Intelligent control method and system for power frequency series resonance device

By constructing the output voltage topology diagram and transfer probability matrix, adjusting the frequency signal and gain difference calibration feedback network, the problem of degradation of control accuracy of the power frequency series resonance device is solved, and the resonance stability and safety of voltage withstand voltage test are improved.

CN118944458AActive Publication Date: 2024-11-12SUZHOU HUADIAN ELECTRIC CO LTD

Patent Information

Application Number
CN202410960459.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

Due to long-term computing and performance degradation of the power frequency series resonance device, the control accuracy is reduced, making it difficult to maintain a stable resonant state, resulting in inaccurate voltage test results and high safety risks.

Method used

By obtaining historical local discharge test data, building an output voltage topology map and transfer probability matrix, adjusting frequency signals and gain difference calibration feedback network, optimizing frequency adjustment strategies and negative feedback networks, and generating intelligent control solutions to improve resonance stability and safety.

Benefits of technology

The resonant state stability and safety of the power frequency series resonant device are achieved, reducing the inaccuracy of the test results and the risk of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944458A_ABST
    Figure CN118944458A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of resonance test equipment, in particular to an intelligent control method and system for a power frequency series resonance device. Acquiring historical partial discharge test data of the power frequency series resonance device for the to-be-tested power equipment, and calculating the abrupt change probability of a voltage abrupt change point during the series circuit resonance test according to the historical partial discharge test data; if the topological node of which the abrupt change probability is greater than the preset abrupt change probability is not located in a topological node area where the voltage abrupt change point is located in the series resonance circuit output voltage topological graph, frequency drift generated when a frequency adjustment strategy is adjusted to the frequency signal is adjusted; if yes, gain control of the feedback network on the operational amplifier is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and secondary optimization is carried out on the calibrated negative feedback network. According to the invention, intelligent control can be carried out when the power frequency series resonance device is subjected to the withstand voltage test, so that the stability of the resonance state is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of resonance testing equipment, and in particular to an intelligent control method and system for an industrial frequency series resonance device. Background Art

[0002] The power frequency series resonance device refers to a device that generates resonance in the circuit by adjusting circuit parameters and using appropriate power electronic equipment under AC power frequency. In the power system, the power frequency series resonance device is usually used to test the insulation performance of high-voltage power equipment, such as transformers, cables, circuit breakers, etc. The power frequency series resonance device can simulate the voltage waveform under actual operating conditions to detect the insulation performance of the equipment under partial discharge and overvoltage, and more accurately evaluate the insulation performance of the equipment. However, due to long-term operation and performance degradation, the series resonance circuit and control system of the power frequency series resonance device have greatly reduced the accuracy of controlling the power frequency series resonance device, resulting in increased bandwidth and poor frequency response when the power frequency series resonance device identifies the resonance point, resulting in omissions and errors in the identification of the resonance point, making it difficult to maintain a stable resonance state, and ultimately causing the voltage of the withstand voltage test to be discontinuous or attenuated, etc., which reduces the accuracy of the withstand voltage test results and easily leads to the occurrence of high-voltage test safety accidents, which is not conducive to the stable operation of the power frequency series resonance device. Summary of the invention

[0003] The present invention overcomes the deficiencies of the prior art and provides an intelligent control method and system for an industrial frequency series resonance device.

[0004] To achieve the above object, the technical solution adopted by the present invention is:

[0005] A first aspect of the present invention provides an intelligent control method for a power frequency series resonance device, comprising the following steps:

[0006] Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculate a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtain a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram;

[0007] If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme;

[0008] If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme;

[0009] After running the first intelligent control scheme or the second intelligent control scheme, the actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

[0010] Furthermore, in a preferred embodiment of the present invention, the historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested is obtained, the historical partial discharge test data is analyzed to construct a series resonance circuit output voltage topology diagram, and a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test is calculated according to the series resonance circuit output voltage topology diagram to obtain the mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram, which specifically includes the following steps:

[0011] Obtain the power equipment to be tested and the test log of the power frequency series resonance device, and retrieve the historical partial discharge test data of the power equipment to be tested through the test log;

[0012] Constructing a cumulative distribution partial discharge map according to the historical partial discharge test data, and extracting a historical output voltage regulation map of the power equipment to be tested based on the cumulative distribution partial discharge map;

[0013] Obtaining the initialization parameter configuration when the power frequency series resonance device generates the historical output voltage adjustment map, extracting the normal output voltage waveform of the power equipment to be tested through the initialization parameter configuration, and presetting the allowable adjustment fluctuation range of the output voltage according to the normal output voltage waveform;

[0014] Taking the allowable adjustment fluctuation range as a reference, the output voltage adjustment value outside the allowable adjustment fluctuation range is calibrated as a voltage mutation point. If there is at least one or more voltage mutation points in the historical output voltage adjustment map, the topological historical output voltage adjustment map is calculated according to Kirchhoff's law to obtain an output voltage topology map of the series resonant circuit of the power frequency series resonant device;

[0015] Obtain a voltage distribution input node of a series resonant circuit output voltage topology diagram, mark a topology node region where a voltage mutation point is located in the series resonant circuit output voltage topology diagram, obtain a voltage distribution in the topology node region, and preset a restart probability according to the voltage distribution in the topology node region;

[0016] Taking the voltage distribution input node as the initial node, the probability vector of the initial node transferring to the topological node area is calculated by restarting the probability, and the transfer probability matrix of the output voltage topology diagram of the series resonant circuit is obtained, and the above steps are repeated to continuously update the iterative transfer probability matrix;

[0017] The iteration frequency is preset, and when the update iteration reaches the iteration frequency, the convergence processing is performed to generate the final transfer probability matrix of the output voltage topology diagram of the series resonant circuit, and the mutation probability of the voltage mutation point in the output voltage topology diagram of the series resonant circuit is obtained according to the final transfer probability matrix.

