Shield tunnel on-line monitoring system
Through real-time data collection and stress distribution analysis, future geological conditions are predicted and excavation paths are adjusted, and the problem of insufficient adaptability of geological conditions in the construction of shield tunnels in the existing technology is solved, which significantly improves construction safety and efficiency and reduces risks.
Patent Information
- Application Number
- CN202411420532.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-10-12
AI Technical Summary
The existing shield tunnel online monitoring system delays response when dealing with complex geological conditions, and it is difficult to adjust the excavation path in a timely manner, resulting in a decrease in construction safety and efficiency, and lacks accurate predictions of structural problems, which increases project risks.
The real-time data acquisition module is used to collect cutting blade wear and geological data, analyze stress distribution and geotechnical parameters, predict future geological conditions through the path adjustment module, establish adjusted excavation paths, and monitor the formation hardness and geological crack distribution through the risk management module. Assess risk levels to achieve real-time monitoring and optimization.
It improves the safety and efficiency of shield tunnel construction, enhances the ability to adapt to complex geological changes, reduces the incidence of accidents and economic losses, and achieves more flexible project management.
Smart Images

Figure CN118965814A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of performance monitoring, and in particular to an online monitoring system for a shield tunnel. Background Art
[0002] The field of performance monitoring technology involves the use of various sensors, instruments and software tools to collect and analyze the operating data of machines, equipment or systems in real time. The core goal of this technology is to ensure the efficiency, safety and reliability of equipment operation. Through the continuous monitoring of key performance indicators, potential failures and performance degradation can be discovered in time, so that preventive measures can be taken or necessary maintenance can be performed. In addition, performance monitoring technology also supports the optimization of operating processes and the improvement of production efficiency. It is widely used in many fields such as manufacturing, energy management, transportation infrastructure and construction engineering.
[0003] Among them, the shield tunnel online monitoring system refers to a real-time monitoring and data analysis system specifically used in the shield tunnel construction process. The system collects key information such as geological conditions, machine status, construction parameters, etc. during tunneling in real time by installing a variety of sensors on the shield machine. Its uses include monitoring the operating status of the shield machine, predicting and preventing potential structural problems, and optimizing the speed and safety of tunneling. This system greatly improves the safety and efficiency of tunnel construction and is an indispensable technical tool for modern urban underground construction.
[0004] Although existing technologies can provide basic equipment performance monitoring, their adaptability and predictive capabilities for complex geological conditions are still insufficient in specific applications such as shield tunnel construction. Existing systems may face delays in real-time processing and analysis of large-scale geological and mechanical data, affecting timely responses to geological mutations. Such technologies lack in-depth analysis of stress distribution and geological risks during construction, making it difficult to adjust the excavation path in time to cope with unpredicted geological conditions, which may lead to a significant decrease in construction safety and efficiency. In addition, traditional monitoring technologies often cannot provide sufficient data support to accurately predict structural problems, which limits project risk management capabilities and increases project uncertainty and potential risks. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings in the prior art and to propose an online monitoring system for a shield tunnel.
[0006] In order to achieve the above object, the present invention adopts the following technical solution: The shield tunnel online monitoring system comprises: The real-time data acquisition module collects the cutterhead wear and geological condition data of the shield machine in real time based on the cutterhead wear status and geological data collection, analyzes the wear mode of the contact between the cutterhead and the rock and soil, identifies the current construction environment, obtains the real-time geotechnical mechanical parameters and construction conditions, and integrates them into real-time monitoring synthetic data; The data analysis and optimization module calculates the stress distribution under the current geological conditions based on the real-time monitoring synthetic data, simulates the influence of differentiated geotechnical parameters and construction conditions on the stress field, determines the geotechnical parameters matching the current geological environment by evaluating the stability of the stress field and the parameter fitting, and establishes the optimal geotechnical parameters; The path adjustment module calculates the feasibility and geological risk of the tunneling path based on the optimal geotechnical parameters, predicts the geological conditions that the shield machine will encounter in the future, and establishes an adjusted tunneling path; Based on the adjusted excavation path, the risk management module monitors the stratum hardness, water level and geological fracture distribution along the path, and compares the risk safety standard threshold. If it is found that the data exceeds the safety range, the degree of excess is calculated and the risk level is re-evaluated to obtain the risk assessment result.
