Dispatching management system for building construction
By collecting and analyzing construction personnel skills and task information in the scheduling management system in the construction field, calculating priority construction coefficients and experience coefficients, the precise matching of personnel and tasks is achieved, and the unreasonable resource allocation and low construction quality in traditional scheduling methods are solved. The problem of construction efficiency and quality has improved.
Patent Information
- Application Number
- CN202411046592.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the field of construction, traditional manual scheduling methods cannot effectively integrate construction personnel skills, task requirements and related factors, resulting in unreasonable resource allocation, inefficient efficiency, and the inability to accurately judge the construction personnel's familiarity and experience of tasks, affecting task allocation Rationality and construction quality.
A scheduling management system for construction was designed, including data collection unit, task analysis unit, experience analysis unit and scheduling analysis unit. By collecting and analyzing construction personnel skills and task information, priority construction coefficient, construction experience coefficient and matching coefficient are calculated. , realize accurate matching and scheduling optimization between personnel and tasks.
It has improved the scientificity and rationality of scheduling decisions, ensured timely handling of key tasks, optimized resource allocation, improved construction efficiency and quality, reduced costs, and improved overall management level and construction quality.
Smart Images

Figure CN119005598A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of dispatching management, in particular to a dispatching management system for building construction. Background Art
[0002] In the field of construction, efficient scheduling management is crucial to the smooth progress of the project. With the continuous expansion of the scale and increasing complexity of construction projects, traditional manual scheduling methods face many challenges. In the past construction process, due to the lack of comprehensive integration and scientific analysis of construction personnel skills, construction task requirements and various related factors, construction resources were allocated irrationally and inefficiently.
[0003] The skill levels of construction workers vary, and the requirements of construction tasks vary. If they cannot be accurately matched, it is easy for construction workers to be unable to do the work or there is no one to do the task. At the same time, key factors such as the urgency, importance, and planned construction period of construction tasks have not been effectively quantitatively evaluated and prioritized, resulting in key tasks not being handled in a timely manner.
[0004] In addition, there is a lack of systematic analysis methods for considering the experience of construction workers, which makes it impossible to accurately judge the construction workers' familiarity and experience with specific construction tasks, affecting the rationality of task allocation and construction quality.
[0005] Therefore, in order to improve the efficiency and quality of construction, reduce costs and avoid waste of resources, it is necessary to invent a scheduling management system for construction that can comprehensively consider multiple factors such as construction personnel skills, construction task characteristics and construction personnel experience. Summary of the invention
[0006] In view of the deficiencies of the prior art, the present invention provides a scheduling management system for construction, which solves the problems raised in the background technology.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A scheduling management system for construction, comprising:
[0008] The data collection unit is used to collect all the skills corresponding to each construction worker and all the skills required for each construction task; it is also used to collect the task data of each construction task and the personal data of each construction worker; the task data includes the urgency, importance, planned completion date, planned duration, and current date of the construction task; the personal data includes the total number of tasks involved in the same type of construction task, working time, and task complexity;
[0009] The task analysis unit is used to perform priority construction analysis on each construction task and obtain the priority construction coefficient of each construction task:
[0010] The experience analysis unit is used to analyze the construction experience of each construction worker for each construction task, and obtain the construction experience coefficient of each construction worker for each construction task:
[0011] The scheduling analysis unit is used to perform personnel-task matching analysis based on all the skills corresponding to each construction worker and all the required skills for each construction task, and to obtain the matching coefficient between each construction worker and each construction task;
[0012] The scheduling execution unit is used to deploy and execute multiple construction personnel and multiple construction tasks based on the priority construction coefficient, construction experience coefficient and matching coefficient.
[0013] Preferably, the personnel task matching analysis method is as follows:
[0014] Step K1, select a construction worker and a construction task;
[0015] The skills required in the construction task are marked as i, i = 1, 2, ... n, and n represents the number of all skills required in the construction task;
[0016] Step K2, obtain the weight value Qi corresponding to all the skills required in the construction task, and the weight value is the proportional coefficient pre-set by the relevant personnel based on experience,
[0017] Step K3, according to the skills required in the construction task, the construction personnel are assigned skills, and the skill assignment result of the construction personnel for the corresponding construction task is obtained;
[0018] Step K4, the result after assigning all the skills of the construction worker is marked as Ri;
[0019] Then through Calculate the matching coefficient P between the construction personnel and the construction tasks respectively;
[0020] Step K5, according to the method of Step 1-Step 4, calculate the matching coefficient between each construction worker and each construction task.
