Converter station digital fire-fighting emergency plan safety management method, system and application
By deploying a blockchain server in the digital converter station platform III area and generating the public and private keys of the fire emergency plan manager, the problems of unauthorized deployment, tampering and erroneous execution in the fire emergency plan management are solved, and the fire emergency plan is realized The security and management efficiency of the system ensure the correctness of data collection.
Patent Information
- Application Number
- CN202410943861.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-15
AI Technical Summary
The existing digital converter station platform has problems such as unauthorized deployment, tampering, network access errors, linkage control errors and data acquisition errors in the fire emergency plan management, resulting in low safety and management efficiency of fire emergency plan.
By deploying a blockchain server in the digital converter station platform III area, the fire emergency plan manager public and private keys are generated, the security management global configuration is submitted using blockchain transactions, and network access, linkage control and Real-time monitoring and verification of data collection ensures the security and correctness of the plan.
It realizes the immutability and traceability of fire emergency plans, improves the safety of the system and the correctness of data collection, and ensures dual inspection of the safety sharing and management platform of fire emergency plans under the open system.
Smart Images

Figure CN118972035A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fire emergency plan safety management for converter stations, and in particular to a method, system and application for safety management of digital fire emergency plans for base converter stations. Background Art
[0002] After 2018, State Grid comprehensively improved the fire-fighting capabilities of its stations. New and existing fire-fighting systems were independent of each other and lacked a unified and coordinated monitoring platform. At the same time, there were high requirements for the legality and compliance of fire-fighting personnel, equipment, and operations. The stations were mainly staffed by electrical professionals with insufficient fire-fighting knowledge and emergency response skills, and fire-fighting management lacked a professional, digital, and online model.
[0003] The existing digital converter station platform adopts an open platform and professional fire emergency application model, in which the basic platform realizes unified modeling of the entire station information, unified data collection and management, and provides standardized service access interfaces such as resource management, data management, public services, and application management, so as to realize flexible expansion of various applications. The application of various professional fire emergency plans is based on the platform to realize specific fire emergency command functions. Through the platform + application construction model, we strive to create a co-built, shared, and open ecological system. However, there are many types of professional fire emergency plans, and the execution security requirements are high. In this open and shared ecological system, the security risks of the fire emergency plan of the digital converter station platform are as follows:
[0004] 1) Unauthorized and tampered fire emergency plan deployment;
[0005] 2) IP outside the fire emergency plan access network address range (fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, fire truck and other fire emergency related subsystems);
[0006] 3) Illegal or erroneous execution of linkage control in the fire emergency plan, including shutdown of the converter valve, start-up of the oil drainage system, start-up of the water spray system, power disconnection, start-up of the fire monitor, linkage control of the robot, linkage control of the camera, linkage control of the drone, and other important controls;
[0007] 4) Errors in data collection of fire emergency plans (fire alarm system, fire water supply system, CAFS system, oil drainage system and other subsystems).
[0008] The existence of the above risks makes the safety management efficiency of the fire emergency plan of the converter station low and cannot guarantee the system safety during the operation of the fire emergency plan. Summary of the invention
[0009] The purpose of the present invention is to provide a fire emergency plan safety management method for a digital converter station platform based on blockchain, which has high fire emergency plan safety management efficiency and ensures system safety during the operation of the fire emergency plan.
[0010] The present invention solves the above technical problems through the following technical means:
[0011] The digital fire emergency plan safety management method for a converter station is characterized by comprising the following steps:
[0012] First, a blockchain server is deployed in the safety zone III of the converter station; a blockchain client is deployed on the blockchain server to access the distributed ledger and provide an access interface to the safety zone I;
[0013] Generate a fire emergency plan manager public key and private key, and a fire emergency plan information maintenance public key and private key through the blockchain server; submit the fire emergency plan security management global configuration in the form of a blockchain transaction;
[0014] Use the fire emergency plan information to maintain the private key signature and submit the fire emergency plan document;
[0015] The fire emergency plan manager reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key, deploys the authorization verification, and after the verification is successful, the fire emergency plan is loaded into the fire emergency command system to start or keep running; if the verification fails, the deployment and operation of the fire emergency plan is terminated;
[0016] During the operation of the fire emergency plan, at least network access inspection, linkage control inspection, and data collection point inspection are also carried out. If any one of the inspections fails, the deployment and operation of the fire emergency plan will be terminated.
