion unit of the j-th hidden layer to the production data of the i-th row and the j-th column of the feature matrix to obtain a combined vector;

[0025] That is, each element of the feature matrix is ​​represented by a combination vector;

[0026] The second i-th unit of the j-th hidden layer inputs the combination vector of the i-th row and j-th column of the feature matrix and outputs the updated feature;

[0027] The updated features output by the Mth second unit of the Nth hidden layer are input into the first classifier, and the classification space of the first classifier represents the risk score of the workshop within the second preset time period G.

[0028] Furthermore, the first unit is constructed based on a convolutional neural network.

[0029] Furthermore, the calculation formula of the i-th second unit of the j-th hidden layer includes:

[0030] The reset gate of the second unit of the i-th hidden layer The calculation formula is as follows:

[0031]

[0032] in and Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the reset gate of the i-th second unit of the j-th hidden layer;

[0033] The update gate of the second unit of the i-th hidden layer The calculation formula is as follows:

[0034]

[0035] in Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the update gate of the i-th second unit of the j-th hidden layer;

[0036] Candidate hidden state of the second unit of the i-th hidden layer The calculation formula is as follows:

[0037]

[0038] in and They respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the candidate hidden state of the i-th second unit of the j-th hidden layer, represents the reset gate of the second unit of the i-th hidden layer, ⊙ represents point-by-point multiplication;

[0039] The hidden state of the second unit of the i-th hidden layer The calculation formula is as follows:

[0040]

[0041] in and denote the update gate and candidate hidden state of the second unit of the i-th hidden layer respectively, and ⊙ denotes point-by-point multiplication;

[0042] Definition: 1≤j≤M, 1≤i≤N, Represents the combination vector of the jth row and the ith column of the feature matrix of the i-th second unit input of the j-th hidden layer, where represents the updated features of the output of the second unit of the i-th hidden layer, represents the updated features of the output of the i-1th second unit of the jth hidden layer, and All are assigned a value of 0, sigmoid represents the sigmoid activation function, and tanh represents the hyperbolic tangent function.

[0043] Furthermore, sample labels of training samples for training the risk scoring model are obtained by manual labeling.

[0044] Furthermore, the loss function of the risk scoring model adopts the cross entropy loss function.

[0045] Furthermore, the first unit is pre-trained before the risk scoring model is trained. During the pre-training process, the feature map output by the first unit is expanded into a vector representation and then input into the second classifier. The classification space of the second classifier represents whether there is a fire in the workshop, and the classification label of the second classifier is manually labeled.

[0046] Furthermore, the risk score of the workshop in the second preset time period G is divided into three levels. Risk scores of 0 to 3 are defined as low risk levels, and no early warning measures are taken at low risk levels; risk scores of 4 to 7 are defined as medium risk levels, and the early warning measures for medium risk levels are to immediately send early warning text messages and emails to relevant responsible persons; risk scores of 8 to 10 are defined as high risk levels, and the early warning measures for high risk levels are to immediately shut down related equipment and production lines, send alarm signals through the public broadcasting system in the workshop, and simultaneously send early warning text messages and emails to relevant responsible persons.

[0047] The beneficial effects of the present invention are as follows: the present invention predicts the risk score by comprehensively considering the correlation impact between different production links in the workshop and the changes in production data of different production links in the time dimension through a risk scoring model, and generates early warning measures according to the risk score to realize automated production safety supervision, thereby reducing labor costs and improving supervision efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1It is a schematic diagram of the intelligent supervision system for the safety production standardization technical service process of the present invention;

[0049] Figure 2 It is a flow chart of the present invention for preprocessing production data to generate a feature matrix.

[0050] In the figure: data collection module 101, feature matrix generation module 102, risk score prediction module 103, early warning measure generation module 104. DETAILED DESCRIPTION

[0051] The subject matter described herein will now be discussed with reference to example embodiments. It should be understood that the discussion of these embodiments is only to enable those skilled in the art to better understand and implement the subject matter described herein, and the functions and arrangements of the elements discussed may be changed without departing from the scope of protection of the contents of this specification. Each example may omit, replace or add various processes or components as needed. In addition, the features described relative to some examples may also be combined in other examples.