[0021] Preferably, the skill assignment processing method is as follows:
[0022] Match all the skills of the construction worker with the skills required in the construction task one by one until all the skills of the construction worker are assigned:
[0023] Select a skill of a construction worker;
[0024] If the skill of the construction worker is the same as one of the skills required in the construction task, the skill of the construction worker is assigned a value of 1;
[0025] If the skill of the construction worker is different from all the skills required in the construction task, the skill of the construction worker is assigned a value of 0.
[0026] Preferably, the personnel task matching analysis method is also as follows:
[0027] Step M1. Create corresponding skill sets S for all skills corresponding to each construction worker. j ={s j1 ,s j2 ,……s jk}, j is the number of construction workers, j = 1, 2, ... m, m represents the number of construction workers;
[0028] In the skill set, k represents the maximum number of construction workers corresponding to all skills;
[0029] Step M2: Establish corresponding required skill sets S for all required skills of each construction task t ={s t1 ,s t2 ,……s te}, t is the number of construction tasks, t = 1, 2, ... v, v represents the number of construction tasks;
[0030] In the required skill set, e represents the maximum number of all required skills corresponding to the construction task;
[0031] Step M3, through the formula: Calculate the matching coefficient P between each construction worker and each construction task jt , P jt It refers to the matching coefficient between the t-th construction task and the j-th construction worker;
[0032] In the formula, G() refers to the number of all elements in the corresponding set, G(S j ∩S t ) is S j and S t The number of elements in the intersection of two sets.
[0033] Preferably, the priority construction analysis method is as follows:
[0034] Select a construction task, extract the planned completion date, planned duration and current date of the construction task, calculate the time difference between the planned completion date and the current date, and then mark it as SJ, and mark the planned duration as JG;
[0035] Extract the urgency and importance of the construction task and mark them as JC and ZC respectively;
[0036] Then through the formula: Calculate the priority construction coefficient of the task;
[0037] In the formula, Refers to the urgency of the construction period of the relevant construction task. The smaller the value is, the more urgent the construction period of the relevant construction task is; conversely, the smaller the value is, the less urgent the construction period of the relevant construction task is. β1, β2, and β3 are weight values respectively predetermined for the urgency, importance, and urgency of the construction task in calculating the priority construction coefficient.
[0038] Preferably, the construction experience analysis method is as follows:
[0039] Select a construction worker and a construction task, extract the total number of tasks, working time, and task complexity of the construction worker in this type of construction task, and mark them as WS, GS, and WZ respectively;
[0040] Then, the construction experience coefficient of the construction worker for the construction task is calculated through the formula: SY = (WS × α1 + GS × α2 + WZ × α3) × 1.25;
[0041] Wherein, α1, α2, and α3 are respectively predetermined weight values for the total number of tasks, working time, and task complexity of the construction task in calculating the priority construction coefficient.
[0042] Preferably, the larger the priority construction coefficient is, the higher the priority of the related construction task is, and the larger the construction experience coefficient is, the more experience the related construction personnel have in the corresponding construction task.
[0043] Preferably, the deployment execution method is as follows:
[0044] First, the priority construction coefficients are sorted from large to small, and the construction experience coefficients and matching coefficients are sorted from high to low respectively;
[0045] Then, from the sorted priority construction coefficients, select the construction task with the highest value and start:
[0046] Then, the construction experience coefficient and matching coefficient of all construction personnel corresponding to the construction task are obtained;
[0047] Then, the comprehensive determination coefficient of each construction worker corresponding to the construction task is calculated by the formula: comprehensive determination coefficient = construction experience coefficient + matching coefficient;
[0048] Afterwards, the construction personnel with comprehensive determination coefficients will be dispatched to the construction tasks.
