Mother board shearing plan calculation method and device, electronic equipment and storage medium

By using fixed-size plate or non-size plate shear model to calculate the number and length of the motherboard in steel plate production, the problem of lack of contract plan for the motherboard after hot-segment shearing is solved, and the accuracy and efficiency of the steel plate shearing are achieved .

CN118966432APending Publication Date: 2024-11-15SGIS SONGSHAN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411027408.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In steel plate production, the motherboard obtained after hot segment shearing lacks a corresponding contract plan, which makes it impossible to determine how many daughterboards each motherboard need to be sheared and the length of each daughterboard, resulting in the shearing not comply with the contract plan. Causes waste.

Method used

Through the fixed-size board or non-size board shear model, the number of daughter boards required for the motherboard to be cut and the length of each daughter board is calculated based on the motherboard number and length to ensure that the final cut daughter board is in compliance with the contract plan.

Benefits of technology

Accurate calculation of the motherboard shear plan is achieved, reducing the waste of steel plates, ensuring that the sheared daughterboard data corresponds to the contract plan, and improving production efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966432A_ABST
    Figure CN118966432A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a mother plate shearing plan calculation method and device, electronic equipment and a storage medium, and relates to the technical field of steel plate shearing. The method comprises the steps of obtaining a mother board number, a mother board length and a corresponding large board number of a mother board to be sheared, finding out a corresponding contract plan according to the large board number, judging a mother board type of the mother board to be sheared according to the contract plan, if the mother board to be sheared is a fixed-length board, using a fixed-length board shearing model, and if the mother board to be sheared is a non-length board, using a non-length board shearing model. The number of the daughter boards needing to be sheared of the mother board to be sheared and the length of each daughter board are obtained through calculation. Therefore, the plan that each mother board should be sheared through hot segmentation shearing can be known, after shearing is finally completed, the number and length of the daughter boards can correspond to those in a contract plan, and the problem of quality objection is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steel plate shearing, and in particular to a method, device, electronic device and storage medium for calculating a mother plate shearing plan. Background Art

[0002] In the steel plate production plan, a large plate needs to be sheared into multiple finished plates (sub-plates) according to the contract plan, and one large plate corresponds to one contract plan. During the shearing process, the large plate needs to be placed on a cooling bed for shearing, but the cooling bed is often not enough to put down the entire large plate. Therefore, in actual production, the large plate will be hot-cut in sections to obtain multiple mother plates, and then the mother plates will be placed on the cooling bed for shearing to obtain sub-plates, and finally the shearing plan is completed.

[0003] However, after the hot segmented cutting, there is no corresponding contract plan for each of the multiple motherboards obtained, that is, it is unknown how many sub-boards each motherboard needs to be cut into, the length of each sub-board, and other information. Summary of the invention

[0004] In view of this, an object of embodiments of the present invention is to provide a motherboard shearing plan calculation method, device, electronic device and storage medium to at least partially improve the above-mentioned problem.

[0005] In order to achieve the above purpose, the technical solution adopted by the embodiment of the present invention is as follows:

[0006] In a first aspect, an embodiment of the present invention provides a method for calculating a motherboard shearing plan, the method comprising:

[0007] Obtaining a motherboard number, a motherboard length, and a corresponding large board number of a motherboard to be sheared; the motherboard number and the motherboard length are generated by thermally segmenting a large board into at least one motherboard to be sheared;

[0008] According to the large plate number, find out the corresponding contract plan;

[0009] According to the contract plan, determining the type of the motherboard to be sheared;

[0010] If the mother board to be sheared is a cut-to-length board, the mother board number, the mother board length and the contract plan are input into the cut-to-length board shearing model to calculate the number of sub-boards required to be sheared from the mother board to be sheared and the length of each sub-board;

[0011] If the motherboard to be sheared is a non-size board, the motherboard number, the motherboard length and the contract plan are input into the non-size board shearing model to calculate the number of sub-boards required to be sheared from the motherboard to be sheared and the length of each sub-board.

[0012] Optionally, the step of inputting the motherboard number, the motherboard length and the contract plan into a cut-to-length board cutting model to calculate the number of sub-boards required to cut the motherboard to be cut and the length of each sub-board includes:

[0013] Determining whether the motherboard length of the motherboard to be sheared is greater than or equal to a first preset length;

[0014] If not, the number of sub-boards of the motherboard to be cut is 1, and the length of the sub-board is the length of the motherboard;

[0015] If so, the number of sub-boards included in the motherboard to be cut and the length of each sub-board are calculated through a loop according to the motherboard number, the motherboard length and the contract plan.