[0017] Furthermore, the specific process of using the fire emergency plan information to maintain the private key signature and submit the fire emergency plan file is as follows:
[0018] After a fire emergency plan of a digital converter station platform is debugged, the fire emergency plan debugging and maintenance personnel use the fire emergency plan information maintenance private key signature to submit the fire emergency plan file HASH and the fire emergency plan network access configuration. Finally, the fire emergency plan manager private key packages and signs it, and updates the global configuration of the fire emergency plan security management in the form of a transaction.
[0019] Furthermore, the verification process is specifically as follows: after the fire emergency plan manager on the digital converter station platform receives a deployment request for a fire emergency plan file, the digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, performs HASH calculation on the fire emergency plan file, and obtains the local fire emergency plan file HASH to be installed; checks whether the TEST fire emergency plan mirror file HASH is consistent with the mirror file HASH in a fire emergency plan information configuration in the fire emergency plan security management global configuration. If they are inconsistent, the verification fails and the deployment is exited; after the verification is successful, the fire emergency plan manager executes the TEST fire emergency plan deployment and loads it into the fire emergency command system, and starts running after the loading is complete.
[0020] Furthermore, the inspections during the operation of the fire emergency plan are as follows:
[0021] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the secure zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key. Based on the global configuration, it monitors the network access behavior of the fire emergency plan in real time. If it is detected that the fire emergency plan has accessed IPs and ports outside its corresponding network configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
[0022] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the blockchain server in the security zone III and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key. Based on the global configuration, the linkage control signal sending behavior of the fire emergency plan is monitored in real time. If it is monitored that the fire emergency plan illegally sends a converter valve shutdown, oil drainage system start-up, water spray system start-up, power disconnection, fire cannon start-up, robot linkage control, camera linkage control, and drone linkage control signal that is not in the corresponding step, then the linkage control signal is shielded and the fire emergency plan is stopped;
[0023] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, and monitors the data collection points of the fire emergency plan in real time based on the global configuration. If the information points of the fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, and fire truck system collected by the fire emergency plan are inconsistent with the global configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
[0024] The present invention also provides a converter station fire emergency plan safety management system, comprising:
[0025] The blockchain server configuration module first deploys a blockchain server in the converter station safety zone III; deploys a blockchain client on the blockchain server to access the distributed ledger and provides an access interface to the safety zone I;
[0026] A key generation module generates a public key and a private key for a fire emergency plan manager and a public key and a private key for fire emergency plan information maintenance through the blockchain server; and submits a global configuration of fire emergency plan security management in the form of a blockchain transaction;
[0027] Globally configure the signature submission module, and use the fire emergency plan information to maintain the private key signature to submit the fire emergency plan file;
[0028] Fire emergency plan deployment authorization verification module, the fire emergency plan manager reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key, deploys authorization verification, and after successful verification, the fire emergency plan is loaded into the fire emergency command system to start or keep running; if the verification fails, the fire emergency plan deployment and operation are terminated;
[0029] The operation-period inspection module also performs at least network access inspection, linkage control inspection, and data collection point inspection during the operation of the fire emergency plan. If any one of the inspections fails, the deployment and operation of the fire emergency plan will be terminated.
[0030] Furthermore, the specific process of the global configuration signature submission module is as follows:
[0031] After a fire emergency plan of a digital converter station platform is debugged, the fire emergency plan debugging and maintenance personnel use the fire emergency plan information maintenance private key signature to submit the fire emergency plan file HASH and the fire emergency plan network access configuration. Finally, the fire emergency plan manager private key packages and signs it, and updates the global configuration of the fire emergency plan security management in the form of a transaction.