[0007] As a further solution of the present invention, the step of acquiring the real-time monitoring synthetic data is specifically as follows: Based on the cutterhead wear status and geological data collection, the cutterhead wear and geological condition data of the shield machine are collected in real time, and the average geological hardness and wear index are calculated using the formula: ; Preliminary geological hardness data; in, Represents the average geological hardness, represents the number of data points, Representative The geological hardness of the data points, is the hardness adjustment coefficient; Integrate the wear data with the geological hardness data using the formula: ; Computationally generate geotechnical wear models; in, represents the geotechnical wear model, Representative wear data points, is the wear adjustment factor, is the offset coefficient.
[0008] Based on the rock and soil wear model, combined with construction conditions and rock and soil mechanics parameters, the formula is adopted: ; Obtain real-time monitoring synthetic data; in, represents real-time monitoring of synthetic data, , To adjust the parameters.
[0009] As a further solution of the present invention, the step of obtaining the stress distribution is specifically as follows: The geotechnical properties and cutterhead wear status are extracted from the real-time monitoring synthetic data using the formula: ; Calculated The weighted average stress distribution of data points is used to generate preliminary stress distribution data; in, Representatives in , The stress distribution in the direction Representative The weight of each monitoring point, Representative Monitoring points in , Geotechnical properties of the direction, is the attenuation coefficient, represents the number of data points; Based on the preliminary stress distribution data, the stress distribution is adjusted through the variability analysis of geotechnical parameters, using the formula: ; Calculate and generate adjusted stress distribution data; in, represents the adjusted stress distribution, is the geotechnical property adjustment factor, represents the measure of soil heterogeneity, is a constant threshold; Based on the adjusted stress distribution data and combined with the construction conditions, the formula is adopted: ; Calculate the adaptability of the adjusted stress distribution data under the current geological environment and generate stress distribution; in, represents the stress distribution, is the density factor of geological conditions, The total number of directions for reference.
[0010] As a further solution of the present invention, the steps for obtaining the optimal geotechnical parameters are specifically as follows: Extract the geotechnical properties and cutterhead wear status from the real-time monitoring synthetic data using the formula: ; Differentiated geotechnical parameters are calculated; in, To differentiate geotechnical parameters, For the The weight of each monitoring point, For the Geotechnical characteristics of each monitoring point; Using the differentiated geotechnical parameters, the formula is adopted: ; Evaluate the stability and parameter fit of the stress field and generate calibrated geotechnical parameters; in, is the calibrated geotechnical parameter, Adjust the parameters for paranoia, , are the calibration coefficient and sensitivity parameter respectively; Combining the construction conditions and the calibrated geotechnical parameters, the formula is adopted: ; Determine the geotechnical parameters that match the current geological environment and establish the optimal geotechnical parameters; in, is the optimal geotechnical parameter.
[0011] As a further solution of the present invention, the step of obtaining the adjusted excavation path is specifically as follows: Based on the optimal geotechnical parameters, the feasibility of the excavation path is calculated using the formula: ; Generate a feasibility score for the excavation path; in, Score the feasibility of the tunneling path, are the sensitivity coefficient and the excavation condition threshold, respectively; Using the feasibility score of the tunneling path described, the future geological conditions are predicted using the formula: ; Calculate and generate geological risk assessment results; in, The geological risk assessment results are: For the The feasibility score of the segment, For the Geotechnical parameters of the segment; Based on the geological risk assessment results, the adjusted excavation path is determined using the formula: ; Calculate and establish adjusted excavation paths; in, The adjusted excavation path is: For the The geological risks of the section.