[0016] Optionally, the step of calculating the number of sub-boards and the length of each sub-board included in the motherboard to be cut by looping according to the motherboard number, the motherboard length and the contract plan comprises the following steps:

[0017] S2431: Initialize the number of the sub-boards to 0, and assign the remaining length of the motherboard to the length of the motherboard;

[0018] S2432: Find the corresponding sub-board number in the contract plan according to the motherboard number, and determine whether the sub-board number is the first sub-board number in the contract plan;

[0019] S2433: If yes, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, increase the motherboard number by 1, increase the number of sub-boards by 1, and record the current sub-board number;

[0020] S2434: If not, determine whether the planned length corresponding to the sub-board number is greater than 0;

[0021] S2435: If the planned length corresponding to the sub-board number is greater than 0, determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number;

[0022] S2436: If the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1, increase the number of sub-boards by 1, and record the current sub-board number;

[0023] S2437: Repeat steps S2432 to S2436 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, and obtain the number of sub-boards included in the motherboard to be cut and the sub-board numbers corresponding to each sub-board;

[0024] S2438: According to each of the sub-board numbers, find out the corresponding sub-board length from the contract plan.

[0025] Optionally, the step of inputting the motherboard number, the motherboard length and the contract plan into a non-size board shearing model to calculate the number of sub-boards required to be sheared from the motherboard to be sheared and the length of each sub-board includes:

[0026] Determining whether the motherboard length of the motherboard to be sheared is greater than or equal to a first preset length;

[0027] If not, the number of sub-boards of the motherboard to be cut is 1, and the length of the sub-board is the length of the motherboard;

[0028] If yes, the number of sub-boards included in the motherboard to be cut is calculated through a loop according to the motherboard number, the motherboard length and the contract plan;

[0029] The length of each of the daughter boards is calculated according to the length of the mother board and the number of the daughter boards.

[0030] Optionally, the step of calculating the number of sub-boards included in the motherboard to be cut by looping according to the motherboard number, the motherboard length and the contract plan comprises the following steps:

[0031] S2531: Initialize the number of the sub-boards to 0, and assign the remaining length of the motherboard to the length of the motherboard;

[0032] S2532: according to the motherboard number, find out the corresponding sub-board number in the contract plan, and determine whether the sub-board number is the first sub-board number in the contract plan;

[0033] S2533: If yes, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1 and the number of sub-boards by 1;

[0034] S2534: If not, determine whether the planned length corresponding to the sub-board number is greater than 0;

[0035] S2535: If the planned length corresponding to the sub-board number is greater than 0, determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number;

[0036] S2536: If the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1 and the number of sub-boards by 1;

[0037] S2537: Repeat steps S2532 to S2536 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, to obtain the number of sub-boards included in the motherboard to be cut;

[0038] S2538: Determine whether the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan;

[0039] S2539: If the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan, increase the number of sub-boards by 1.

[0040] Optionally, calculating the length of each of the daughter boards according to the length of the mother board and the number of the daughter boards includes:

[0041] Determining whether the length of the motherboard is less than a second preset length;

[0042] If yes, subtract the first head and tail length from the motherboard length, and divide the result by the number of daughterboards to obtain an average length;

[0043] If not, subtract the second head and tail length from the motherboard length and divide the result by the number of daughterboards to obtain an average length;

[0044] Determining whether the average length is within a range of a minimum length and a maximum length in the contract plan;

[0045] If so, the average length is used as the length of each of the sub-boards.

[0046] Optionally, the method further comprises:

[0047] If the number of sub-panels in the contract plan is an even number, the first rule is used to perform thermal segmented shearing on the large panel;

[0048] If the number of sub-panels in the contract plan is an odd number, the second rule is used to perform thermal segmented shearing on the large panel.

[0049] In a second aspect, an embodiment of the present invention provides a motherboard shearing plan calculation device, the device comprising:

[0050] A motherboard information acquisition unit, used to acquire a motherboard number, a motherboard length and a corresponding large board number of a motherboard to be sheared; the motherboard number and the motherboard length are generated after a large board is thermally segmented and sheared into at least one motherboard to be sheared;

[0051] A contract plan search unit, used to search for a corresponding contract plan according to the large plate number;

[0052] A motherboard type determination unit, used for determining the motherboard type of the motherboard to be sheared according to the contract plan;

[0053] A cut-to-length board calculation unit, for inputting the mother board number, the mother board length and the contract plan into a cut-to-length board cutting model if the mother board to be cut is a cut-to-length board, and calculating the number of sub-boards required to be cut from the mother board to be cut and the length of each sub-board;

[0054] The non-size board calculation unit is used to input the mother board number, the mother board length and the contract plan into the non-size board shearing model if the mother board to be sheared is a non-size board, and calculate the number of sub-boards required to be sheared from the mother board to be sheared and the length of each sub-board.