[0018] Furthermore, in a preferred embodiment of the present invention, if the topological node with a mutation probability greater than a preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme, which specifically includes the following steps:

[0019] In the output voltage topology diagram of the series resonant circuit of the power frequency series resonant device, a topology node whose mutation probability is greater than a preset mutation probability is marked, which is defined as an abnormal control topology node of the series resonant circuit, and it is determined whether the abnormal control topology node of the series resonant circuit is in the topology node region where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit;

[0020] If the voltage mutation point is not in the topological node area where the output voltage topological diagram of the series resonant circuit is located, extracting the preset frequency step and the preset frequency range of the power frequency series resonant device for the power equipment to be tested through initialization parameter configuration;

[0021] Obtain a voltage-current curve graph after the preset frequency range is scanned according to a preset frequency step length by a frequency scanning technology, and mark the frequency points where the current value is the largest and the voltage value is the smallest according to the voltage-current curve graph to obtain multiple resonant frequency points;

[0022] Obtaining the current distribution and voltage distribution of each resonant frequency point in the output voltage topology diagram of the series resonant circuit, presetting the search range of each resonant frequency point based on the current distribution and voltage distribution, and drawing the frequency signal of each resonant frequency point;

[0023] Acquire a communication protocol and a control technology of the power frequency series resonance device, determine a frequency adjustment mechanism of the power frequency series resonance device according to the communication protocol and the control technology, and retrieve a frequency adjustment strategy of the frequency adjustment mechanism for the power frequency series resonance device;

[0024] The frequency adjustment strategy is used to extract the adjustment frequency signal that is ultimately generated when the input voltage of the variable frequency power supply is adjusted to the frequency signal of each resonant frequency point, and at this time, it is determined whether the adjustment frequency signal is within the search range corresponding to each resonant frequency point;

[0025] If not, performing Hilbert transform on the adjustment frequency signal that is not located in the search range of the resonant frequency point and the corresponding frequency signal to obtain the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal, and calculating the phase difference between the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal to obtain the instantaneous phase difference;

[0026] Preset an unpacking phase interval, and expand the instantaneous phase difference in the unpacking phase interval to solve the time derivative of the instantaneous phase difference, calculate the frequency offset according to the time derivative, and obtain the frequency drift of the regulated frequency signal;

[0027] The frequency regulation strategy of the power frequency series resonance device is recalibrated by the frequency regulation mechanism based on the frequency drift, thereby obtaining a first intelligent control solution.

[0028] Furthermore, in a preferred embodiment of the present invention, if the topological node with a mutation probability greater than a preset mutation probability is in a topological node region where a voltage mutation point is located in a topological diagram of an output voltage of a series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized for a second time to obtain a second intelligent control scheme, which specifically includes the following steps:

[0029] If the abnormal control topology node of the series resonant circuit is in the topology node area where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit, the preset frequency step and the preset frequency range of the power frequency series resonant device for the power equipment to be tested are obtained by initializing the parameter configuration;

[0030] Obtaining layout information of all operational amplifiers of the power frequency series resonance device arranged in the series resonance circuit, dividing the preset frequency range into a plurality of sub-frequency ranges based on the layout information, and performing precise step scanning on each sub-frequency range based on the preset frequency step length to obtain an accurate resonance point distribution diagram;

[0031] Obtaining the actual resonance point distribution diagram corresponding to each sub-frequency range when the industrial frequency series resonance device generates the historical output voltage adjustment spectrum, taking the accurate resonance point distribution diagram as a reference, planning the frequency range where the accurate resonance point is missing in the actual resonance point distribution diagram of each sub-frequency range, and defining it as a low-frequency response area;

[0032] Obtaining a negative feedback network of the operational amplifier and simultaneously obtaining an actual gain adjustment value of the negative feedback network in each low frequency response region, calculating a deviation between each actual gain adjustment value and an accurate gain adjustment value to obtain a gain deviation, and determining a quality factor of the negative feedback network controlling the bandwidth of the series resonant circuit according to the gain deviation;

[0033] Preset an ideal quality factor, calibrate and initialize the gain control of the feedback network for the operational amplifier according to the quality factor, until the quality factor approaches the ideal quality factor, and obtain a calibrated negative feedback network;

[0034] The new inductive reactance parameters and the new capacitive reactance parameters are output through the calibrated negative feedback network to accurately control the industrial frequency series resonant device. If the resonance point distribution diagram after the calibration scan still lacks the accurate resonance point, an adjusted feedback loop compensation network is constructed to improve the control accuracy of the operational amplifier, thereby obtaining a second intelligent control scheme.

[0035] Furthermore, in a preferred embodiment of the present invention, the negative feedback network outputs new inductance reactance parameters and new capacitance reactance parameters through calibration to accurately control the power frequency series resonance device. If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points, an adjusted feedback loop compensation network is constructed to improve the control accuracy of the operational amplifier, and a second intelligent control scheme is obtained, which specifically includes the following steps:

[0036] The calibrated negative feedback network outputs new inductive reactance parameters and new capacitive reactance parameters to accurately control the power frequency series resonance device to rescan the preset frequency range, and obtain a resonance point distribution diagram after the calibration scan;

[0037] If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points compared to the accurate resonance point distribution diagram, then the model specifications of each operational amplifier in the series resonance circuit are obtained, and the preset gain-bandwidth product of each operational amplifier is retrieved from the big data network based on the model specifications;

[0038] Obtain an accurate resonance point at a current peak and a voltage peak in an accurate resonance point distribution diagram, define it as a peak resonance point, extract a target frequency response value of a negative feedback network of an operational amplifier in response to the peak resonance point, and determine a preset feedback coefficient of a feedback loop compensation network according to the target frequency response value and a preset gain-bandwidth product;

[0039] A pole analysis algorithm is introduced to analyze the pole position change of the series resonant circuit in the power frequency series resonant device when scanning a preset frequency range, so as to determine the pole position change and the corresponding phase margin of the series resonant circuit under the change of the scanning frequency range, and the actual frequency response value of the series resonant circuit scanning the peak resonance point in the power frequency series resonant device is calculated according to the pole position change and the corresponding phase margin;

[0040] Based on the big data network, the series resonance knowledge graph is obtained, the model specifications of the operational amplifier are imported into the series resonance knowledge graph for identification, the feedback loop compensation network architecture is determined, and the feedback loop compensation network architecture is initialized by presetting the feedback coefficient;

[0041] Adjusting the phase delay between the actual frequency response value and the target frequency response value in the initialized feedback loop compensation network architecture until the feedback coefficient in the series resonant circuit output voltage topology diagram reaches a preset feedback coefficient, thereby obtaining an adjusted feedback loop compensation network;

[0042] The adjusted feedback loop compensation network is uploaded to the series resonant circuit control terminal of the industrial frequency series resonant device to improve the frequency response performance of the amplifier adjusting the inductance and capacitance to scan different frequency ranges, thereby obtaining a second intelligent control scheme.