[0012] As a further solution of the present invention, the steps of obtaining the risk assessment results are specifically as follows: Based on the adjusted excavation path, the ground hardness, water level and geological fracture distribution along the path are monitored, using the formula: ; Calculate the overall geological state and generate a comprehensive geological state score; in, , , They are the monitoring data of stratum hardness, water level and geological fracture distribution. Comprehensive score for geological status, They are adjustment factors to enhance the influence and nonlinear effects of hardness, water level and crack data; Using the comprehensive geological status score, compare the safety standard threshold of risk , using the formula: ; if , then the degree to which each monitoring point exceeds the safety range is calculated to generate a measure of exceeding the safety range; in, For measurements beyond the safety range, , is to enhance the nonlinear and regularization effects of the metric beyond the safety range; Based on the measure of exceeding the safety range, the risk level is re-evaluated using the formula: ; Calculate and obtain risk assessment results; in, The risk assessment results are: is the risk sensitivity coefficient.
[0013] Compared with the prior art, the advantages and positive effects of the present invention are: In the present invention, the safety and efficiency of the shield tunnel construction process are significantly improved through real-time data-driven analysis and differentiated geotechnical parameter simulation. Real-time monitoring and refined geological condition analysis enable accurate grasp of key parameters in the tunnel excavation process, optimization of construction strategies, and enhanced adaptability to complex geological changes. Risk assessment and early warning mechanisms can promptly detect and respond to possible safety issues, thereby reducing the accident rate and ensuring the safety of construction personnel and equipment. By analyzing the predicted geological conditions, the excavation path is adjusted to adapt to the geological difficulties that may be encountered in the future, thereby achieving greater flexibility in project management and reducing potential economic losses. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 is a system flow chart of the present invention; Figure 2 A flowchart of the steps for obtaining the synthetic data for real-time monitoring of the present invention; Figure 3 A flow chart of the steps for obtaining stress distribution of the present invention; Figure 4 Flow chart of the steps for obtaining the optimal geotechnical parameters of the present invention; Figure 5 A flow chart of the steps for obtaining the adjusted excavation path of the present invention; Figure 6 The figure is a flow chart of the steps for obtaining the risk assessment results of the present invention. DETAILED DESCRIPTION
[0015] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0016] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0017] Example 1: Please refer to Figure 1 , the shield tunnel online monitoring system includes: The real-time data acquisition module collects the cutterhead wear and geological condition data of the shield machine in real time based on the cutterhead wear status and geological data collection, analyzes the wear mode of the contact between the cutterhead and the rock and soil, identifies the current construction environment, obtains the real-time geotechnical mechanical parameters and construction conditions, and integrates them into real-time monitoring synthetic data; The data analysis and optimization module calculates the stress distribution under the current geological conditions based on real-time monitoring synthetic data, simulates the influence of differentiated geotechnical parameters and construction conditions on the stress field, determines the geotechnical parameters that match the current geological environment by evaluating the stability of the stress field and the degree of parameter fit, and establishes the optimal geotechnical parameters; The path adjustment module calculates the feasibility and geological risks of the tunneling path based on the optimal geotechnical parameters, predicts the geological conditions that the shield machine will encounter in the future, and establishes the adjusted tunneling path; Based on the adjusted excavation path, the risk management module monitors the stratum hardness, water level and geological fracture distribution along the path and compares the risk safety standard threshold. If it is found that the data exceeds the safety range, the degree of excess is calculated and the risk level is re-evaluated to obtain the risk assessment result.
[0018] Real-time monitoring synthetic data include geotechnical mechanical parameters and construction conditions. The optimal geotechnical parameters include stress distribution, geotechnical parameter fitting degree, and stress field stability. The adjusted excavation path includes the feasibility of the excavation path and geological risks. The risk assessment results specifically include the re-evaluated risk level and analysis of the degree of exceeding the standard.