[0032] Furthermore, the verification process of the fire emergency plan deployment authorization verification module is as follows: after the fire emergency plan manager on the digital converter station platform receives a deployment request for a fire emergency plan file, the digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, performs HASH calculation on the fire emergency plan file, and obtains the local fire emergency plan file HASH to be installed; checks whether the TEST fire emergency plan mirror file HASH is consistent with the mirror file HASH in a fire emergency plan information configuration in the fire emergency plan security management global configuration. If they are inconsistent, the verification fails and the deployment is exited; after the verification is successful, the fire emergency plan manager executes the TEST fire emergency plan deployment and loads it into the fire emergency command system, and starts running after the loading is complete.
[0033] Furthermore, the inspection module inspection during operation is specifically:
[0034] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the secure zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key. Based on the global configuration, it monitors the network access behavior of the fire emergency plan in real time. If it is detected that the fire emergency plan has accessed IPs and ports outside its corresponding network configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
[0035] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the blockchain server in the security zone III and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key. Based on the global configuration, the linkage control signal sending behavior of the fire emergency plan is monitored in real time. If it is monitored that the fire emergency plan illegally sends a converter valve shutdown, oil drainage system start-up, water spray system start-up, power disconnection, fire cannon start-up, robot linkage control, camera linkage control, and drone linkage control signal that is not in the corresponding step, then the linkage control signal is shielded and the fire emergency plan is stopped;
[0036] During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, and monitors the data collection points of the fire emergency plan in real time based on the global configuration. If the information points of the fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, and fire truck system collected by the fire emergency plan are inconsistent with the global configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
[0037] The present invention also provides a digital converter station platform using the above system.
[0038] The present invention also provides a converter station using the above-mentioned digital converter station platform.
[0039] The effects of the present invention are:
[0040] The present invention configures a blockchain server in the digital converter station platform zone III to generate a public key and a private key for a fire emergency plan manager, thereby making the fire emergency plan security management configuration process in the digital converter station platform tamper-proof and traceable, and ensuring the secure sharing of the fire emergency plan of the station control system in an open system.
[0041] With the endorsement of the blockchain public chain, the security of all fire emergency plans in digital converter stations, network access security, linkage control security and data collection accuracy are improved.
[0042] Double inspection is carried out at the beginning and during the operation of the emergency plan to ensure the security of the management platform. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is the overall flow chart of the present invention;
[0044] Figure 2 This is a diagram of the station control system architecture of the present invention;
[0045] Figure 3 This is the architecture diagram of the fire emergency plan platform of the station control system of the present invention;
[0046] Figure 4 A diagram showing the global configuration data structure of the fire emergency plan safety management of the station control system of the present invention in the blockchain;
[0047] Figure 5 This is a data structure diagram of the fire emergency plan information configuration in the blockchain of the station control system of the present invention. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] like Figure 1 The figure shows the overall flow chart of the fire emergency plan safety management method of the station control system platform based on blockchain of the present invention, as shown in FIG. Figure 2The station control system architecture of the present invention is shown as a schematic diagram, which includes the following steps:
[0050] Step 1: configure a blockchain server in Zone III of the intelligent converter station monitoring system, deploy a blockchain client on the blockchain server to access the distributed ledger, and provide an access interface to the security zone I.
[0051] Step 2: The operator of the smart converter station generates the public key and private key of the fire emergency plan manager through the blockchain server; the public key and private key of the fire emergency plan information maintenance. The above technical and management endorsements are subject to risks, such as the relevant algorithms being hacked, key leakage, etc. At the same time, the relevant algorithms and management measures also need to be updated synchronously. Submit the security registration information (including the public key for the fire emergency plan information maintenance and the current number of fire emergency plans) with the signature of the fire emergency plan manager private key to generate the global configuration of the fire emergency plan security management. The global configuration data structure is as follows: Figure 4 As shown, it contains the following parts:
[0052] 1) Engineer signature. This signature is generated by encrypting the entire data structure using the private key of the fire emergency plan manager to identify whether the data structure has been tampered with.