[0043] Furthermore, in a preferred embodiment of the present invention, after running the first intelligent control scheme or the second intelligent control scheme, actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit to improve the safety of the withstand voltage test of the power frequency series resonance device, which specifically includes the following steps:

[0044] Performing actual testing on the power equipment to be tested by using a power frequency series resonance device, running the first intelligent control scheme or the second intelligent control scheme during the test to adjust the resonant steady state of the power frequency series resonance device and recording test data, thereby obtaining actual partial discharge test data of the power equipment to be tested;

[0045] Preset a number of uniform timing test intervals, extract the actual partial discharge test data corresponding to each uniform timing test interval based on the actual partial discharge test data, and define the data as a sub-test data group;

[0046] According to several groups of sub-test data groups, the discharge signal strength and the discharge signal distribution applied by the power frequency series resonance device to the power equipment to be tested at each uniform time sequence test interval are obtained, and based on the discharge signal strength and the discharge signal distribution, a model fitting is performed to construct an electrical tree effect time sequence discharge model corresponding to each group of sub-test data groups;

[0047] Introducing the LSTM algorithm to perform time-series dynamic calculation on the electrical tree-like effect time-series discharge model corresponding to each group of sub-test data groups and construct a model to generate a tree-like discharge dynamic model;

[0048] Preset a future sequential test interval, and predict the discharge state trend of the future sequential test interval by using the tree-like discharge dynamic model to determine the actual partial discharge amplitude of the circuit device to be tested when the power frequency series resonant device is in the future sequential test interval;

[0049] Obtaining historical withstand voltage assessment information of the power equipment to be tested, presetting a breakdown critical value of the partial discharge test according to the historical withstand voltage assessment information, and obtaining a minimum partial discharge amplitude required to reach the breakdown critical value, and determining whether the actual partial discharge amplitude exceeds the minimum partial discharge amplitude;

[0050] If it exceeds, the early warning mechanism of the power frequency series resonance device is controlled to send out an alarm signal. At this time, the difference between the actual partial discharge amplitude and the minimum partial discharge amplitude is calculated to obtain the amplitude deviation rate;

[0051] When the amplitude deviation rate is greater than the preset amplitude deviation rate, an instantaneous protection control signal is generated based on the amplitude deviation rate. The instantaneous protection control signal immediately cuts off the power supply of the power frequency series resonance device when a breakdown occurs, so as to improve the safety factor of the power frequency series resonance device during the withstand voltage test.

[0052] A second aspect of the present invention provides an intelligent control system for a power frequency series resonance device, wherein the intelligent control system for the power frequency series resonance device comprises a memory and a processor, wherein the memory stores an intelligent control method program for the power frequency series resonance device, and when the intelligent control method program for the power frequency series resonance device is executed by the processor, the following steps are implemented:

[0053] Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculate a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtain a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram;

[0054] If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme;

[0055] If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme;

[0056] After running the first intelligent control scheme or the second intelligent control scheme, the actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

[0057] The present invention solves the technical defects existing in the background technology, and the beneficial technical effects of the present invention are:

[0058] The historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested is obtained, and the transfer probability matrix of the voltage mutation point generated during the resonance test of the series resonance circuit is calculated according to the historical partial discharge test data, and the mutation probability of the voltage mutation point in the output voltage topology diagram of the series resonance circuit is obtained; if the topological node with a mutation probability greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series resonance circuit, the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted; if it is in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series resonance circuit, the gain control of the feedback network for the operational amplifier is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the negative feedback network after the calibration is performed is optimized twice; a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, and the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and a warning signal and an instantaneous protection control signal are generated to cut off the circuit. The present invention can perform intelligent control on the power frequency series resonance device when performing a withstand voltage test, thereby ensuring the stability of the resonance state and improving the safety factor of the withstand voltage test. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0060] Figure 1 A first method flow chart of an intelligent control method for a power frequency series resonance device is shown;

[0061] Figure 2 A second method flow chart of an intelligent control method for an industrial frequency series resonance device is shown;

[0062] Figure 3 A third method flow chart of an intelligent control method for a power frequency series resonance device is shown;

[0063] Figure 4 The system framework diagram of an intelligent control system of an industrial frequency series resonance device is shown. DETAILED DESCRIPTION

[0064] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0065] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0066] The first aspect of the present invention provides an intelligent control method for a power frequency series resonance device, such as Figure 1 As shown, the following steps are included:

[0067] S102: Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct an output voltage topology diagram of the series resonance circuit, calculate a transfer probability matrix of voltage mutation points generated during the series resonance circuit test according to the output voltage topology diagram of the series resonance circuit, and obtain a mutation probability of the voltage mutation point in the output voltage topology diagram of the series resonance circuit;

[0068] S104: If the topological node with a mutation probability greater than a preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and a frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme;

[0069] S106: If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme;

[0070] S108: After running the first intelligent control scheme or the second intelligent control scheme, actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

[0071] Furthermore, in a preferred embodiment of the present invention, the historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested is obtained, the historical partial discharge test data is analyzed to construct a series resonance circuit output voltage topology diagram, and a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test is calculated according to the series resonance circuit output voltage topology diagram to obtain the mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram, which specifically includes the following steps:

[0072] Obtain the power equipment to be tested and the test log of the power frequency series resonance device, and retrieve the historical partial discharge test data of the power equipment to be tested through the test log;

[0073] Constructing a cumulative distribution partial discharge map according to the historical partial discharge test data, and extracting a historical output voltage regulation map of the power equipment to be tested based on the cumulative distribution partial discharge map;

[0074] Obtaining the initialization parameter configuration when the power frequency series resonance device generates the historical output voltage adjustment map, extracting the normal output voltage waveform of the power equipment to be tested through the initialization parameter configuration, and presetting the allowable adjustment fluctuation range of the output voltage according to the normal output voltage waveform;

[0075] Taking the allowable adjustment fluctuation range as a reference, the output voltage adjustment value outside the allowable adjustment fluctuation range is calibrated as a voltage mutation point. If there is at least one or more voltage mutation points in the historical output voltage adjustment map, the topological historical output voltage adjustment map is calculated according to Kirchhoff's law to obtain an output voltage topology map of the series resonant circuit of the power frequency series resonant device;

[0076] Obtain a voltage distribution input node of a series resonant circuit output voltage topology diagram, mark a topology node region where a voltage mutation point is located in the series resonant circuit output voltage topology diagram, obtain a voltage distribution in the topology node region, and preset a restart probability according to the voltage distribution in the topology node region;

[0077] Taking the voltage distribution input node as the initial node, the probability vector of the initial node transferring to the topological node area is calculated by restarting the probability, and the transfer probability matrix of the output voltage topology diagram of the series resonant circuit is obtained, and the above steps are repeated to continuously update the iterative transfer probability matrix;

[0078] The iteration frequency is preset, and when the update iteration reaches the iteration frequency, the convergence processing is performed to generate the final transfer probability matrix of the output voltage topology diagram of the series resonant circuit, and the mutation probability of the voltage mutation point in the output voltage topology diagram of the series resonant circuit is obtained according to the final transfer probability matrix.