[0019] See also Figure 2 ,The specific steps for obtaining real-time monitoring synthetic data are: Based on the cutterhead wear status and geological data collection, the cutterhead wear and geological condition data of the shield machine are collected in real time, and the average geological hardness and wear index are calculated using the formula: ; Preliminary geological hardness data; in, Represents the average geological hardness, represents the number of data points, Representative The geological hardness of the data points, is the hardness adjustment coefficient; Integrate wear data with geological hardness data using the formula: ; Computationally generate geotechnical wear models; in, represents the geotechnical wear model, Representative wear data points, is the wear adjustment factor, is the offset coefficient. Based on the rock and soil wear model, combined with construction conditions and rock and soil mechanics parameters, the formula is adopted: ; Obtain real-time monitoring synthetic data; in, represents real-time monitoring of synthetic data, , To adjust the parameters.
[0020] Step 1: Average Geological Hardness Calculation of formula: ; Parameter Description: : Number of data points, indicating the number of geological hardness samples collected.
[0021] : No. The geological hardness of each data point.
[0022] : Hardness adjustment factor, used to adjust the calculation of geological hardness to better reflect the actual wear effects.
[0023] Assume the following example: Assume there are three geological hardness data points: Assuming the adjustment factor .
[0024] Calculation process: Calculate the adjustment value for each geological hardness data point: ; ; ; Sum: ; Calculate the average: ; Result interpretation: The average geological hardness obtained , represents the average impact of the actual construction environment on wear after adjustment.
[0025] Step 2: Geotechnical Wear Model Calculation of formula: ; Parameter Description: : No. wear data points.
[0026] : The average geological hardness obtained from step 1.
[0027] : Wear adjustment factor.
[0028] : Offset factor, used to balance wear data.
[0029] Assume the following example: Assume the wear data point is From step 1 Assumptions , .
[0030] Calculation process: Calculate the adjustment value for each wear data point: ; ; ; Sum: ; Calculate the average: ; Result interpretation: The obtained rock wear model , represents the average degree of wear after adjustment and balancing.
[0031] Step 3: Real-time monitoring of synthetic data Calculation of formula: ; Parameter Description: : Geotechnical wear model obtained from step 2.
[0032] and : Adjustment parameters, used to adjust the final output according to construction conditions.
[0033] Assume the following example: From step 2 Assumptions .
[0034] Calculation process: calculate Values: ; Result interpretation: The obtained real-time monitoring synthetic data , represents the monitoring results after comprehensive consideration of geological hardness and wear data, and is used for actual construction monitoring and adjustment.
[0035] See also Figure 3 , the specific steps for obtaining stress distribution are: The geotechnical properties and cutterhead wear status are extracted from the real-time monitoring synthetic data using the formula: ; Calculated The weighted average stress distribution of data points is used to generate preliminary stress distribution data; in, Representatives in , The stress distribution in the direction Representative The weight of each monitoring point, Representative Monitoring points in , Geotechnical properties of the direction, is the attenuation coefficient, represents the number of data points; Based on the preliminary stress distribution data, the stress distribution is adjusted through the variability analysis of geotechnical parameters, using the formula: ; Calculate and generate adjusted stress distribution data; in, represents the adjusted stress distribution, is the geotechnical property adjustment factor, represents the measure of soil heterogeneity, is a constant threshold; Based on the adjusted stress distribution data and combined with the construction conditions, the formula is adopted: ; Calculate the adaptability of the adjusted stress distribution data under the current geological environment and generate stress distribution; in, represents the stress distribution, is the density factor of geological conditions, The total number of directions for reference.
[0036] Detailed explanation of formula and calculation process; Step 1 formula: ; Parameter details: exist Stress distribution in the direction.
[0037] : number of data points.
[0038] : No. The weight of each monitoring point is assigned according to the accuracy of the monitoring equipment or the importance of the monitoring point.
[0039] : Attenuation coefficient, which controls the influence of geotechnical properties on stress distribution.
[0040] : No. Monitoring points in The geotechnical characteristic parameters of the direction, including the hardness and density of the rock.