[0049] Preferably, the urgency and importance of each construction task are determined by the relevant personnel by comparing all the construction tasks: the urgency is divided into e1 emergency levels, and the e1 levels are assigned values of 1, 2, 3, ... f e1 ; Divide the importance into e2 levels, and assign the e2 levels values 1, 2, 3, ...f e2 ; The total number of tasks is the number of construction tasks of the same type that a construction worker participates in; the working time is the total time a construction worker participates in all similar construction tasks; the complexity of the task is divided into e3 important levels according to the technical difficulty and scale factors of the project, and the e3 levels are assigned values of 1, 2, 3, ... f respectively e3 ;
[0050] Among them, f e1 、f e2 、f e3 They are the maximum values corresponding to urgency, importance, and task complexity, respectively. The larger the value corresponding to urgency, the more urgent the related task is; the larger the value corresponding to importance, the more important the related task is; the larger the value corresponding to task complexity, the more complex the related task is.
[0051] The present invention provides a scheduling management system for construction. Compared with the prior art, it has the following advantages:
[0052] Beneficial effects:
[0053] The present invention comprehensively collects the skills, personal data and relevant information of construction personnel and construction tasks through the data collection unit, provides a rich and accurate data basis for precise scheduling, and helps to improve the scientificity and rationality of scheduling decisions.
[0054] In the present invention, the task analysis unit performs construction priority analysis on the construction tasks and obtains the priority construction coefficient, which can accurately identify the most urgent and important construction tasks and ensure that the key tasks are processed in time, thereby avoiding delays in the construction period and ensuring the progress of the project.
[0055] In the present invention, the experience analysis unit calculates the construction experience coefficient of the construction personnel for each construction task, so that experienced construction personnel can be given priority in the scheduling process, thereby improving the construction quality and efficiency.
[0056] In the present invention, the personnel-task matching analysis of the scheduling analysis unit accurately obtains the matching coefficient between the construction personnel and the construction tasks, realizes the accurate matching of personnel and tasks, gives full play to the skill advantages of the construction personnel, and improves the work efficiency and the quality of task completion.
[0057] In the present invention, the scheduling execution unit performs deployment and execution according to the priority construction coefficient, the construction experience coefficient and the matching coefficient, comprehensively considering the urgency of the task, the experience of the personnel and the skill matching degree, and can optimize resource allocation, improve construction efficiency, reduce construction costs, ensure the smooth progress of construction, and improve the overall management level and quality of the construction project.
[0058] In addition, the various analysis methods and calculation methods of this system are clear, scientific, easy to operate and implement, have high practicality and promotion value, and can bring significant economic and social benefits to the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] Figure 1 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] As embodiment 1 of the present invention
[0062] See also Figure 1 The present invention provides a technical solution: a construction scheduling management system, comprising:
[0063] A data collection unit is used to collect all the skills corresponding to each construction worker and all the skills required for each construction task;
[0064] The scheduling analysis unit is used to perform personnel-task matching analysis based on all the skills corresponding to each construction worker and all the required skills for each construction task, and to obtain the matching coefficient between each construction worker and each construction task;
[0065] The personnel-task matching analysis method is as follows:
[0066] Step K1, select a construction worker and a construction task;
[0067] The skills required in the construction task are marked as i, i = 1, 2, ... n, and n represents the number of all skills required in the construction task;
[0068] Step K2, obtain the weight value Qi corresponding to all the skills required in the construction task, and the weight value is the proportional coefficient pre-set by the relevant personnel based on experience,
[0069] Step K3, assigning skills to the construction personnel according to the skills required in the construction task;
[0070] The method is as follows:
[0071] Match all the skills of the construction worker with the skills required in the construction task one by one until all the skills of the construction worker are assigned:
[0072] Take a skill of a construction worker as an example;
[0073] If the skill of the construction worker is the same as one of the skills required in the construction task, the skill of the construction worker is assigned a value of 1;