[0053] 2) Timestamp, which represents the generation time of the entire data structure on the blockchain and is used to identify version updates of the data structure.
[0054] 3) Security registration data, including the entire fire emergency plan information maintenance public key and the number of fire emergency plans, which are used to identify the identity of the fire emergency plan information maintainer.
[0055] 4) Fire emergency plan information data, including fire emergency plan information maintenance public key, signature, fire emergency plan index number, network access configuration, resource access configuration, file directory permission access configuration, image file HASH and timestamp, used to identify the registration information of the fire emergency plan. The fire emergency plan information data results are as follows: Figure 5 shown.
[0056] Step 3: After the debugging of a fire emergency plan on the digital converter station platform is completed, the fire emergency plan debugging and maintenance personnel use the fire emergency plan information maintenance private key signature to submit the fire emergency plan file HASH and the fire emergency plan network access configuration. Finally, the fire emergency plan manager private key packages and signs it, and updates the fire emergency plan security management global configuration in the form of a transaction.
[0057] Step 4. After the fire emergency plan manager on the digital converter station platform receives a deployment request for a fire emergency plan (TEST fire emergency plan) file, the digital converter station platform connects to the blockchain server in Security Zone III and reads the latest fire emergency plan security management global configuration signed by the private key of the fire emergency plan manager (based on the timestamp), performs HASH calculation on the TEST fire emergency plan file, and obtains the local fire emergency plan file HASH to be installed; checks whether the TEST fire emergency plan mirror file HASH is consistent with the mirror file HASH in a fire emergency plan information configuration in the fire emergency plan security management global configuration. If they are inconsistent, the verification fails and the deployment is exited; after the verification is successful, the fire emergency plan manager executes the TEST fire emergency plan deployment and loads it into the fire emergency command system, and starts running after the loading is complete.
[0058] Step 5: During the operation of the TEST fire emergency plan, the fire emergency plan manager digital converter station platform connects to the secure zone III blockchain server and reads the latest fire emergency plan security management global configuration (based on the timestamp) signed by the fire emergency plan manager's private key. Based on the global configuration, the network access behavior of the TEST fire emergency plan is monitored in real time. If the TEST fire emergency plan is detected to have access to IPs and ports outside of its corresponding network configuration, the fire emergency plan manager stops the operation of the TEST fire emergency plan. The legal subsystems specifically include:
[0059] 1) Fire alarm system;
[0060] 2) Fire water supply system;
[0061] 3) CAFS system;
[0062] 4) Oil drainage system;
[0063] 5) Mobile operation terminal;
[0064] 6) Fire truck system.
[0065] Step 6: During the operation of the TEST fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration (based on the timestamp) signed by the fire emergency plan manager private key. Based on the global configuration, the linkage control signal sending behavior of the TEST fire emergency plan is monitored in real time. If it is detected that the TEST fire emergency plan illegally sends signals such as the converter valve shutdown, oil drainage system start-up, water spray system start-up, power disconnection, fire cannon start-up, robot linkage control, camera linkage control, and drone linkage control that are not in the corresponding steps, the linkage control signal is shielded and the TEST fire emergency plan is stopped. The illegal control signals specifically include:
[0066] 1) Shut down the converter valves that are not in the corresponding steps of the fire emergency plan;
[0067] 2) The oil discharge system is not started in the corresponding step of the fire emergency plan;
[0068] 3) The water spray system is not activated in the corresponding step of the fire emergency plan;
[0069] 4) Power supply is disconnected when not in the corresponding step of the fire emergency plan;
[0070] 5) The fire monitor is not turned on in the corresponding step of the fire emergency plan;
[0071] 6) Robot linkage control that is not in the corresponding steps of the fire emergency plan;
[0072] 7) Camera linkage control that is not in the corresponding steps of the fire emergency plan;
[0073] 8) Unmanned aerial vehicle linkage control that is not in the corresponding steps of the fire emergency plan.