[0041] Calculation process and examples: Assumptions: (three monitoring points); ; ; ; calculate : Calculate the contribution of each monitoring point: Contribution No. 1: ; Contribution No. 2: ; Contribution No. 3: ; Summarize and calculate the mean stress distribution: ; Result interpretation: What you get Representatives in , The average stress distribution in the direction of the stress is taken into account. This value takes into account the influence of soil characteristics and their spatial distribution.
[0042] Step 2 formula: ; Parameter details: Adjusted stress distribution.
[0043] : Original stress distribution.
[0044] : Geotechnical property adjustment coefficient, taking into account the additional influence of geotechnical parameters on stress distribution.
[0045] : Measurement of heterogeneity of rock and soil.
[0046] : Small constant to prevent division by zero errors.
[0047] Calculation process and examples: Assumptions: ; ; ; Use the value calculated in step 1 ; Calculate the adjusted stress distribution: ; Result interpretation: What you get Represents the adjusted stress distribution after taking into account the heterogeneity of geotechnical properties.
[0048] Step 3 formula: ; Parameter details: : The final stress distribution, taking into account the adjusted stress distribution in multiple directions .
[0049] Adjusted stress distribution, obtained from step 2.
[0050] : Density factor of geological conditions, which affects the calculation of stress distribution.
[0051] : Total number of directions, indicating how many directions the stress distribution calculation is performed in.
[0052] Calculation process and examples: Assumptions: (consider three directions, assuming that the stress distribution calculation in each direction is the same); (Assuming the geological density factor is the same in all directions); Use the value calculated in step 2 ; Calculate the adjusted stress distribution in each direction: direction ; direction (same direction 1); direction (same direction 1); Sum and calculate the average: ; Result interpretation: What you get Represents the average adjusted stress distribution after integrating all considered directions. This value reflects the overall impact of geological conditions and balances stress data in different directions.
[0053] See also Figure 4 , the specific steps for obtaining the optimal geotechnical parameters are: Extract the geotechnical properties and cutterhead wear status from the real-time monitoring synthetic data using the formula: ; Differentiated geotechnical parameters are calculated; in, To differentiate geotechnical parameters, For the The weight of each monitoring point, For the Geotechnical characteristics of each monitoring point; Using differentiated geotechnical parameters, the formula is adopted: ; Evaluate the stability and parameter fit of the stress field and generate calibrated geotechnical parameters; in, is the calibrated geotechnical parameter, Adjust the parameters for paranoia, are the calibration coefficient and sensitivity parameter respectively; Combining the construction conditions and calibrated geotechnical parameters, the formula is adopted: ; Determine the geotechnical parameters that match the current geological environment and establish the optimal geotechnical parameters; in, is the optimal geotechnical parameter.
[0054] Step 1: Calculate differentiated geotechnical parameters ; formula ; Parameters detailed explanation; : Differentiated geotechnical parameters, representing the weighted average of geotechnical properties extracted from real-time data.
[0055] : The number of data points.
[0056] : No. The weight of a monitoring point represents the importance of the data at that point.
[0057] : No. The geotechnical properties of each monitoring point, including rock hardness, humidity, etc.
[0058] : A function used to process The data is simply normalized or subjected to other mathematical operations.
[0059] Calculation example; Assume there are 3 data points: ; ; ; Assumptions ,but: ; This result means that the average geotechnical characteristic parameters at each point are , this value is calculated by weighted average.
[0060] Step 2: Calibrated geotechnical parameters ; formula; ; Parameters detailed explanation; : Calibrated geotechnical parameters used to adjust preliminary parameters to better match actual conditions.
[0061] : Calibration coefficient, used to adjust the influence of the parameter.
[0062] : Adjust the sensitivity and bias of the parameters.
[0063] Calculation example; Assumptions: ; Use the previous Value and ; ; for : ; for : ; for : ; These calculations illustrate how the geotechnical parameters at each point can be adjusted by nonlinear functions to better reflect the variability of actual geological conditions.
[0064] Step 3: Final Geotechnical Parameters ; formula; ; Parameters detailed explanation; : The final determined geotechnical parameters are the average values of the calibrated parameters.