[0055] In a third aspect, an embodiment of the present invention provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any of the above-described methods when executing the program.

[0056] In a fourth aspect, an embodiment of the present invention provides a storage medium having a computer program stored thereon, wherein the computer program implements any of the above-described methods when executed by a processor.

[0057] The embodiments of the present invention provide a motherboard cutting plan calculation method, device, electronic device and storage medium, which calculate the number of sub-boards required to be cut from the motherboard to be cut and the length of each sub-board through a fixed-size board cutting model or a non-size board cutting model, so that the final cut sub-board data and the length of each sub-board can correspond to those in the contract plan and meet the cutting requirements of the contract plan.

[0058] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0060] Figure 1 A schematic structural block diagram of an electronic device provided by an embodiment of the present invention;

[0061] Figure 2 A schematic flow chart of a method for calculating a motherboard shearing plan is provided for an embodiment of the present invention;

[0062] Figure 3 A schematic diagram of a flow chart of a shear model calculation for a cut-to-length plate provided in an embodiment of the present invention;

[0063] Figure 4 Another schematic diagram of a flow chart of the shear model calculation of a cut-to-length plate provided in an embodiment of the present invention;

[0064] Figure 5 A schematic structural block diagram of a motherboard shearing plan calculation device provided in an embodiment of the present invention.

[0065] Icons: 100-electronic device; 101-memory; 102-communication interface; 103-processor; 104-bus; 300-motherboard cutting plan calculation device; 310-motherboard information acquisition unit; 320-contract plan search unit; 330-motherboard type judgment unit; 340-fixed-size board calculation unit; 350-non-size board calculation unit. DETAILED DESCRIPTION

[0066] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0067] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0069] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0070] In the steel industry, the mother plate number refers to the plate number generated after the steel plate is hot-cut into sections. A large plate is divided into several mother plates, and the mother plate may include one or more sub-plates. The mother plate number consists of 12 digits, including the unit number, production date, serial number, and the corresponding serial number of the mother plate. The sub-plate number refers to the plate number generated after the steel plate is sheared from the mother plate. A mother plate is divided into one or more sub-plates. The sub-plate number is the unique identification number corresponding to the finished steel plate, consisting of 12 digits, including the unit number, production date, serial number, and the corresponding serial number of the sub-plate.

[0071] In the steel plate production plan, a large plate needs to be sheared into multiple finished plates (sub-plates) according to the contract plan, and one large plate corresponds to one contract plan. During the shearing process, the large plate needs to be placed on a cooling bed for shearing, but the cooling bed is often not enough to put down the entire large plate. Therefore, in actual production, the large plate will be hot-cut in sections to obtain multiple mother plates, and then the mother plates will be placed on the cooling bed for shearing to obtain sub-plates, and finally the shearing plan is completed.

[0072] However, after hot segmented shearing, there is no corresponding contract plan for each of the multiple mother plates obtained, that is, it is unknown how many sub-plates each mother plate needs to be cut into, the length of each sub-plate and other information. For operators, it is easy to cut steel plates that do not meet the standards in the contract plan, resulting in waste of steel plates.

[0073] Based on the above situation, an embodiment of the present invention provides a motherboard cutting plan calculation method, device, electronic device and storage medium, which calculates the number of sub-boards required to be cut from the motherboard to be cut and the length of each sub-board through a fixed-size board cutting model or a non-size board cutting model, so that the final cut sub-board data and the length of each sub-board can correspond to those in the contract plan, and the operator can cut the motherboard according to the calculated number of sub-boards and the length of each sub-board.

[0074] To implement the process steps and functions of each example of the present invention, please refer to Figure 1 , Figure 1 A schematic structural block diagram of an electronic device provided by an embodiment of the present invention. The electronic device 100 includes a memory 101 and a processor 103, and the memory 101 and the processor 103 are electrically connected to each other directly or indirectly to realize data transmission or interaction. For example, these elements can be electrically connected to each other through one or more communication buses 104 or signal lines. The memory 101 can be used to store software programs and modules, and the processor 103 executes the software programs and modules stored in the memory 101 to perform various functional applications and data processing.