[0074] Step 7. During the operation of the TEST fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration (based on timestamp) signed by the fire emergency plan manager's private key, and monitors the data collection points of the TEST fire emergency plan in real time based on the global configuration. If the information points of the fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, and fire truck system collected by the TEST fire emergency plan are inconsistent with the global configuration, the fire emergency plan manager stops the operation of the TEST fire emergency plan.
[0075] Specifically include:
[0076] 1) Incorrect fire alarm system data collection;
[0077] 2) Incorrect fire water supply system data collection;
[0078] 3) Incorrect CAFS system data collection;
[0079] 4) Incorrect oil discharge system data collection;
[0080] 5) Wrong operation mobile terminal collects data;
[0081] 6) Incorrect fire truck system data collection.
[0082] Figure 3 The fire emergency plan platform in the station control system shown in FIG. 1 is executed according to the above steps (1) to (7).
[0083] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A digital fire emergency plan safety management method for a converter station, characterized in that: The following steps are involved: First, a blockchain server is deployed in the safety zone III of the converter station; a blockchain client is deployed on the blockchain server to access the distributed ledger and provide an access interface to the safety zone I; Generate a fire emergency plan manager public key and private key, and a fire emergency plan information maintenance public key and private key through the blockchain server; submit the fire emergency plan security management global configuration in the form of a blockchain transaction; Submit the fire emergency plan document using the fire emergency plan information maintenance private key signature; The fire emergency plan manager reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key, deploys the authorization verification, and after the verification is successful, the fire emergency plan is loaded into the fire emergency command system to start or keep running; if the verification fails, the deployment and operation of the fire emergency plan is terminated; During the operation of the fire emergency plan, at least network access inspection, linkage control inspection, and data collection point inspection are also carried out. If any one of the inspections fails, the deployment and operation of the fire emergency plan will be terminated.
2. The method for safety management of digital fire emergency plan for converter station according to claim 1, characterized in that: The specific process of using the fire emergency plan information to maintain the private key signature and submit the fire emergency plan file is as follows: After a fire emergency plan of a digital converter station platform is debugged, the fire emergency plan debugging and maintenance personnel use the fire emergency plan information maintenance private key signature to submit the fire emergency plan file HASH and the fire emergency plan network access configuration. Finally, the fire emergency plan manager private key packages and signs it, and updates the global configuration of the fire emergency plan security management in the form of a transaction.
3. The method for safety management of digital fire emergency plan for converter station according to claim 1, characterized in that: The verification process is specifically as follows: after the fire emergency plan manager on the digital converter station platform receives a deployment request for a fire emergency plan file, the digital converter station platform connects to the blockchain server in the security zone III and reads the latest fire emergency plan security management global configuration signed by the private key of the fire emergency plan manager, performs HASH calculation on the fire emergency plan file, and obtains the local fire emergency plan file HASH to be installed; checks whether the TEST fire emergency plan mirror file HASH is consistent with the mirror file HASH in a fire emergency plan information configuration in the fire emergency plan security management global configuration. If they are inconsistent, the verification fails and the deployment is exited; after the verification is successful, the fire emergency plan manager executes the TEST fire emergency plan deployment and loads it into the fire emergency command system, and starts running after loading is completed.