[0079] It should be noted that the power frequency series resonance device is mainly composed of resistors, inductors and capacitors connected in a specific way. When the AC voltage frequency in the circuit matches the inherent resonant frequency of the circuit, the inductive reactance of the inductor and the capacitive reactance of the capacitor can be made exactly equal to resonate. It can be seen from this that when the power frequency series resonance device performs partial discharge test on power equipment, if its test voltage is intermittently supplied or unstable, it may be a circuit control error caused by the high bandwidth of the inductor and capacitor in the series circuit after the power frequency series resonance device controls the variable frequency power supply to boost the voltage, resulting in a frequency response delay. It may also be that the control system of the power frequency series resonance device adjusts the variable frequency power supply to the resonant frequency and a frequency deviation occurs. The above two situations cause the power frequency series resonance device to be unable to reach the resonant steady state and produce a sudden change in the output voltage, which affects the quality and accuracy of the withstand voltage test of the electrical equipment. Therefore, this method calculates the mutation probability of the historical voltage mutation data of the power equipment in the series circuit of the power frequency series resonant device; if the mutation probability is greater than the preset mutation probability, it means that a certain circuit node in the series resonant circuit may have a series control abnormality, and then combines it to determine whether the circuit node with the series control abnormality is in the circuit topology area where the historical voltage mutation data is located. If it is, it means that the cause of the unstable output voltage of the power frequency series resonant device is related to the control error of the series resonant circuit, otherwise the possibility of series circuit control error is ruled out, and the frequency adjustment error factor of the control system is further considered to achieve accurate judgment and abnormality tracing for the behavior that affects the abnormal voltage output of the power frequency series resonant device, optimize the ability of the power frequency series resonant device to intelligently solve the resonance steady-state abnormality, and improve the test stability of the power frequency series resonant device.

[0080] Furthermore, in a preferred embodiment of the present invention, if the topological node with a mutation probability greater than a preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme, which specifically includes the following steps:

[0081] In the output voltage topology diagram of the series resonant circuit of the power frequency series resonant device, a topology node whose mutation probability is greater than a preset mutation probability is marked, which is defined as an abnormal control topology node of the series resonant circuit, and it is determined whether the abnormal control topology node of the series resonant circuit is in the topology node region where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit;

[0082] If the voltage mutation point is not in the topological node area where the output voltage topological diagram of the series resonant circuit is located, extracting the preset frequency step and the preset frequency range of the power frequency series resonant device for the power equipment to be tested through initialization parameter configuration;

[0083] Obtain a voltage-current curve graph after the preset frequency range is scanned according to a preset frequency step length by a frequency scanning technology, and mark the frequency points where the current value is the largest and the voltage value is the smallest according to the voltage-current curve graph to obtain multiple resonant frequency points;

[0084] Obtaining the current distribution and voltage distribution of each resonant frequency point in the output voltage topology diagram of the series resonant circuit, presetting the search range of each resonant frequency point based on the current distribution and voltage distribution, and drawing the frequency signal of each resonant frequency point;

[0085] Acquire a communication protocol and a control technology of the power frequency series resonance device, determine a frequency adjustment mechanism of the power frequency series resonance device according to the communication protocol and the control technology, and retrieve a frequency adjustment strategy of the frequency adjustment mechanism for the power frequency series resonance device;

[0086] The frequency adjustment strategy is used to extract the adjustment frequency signal that is ultimately generated when the input voltage of the variable frequency power supply is adjusted to the frequency signal of each resonant frequency point, and at this time, it is determined whether the adjustment frequency signal is within the search range corresponding to each resonant frequency point;

[0087] If not, performing Hilbert transform on the adjustment frequency signal that is not located in the search range of the resonant frequency point and the corresponding frequency signal to obtain the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal, and calculating the phase difference between the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal to obtain the instantaneous phase difference;

[0088] Preset an unpacking phase interval, and expand the instantaneous phase difference in the unpacking phase interval to solve the time derivative of the instantaneous phase difference, calculate the frequency offset according to the time derivative, and obtain the frequency drift of the regulated frequency signal;

[0089] The frequency regulation strategy of the power frequency series resonance device is recalibrated by the frequency regulation mechanism based on the frequency drift, thereby obtaining a first intelligent control solution.

[0090] It should be noted that, through the analysis of the previous step, if the circuit node with abnormal series control is not in the topological node area where the voltage mutation point is located in the series circuit output voltage topology diagram, it means that the reason for the unstable output voltage of the power frequency series resonance device may be due to the error in the frequency regulation strategy pre-formulated by the control system. Some erroneous frequency regulation parameters cause the power frequency series resonance device to increase the frequency of the variable frequency voltage at a certain node. There is a deviation between the regulation frequency signal and the resonant frequency, so it cannot match the resonant frequency, resulting in the phenomenon that it is difficult to always maintain a stable resonant state, thereby causing the output voltage of the power frequency series resonance device to be unstable when testing power equipment, which greatly reduces the test accuracy of the power frequency series resonance device. The method can determine the frequency signal of the resonant frequency point and the search range of the resonant frequency point, wherein the search range of the resonant frequency point is an allowable range within which the resonant frequency point can be searched; by analyzing whether the regulated frequency signal finally generated after the frequency modulation of the variable frequency power supply in the frequency regulation strategy is within the search range of the corresponding resonant frequency point, if not, it means that a deviation, i.e., a drift phenomenon, occurs between the regulated frequency signal generated by the actual frequency modulation and the predetermined frequency signal of the corresponding resonant frequency point, and therefore the instantaneous phase difference between the two is calculated by Hilbert transform, and the frequency drift amount between the two can be further determined based on the instantaneous phase difference, so as to adjust and repair the boost control error of the variable frequency power supply by the power frequency series resonance device regulation strategy, thereby achieving a high consistency between the power supply boost frequency and the resonant frequency, improving the resonant matching quality, and making the power frequency series resonance device always in a stable resonant state, greatly improving the test stability, and having high reliability.

[0091] Furthermore, in a preferred embodiment of the present invention, if the topological node with a mutation probability greater than a preset mutation probability is in a topological node region where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme, such as Figure 2 As shown, the specific steps include:

[0092] S202: If the abnormal control topology node of the series resonant circuit is in the topology node region where the voltage mutation point is located in the series resonant circuit output voltage topology diagram, obtaining a preset frequency step and a preset frequency range of the power frequency series resonant device for the power equipment to be tested through initialization parameter configuration;

[0093] S204: Obtaining layout information of all operational amplifiers of the power frequency series resonance device in the series resonance circuit, dividing the preset frequency range into a plurality of sub-frequency ranges based on the layout information, and performing precise step scanning on each sub-frequency range based on the preset frequency step length to obtain an accurate resonance point distribution diagram;

[0094] S206: Obtaining an actual resonance point distribution diagram corresponding to each sub-frequency range when the power frequency series resonance device generates the historical output voltage adjustment map, taking the accurate resonance point distribution diagram as a reference, planning a frequency range where the accurate resonance point is missing in the actual resonance point distribution diagram of each sub-frequency range, and defining it as a low-frequency response area;

[0095] S208: obtaining a negative feedback network of the operational amplifier, and obtaining an actual gain adjustment value of the negative feedback network in each low frequency response region, calculating a deviation between each actual gain adjustment value and an accurate gain adjustment value to obtain a gain deviation, and determining a quality factor of the negative feedback network for controlling the bandwidth of the series resonant circuit according to the gain deviation;

[0096] S210: Preset an ideal quality factor, calibrate and initialize the gain control of the feedback network for the operational amplifier according to the quality factor, until the quality factor approaches the ideal quality factor, and obtain a calibrated negative feedback network;

[0097] S212: Output new inductive reactance parameters and new capacitive reactance parameters through the calibrated negative feedback network to accurately control the industrial frequency series resonant device. If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points, construct an adjusted feedback loop compensation network to improve the control accuracy of the operational amplifier, and obtain a second intelligent control scheme.