[0075] The electronic device 100 may be, but is not limited to, a personal computer (PC), a server, a distributed computer, etc. It is understandable that the electronic device 100 is not limited to a physical server, but may also be a virtual machine on a physical server, a virtual machine built on a cloud platform, etc., which can provide the same functions as the server or virtual machine. The operating system of the electronic device 100 may be, but is not limited to, a Windows system, a Linux system, etc.

[0076] Among them, the memory 101 can be, but is not limited to, a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable read-only memory (EEPROM), etc.

[0077] The communication connection between the electronic device 100 and an external device is achieved through at least one communication interface 102 (which can be wired or wireless).

[0078] The processor 103 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the embodiment of the present invention can be completed by the hardware integrated logic circuit in the processor 103 or the instructions in the form of software. The processor 103 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.

[0079] Understandably, Figure 1 The structure shown is for illustration only. The electronic device 100 may also include Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown. Figure 1 Each component shown in the figure can be implemented by hardware, software or a combination thereof.

[0080] The following is an exemplary description of the motherboard shearing plan calculation method provided by the present invention. Specifically, Figure 2 A schematic diagram of a process flow of a motherboard shearing plan calculation method is provided for an embodiment of the present invention, see Figure 2 , the execution subject of this method can be the above Figure 1 The electronic device 100 shown in FIG. 1 includes: Figure 2 The following steps are described:

[0081] S210: Obtain the motherboard number, motherboard length and corresponding large board number of the motherboard to be cut.

[0082] The motherboard number and the motherboard length are generated after a large board is thermally segmented into at least one motherboard to be cut.

[0083] In the production of finished steel plates, one large plate corresponds to a contract plan, which includes the type of shearing, whether it is a fixed-length plate or a non-sized plate, and the planned cutting length of each sub-plate.

[0084] After the large plate is subjected to hot segmented shearing, at least one mother plate to be sheared is obtained, and the mother plate to be sheared includes a mother plate number and a mother plate length.

[0085] S220: Find the corresponding contract plan according to the plate number.

[0086] One large plate corresponds to one contract plan, so the corresponding contract plan can be found according to the large plate number corresponding to the mother plate to be cut.

[0087] S230: According to the contract plan, the type of the motherboard to be cut is determined.

[0088] S240: If the mother board to be cut is a cut-to-length board, the mother board number, mother board length and contract plan are input into the cut-to-length board cutting model to calculate the number of sub-boards required to cut the mother board to be cut and the length of each sub-board.

[0089] S250: If the motherboard to be sheared is a non-size board, the motherboard number, motherboard length and contract plan are input into the non-size board shearing model to calculate the number of sub-boards required to be sheared from the motherboard to be sheared and the length of each sub-board.

[0090] For cut-to-length boards, they need to be cut according to the calculated length of the sub-boards in the contract plan, while for off-length boards, the length of each sub-board is cut to be consistent, which only needs to be within a certain range. Therefore, two calculation models are used to calculate the number of sub-boards and the length of each sub-board for cut-to-length boards and off-length boards respectively.

[0091] The method calculates the number of sub-boards and the length of each sub-board required to be cut from the motherboard to be cut according to the motherboard number, the motherboard length and the corresponding large board number through a fixed-size board shearing model or a non-size board shearing model, thereby enabling the operator to install the correct shearing plan to shear the motherboard and reduce quality objection problems.

[0092] For the cut-to-length plate shear model, refer to Figure 3 , Figure 3 The schematic diagram of the flow chart of the cut-to-length plate shear model calculation provided by the embodiment of the present invention, step S240 may include the following: Figure 3 The following steps are shown:

[0093] S241: Determine whether the length of the motherboard to be cut is greater than or equal to a first preset length. If yes, execute step S243; if no, execute step S242.

[0094] In the production of finished boards, if the length of the motherboard is less than a preset length, it is generally not cut again and can be directly used as a daughter board of the motherboard. The first preset length can be 3 meters.

[0095] S242: The number of sub-boards to be cut from the motherboard is 1, and the length of the sub-board is the same as the length of the motherboard.

[0096] S243: According to the motherboard number, the motherboard length and the contract plan, the number of sub-boards included in the motherboard to be cut and the length of each sub-board are calculated through a loop.

[0097] For motherboards whose length is greater than or equal to the first preset length, they need to be cut. The sub-boards included in the motherboard can be calculated in sequence in a loop to ensure that the sub-boards in the motherboard meet the requirements of the contract plan, so that all the cut sub-boards meet the requirements of the contract plan.