[0052] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in one or more embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0053] like Figure 1-Figure 2 As shown in the figure, the intelligent supervision system of safety production standardization technical service process includes:

[0054] The data collection module 101 is used to collect production data of M production links at N time points of the workshop within a first preset time period T according to a preset time interval t;

[0055] Production data includes: equipment temperature, equipment pressure, equipment vibration signal, equipment current, equipment voltage, on-site gas concentration and images;

[0056] The equipment vibration signal is represented by a time domain waveform, with the horizontal axis representing the time point and the vertical axis representing the amplitude, which is represented by acceleration;

[0057] A feature matrix generation module 102 is used to pre-process the production data of M production links to generate a feature matrix;

[0058] The element in the i-th row and j-th column of the feature matrix represents the production data of the i-th production link at the j-th time point, 1≤i≤M, 1≤j≤N, N=T / t;

[0059] A risk score prediction module 103 is used to input the feature matrix into the risk score model, and the output value represents the risk score of the workshop in the second preset time period G;

[0060] The risk score ranges from 0 to 10;

[0061] The early warning measure generation module 104 is used to generate early warning measures according to the risk score of the workshop within the second preset time period G.

[0062] In one embodiment of the present invention, T, t, M, N and G are all custom parameters. Preferably, T is set to 1 hour, t is set to 2 minutes, N is 30, M is set according to the actual number of production links, and G is set to 1 hour.

[0063] In one embodiment of the present invention, sensors designed for different production parameters are used to accurately acquire data. For example, temperature sensors are used to monitor the real-time temperature of the equipment, and industrial-grade pressure sensors are deployed to ensure accurate collection of pressure values ​​during equipment operation.

[0064] In one embodiment of the present invention, Figure 2 As shown, the production data of M production links are preprocessed to generate a feature matrix, including the following steps:

[0065] Step S201, for missing values ​​in the production data, filling is performed by taking the average of the value at the previous time point and the value at the next time point;

[0066] Step S202, the time domain waveform representation of the device vibration signal is converted into a frequency domain waveform representation by fast Fourier transform, the horizontal axis of the frequency domain waveform represents the frequency, and the vertical axis represents the energy value, and the frequency domain waveform includes energy values ​​corresponding to K frequencies, where K is a custom parameter, and preferably, K is set to 100;

[0067] Step S203, the production data is normalized by the maximum and minimum normalization method, and the formula is as follows:

[0068]

[0069] Where 1≤v≤N, Norm vRepresents the normalized production data, Ele v represents the production data corresponding to the vth time point, Ele max and Ele min Respectively represent the maximum and minimum values ​​of production data at all time points.

[0070] In one embodiment of the present invention, the risk scoring model includes N hidden layers, each hidden layer includes M first units, expansion units, splicing units, and second units;

[0071] The i-th first unit of the j-th hidden layer inputs the image of the production data of the i-th row and j-th column of the feature matrix and outputs a feature map;

[0072] The i-th expansion unit of the j-th hidden layer is used to expand the feature map output by the i-th first unit of the j-th hidden layer into a vector representation;

[0073] The i-th concatenation unit of the j-th hidden layer is used to concatenate the vector representation of the feature map output by the i-th expansion unit of the j-th hidden layer to the production data of the i-th row and the j-th column of the feature matrix to obtain a combined vector;

[0074] That is, each element of the feature matrix is ​​represented by a combination vector;

[0075] The second i-th unit of the j-th hidden layer inputs the combination vector of the i-th row and j-th column of the feature matrix and outputs the updated feature;

[0076] The updated features output by the Mth second unit of the Nth hidden layer are input into the first classifier, and the classification space of the first classifier represents the risk score of the workshop within the second preset time period G.

[0077] In one embodiment of the present invention, the first classifier is a softmax classifier.

[0078] In one embodiment of the present invention, the first unit is constructed based on a convolutional neural network.