[0098] It should be noted that the power frequency series resonance device adjusts the parameters of the inductor and capacitor so that the circuit resonates at the power frequency, thereby generating a high voltage on the device under test. When the circuit node with abnormal series control is not in the topological node area where the voltage mutation point is located in the output voltage topology diagram of the series circuit, it means that the adjustment parameters of the inductor and capacitor increase and widen the bandwidth of the series circuit, thereby reducing the selection accuracy and high transmission efficiency near the resonant frequency point, making the frequency response capability of the series resonance circuit poor, resulting in unstable output voltage of the power frequency series resonance device. This method uses the accurate resonance point distribution map as a reference benchmark to analyze the lack of accurate resonance points in the actual resonance point distribution map, so as to determine the resonance point area with low frequency response in the historical test process of the power equipment, that is, the bandwidth increase area; from the frequency transmission characteristics of the series resonance circuit, it can be known that in order to improve the recognition and passing ability of the resonance frequency, the bandwidth in the series resonance circuit should be kept at a certain narrowness; therefore, this method determines the quality factor of the negative feedback network controlling the bandwidth of the series circuit according to the gain deviation between the actual gain adjustment value output by the negative feedback network of the operational amplifier in the series resonance circuit and the accurate gain adjustment value; wherein, the quality factor is an important parameter representing the selectivity and bandwidth of the series circuit, and the quality factor can often be controlled by adjusting the component parameters of the inductor, capacitor and resistor. The high quality factor circuit has a narrower bandwidth, while the low quality factor circuit has a wider bandwidth. The feedback network is adjusted according to the quality factor to control the gain of the operational amplifier, that is, the gain is increased to reversely reduce the bandwidth, thereby calibrating the feedback network. The calibrated feedback network can adaptively calibrate the control parameters of the capacitor and inductor according to the accurate gain adjustment of the operational amplifier, thereby achieving precise control of the output parameters of each component in the series circuit, greatly improving the frequency response ability of the series resonant circuit to identify the selected resonance point, avoiding the phenomenon of resonance point omission and misjudgment, and further improving the resonance stability of the industrial frequency series resonant device.

[0099] Furthermore, in a preferred embodiment of the present invention, the negative feedback network outputs new inductance reactance parameters and new capacitance reactance parameters through calibration to accurately control the power frequency series resonance device. If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points, an adjusted feedback loop compensation network is constructed to improve the control accuracy of the operational amplifier, and a second intelligent control scheme is obtained, such as Figure 3 As shown, the specific steps include:

[0100] S302: Outputting new inductive reactance parameters and new capacitive reactance parameters through the calibrated negative feedback network to accurately control the power frequency series resonance device to rescan the preset frequency range, and obtain a resonance point distribution diagram after the calibration scan;

[0101] S304: If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points compared to the accurate resonance point distribution diagram, obtain the model specifications of each operational amplifier in the series resonance circuit, and retrieve the preset gain-bandwidth product of each operational amplifier from the big data network based on the model specifications;

[0102] S306: Obtain an accurate resonance point at a current peak and a voltage peak in the accurate resonance point distribution diagram, define it as a peak resonance point, extract a target frequency response value of a negative feedback network of the operational amplifier in response to the peak resonance point, and determine a preset feedback coefficient of a feedback loop compensation network according to the target frequency response value and a preset gain-bandwidth product;

[0103] S308: introducing a pole analysis algorithm to analyze the pole position change of the series resonant circuit in the power frequency series resonant device when scanning a preset frequency range, so as to determine the pole position change and the corresponding phase margin of the series resonant circuit when the scanning frequency range changes, and calculating the actual frequency response value of the series resonant circuit in the power frequency series resonant device scanning the peak resonance point according to the pole position change and the corresponding phase margin;

[0104] S310: acquiring a series resonance knowledge graph based on a big data network, importing the model specifications of the operational amplifier into the series resonance knowledge graph for identification, determining a feedback loop compensation network architecture, and initializing the feedback loop compensation network architecture by presetting a feedback coefficient;

[0105] S312: adjusting the phase delay between the actual frequency response value and the target frequency response value in the initialized feedback loop compensation network architecture until the feedback coefficient in the series resonant circuit output voltage topology diagram reaches a preset feedback coefficient, thereby obtaining an adjusted feedback loop compensation network;

[0106] S314: Uploading the adjusted feedback loop compensation network to the series resonant circuit control terminal of the industrial frequency series resonant device to improve the frequency response performance of the amplifier adjusting the inductance and capacitance to scan different frequency ranges, and obtain a second intelligent control scheme.

[0107] It should be noted that the calibrated negative feedback network outputs new inductive reactance parameters and new capacitive reactance parameters to accurately and stably control the bandwidth limit of the series resonant circuit in the industrial frequency series resonant device. However, when the resonance point distribution diagram after the calibrated negative feedback network is adjusted and scanned, there are still accurate resonance points missing. At this time, it means that the calibrated negative feedback network is still difficult to meet the actual frequency response requirements of the inductance and capacitance in the current series resonant circuit after precise adjustment. This proves that the calibrated negative feedback network may have certain applicability defects for the operational amplifier in the current series resonant circuit, which reduces the adaptability of the negative feedback network to adjust the series resonant circuit with different frequency response requirements. The method analyzes the actual frequency response and phase margin of the series resonant circuit in the current industrial frequency series resonant device when scanning the peak resonance point, thereby evaluating whether the series resonant circuit has sufficient phase margin within the target operating frequency range to avoid the occurrence of oscillation and instability; and adjusts the phase delay between the actual frequency response value of the series circuit scanning the peak resonance point and the target frequency response value until the feedback coefficient reaches the preset feedback coefficient, wherein the feedback coefficient determines the degree of influence of the feedback loop on the gain of the operational amplifier, and a lower feedback coefficient can improve the frequency response and reduce nonlinear distortion; thereby, a feedback loop compensation network can be constructed to compensate for the deficiencies and changes of the operational amplifier in different frequency response requirements, improve the frequency response performance of the amplifier adjusting the inductance and capacitance to scan different frequency ranges, and further optimize the adaptability of the negative feedback network to adjust the series resonant circuit with different frequency response requirements, thereby maintaining the reliability of bandwidth control and improving the resonance stability of the industrial frequency series resonant device.