[0065] Calculation example; Combining the previous steps value: ; this The values represent the average geotechnical parameters after comprehensive consideration of the data from all monitoring points, and are applicable to the current geological environment.
[0066] See also Figure 5 , the specific steps for obtaining the adjusted excavation path are: Based on the optimal geotechnical parameters, the feasibility of the excavation path is calculated using the formula: ; Generate a feasibility score for the excavation path; in, Score the feasibility of the tunneling path, are the sensitivity coefficient and the excavation condition threshold, respectively; Use the tunneling path feasibility score to predict future geological conditions using the formula: ; Calculate and generate geological risk assessment results; in, The geological risk assessment results are: For the The feasibility score of the segment, For the Geotechnical parameters of the segment; Based on the geological risk assessment results, the adjusted excavation path is determined using the formula: ; Calculate and establish adjusted excavation paths; in, The adjusted excavation path is: For the The geological risks of the section.
[0067] Detailed explanation of the formula for step 1; formula: ; Parameter explanation: : The feasibility score of the excavation path, indicating the average feasibility of the entire path.
[0068] : Indicates the number of segments on the path.
[0069] : No. Optimal geotechnical parameters of the segment.
[0070] : Sensitivity coefficient, which affects the sensitivity of geotechnical parameter differences to the score.
[0071] : Excavation condition threshold, which is the key geotechnical parameter threshold that determines the feasibility of the path.
[0072] Calculation example: Assume there are 5 sections of excavation path, and the geotechnical parameters of each section are The calculation process is as follows: Calculate the feasibility score for each segment: when ; when ; when ; when ; when ; Average Feasibility Rating: ; This result It represents the average feasibility score of the entire excavation path, which is closer to the threshold, indicating that the path is feasible as a whole, but there are certain risks.
[0073] Detailed explanation of the formula for step 2; formula: ; Parameter explanation: :Geological risk assessment results, reflecting the risk level of predicted future geological conditions.
[0074] : No. The feasibility score of the segment, obtained from step 1.
[0075] : No. Geotechnical parameters of the segment.
[0076] Calculation example: Use the feasibility score and geotechnical parameters calculated in step 1 : ; this Represents the result of geological risk assessment, with lower values implying relatively lower risks.
[0077] Detailed explanation of the formula for step 3; formula: ; Parameter explanation: Adjusted excavation path and comprehensive score.
[0078] : No. The geological risk and feasibility score of the section.
[0079] Calculation example: Assumptions For all : ; this It represents the comprehensive score of the adjusted excavation path. The value reflects the overall risk and feasibility of the excavation path.
[0080] See also Figure 6 , the specific steps for obtaining risk assessment results are: Based on the adjusted excavation path, the ground hardness, water level and geological fracture distribution along the path are monitored using the formula: ; Calculate the overall geological state and generate a comprehensive geological state score; in, They are the monitoring data of stratum hardness, water level and geological fracture distribution. Comprehensive score for geological status, They are adjustment factors to enhance the influence and nonlinear effects of hardness, water level and crack data; Using the comprehensive geological status score to compare the safety standard threshold of risk , using the formula: ; if , then the degree to which each monitoring point exceeds the safety range is calculated to generate a measure of exceeding the safety range; in, For measurements beyond the safety range, is to enhance the nonlinear and regularization effects of the metric beyond the safety range; Based on the measurement beyond the safety range, re-evaluate the risk level using the formula: ; Calculate and obtain risk assessment results; in, The risk assessment results are: is the risk sensitivity coefficient.
[0081] Detailed explanation and examples of formula 1; formula: ; Parameter explanation: : The number of monitoring points.
[0082] : Coefficient used to enhance the influence and nonlinear effects of hardness, water level and crack data.
[0083] : No. The formation hardness, water level and fracture data of each monitoring point.
[0084] Assumed parameters: (Number of monitoring points); (Adjustment factor); (hardness, water level and crack data); Calculation process: Calculate the combined contribution of each monitoring point: ; ; ; Calculate the comprehensive geological status score : ; Example results: Overall Rating It represents the overall geological status of the monitoring point, taking into account the combined effects of hardness, water level and cracks.