[0098] After the large board is thermally segmented into multiple motherboards, one motherboard is calculated from the first daughter board in the contract plan, and the other motherboards are calculated from the middle position. For example, the serial number of the large board is 8P4719105000, and it is thermally segmented into two motherboards, with the motherboard numbers 8P4719105100 and 8P4719105400 respectively. For the two motherboards, the calculation method is different. For details, see Figure 4 , step S243 may include: Figure 4 The following steps are shown:

[0099] S2431: Initialize the number of sub-boards to 0, and assign the remaining length of the motherboard to the motherboard length.

[0100] S2432: According to the motherboard number, find out the corresponding sub-board number in the contract plan, and determine whether the sub-board number is the first sub-board number in the contract plan.

[0101] S2433: Subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, increase the motherboard number by 1, increase the number of sub-boards by 1, and record the current sub-board number.

[0102] S2434: Determine whether the planned length corresponding to the sub-board number is greater than 0.

[0103] S2435: Determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number.

[0104] S2436: Subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, add 1 to the motherboard number, add 1 to the number of sub-boards, and record the current sub-board number.

[0105] S2437: Repeat steps S2432 to S2436 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, and obtain the number of sub-boards included in the motherboard to be cut and the sub-board numbers corresponding to each sub-board.

[0106] S2438: According to each sub-board number, find out the corresponding sub-board length from the contract plan.

[0107] Continuing with the above example, the length of the large board is 50 meters, and the contract plan is to cut 5 sub-boards of 10 meters, 9 meters, 9 meters, 8 meters, and 7 meters. The two mother boards cut by hot segmentation, 8P4719105100 is 30 meters long, and 8P4719105400 is 20 meters. For the mother board 8P4719105100, its serial number is 100, which corresponds to the first sub-board number in the contract plan. Therefore, subtract 10 from 30 to get the remaining length of the mother board, which is 20 meters. The current number of sub-boards is 1, the new mother board number is 8P4719105200, and the current sub-board number is 8P4719105100. According to the motherboard number 8P4719105200, the remaining length of the motherboard is 20 meters. The remaining length of the motherboard is 20 meters, which is greater than the planned length of the second sub-board. Then, 20 minus 9 is used to obtain the remaining length of the motherboard, which is 11 meters. The current number of sub-boards is 2. The new motherboard number is 8P4719105300, and the current sub-board number is 8P4719105200. According to the motherboard number 8P4719105300, the remaining length of the motherboard is 11 meters. The remaining length is 2 meters. The current number of sub-boards is 3. The new motherboard number is 8P4719105400, and the current sub-board number is 8P4719105300. Since the remaining length of 2 meters is less than the planned length of the fourth sub-board, the calculation ends. Finally, the motherboard calculated the number of sub-boards to be 3, and the sub-board numbers were 8P4719105100, 8P4719105200, and 8P4719105300. Then, according to the sub-board numbers, the contract plan was searched for the planned lengths, which were 10 meters, 9 meters, and 9 meters respectively.

[0108] For the motherboard of 8P4719105400, its serial number is 400 and its length is 20 meters. According to the above steps, it can be calculated that the number of daughter boards is 2, and the daughter board numbers are 8P4719105400 and 8P4719105500, and the planned lengths are 8 meters and 7 meters respectively.

[0109] When the operator sees the motherboard number 8P4719105100, he will cut it according to 10 meters, 9 meters, and 9 meters, and print the sub-board number. When the operator sees the motherboard number 8P4719105400, he will cut it according to 8 meters, 7 meters, and print the sub-board number. Then the large board 8P4719105000 can be cut according to the contract plan.

[0110] For the non-size board shearing model, it is necessary to calculate the number of sub-boards that need to be sheared from the motherboard, and then calculate the length of each sub-board. The contract plan for non-size boards still has a planned length for each sub-board, but it is not cut according to the planned length, but within a certain range. Specifically, the above step S250 may include the steps of:

[0111] S251: Determine whether the length of the motherboard to be cut is greater than or equal to a first preset length.

[0112] S252: If not, the number of sub-boards to be cut from the motherboard is 1, and the length of the sub-board is the length of the motherboard.

[0113] S253: If yes, the number of sub-boards included in the motherboard to be cut is calculated through a loop according to the motherboard number, the motherboard length and the contract plan.

[0114] S254: Calculate the length of each daughter board according to the length of the mother board and the number of daughter boards.