[0108] Furthermore, in a preferred embodiment of the present invention, after running the first intelligent control scheme or the second intelligent control scheme, actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit to improve the safety of the withstand voltage test of the power frequency series resonance device, which specifically includes the following steps:

[0109] Performing actual testing on the power equipment to be tested by using a power frequency series resonance device, running the first intelligent control scheme or the second intelligent control scheme during the test to adjust the resonant steady state of the power frequency series resonance device and recording test data, thereby obtaining actual partial discharge test data of the power equipment to be tested;

[0110] Preset a number of uniform timing test intervals, extract the actual partial discharge test data corresponding to each uniform timing test interval based on the actual partial discharge test data, and define the data as a sub-test data group;

[0111] According to several groups of sub-test data groups, the discharge signal strength and the discharge signal distribution applied by the power frequency series resonance device to the power equipment to be tested at each uniform time sequence test interval are obtained, and based on the discharge signal strength and the discharge signal distribution, a model fitting is performed to construct an electrical tree effect time sequence discharge model corresponding to each group of sub-test data groups;

[0112] Introducing the LSTM algorithm to perform time-series dynamic calculation on the electrical tree-like effect time-series discharge model corresponding to each group of sub-test data groups and construct a model to generate a tree-like discharge dynamic model;

[0113] Preset a future sequential test interval, and predict the discharge state trend of the future sequential test interval by using the tree-like discharge dynamic model to determine the actual partial discharge amplitude of the circuit device to be tested when the power frequency series resonant device is in the future sequential test interval;

[0114] Obtaining historical withstand voltage assessment information of the power equipment to be tested, presetting a breakdown critical value of the partial discharge test according to the historical withstand voltage assessment information, and obtaining a minimum partial discharge amplitude required to reach the breakdown critical value, and determining whether the actual partial discharge amplitude exceeds the minimum partial discharge amplitude;

[0115] If it exceeds, the early warning mechanism of the power frequency series resonance device is controlled to send out an alarm signal. At this time, the difference between the actual partial discharge amplitude and the minimum partial discharge amplitude is calculated to obtain the amplitude deviation rate;

[0116] When the amplitude deviation rate is greater than the preset amplitude deviation rate, an instantaneous protection control signal is generated based on the amplitude deviation rate. The instantaneous protection control signal immediately cuts off the power supply of the power frequency series resonance device when a breakdown occurs, so as to improve the safety factor of the power frequency series resonance device during the withstand voltage test.

[0117] It should be noted that when using a power frequency series resonance device to conduct partial discharge tests on electrical equipment, when the voltage output by the power frequency series resonance device exceeds the withstand voltage limit of the electrical equipment, the partial discharge inside it may cause electrical breakdown to the electrical equipment. The continuous electrical breakdown phenomenon is dangerous and may cause a certain degree of damage to nearby testers and electrical equipment. Therefore, it is necessary to cut off the circuit of the power frequency series resonance device in time to eliminate the continuous electrical breakdown phenomenon. When the electrical breakdown phenomenon occurs, the partial discharge inside the electrical equipment will show a tree-like discharge phenomenon, which is a precursor to the electrical breakdown phenomenon. Therefore, the method constructs a tree-like discharge dynamic model based on the uniform timing test interval through the actual partial discharge test data of the power equipment to be tested, and then predicts the partial discharge trend of the future timing test interval, that is, the actual partial discharge amplitude, according to the tree-like discharge dynamic model; if the actual partial discharge amplitude exceeds the minimum partial discharge amplitude required for the breakdown critical value, it means that the partial discharge in the future timing test interval will produce an electric breakdown phenomenon. At this time, the early warning mechanism of the power frequency series resonance device can be controlled to send out an alarm signal in advance to warn nearby test personnel to stay away and take corresponding defensive measures, and generate an instantaneous protection control signal according to the amplitude deviation rate to cut off the power supply operation of the power frequency series resonance device, so as to avoid the electric breakdown phenomenon from damaging the test personnel and electrical equipment, improve the safety factor of the power frequency series resonance device during the withstand voltage test, and at the same time prevent the failure phenomenon caused by the excessive operating voltage or current of the power frequency series resonance device, ensure the service life, and have high safety and reliability.

[0118] In addition, the intelligent control method of the power frequency series resonance device further includes the following steps:

[0119] Acquire a frequency modulation strategy of the power frequency series resonance device, extract the resonance steady-state values ​​of the power frequency series resonance device at multiple preset time nodes based on the frequency modulation strategy, and obtain multiple resonance steady-state values;

[0120] Calculating a resonance frequency matching rate of the power frequency series resonance device at the resonance point according to the multiple resonance steady-state values, and if the resonance frequency matching rate is lower than a preset resonance frequency matching rate, obtaining an actual frequency modulation error rate of the power frequency series resonance device;

[0121] Obtaining the operating parameters corresponding to different preset frequency modulation error rates of each control mechanism in the power frequency series resonance device through a big data network, and calculating the correlation between the actual frequency modulation error rate and different preset frequency modulation error rates through a Spearson correlation coefficient to obtain multiple correlations;

[0122] Extracting a preset frequency modulation error rate corresponding to a maximum correlation degree from a plurality of correlation degrees, and determining actual operating parameters corresponding to each control mechanism of the power frequency series resonance device under an actual frequency modulation error rate according to the preset frequency modulation error rate corresponding to the maximum correlation degree;

[0123] The reference operating parameters of each control mechanism are obtained, and the deviation between the actual operating parameters corresponding to each control mechanism and the reference operating parameters corresponding to each control mechanism is calculated to obtain the deviation value of each control mechanism. The frequency modulation strategy of the industrial frequency series resonance device is adjusted based on the deviation value of each control mechanism to eliminate the frequency modulation error of the industrial frequency series resonance device.

[0124] It should be noted that due to the long-term operation of the power frequency series resonance device under different environmental conditions, its internal control mechanism has certain aging, wear or poor contact and other fault phenomena, which leads to frequency modulation errors when the power frequency series resonance device executes the frequency modulation strategy during the actual test process, resulting in an error rate in the final test result, which is not conducive to the efficient and accurate testing of the power frequency series resonance device. This method can eliminate the frequency modulation error of the power frequency series resonance device by accurately regulating the operating parameter errors generated when each control mechanism in the power frequency series resonance device executes the frequency modulation strategy, thereby improving the accuracy and reliability of the withstand voltage test results and ensuring the test control quality of the power frequency series resonance device.