[0085] Detailed explanation and example of formula 2; formula: ; Parameter explanation: : No. The geological status score of each monitoring point.
[0086] : Safety threshold.
[0087] : Coefficient used to enhance the nonlinear and regularization effects of the metric beyond the safety range.
[0088] Assumed parameters: (safety threshold); (Adjustment factor); Calculation process: Calculate the measure of safety margin exceeded for each monitoring point: ; Calculate the total metric that exceeds the safety limit : ; Example results: Total Metrics It represents the total degree to which the entire monitoring area exceeds the safety threshold and is a comprehensive risk indicator.
[0089] Detailed explanation and example of formula 3; formula: ; Parameter explanation: : No. The safety limit measurement of each monitoring point.
[0090] : Risk sensitivity coefficient.
[0091] Assumed parameters: (risk sensitivity coefficient); Calculation process: Calculate risk level: ; Example results: Risk Assessment Results Indicates the overall risk level, with lower values indicating that the overall risk is acceptable, but attention should still be paid to specific high-risk areas.
[0092] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. The shield tunnel online monitoring system is characterized by: The system comprises: The real-time data acquisition module collects the cutterhead wear and geological condition data of the shield machine in real time based on the cutterhead wear status and geological data collection, analyzes the wear mode of the contact between the cutterhead and the rock and soil, identifies the current construction environment, obtains the real-time geotechnical mechanical parameters and construction conditions, and integrates them into real-time monitoring synthetic data; The data analysis and optimization module calculates the stress distribution under the current geological conditions based on the real-time monitoring synthetic data, simulates the influence of differentiated geotechnical parameters and construction conditions on the stress field, determines the geotechnical parameters matching the current geological environment by evaluating the stability of the stress field and the parameter fitting, and establishes the optimal geotechnical parameters; The path adjustment module calculates the feasibility and geological risk of the tunneling path based on the optimal geotechnical parameters, predicts the geological conditions that the shield machine will encounter in the future, and establishes an adjusted tunneling path; Based on the adjusted excavation path, the risk management module monitors the stratum hardness, water level and geological fracture distribution along the path, and compares the risk safety standard threshold. If it is found that the data exceeds the safety range, the degree of excess is calculated and the risk level is re-evaluated to obtain the risk assessment result.
2. The shield tunnel online monitoring system according to claim 1 is characterized in that: The steps for obtaining the real-time monitoring synthetic data are specifically as follows: Based on the cutterhead wear status and geological data collection, the cutterhead wear and geological condition data of the shield machine are collected in real time, and the average geological hardness and wear index are calculated using the formula: ; Preliminary geological hardness data; in, Represents the average geological hardness, represents the number of data points, Representative The geological hardness of the data points, is the hardness adjustment coefficient; Integrate the wear data with the geological hardness data using the formula: ; Computationally generate geotechnical wear models; in, represents the geotechnical wear model, Representative wear data points, is the wear adjustment factor, is the offset coefficient. Based on the rock and soil wear model, combined with construction conditions and rock and soil mechanics parameters, the formula is adopted: ; Obtain real-time monitoring synthetic data; in, represents real-time monitoring of synthetic data, , To adjust the parameters.
3. The shield tunnel online monitoring system according to claim 2 is characterized in that: The steps of obtaining the stress distribution are specifically as follows: The geotechnical properties and cutterhead wear status are extracted from the real-time monitoring synthetic data using the formula: ; Calculated The weighted average stress distribution of data points is used to generate preliminary stress distribution data; in, Representatives in , The stress distribution in the direction, Representative The weight of each monitoring point, Representative Monitoring points in , Geotechnical properties of the direction, is the attenuation coefficient, represents the number of data points; Based on the preliminary stress distribution data, the stress distribution is adjusted through the variability analysis of geotechnical parameters, using the formula: ; Calculate and generate adjusted stress distribution data; in, represents the adjusted stress distribution, is the geotechnical property adjustment factor, Represents the measure of soil heterogeneity, is a constant threshold; Based on the adjusted stress distribution data and combined with the construction conditions, the formula is adopted: ; Calculate the adaptability of the adjusted stress distribution data under the current geological environment and generate stress distribution; in, represents the stress distribution, is the density factor of geological conditions, The total number of directions for reference.