[0079] In one embodiment of the present invention, the calculation formula of the i-th second unit of the j-th hidden layer includes:

[0080] The reset gate of the second unit of the i-th hidden layer The calculation formula is as follows:

[0081]

[0082] in and Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the reset gate of the i-th second unit of the j-th hidden layer;

[0083] The update gate of the second unit of the i-th hidden layer The calculation formula is as follows:

[0084]

[0085] in Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the update gate of the i-th second unit of the j-th hidden layer;

[0086] Candidate hidden state of the second unit of the i-th hidden layer The calculation formula is as follows:

[0087]

[0088] in and They respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the candidate hidden state of the i-th second unit of the j-th hidden layer, represents the reset gate of the second unit of the i-th hidden layer, ⊙ represents point-by-point multiplication;

[0089] The hidden state of the second unit of the i-th hidden layer The calculation formula is as follows:

[0090]

[0091] in and denote the update gate and candidate hidden state of the second unit of the i-th hidden layer respectively, and ⊙ denotes point-by-point multiplication;

[0092] Definition: 1≤j≤M, 1≤i≤N, x j i Represents the combination vector of the jth row and the ith column of the feature matrix of the i-th second unit input of the j-th hidden layer, where represents the updated features of the output of the second unit of the i-th hidden layer, represents the updated features of the output of the i-1th second unit of the jth hidden layer, and All are assigned a value of 0, sigmoid represents the sigmoid activation function, and tanh represents the hyperbolic tangent function.

[0093] In one embodiment of the present invention, sample labels of training samples for training the risk scoring model are obtained by manual labeling.

[0094] In one embodiment of the present invention, the loss function of the risk scoring model adopts a cross entropy loss function.

[0095] In one embodiment of the present invention, the first unit is pre-trained before the risk scoring model is trained. During the pre-training process, the feature map output by the first unit is expanded into a vector representation and then input into the second classifier. The classification space of the second classifier represents whether there is a fire in the workshop, and the classification label of the second classifier is manually labeled.

[0096] It should be noted that pre-training can speed up the training of the model, extract the key features of the image, and significantly reduce the computational burden and time cost of custom training; and when the new task has something in common with the initial task, through the transfer learning strategy, the features extracted by pre-training can be fully utilized to achieve a significant leap in performance in the new task scenario; in addition, the parameters of the pre-trained model have a strong generalization ability for common patterns due to the experience of being trained on massive data sets. Therefore, in the process of fine-tuning the new data set, the model is more focused on capturing subtle changes unique to the task rather than reconstructing global features. This mechanism effectively reduces the risk of overfitting.

[0097] In one embodiment of the present invention, the second classifier is a sigmoid classifier.

[0098] In one embodiment of the present invention, the risk score of the workshop in the second preset time period G is divided into three levels, and the risk score of 0 to 3 is defined as a low risk level, and no early warning measures are taken at the low risk level. The risk score of 4 to 7 is defined as a medium risk level, and the early warning measures for the medium risk level are to immediately send early warning text messages and emails to relevant responsible persons. The risk score of 8 to 10 is defined as a high risk level, and the early warning measures for the high risk level are to immediately shut down the associated equipment and production lines, send an alarm signal through the public broadcasting system in the workshop, and simultaneously send early warning text messages and emails to relevant responsible persons to ensure rapid response and processing.

[0099] The above describes an embodiment of the present embodiment, but the present embodiment is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present embodiment, ordinary technicians in this field can also make many forms, all of which are within the protection of the present embodiment.

Claims

1. The intelligent supervision system of safety production standardization technical service process is characterized by: include: A data collection module, which is used to collect production data of M production links at N time points in the workshop according to a preset time interval t within a first preset time period T; Production data includes: equipment temperature, equipment pressure, equipment vibration signal, equipment current, equipment voltage, on-site gas concentration and images; The equipment vibration signal is represented by a time domain waveform, with the horizontal axis representing the time point and the vertical axis representing the amplitude, which is represented by acceleration; A feature matrix generation module, which is used to pre-process the production data of M production links to generate a feature matrix; The element in the i-th row and j-th column of the feature matrix represents the production data of the i-th production link at the j-th time point, 1≤i≤M, 1≤j≤N, N=T / t; A risk score prediction module, which is used to input the feature matrix into the risk score model, and the output value represents the risk score of the workshop in the second preset time period G; The risk score ranges from 0 to 10; The early warning measure generation module is used to generate early warning measures according to the risk score of the workshop within the second preset time period G.

2. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: T, t, M, N, and G are custom parameters.

3. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: Preprocessing the production data of M production links to generate a feature matrix includes the following steps: Step S201, for missing values ​​in the production data, filling is performed by taking the average of the value at the previous time point and the value at the next time point; Step S202, converting the time domain waveform representation of the device vibration signal into a frequency domain waveform representation by fast Fourier transform, wherein the horizontal axis of the frequency domain waveform represents the frequency, and the vertical axis represents the energy value, and the frequency domain waveform includes energy values ​​corresponding to K frequencies, where K is a custom parameter; Step S203, the production data is normalized by the maximum and minimum normalization method, and the formula is as follows: Where 1≤v≤N, Norm v Represents the normalized production data, Ele v represents the production data corresponding to the vth time point, Ele max and Ele min Respectively represent the maximum and minimum values ​​of production data at all time points.

4. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: The risk scoring model includes N hidden layers, each of which includes M first units, expansion units, splicing units, and second units; The i-th first unit of the j-th hidden layer inputs the image of the production data of the i-th row and j-th column of the feature matrix and outputs a feature map; The i-th expansion unit of the j-th hidden layer is used to expand the feature map output by the i-th first unit of the j-th hidden layer into a vector representation; The i-th concatenation unit of the j-th hidden layer is used to concatenate the vector representation of the feature map output by the i-th expansion unit of the j-th hidden layer to the production data of the i-th row and the j-th column of the feature matrix to obtain a combined vector; That is, each element of the feature matrix is ​​represented by a combination vector; The second i-th unit of the j-th hidden layer inputs the combination vector of the i-th row and j-th column of the feature matrix and outputs the updated feature; The updated features output by the Mth second unit of the Nth hidden layer are input into the first classifier, and the classification space of the first classifier represents the risk score of the workshop within the second preset time period G.

5. The intelligent supervision system for production safety standardization technical service process according to claim 4 is characterized in that: The first unit is built on convolutional neural networks.

6. The intelligent supervision system for production safety standardization technical service process according to claim 4 is characterized in that: The calculation formula for the second unit of the i-th hidden layer includes: The reset gate of the second unit of the i-th hidden layer The calculation formula is as follows: in and Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the reset gate of the i-th second unit of the j-th hidden layer; The update gate of the second unit of the i-th hidden layer The calculation formula is as follows: in Respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the update gate of the i-th second unit of the j-th hidden layer; Candidate hidden state of the second unit of the i-th hidden layer The calculation formula is as follows: in and They respectively represent the first weight parameter, the second weight parameter and the bias parameter corresponding to the candidate hidden state of the i-th second unit of the j-th hidden layer, represents the reset gate of the second unit of the i-th hidden layer, ⊙ represents point-by-point multiplication; The hidden state of the second unit of the i-th hidden layer The calculation formula is as follows: in and denote the update gate and candidate hidden state of the second unit of the i-th hidden layer respectively, and ⊙ denotes point-by-point multiplication; Definition: 1≤j≤M, 1≤i≤N, Represents the combination vector of the jth row and the ith column of the feature matrix of the i-th second unit input of the j-th hidden layer, where represents the updated features of the output of the second unit of the i-th hidden layer, represents the updated features of the output of the i-1th second unit of the jth hidden layer, and All are assigned a value of 0, sigmoid represents the sigmoid activation function, and tanh represents the hyperbolic tangent function.

7. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: The sample labels of the training samples used to train the risk scoring model are obtained through manual labeling.

8. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: The loss function of the risk scoring model adopts the cross entropy loss function.

9. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: Before training the risk scoring model, the first unit is pre-trained. During the pre-training process, the feature map output by the first unit is expanded into a vector representation and then input into the second classifier. The classification space of the second classifier represents whether there is a fire in the workshop, and the classification label of the second classifier is manually labeled.

10. The intelligent supervision system for production safety standardization technical service process according to claim 1 is characterized in that: The risk scores of the workshop in the second preset time period G are divided into three levels, and the risk scores of 0 to 3 are defined as low risk levels, and no early warning measures are taken for low risk levels; A risk score of 4 to 7 is defined as a medium risk level. The early warning measure for the medium risk level is to immediately send early warning text messages and emails to the relevant responsible persons; a risk score of 8 to 10 is defined as a high risk level. The early warning measure for the high risk level is to immediately shut down the related equipment and production lines, send an alarm signal through the public broadcasting system in the workshop, and simultaneously send early warning text messages and emails to the relevant responsible persons.