[0125] A second aspect of the present invention provides an intelligent control system for a power frequency series resonance device, wherein the intelligent control system for the power frequency series resonance device comprises a memory 41 and a processor 42, wherein the memory 41 stores an intelligent control method program for the power frequency series resonance device, and when the intelligent control method program for the power frequency series resonance device is executed by the processor 42, Figure 4 As shown, implement the following steps:

[0126] Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculate a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtain a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram;

[0127] If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme;

[0128] If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme;

[0129] After running the first intelligent control scheme or the second intelligent control scheme, the actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

[0130] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An intelligent control method for a power frequency series resonance device, It is characterized in that The following steps are involved: Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculate a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtain a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram; If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme; If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme; After running the first intelligent control scheme or the second intelligent control scheme, the actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

2. The intelligent control method of a power frequency series resonance device according to claim 1, It is characterized in that The method of obtaining historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyzing the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculating a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtaining a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram specifically includes the following steps: Obtain the power equipment to be tested and the test log of the power frequency series resonance device, and retrieve the historical partial discharge test data of the power equipment to be tested through the test log; Constructing a cumulative distribution partial discharge map according to the historical partial discharge test data, and extracting a historical output voltage regulation map of the power equipment to be tested based on the cumulative distribution partial discharge map; Obtaining the initialization parameter configuration when the power frequency series resonance device generates the historical output voltage adjustment map, extracting the normal output voltage waveform of the power equipment to be tested through the initialization parameter configuration, and presetting the allowable adjustment fluctuation range of the output voltage according to the normal output voltage waveform; Taking the allowable adjustment fluctuation range as a reference, the output voltage adjustment value outside the allowable adjustment fluctuation range is calibrated as a voltage mutation point. If there is at least one or more voltage mutation points in the historical output voltage adjustment map, the topological historical output voltage adjustment map is calculated according to Kirchhoff's law to obtain an output voltage topology map of the series resonant circuit of the power frequency series resonant device; Obtain a voltage distribution input node of a series resonant circuit output voltage topology diagram, mark a topology node region where a voltage mutation point is located in the series resonant circuit output voltage topology diagram, obtain a voltage distribution in the topology node region, and preset a restart probability according to the voltage distribution in the topology node region; Taking the voltage distribution input node as the initial node, the probability vector of the initial node transferring to the topological node area is calculated by restarting the probability, and the transfer probability matrix of the output voltage topology diagram of the series resonant circuit is obtained, and the above steps are repeated to continuously update the iterative transfer probability matrix; The iteration frequency is preset, and when the update iteration reaches the iteration frequency, the convergence processing is performed to generate the final transfer probability matrix of the output voltage topology diagram of the series resonant circuit, and the mutation probability of the voltage mutation point in the output voltage topology diagram of the series resonant circuit is obtained according to the final transfer probability matrix.

3. The intelligent control method of a power frequency series resonance device according to claim 1, It is characterized in that If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme, which specifically includes the following steps: In the output voltage topology diagram of the series resonant circuit of the power frequency series resonant device, a topology node whose mutation probability is greater than a preset mutation probability is marked, which is defined as an abnormal control topology node of the series resonant circuit, and it is determined whether the abnormal control topology node of the series resonant circuit is in the topology node region where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit; If the voltage mutation point is not in the topological node area where the output voltage topological diagram of the series resonant circuit is located, extracting the preset frequency step and the preset frequency range of the power frequency series resonant device for the power equipment to be tested through initialization parameter configuration; Obtain a voltage-current curve graph after the preset frequency range is scanned according to a preset frequency step length by a frequency scanning technology, and mark the frequency points where the current value is the largest and the voltage value is the smallest according to the voltage-current curve graph to obtain multiple resonant frequency points; Obtaining the current distribution and voltage distribution of each resonant frequency point in the output voltage topology diagram of the series resonant circuit, presetting the search range of each resonant frequency point based on the current distribution and voltage distribution, and drawing the frequency signal of each resonant frequency point; Acquire a communication protocol and a control technology of the power frequency series resonance device, determine a frequency adjustment mechanism of the power frequency series resonance device according to the communication protocol and the control technology, and retrieve a frequency adjustment strategy of the frequency adjustment mechanism for the power frequency series resonance device; The frequency adjustment strategy is used to extract the adjustment frequency signal that is ultimately generated when the input voltage of the variable frequency power supply is adjusted to the frequency signal of each resonant frequency point, and at this time, it is determined whether the adjustment frequency signal is within the search range corresponding to each resonant frequency point; If not, performing Hilbert transform on the adjustment frequency signal that is not located in the search range of the resonant frequency point and the corresponding frequency signal to obtain the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal, and calculating the phase difference between the envelope arctangent value of the adjustment frequency signal and the envelope arctangent value of the frequency signal to obtain the instantaneous phase difference; Preset an unpacking phase interval, and expand the instantaneous phase difference in the unpacking phase interval to solve the time derivative of the instantaneous phase difference, calculate the frequency offset according to the time derivative, and obtain the frequency drift of the regulated frequency signal; The frequency regulation strategy of the power frequency series resonance device is recalibrated by the frequency regulation mechanism based on the frequency drift, thereby obtaining a first intelligent control solution.

4. The intelligent control method of a power frequency series resonance device according to claim 1, It is characterized in that If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme, which specifically includes the following steps: If the abnormal control topology node of the series resonant circuit is in the topology node area where the voltage mutation point is located in the output voltage topology diagram of the series resonant circuit, the preset frequency step and the preset frequency range of the power frequency series resonant device for the power equipment to be tested are obtained by initializing the parameter configuration; Obtaining layout information of all operational amplifiers of the power frequency series resonance device arranged in the series resonance circuit, dividing the preset frequency range into a plurality of sub-frequency ranges based on the layout information, and performing precise step scanning on each sub-frequency range based on the preset frequency step length to obtain an accurate resonance point distribution diagram; Obtaining the actual resonance point distribution diagram corresponding to each sub-frequency range when the industrial frequency series resonance device generates the historical output voltage adjustment spectrum, taking the accurate resonance point distribution diagram as a reference, planning the frequency range where the accurate resonance point is missing in the actual resonance point distribution diagram of each sub-frequency range, and defining it as a low-frequency response area; Obtaining a negative feedback network of the operational amplifier and simultaneously obtaining an actual gain adjustment value of the negative feedback network in each low frequency response region, calculating a deviation between each actual gain adjustment value and an accurate gain adjustment value to obtain a gain deviation, and determining a quality factor of the negative feedback network controlling the bandwidth of the series resonant circuit according to the gain deviation; Preset an ideal quality factor, calibrate and initialize the gain control of the feedback network for the operational amplifier according to the quality factor, until the quality factor approaches the ideal quality factor, and obtain a calibrated negative feedback network; The new inductive reactance parameters and the new capacitive reactance parameters are output through the calibrated negative feedback network to accurately control the industrial frequency series resonant device. If the resonance point distribution diagram after the calibration scan still lacks the accurate resonance point, an adjusted feedback loop compensation network is constructed to improve the control accuracy of the operational amplifier, thereby obtaining a second intelligent control scheme.