[0115] The number of sub-boards included in the mother board to be cut is calculated in a similar way to the fixed-size board. Then, the length of each sub-board is obtained by equally dividing the mother board length and the number of sub-boards.

[0116] Specifically, the step of cyclically calculating the number of sub-boards included in the mother board to be cut may include the steps of:

[0117] S2531: Initialize the number of sub-boards to 0, and assign the remaining length of the motherboard to the motherboard length.

[0118] S2532: According to the motherboard number, find out the corresponding sub-board number in the contract plan, and determine whether the sub-board number is the first sub-board number in the contract plan.

[0119] S2533: If yes, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and add 1 to the motherboard number and 1 to the number of sub-boards.

[0120] S2534: If not, determine whether the planned length corresponding to the sub-board number is greater than 0.

[0121] S2535: If the planned length corresponding to the sub-board number is greater than 0, determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number.

[0122] S2536: If the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1 and the number of sub-boards by 1.

[0123] S2537: Repeat steps S2532 to S2536 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, to obtain the number of sub-boards included in the motherboard to be cut.

[0124] S2538: Determine whether the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan.

[0125] S2539: If the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan, increase the number of sub-boards by 1.

[0126] For the above example, if the shearing type is non-length plate, the length of the large plate is 50 meters, the contract plan is to shear 10, 9, 9, 8, 7 meters, and the two mother plates of hot segmented shearing, 8P4719105100 is 30 meters long, and 8P4719105400 is 20 meters long. The method of calculating the number of sub-plates is the same as the cut-length plate shearing model. It can be obtained that the number of sub-plates of the 8P4719105100 mother plate is 3, and the number of sub-plates of the 8P4719105400 mother plate is 2. In addition, if the remaining mother plate length is greater than or equal to the minimum length in the contract plan, add 1 to the number of sub-plates. For example, the minimum length in the contract plan is 5 meters and the maximum length is 15 meters. The remaining length of the 8P4719105100 motherboard after calculation is 2 meters, which is not enough to cut a daughter board. The remaining length of the 8P4719105400 motherboard after calculation is 5 meters, so the number of daughter boards is increased by one, that is, the number of daughter boards of the 8P4719105400 motherboard is 3.

[0127] When calculating the length of each daughter board, the motherboard is generally not square at the head and tail, but has a certain width, so the length of the head and tail needs to be subtracted before calculation. Specifically, step S254 may include the steps of:

[0128] S2541: Determine whether the length of the motherboard is less than a second preset length.

[0129] For motherboards of different lengths, the lengths of the head and tail are different. We use a certain length as a boundary to process the head and tail of the motherboard separately. For example, the second preset length may be 20 meters.

[0130] S2542: If yes, subtract the first head and tail length from the motherboard length, and divide the result by the number of daughterboards to obtain the average length.

[0131] Among them, the first head and tail length can be 1 meter.

[0132] S2543: If not, subtract the second head and tail length from the motherboard length, and divide the result by the number of daughterboards to obtain the average length.

[0133] Among them, the first head and tail length can be 0.5 meters.

[0134] S2544: Determine whether the average length is between the minimum length and the maximum length in the contract plan.

[0135] S2545: If so, use the average length as the length of each sub-board.

[0136] In the above example, the length of the 8P4719105100 motherboard is 30 meters, and the number of daughterboards is 3, then (30-0.5) / 3=9.8 meters. Rounding to one decimal place, the length of each daughterboard is 9.8 meters. And 9.8 meters in the above contract plan has a minimum length of 5 meters and a maximum length of 15 meters, so 9.8 meters is used as the length of each daughterboard of the 8P4719105100 motherboard.

[0137] The length of the motherboard 8P4719105400 is 20 meters, and the number of sub-boards is 3, then (20-0.5) / 3=6.5 meters. Within the contract plan, 6.5 meters is used as the length of each sub-board of the 8P4719105400 motherboard.

[0138] Finally, the non-sized large plate 8P4719105000 was sheared to obtain three 9.8-meter sub-plates and three 6.5-meter sub-plates.

[0139] Furthermore, in order to reduce waste and make the cutting of the sub-board more reasonable, the motherboard cutting plan calculation method may also include:

[0140] If the number of sub-panels in the contract plan is even, use the first rule to perform thermal segmented shearing on the large panel.

[0141] If the number of sub-panels in the contract plan is odd, use the second rule to perform thermal segmentation shearing on the large panel.