4. The digital fire emergency plan safety management method for converter stations according to any one of claims 1 to 3, characterized in that: The specific inspections during the operation of the fire emergency plan are: During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the secure zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key. Based on the global configuration, it monitors the network access behavior of the fire emergency plan in real time. If it is detected that the fire emergency plan has accessed IPs and ports outside its corresponding network configuration, the fire emergency plan manager stops the operation of the fire emergency plan. During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the blockchain server in the security zone III and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key. Based on the global configuration, the linkage control signal sending behavior of the fire emergency plan is monitored in real time. If it is monitored that the fire emergency plan illegally sends a converter valve shutdown, oil drainage system start-up, water spray system start-up, power disconnection, fire cannon start-up, robot linkage control, camera linkage control, and drone linkage control signal that is not in the corresponding step, then the linkage control signal is shielded and the fire emergency plan is stopped; During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, and monitors the data collection points of the fire emergency plan in real time based on the global configuration. If the information points of the fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, and fire truck system collected by the fire emergency plan are inconsistent with the global configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
5. Converter station digital fire emergency plan safety management system, characterized by: include: The blockchain server configuration module first deploys the blockchain server in the converter station safety zone III; Deploy a blockchain client on the blockchain server to access the distributed ledger and provide an access interface to the security zone I; A key generation module generates a public key and a private key for a fire emergency plan manager and a public key and a private key for fire emergency plan information maintenance through the blockchain server; and submits a global configuration of fire emergency plan security management in the form of a blockchain transaction; Globally configure the signature submission module, and use the fire emergency plan information to maintain the private key signature to submit the fire emergency plan file; Fire emergency plan deployment authorization verification module, the fire emergency plan manager reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key, deploys authorization verification, and after successful verification, the fire emergency plan is loaded into the fire emergency command system to start or keep running; if the verification fails, the fire emergency plan deployment and operation are terminated; The operation-period inspection module also performs at least network access inspection, linkage control inspection, and data collection point inspection during the operation of the fire emergency plan. If any one of the inspections fails, the deployment and operation of the fire emergency plan will be terminated.
6. The digital fire emergency plan safety management system for converter stations according to claim 5 is characterized in that: The specific process of global configuration signature submission module is as follows: After a fire emergency plan of a digital converter station platform is debugged, the fire emergency plan debugging and maintenance personnel use the fire emergency plan information maintenance private key signature to submit the fire emergency plan file HASH and the fire emergency plan network access configuration. Finally, the fire emergency plan manager private key packages and signs it, and updates the global configuration of the fire emergency plan security management in the form of a transaction.
7. The digital fire emergency plan safety management system for converter stations according to claim 5 is characterized in that: The verification process of the fire emergency plan deployment authorization verification module is specifically as follows: after the fire emergency plan manager on the digital converter station platform receives a deployment request for a fire emergency plan file, the digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, performs HASH calculation on the fire emergency plan file, and obtains the local fire emergency plan file HASH to be installed; checks whether the TEST fire emergency plan mirror file HASH is consistent with the mirror file HASH in a fire emergency plan information configuration in the fire emergency plan security management global configuration. If they are inconsistent, the verification fails and the deployment is exited; after the verification is successful, the fire emergency plan manager executes the TEST fire emergency plan deployment and loads it into the fire emergency command system, and starts running after loading is completed.
8. The digital fire emergency plan safety management system for converter stations according to any one of claims 5 to 7, characterized in that: The inspection module inspection during operation is specifically as follows: During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the secure zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key. Based on the global configuration, it monitors the network access behavior of the fire emergency plan in real time. If it is detected that the fire emergency plan has accessed IPs and ports outside its corresponding network configuration, the fire emergency plan manager stops the operation of the fire emergency plan. During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the blockchain server in the security zone III and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager private key. Based on the global configuration, the linkage control signal sending behavior of the fire emergency plan is monitored in real time. If it is monitored that the fire emergency plan illegally sends a converter valve shutdown, oil drainage system start-up, water spray system start-up, power disconnection, fire cannon start-up, robot linkage control, camera linkage control, and drone linkage control signal that is not in the corresponding step, then the linkage control signal is shielded and the fire emergency plan is stopped; During the operation of the fire emergency plan, the fire emergency plan manager digital converter station platform connects to the security zone III blockchain server and reads the latest fire emergency plan security management global configuration signed by the fire emergency plan manager's private key, and monitors the data collection points of the fire emergency plan in real time based on the global configuration. If the information points of the fire alarm system, fire water supply system, CAFS system, oil drainage system, mobile operation terminal, and fire truck system collected by the fire emergency plan are inconsistent with the global configuration, the fire emergency plan manager stops the operation of the fire emergency plan.
9. A digital converter station platform using the system described in any one of claims 5 to 8.
10. A converter station using the digital converter station platform according to claim 9.