[0074] If the skill of the construction worker is different from all the skills required in the construction task, the skill of the construction worker is assigned a value of 0;
[0075] Step K4, the result after assigning all the skills of the construction worker is marked as Ri;
[0076] Then through Calculate the matching coefficient P between the construction personnel and the construction tasks respectively;
[0077] Step K5: Calculate the matching coefficient P between each construction worker and each construction task according to the method of Step 1-Step 4. jt , P jt It refers to the matching coefficient between the t-th construction task and the j-th construction worker, t = 1, 2, ... v, v represents the number of construction tasks, j = 1, 2, ... m, m represents the number of construction workers;
[0078] For example:
[0079] Assume we have 3 construction workers (A, B, C) and 2 construction tasks (T1, T2);
[0080] For construction task T1, the required skills are s1, s2, and s3, and their weight values are Q1 = 0.3, Q2 = 0.5, and Q3 = 0.2 respectively;
[0081] The skills of construction worker A are s1 and s4, the skills of construction worker B are s2 and s3, and the skills of construction worker C are s3 and s5;
[0082] Perform personnel-task matching analysis in the above manner:
[0083] For the matching of construction worker A and construction task T1:
[0084] The skill s1 of construction worker A is the same as the skill s1 required for construction task T1, and is assigned a value of 1; the skill s4 is different from the skill required for construction task T1, and is assigned a value of 0;
[0085] So Ri=[1,0,0];
[0086] The matching coefficient between the construction personnel and the construction task is:
[0087] P = 1*0.3+0*0.5+0*0.2 = 0.3
[0088] The matching coefficients between construction workers B and C and construction task T1, and the matching coefficients between construction workers A, B and C and construction task T2 are calculated in the same way.
[0089] A scheduling execution unit is used to dispatch and execute multiple construction personnel and multiple construction tasks according to the matching coefficient;
[0090] The deployment is performed as follows:
[0091] Step G1, sort all matching coefficients in descending order;
[0092] Step G2, select the construction worker and construction task with the highest matching coefficient, and deploy the construction worker to the construction task;
[0093] Continue to follow the above steps until all construction workers are assigned to corresponding construction tasks, or all construction tasks are assigned to corresponding construction workers;
[0094] In this example:
[0095] For a construction worker, if he has been assigned a task, he will no longer be considered in the subsequent assignment, unless all construction workers have been assigned and there are still unassigned construction tasks;
[0096] For a construction task, if enough construction workers have been assigned or the most suitable combination of construction workers has been found, the task will no longer be considered in subsequent assignments;
[0097] If there are multiple combinations with the same and high matching coefficients, the priority order of deployment is determined by comprehensively considering other factors related to the construction personnel and the construction tasks. The relevant factors include but are not limited to: the experience of the construction personnel and the urgency of the construction tasks;
[0098] It should be noted that the specific deployment execution method needs to be flexibly adjusted and optimized according to the actual construction scenario and needs to achieve the best deployment effect.
[0099] Through detailed skill matching analysis and clear deployment execution methods, this embodiment can accurately match the skills of construction personnel with the requirements of construction tasks, improve the rationality and accuracy of construction task allocation, and thus improve construction efficiency and quality.
[0100] Embodiment 2
[0101] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the technical solution of the present embodiment is different from that of the first embodiment only in that:
[0102] In this embodiment, the personnel task matching analysis method is also as follows:
[0103] Step M1. Create corresponding skill sets S for all skills corresponding to each construction worker. j ={s j1 ,s j2 ,……s jk}, j is the number of construction workers, j = 1, 2, ... m, m represents the number of construction workers;
[0104] In the skill set, k represents the maximum number of construction workers corresponding to all skills;
[0105] Step M2: Establish corresponding required skill sets S for all required skills of each construction task t ={s t1 ,s t2 ,……s te}, t is the number of construction tasks, t = 1, 2, ... v, v represents the number of construction tasks;
[0106] In the required skill set, e represents the maximum number of all required skills corresponding to the construction task;
[0107] Step M3, through the formula: Calculate the matching coefficient P between each construction worker and each construction task jt , P jt It refers to the matching coefficient between the t-th construction task and the j-th construction worker;
[0108] In the formula, G() refers to the number of all elements in the corresponding set, G(S j ∩S t ) is S j and S t The number of elements in the intersection of two sets.