4. The shield tunnel online monitoring system according to claim 3 is characterized in that: The steps for obtaining the optimal geotechnical parameters are specifically as follows: Extract the geotechnical properties and cutterhead wear status from the real-time monitoring synthetic data using the formula: ; Differentiated geotechnical parameters are calculated; in, To differentiate geotechnical parameters, For the The weight of each monitoring point, For the Geotechnical characteristics of each monitoring point; Using the differentiated geotechnical parameters, the formula is adopted: ; Evaluate the stability and parameter fit of the stress field and generate calibrated geotechnical parameters; in, is the calibrated geotechnical parameter, Adjust the parameters for paranoia, are the calibration coefficient and sensitivity parameter respectively; Combining the construction conditions and the calibrated geotechnical parameters, the formula is adopted: ; Determine the geotechnical parameters that match the current geological environment and establish the optimal geotechnical parameters; in, is the optimal geotechnical parameter.
5. The shield tunnel online monitoring system according to claim 4 is characterized in that: The steps for obtaining the adjusted excavation path are specifically as follows: Based on the optimal geotechnical parameters, the feasibility of the excavation path is calculated using the formula: ; Generate a feasibility score for the excavation path; in, Score the feasibility of the tunneling path, , are the sensitivity coefficient and the excavation condition threshold, respectively; Using the feasibility score of the tunneling path described, the future geological conditions are predicted using the formula: ; Calculate and generate geological risk assessment results; in, The geological risk assessment results are: For the The feasibility score of the segment, For the Geotechnical parameters of the segment; Based on the geological risk assessment results, the adjusted excavation path is determined using the formula: ; Calculate and establish adjusted excavation paths; in, The adjusted excavation path is: For the The geological risks of the section.
6. The shield tunnel online monitoring system according to claim 5, characterized in that: The steps for obtaining the risk assessment results are specifically as follows: Based on the adjusted excavation path, the ground hardness, water level and geological fracture distribution along the path are monitored, using the formula: ; Calculate the overall geological state and generate a comprehensive geological state score; in, , , They are the monitoring data of stratum hardness, water level and geological fracture distribution. Comprehensive score for geological status, They are adjustment factors to enhance the influence and nonlinear effects of hardness, water level and crack data; Using the comprehensive geological status score, compare the safety standard threshold of risk , using the formula: ; if , then the degree to which each monitoring point exceeds the safety range is calculated to generate a measure of exceeding the safety range; in, For measurements beyond the safety range, , is to enhance the nonlinear and regularization effects of the metric beyond the safety range; Based on the measure of exceeding the safety range, the risk level is re-evaluated using the formula: ; Calculate and obtain risk assessment results; in, The risk assessment results are: is the risk sensitivity coefficient.
Citation Information
Patent Citations
Tunneling prediction method and system for tunnel based on TBM rock-machine parameter dynamic interaction mechanism
CN109933577A
Tunnel shield tunneling machine construction cutter head and tunneling parameter setting method
CN116591699A
Determination method for reserved excavation of deeply-buried soft rock tunnel considering construction disturbance
CN118313311A
Real-time control system and method for controlling underground boring machine
CN1391632A
Cited By
Shield tunneling machine key parameter analysis method, system and equipment and storage medium
CN119646455A
Shield tunneling machine cutterhead center area deformation detection system and method
CN119984165A
A shield machine cutterhead center area deformation detection system and method
CN119984165B
Tunnel three-dimensional live-action dynamic monitoring system based on multi-source information fusion
CN121582530A
Three-dimensional real scene dynamic monitoring system for tunnel based on multi-source information fusion
CN121582530B