5. The intelligent control method of a power frequency series resonance device according to claim 4, It is characterized in that The negative feedback network that has been calibrated outputs new inductance and reactance parameters and new capacitance and reactance parameters to accurately control the power frequency series resonance device. If the resonance point distribution diagram after the calibration scan still lacks an accurate resonance point, an adjusted feedback loop compensation network is constructed to improve the control accuracy of the operational amplifier, and a second intelligent control scheme is obtained, which specifically includes the following steps: The calibrated negative feedback network outputs new inductive reactance parameters and new capacitive reactance parameters to accurately control the power frequency series resonance device to rescan the preset frequency range, and obtain a resonance point distribution diagram after the calibration scan; If the resonance point distribution diagram after the calibration scan still lacks accurate resonance points compared to the accurate resonance point distribution diagram, then the model specifications of each operational amplifier in the series resonance circuit are obtained, and the preset gain-bandwidth product of each operational amplifier is retrieved from the big data network based on the model specifications; Obtain an accurate resonance point at a current peak and a voltage peak in an accurate resonance point distribution diagram, define it as a peak resonance point, extract a target frequency response value of a negative feedback network of an operational amplifier in response to the peak resonance point, and determine a preset feedback coefficient of a feedback loop compensation network according to the target frequency response value and a preset gain-bandwidth product; A pole analysis algorithm is introduced to analyze the pole position change of the series resonant circuit in the power frequency series resonant device when scanning a preset frequency range, so as to determine the pole position change and the corresponding phase margin of the series resonant circuit under the change of the scanning frequency range, and the actual frequency response value of the series resonant circuit scanning the peak resonance point in the power frequency series resonant device is calculated according to the pole position change and the corresponding phase margin; Based on the big data network, the series resonance knowledge graph is obtained, the model specifications of the operational amplifier are imported into the series resonance knowledge graph for identification, the feedback loop compensation network architecture is determined, and the feedback loop compensation network architecture is initialized by presetting the feedback coefficient; Adjusting the phase delay between the actual frequency response value and the target frequency response value in the initialized feedback loop compensation network architecture until the feedback coefficient in the series resonant circuit output voltage topology diagram reaches a preset feedback coefficient, thereby obtaining an adjusted feedback loop compensation network; The adjusted feedback loop compensation network is uploaded to the series resonant circuit control terminal of the industrial frequency series resonant device to improve the frequency response performance of the amplifier adjusting the inductance and capacitance to scan different frequency ranges, thereby obtaining a second intelligent control scheme.

6. The intelligent control method of a power frequency series resonance device according to claim 1, It is characterized in that After running the first intelligent control scheme or the second intelligent control scheme, actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device, which specifically includes the following steps: Performing actual testing on the power equipment to be tested by using a power frequency series resonance device, running the first intelligent control scheme or the second intelligent control scheme during the test to adjust the resonant steady state of the power frequency series resonance device and recording test data, thereby obtaining actual partial discharge test data of the power equipment to be tested; Preset a number of uniform timing test intervals, extract the actual partial discharge test data corresponding to each uniform timing test interval based on the actual partial discharge test data, and define the data as a sub-test data group; According to several groups of sub-test data groups, the discharge signal strength and the discharge signal distribution applied by the power frequency series resonance device to the power equipment to be tested at each uniform time sequence test interval are obtained, and based on the discharge signal strength and the discharge signal distribution, a model fitting is performed to construct an electrical tree effect time sequence discharge model corresponding to each group of sub-test data groups; Introducing the LSTM algorithm to perform time-series dynamic calculation on the electrical tree-like effect time-series discharge model corresponding to each group of sub-test data groups and construct a model to generate a tree-like discharge dynamic model; Preset a future sequential test interval, and predict the discharge state trend of the future sequential test interval by using the tree-like discharge dynamic model to determine the actual partial discharge amplitude of the circuit device to be tested when the power frequency series resonant device is in the future sequential test interval; Obtaining historical withstand voltage assessment information of the power equipment to be tested, presetting a breakdown critical value of the partial discharge test according to the historical withstand voltage assessment information, and obtaining a minimum partial discharge amplitude required to reach the breakdown critical value, and determining whether the actual partial discharge amplitude exceeds the minimum partial discharge amplitude; If it exceeds, the early warning mechanism of the power frequency series resonance device is controlled to send out an alarm signal. At this time, the difference between the actual partial discharge amplitude and the minimum partial discharge amplitude is calculated to obtain the amplitude deviation rate; When the amplitude deviation rate is greater than the preset amplitude deviation rate, an instantaneous protection control signal is generated based on the amplitude deviation rate. The instantaneous protection control signal immediately cuts off the power supply of the power frequency series resonance device when a breakdown occurs, so as to improve the safety factor of the power frequency series resonance device during the withstand voltage test.

7. An intelligent control system for an industrial frequency series resonance device, It is characterized in that The intelligent control system of the power frequency series resonance device comprises a memory and a processor, wherein the memory stores an intelligent control method program of the power frequency series resonance device, and when the intelligent control method program of the power frequency series resonance device is executed by the processor, the following steps are implemented: Acquire historical partial discharge test data of the power frequency series resonance device for the power equipment to be tested, analyze the historical partial discharge test data to construct a series resonance circuit output voltage topology diagram, calculate a transfer probability matrix of a voltage mutation point generated during the series resonance circuit test according to the series resonance circuit output voltage topology diagram, and obtain a mutation probability of the voltage mutation point in the series resonance circuit output voltage topology diagram; If the topological node whose mutation probability is greater than the preset mutation probability is not in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, a frequency signal of the resonant frequency point is obtained, and the frequency drift generated when the frequency adjustment strategy is adjusted to the frequency signal is adjusted to obtain a first intelligent control scheme; If the topological node whose mutation probability is greater than the preset mutation probability is in the topological node area where the voltage mutation point is located in the output voltage topological diagram of the series resonant circuit, the gain control of the operational amplifier by the feedback network is calibrated according to the gain difference between the actual resonance point distribution diagram and the accurate resonance point distribution diagram, and the calibrated negative feedback network is optimized twice to obtain a second intelligent control scheme; After running the first intelligent control scheme or the second intelligent control scheme, the actual partial discharge test data of the power equipment to be tested is obtained, a tree-like discharge dynamic model is constructed according to the actual partial discharge test data, the partial discharge amplitude is predicted and analyzed based on the tree-like discharge dynamic model, and an early warning signal and an instantaneous protection control signal are generated to cut off the circuit, so as to improve the safety of the withstand voltage test of the power frequency series resonance device.

Citation Information

Patent Citations

  • Resonance compensating circuit and method of piezoelectric assembly

    CN108574425A

  • Fault diagnosis comprehensive positioning method for intelligent distribution network

    CN111596170A

  • Nondestructive testing method for cable construction

    CN112083301A

  • Protected resonator

    US20100187948A1

Cited By

  • Frequency conversion series resonance withstand voltage detection device and detection method

    CN119224509A

  • Series resonance whole process autonomous decision control system based on deep reinforcement learning

    CN121857313A