[0109] Combined with the assumed values in the above example, perform personnel-task matching analysis in the above manner:
[0110] The skill set of construction worker A is SA{s1,s4}, and the required skill set of construction task T1 is ST1={s1,s2,s3};
[0111] Then substitute it into the formula: Calculate its matching coefficient;
[0112] The matching coefficients between construction workers B and C and construction task T1, and the matching coefficients between construction workers A, B and C and construction task T2 are calculated in the same way.
[0113] This embodiment establishes a skill set and calculates the matching coefficient through a specific formula, so that the matching analysis is more concise and efficient, and the matching degree between the construction personnel and the construction tasks can be quickly obtained.
[0114] Embodiment 3
[0115] As the third embodiment of the present invention, when the present application is implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments, and the difference between the technical solution of this embodiment and the first and second embodiments is only in this embodiment;
[0116] The data collection unit is also used to collect task data for each construction task;
[0117] Task information includes: the urgency, importance, planned completion date, planned duration, and current date of the construction task;
[0118] The urgency and importance of each construction task are determined by the relevant personnel by comparing all the construction tasks:
[0119] The urgency level is divided into e1 emergency levels, and the e1 levels are assigned values of 1, 2, 3, ...f e1 ;
[0120] The importance is divided into e2 levels, and the e2 levels are assigned values of 1, 2, 3, ...f e1 ;
[0121] Among them, f e1 、f e2 The maximum values corresponding to the urgency and importance are respectively. The larger the value corresponding to the urgency, the more urgent the related task is; the larger the value corresponding to the importance, the more important the related task is.
[0122] Also includes:
[0123] The task analysis unit is used to perform priority construction analysis on each construction task and obtain the priority construction coefficient of each construction task:
[0124] The specific method is as follows:
[0125] Take a construction task as an example.
[0126] Extract the planned completion date, planned duration and current date of the construction task, calculate the time difference between the planned completion date and the current date, and then mark it as SJ, and mark the planned duration as JG;
[0127] Extract the urgency and importance of the construction task and mark them as JC and ZC respectively;
[0128] Then through the formula: Calculate the priority construction coefficient of the task;
[0129] In the formula, Refers to the urgency of the construction period of the relevant construction task. The smaller the value is, the more urgent the construction period of the relevant construction task is; conversely, the less urgent the construction period of the relevant construction task is. β1, β2, and β3 are weight values respectively predetermined for the urgency, importance, and urgency of the construction task in calculating the priority construction coefficient.
[0130] By analogy, the priority construction coefficient of each construction task is calculated;
[0131] Among them, the larger the priority construction coefficient is, the higher the priority of the related construction task is.
[0132] This embodiment takes into account the urgency, importance, and planned completion date of the construction task, and performs a priority construction analysis to obtain a priority construction coefficient, which helps to prioritize important and urgent construction tasks, reasonably arrange the construction sequence, and improve the ability to control the overall construction progress.
[0133] Embodiment 4
[0134] As the fourth embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the second embodiment and the third embodiment, the difference between the present embodiment and the first embodiment, the second embodiment and the third embodiment is that
[0135] The data collection unit is also used to collect personal data of individual construction workers;
[0136] Personal data includes: total number of tasks, working hours, and task complexity of participating in similar construction tasks;
[0137] The total number of tasks is the number of construction tasks of the same type that a construction worker participates in;
[0138] Working time is the total time a construction worker spends on all similar construction tasks;
[0139] The complexity of the task is divided into e3 important levels according to the technical difficulty and scale factors of the project, and the e3 levels are assigned values 1, 2, 3, ... f e3 ; Among them, f e3 is the maximum value corresponding to the complexity of the task. The larger the value corresponding to the complexity of the task, the more complex the related task is.
[0140] Also includes:
[0141] The experience analysis unit is used to analyze the construction experience of each construction worker for each construction task, and obtain the construction experience coefficient of each construction worker for each construction task:
[0142] The specific method is as follows:
[0143] Take a construction worker and a construction task as an example.