[0142] For example, if the contract plan is to cut 6 daughter boards, to cut into 2 mother boards, you can cut them in sections according to the ratio of 1:1. To cut them into 3 mother boards, you can cut them in sections according to the ratio of 1:1:1. If the contract plan is to cut 7 daughter boards, to cut them into 2 mother boards, you can cut them in sections according to the ratio of 4:3. To cut them into 3 mother boards, you can cut them in sections according to the ratio of 3:2:2.

[0143] Furthermore, the present invention also provides a motherboard shearing plan calculation device 300. For details, see Figure 5 , Figure 5 A schematic structural block diagram of a motherboard shearing plan calculation device provided in an embodiment of the present invention, the motherboard shearing plan calculation device 300 includes:

[0144] The motherboard information acquisition unit 310 is used to acquire the motherboard number, motherboard length and corresponding large board number of the motherboard to be sheared; wherein the motherboard number and motherboard length are generated after a large board is thermally segmented and sheared into at least one motherboard to be sheared.

[0145] The contract plan search unit 320 is used to search for the corresponding contract plan according to the large plate number.

[0146] The motherboard type determination unit 330 is used to determine the motherboard type of the motherboard to be cut according to the contract plan.

[0147] The cut-to-length board calculation unit 340 is used to input the mother board number, mother board length and contract plan into the cut-to-length board cutting model if the mother board to be cut is a cut-to-length board, and calculate the number of sub-boards required to be cut from the mother board to be cut and the length of each sub-board.

[0148] The non-size board calculation unit 350 is used to input the motherboard number, motherboard length and contract plan into the non-size board cutting model if the motherboard to be cut is a non-size board, and calculate the number of sub-boards required to cut the motherboard to be cut and the length of each sub-board.

[0149] In summary, the embodiments of the present invention provide a method, device, electronic device and storage medium for calculating a mother plate cutting plan, which calculates the mother plate to be cut to obtain the number of sub-plates, sub-plate numbers and lengths of each sub-plate that the mother plate should include, so that the operator can cut and print the sub-plate numbers according to the number of sub-plates, sub-plate numbers and lengths of each sub-plate to complete the contract plan corresponding to the large plate and reduce the problem of objections to the quality of the steel plate.

[0150] In the embodiments provided by the present invention, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present invention. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of the code, and a module, a program segment or a part of the code contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0151] In addition, the functional modules in the various embodiments of the present invention may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.

[0152] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a computer-readable storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0153] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0154] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A motherboard shearing plan calculation method, characterized in that: The method comprises: Obtaining a motherboard number, a motherboard length, and a corresponding large board number of a motherboard to be sheared; the motherboard number and the motherboard length are generated by thermally segmenting a large board into at least one motherboard to be sheared; According to the large plate number, find out the corresponding contract plan; According to the contract plan, determining the type of the motherboard to be sheared; If the mother board to be sheared is a cut-to-length board, the mother board number, the mother board length and the contract plan are input into the cut-to-length board shearing model to calculate the number of sub-boards required to be sheared from the mother board to be sheared and the length of each sub-board; If the motherboard to be sheared is a non-size board, the motherboard number, the motherboard length and the contract plan are input into the non-size board shearing model to calculate the number of sub-boards required to be sheared from the motherboard to be sheared and the length of each sub-board.

2. The method according to claim 1, characterized in that The step of inputting the motherboard number, the motherboard length and the contract plan into the cut-to-length board cutting model to calculate the number of sub-boards required to be cut from the motherboard to be cut and the length of each sub-board includes: Determining whether the motherboard length of the motherboard to be sheared is greater than or equal to a first preset length; If not, the number of sub-boards of the motherboard to be cut is 1, and the length of the sub-board is the length of the motherboard; If so, the number of sub-boards included in the motherboard to be cut and the length of each sub-board are calculated through a loop according to the motherboard number, the motherboard length and the contract plan.

3. The method according to claim 2, characterized in that The method of calculating the number of sub-boards and the length of each sub-board included in the motherboard to be cut by looping according to the motherboard number, the motherboard length and the contract plan comprises the following steps: S2431: Initialize the number of the sub-boards to 0, and assign the remaining length of the motherboard to the length of the motherboard; S2432: Find the corresponding sub-board number in the contract plan according to the motherboard number, and determine whether the sub-board number is the first sub-board number in the contract plan; S2433: If yes, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, increase the motherboard number by 1, increase the number of sub-boards by 1, and record the current sub-board number; S2434: If not, determine whether the planned length corresponding to the sub-board number is greater than 0; S2435: If the planned length corresponding to the sub-board number is greater than 0, determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number; S2436: If the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1, increase the number of sub-boards by 1, and record the current sub-board number; S2437: Repeat steps S2432 to S2436 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, and obtain the number of sub-boards included in the motherboard to be cut and the sub-board numbers corresponding to each sub-board; S2438: According to each of the sub-board numbers, find out the corresponding sub-board length from the contract plan.