[0144] The total number of tasks, working time, and task complexity of the construction worker involved in this type of construction task are extracted and marked as WS, GS, and WZ respectively;
[0145] Then, the construction experience coefficient of the construction worker for the construction task is calculated through the formula: SY = (WS × α1 + GS × α2 + WZ × α3) × 1.25;
[0146] Wherein, α1, α2, and α3 are respectively predetermined weight values for the total number of tasks, working time, and task complexity of the construction task in calculating the priority construction coefficient;
[0147] By analogy, the construction experience coefficient of each construction worker for each construction task is calculated;
[0148] Among them, the larger the construction experience coefficient is, the more experience the relevant construction personnel have in the corresponding construction tasks.
[0149] This embodiment collects personal information of construction personnel and performs construction experience analysis to obtain a construction experience coefficient, which can fully consider the experience level of construction personnel when allocating personnel tasks, allowing experienced personnel to undertake more suitable tasks and ensure construction quality and efficiency.
[0150] Embodiment 5
[0151] As the fifth embodiment of the present invention, when the present application is specifically implemented, compared with the first, second, third and fourth embodiments, the technical solution of this embodiment is to combine and implement the solutions of the above-mentioned first, second, third and fourth embodiments.
[0152] This embodiment combines the advantages of embodiments one to four, comprehensively considers the skills of construction personnel, the requirements of construction tasks, the priority of tasks and the experience of construction personnel, and realizes more scientific, reasonable, efficient and accurate construction scheduling management, optimizes the allocation of construction resources to the greatest extent, and improves the overall benefits of construction projects.
[0153] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0154] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0155] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A construction scheduling management system, characterized in that: include: The data collection unit is used to collect all the skills corresponding to each construction worker and all the skills required for each construction task; it is also used to collect the task data of each construction task and the personal data of each construction worker; the task data includes the urgency, importance, planned completion date, planned duration, and current date of the construction task; the personal data includes the total number of tasks involved in the same type of construction task, working time, and task complexity; The task analysis unit is used to perform priority construction analysis on each construction task and obtain the priority construction coefficient of each construction task: The experience analysis unit is used to analyze the construction experience of each construction worker for each construction task, and obtain the construction experience coefficient of each construction worker for each construction task: The scheduling analysis unit is used to perform personnel-task matching analysis based on all the skills corresponding to each construction worker and all the required skills for each construction task, and to obtain the matching coefficient between each construction worker and each construction task; The scheduling execution unit is used to deploy and execute multiple construction personnel and multiple construction tasks based on the priority construction coefficient, construction experience coefficient and matching coefficient.
2. A construction scheduling management system according to claim 1, characterized in that: The personnel-task matching analysis method is as follows: Step K1, select a construction worker and a construction task; The skills required in the construction task are marked as i, i = 1, 2, ... n, and n represents the number of all skills required in the construction task; Step K2, obtain the weight value Qi corresponding to all the skills required in the construction task, and the weight value is the proportional coefficient pre-set by the relevant personnel based on experience, Step K3, according to the skills required in the construction task, the construction personnel are assigned skills, and the skill assignment result of the construction personnel for the corresponding construction task is obtained; Step K4, the result after assigning all the skills of the construction worker is marked as Ri; Then through Calculate the matching coefficient P between the construction personnel and the construction tasks respectively; Step K5, according to the method of Step 1-Step 4, calculate the matching coefficient between each construction worker and each construction task.
3. A construction scheduling management system according to claim 2, characterized in that: Skill assignment is handled as follows: Match all the skills of the construction worker with the skills required in the construction task one by one until all the skills of the construction worker are assigned: Select a skill of a construction worker; If the skill of the construction worker is the same as one of the skills required in the construction task, the skill of the construction worker is assigned a value of 1; If the skill of the construction worker is different from all the skills required in the construction task, the skill of the construction worker is assigned a value of 0.
4. A construction scheduling management system according to claim 1, characterized in that: The personnel task matching analysis method is also as follows: Step M1. Create corresponding skill sets S for all skills corresponding to each construction worker. j ={s j1 ,s j2 ,……s jk }, j is the number of construction workers, j = 1, 2, ... m, m represents the number of construction workers; In the skill set, k represents the maximum number of construction workers corresponding to all skills; Step M2: Establish corresponding required skill sets S for all required skills of each construction task t ={s t1 ,s t2 ,……s te }, t is the number of construction tasks, t = 1, 2, ... v, v represents the number of construction tasks; In the required skill set, e represents the maximum number of all required skills corresponding to the construction task; Step M3, through the formula Calculate the matching coefficient P between each construction worker and each construction task jt , P jt It refers to the matching coefficient between the t-th construction task and the j-th construction worker; In the formula, G() refers to the number of all elements in the corresponding set, G(S j ∩S t ) is S j and S t The number of elements in the intersection of two sets.