4. The method according to claim 1, characterized in that: The step of inputting the motherboard number, the motherboard length and the contract plan into the non-size board shearing model to calculate the number of sub-boards required to be sheared from the motherboard to be sheared and the length of each sub-board includes: Determining whether the motherboard length of the motherboard to be sheared is greater than or equal to a first preset length; If not, the number of sub-boards of the motherboard to be cut is 1, and the length of the sub-board is the length of the motherboard; If yes, the number of sub-boards included in the motherboard to be cut is calculated through a loop according to the motherboard number, the motherboard length and the contract plan; The length of each of the daughter boards is calculated according to the length of the mother board and the number of the daughter boards.

5. The method according to claim 4, characterized in that The method of calculating the number of sub-boards included in the motherboard to be cut by looping according to the motherboard number, the motherboard length and the contract plan comprises the following steps: S2531: Initialize the number of the sub-boards to 0, and assign the remaining length of the motherboard to the length of the motherboard; S2532: according to the motherboard number, find out the corresponding sub-board number in the contract plan, and determine whether the sub-board number is the first sub-board number in the contract plan; S2533: If yes, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1 and the number of sub-boards by 1; S2534: If not, determine whether the planned length corresponding to the sub-board number is greater than 0; S2535: If the planned length corresponding to the sub-board number is greater than 0, determine whether the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number; S2536: If the remaining length of the motherboard is greater than or equal to the planned length corresponding to the sub-board number, subtract the planned length corresponding to the sub-board number from the remaining length of the motherboard to obtain a new remaining length of the motherboard, and increase the motherboard number by 1 and the number of sub-boards by 1; S2537: Repeat steps S2532 to S2536 until the remaining length of the motherboard is less than the first preset length, or the planned length corresponding to the sub-board number is less than or equal to 0, or the remaining length of the motherboard is less than the planned length corresponding to the sub-board number, to obtain the number of sub-boards included in the motherboard to be cut; S2538: Determine whether the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan; S2539: If the remaining length of the motherboard is greater than or equal to the minimum length in the contract plan, increase the number of sub-boards by 1.

6. The method according to claim 4, characterized in that The step of calculating the length of each of the daughter boards according to the length of the mother board and the number of the daughter boards comprises: Determining whether the length of the motherboard is less than a second preset length; If yes, subtract the first head and tail length from the motherboard length, and divide the result by the number of daughterboards to obtain an average length; If not, subtract the second head and tail length from the motherboard length and divide the result by the number of daughterboards to obtain an average length; Determining whether the average length is within a range of a minimum length and a maximum length in the contract plan; If so, the average length is used as the length of each of the sub-boards.

7. The method according to claim 1, characterized in that The method further comprises: If the number of sub-panels in the contract plan is an even number, the first rule is used to perform thermal segmented shearing on the large panel; If the number of sub-panels in the contract plan is an odd number, the second rule is used to perform thermal segmented shearing on the large panel.

8. A motherboard shearing plan calculation device, characterized in that: The device comprises: A motherboard information acquisition unit, used to acquire a motherboard number, a motherboard length and a corresponding large board number of a motherboard to be sheared; the motherboard number and the motherboard length are generated after a large board is thermally segmented and sheared into at least one motherboard to be sheared; A contract plan search unit, used to search for a corresponding contract plan according to the large plate number; A motherboard type determination unit, used for determining the motherboard type of the motherboard to be sheared according to the contract plan; A cut-to-length board calculation unit, for inputting the mother board number, the mother board length and the contract plan into a cut-to-length board cutting model if the mother board to be cut is a cut-to-length board, and calculating the number of sub-boards required to be cut from the mother board to be cut and the length of each sub-board; The non-size board calculation unit is used to input the mother board number, the mother board length and the contract plan into the non-size board shearing model if the mother board to be sheared is a non-size board, and calculate the number of sub-boards required to be sheared from the mother board to be sheared and the length of each sub-board.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 7 is implemented.

10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.

Citation Information

Cited By

  • Method for determining shearing length of steel plate

    CN115564083A