5. A construction scheduling management system according to claim 1, characterized in that: The priority construction analysis method is as follows: Select a construction task, extract the planned completion date, planned duration and current date of the construction task, calculate the time difference between the planned completion date and the current date, and then mark it as SJ, and mark the planned duration as JG; Extract the urgency and importance of the construction task and mark them as JC and ZC respectively; Then through the formula Calculate the priority construction coefficient of the task; In the formula, Refers to the urgency of the construction period of the relevant construction task. The smaller the value is, the more urgent the construction period of the relevant construction task is; conversely, the smaller the value is, the less urgent the construction period of the relevant construction task is. β1, β2, and β3 are weight values respectively predetermined for the urgency, importance, and urgency of the construction task in calculating the priority construction coefficient.
6. A construction scheduling management system according to claim 5, characterized in that: The construction experience analysis method is as follows: Select a construction worker and a construction task, extract the total number of tasks, working time, and task complexity of the construction worker in this type of construction task, and mark them as WS, GS, and WZ respectively; Then, the construction experience coefficient of the construction worker for the construction task is calculated through the formula SY=(WS×α1+GS×α2+WZ×α3)×1.25; Wherein, α1, α2, and α3 are respectively predetermined weight values for the total number of tasks, working time, and task complexity of the construction task in calculating the priority construction coefficient.
7. A construction scheduling management system according to claim 6, characterized in that: The larger the priority construction coefficient is, the higher the priority of the related construction task is; the larger the construction experience coefficient is, the more experience the related construction personnel have in the corresponding construction task.
8. A construction scheduling management system according to claim 1, characterized in that: The deployment is performed as follows: First, the priority construction coefficients are sorted from large to small, and the construction experience coefficients and matching coefficients are sorted from high to low respectively; Then, from the sorted priority construction coefficients, select the construction task with the highest value and start: Then, the construction experience coefficient and matching coefficient of all construction personnel corresponding to the construction task are obtained; Then, the comprehensive determination coefficient of each construction worker corresponding to the construction task is calculated by the formula: comprehensive determination coefficient = construction experience coefficient + matching coefficient; Afterwards, the construction personnel with comprehensive determination coefficients will be dispatched to the construction tasks.
9. A construction scheduling management system according to claim 1, characterized in that: The urgency and importance of each construction task are determined by the relevant personnel by comparing all the construction tasks: the urgency is divided into e1 emergency levels, and the e1 levels are assigned values of 1, 2, 3, ... f e1 ; Divide the importance into e2 levels, and assign the e2 levels values 1, 2, 3, ...f e2 ; The total number of tasks is the number of construction tasks of the same type that a construction worker participates in; the working time is the total time a construction worker participates in all similar construction tasks; the complexity of the task is divided into e3 important levels according to the technical difficulty and scale factors of the project, and the e3 levels are assigned values of 1, 2, 3, ... f respectively e3 ; Among them, f e1 、f e2 、f e3 They are the maximum values corresponding to the urgency, importance and complexity of the task respectively.
10. A construction scheduling management system according to claim 9, characterized in that: The larger the value assigned to the urgency, the more urgent the related task is; the larger the value assigned to the importance, the more important the related task is; the larger the value assigned to the task complexity, the more complex the related task is.
Citation Information
Patent Citations
Building construction scheduling scheme optimization method and storage medium
CN116205473A
Construction progress adjustment prediction method based on Nash equilibrium, medium and system
CN116976636A
Engineering project progress management system and method based on big data
CN117350487A
Intelligent scheduling method and system for fabricated building components by applying BIM (Building Information Modeling) technology
CN117592749A
Engineering construction data management system and method based on Internet of Things
CN117952570A
Cited By
Assembly type prefabricated building installation construction management method and system
CN119476885A
Intelligent road construction control system and method
CN119849711A