Foundation type selection method, system and equipment for overhead transmission line and medium
Through parameter sensitivity analysis and grading and zoning processing based on historical geological data, a special geological distribution map was drawn, which solved the problems of low efficiency and high cost of basic selection of overhead transmission lines in the existing technology, and achieved efficient and accurate basic selection .
Patent Information
- Application Number
- CN202411024556.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-29
AI Technical Summary
The basic selection scheme of existing overhead transmission lines is inefficient and costly, making it difficult to cope with complex landforms and geological conditions, resulting in extended construction period and large manpower and material consumption.
Parameter sensitivity analysis is carried out based on historical geological survey data, basic geospatial historical data are constructed, grading and zoning are processed, and thematic geological distribution maps are drawn to achieve rapid basic selection.
It improves the efficiency of basic selection, reduces human and material cost investment, simplifies the selection process, provides reliable guidance, and improves the scientificity and accuracy of selection.
Smart Images

Figure CN119046310A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of overhead power transmission line foundation selection, and in particular relates to an overhead power transmission line foundation selection method, system, equipment and medium. Background Art
[0002] The construction of power grids is developing rapidly. With the continuous increase in the length of construction, the construction of transmission lines has encountered many challenges. The extension of overhead transmission lines means that a project must cross diverse and complex landforms and geological conditions. The complexity of geological conditions and the ultra-long distance of transmission lines bring huge challenges to basic geological surveys and selection from the perspectives of economic and technical practice. Higher requirements are put forward for green and environmental protection of power grid construction. It has become a development trend to fully explore the value of engineering construction data and digitally transform power grid construction.
[0003] At present, the existing overhead transmission line foundation selection scheme is highly dependent on detailed geological survey data as support; in order to ensure accuracy and feasibility, the existing scheme requires comprehensive sampling and survey work in all areas along the project route, and faces many challenges in the implementation process, mainly including:
[0004] 1) The existing scheme requires a lot of manpower and material resources. To explain further, geological survey work itself requires professional technicians and advanced equipment. The existing scheme needs to cover a wide area, which undoubtedly increases the consumption of manpower and material resources.
[0005] 2) The preliminary survey of overhead transmission lines is a huge challenge; further explained, since overhead transmission lines often pass through complex and changeable geographical environments, including mountains, rivers, cities and other landforms, the difficulty and complexity of the survey work are relatively high, which requires the survey team to have rich experience and professional skills to ensure the accuracy and reliability of the data;
[0006] 3) The existing foundation selection scheme will significantly increase the construction period and has low efficiency; further explaining, geological survey and data analysis is a time-consuming process that requires a lot of time and effort, which not only prolongs the construction period of the overhead transmission line, but may also have an adverse impact on the overall progress of the project. Summary of the invention
[0007] The purpose of the present invention is to provide a method, system, device and medium for selecting the foundation of an overhead power transmission line to solve one or more of the above-mentioned technical problems. The technical solution provided by the present invention selects the foundation of an overhead power transmission line based on historical geological survey data, which can improve the efficiency of the foundation selection work and reduce the investment in manpower, material resources and other costs.
[0008] In order to achieve the above object, the present invention adopts the following technical solutions:
[0009] In a first aspect, the present invention provides a method for selecting a foundation for an overhead power transmission line, comprising the following steps:
[0010] Conduct parameter sensitivity analysis based on the overhead transmission line to be selected for foundation and determine the main geological parameters that affect foundation selection;
[0011] Acquire the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographic geological data, construct and obtain the basic geographic spatial historical data including the main geological parameters, and construct and obtain the surface data of the area where the overhead transmission line is to be built based on the basic geographic spatial historical data;
[0012] Based on the surface data of the proposed area for the overhead transmission line, the main geological parameters are graded and zoned, and legends are set, and a thematic geological distribution map is drawn;
[0013] The foundation selection is carried out based on the thematic geological distribution map to obtain the foundation selection result of the overhead transmission line.
[0014] A further improvement of the present invention is that the main geological parameters include one or more of the thickness of the covering layer, the basic quality grade of the bedrock, the slope, the vertical uplift force of the foundation and the groundwater parameters.
[0015] A further improvement of the present invention is that the basic geographic spatial historical data includes vector geographic elements, remote sensing image data, digital elevation model data and historical geological survey data.
[0016] A further improvement of the present invention is that the step of constructing and obtaining the surface data of the planned construction area of the overhead transmission line based on the basic geographic space historical data comprises:
[0017] Based on the existing historical geological survey parameters and point information in the basic geographic spatial data, the surface data of the planned construction area of the overhead transmission line is constructed and obtained through interpolation method.
[0018] In a second aspect, the present invention provides an overhead transmission line foundation selection system, comprising:
[0019] An analysis module is used to perform parameter sensitivity analysis based on the overhead transmission line to be selected for foundation and determine the main geological parameters that affect the foundation selection;
[0020] A data processing module is used to obtain the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographical geological data, construct and obtain the basic geographical spatial historical data including the main geological parameters, and construct and obtain the surface data of the area where the overhead transmission line is to be built based on the basic geographical spatial historical data;
[0021] A drawing module, for performing hierarchical and zoning processing and legend setting on the main geological parameters based on the surface data of the area where the overhead transmission line is to be built, and drawing a thematic geological distribution map;
[0022] The selection module is used to perform basic selection based on the thematic geological distribution map to obtain basic selection results for overhead transmission lines.
[0023] A further improvement of the present invention is that the main geological parameters include one or more of the thickness of the covering layer, the basic quality grade of the bedrock, the slope, the vertical uplift force of the foundation and the groundwater parameters.
[0024] A further improvement of the present invention is that the basic geographic spatial historical data includes vector geographic elements, remote sensing image data, digital elevation model data and historical geological survey data.
[0025] A further improvement of the present invention is that, in the data processing module, the step of constructing and obtaining the surface data of the planned construction area of the overhead transmission line based on the basic geographic spatial historical data specifically includes:
[0026] Based on the existing historical geological survey parameters and point information in the basic geographic spatial data, the surface data of the planned construction area of the overhead transmission line is constructed and obtained through interpolation method.
[0027] According to a third aspect of the present invention, there is provided an electronic device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for selecting a foundation for an overhead transmission line as described in any one of the first aspects of the present invention is implemented.
[0028] According to a fourth aspect of the present invention, there is provided a non-transitory computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the method for selecting a foundation for an overhead transmission line as described in any one of the first aspects of the present invention is implemented.
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] In view of the obvious deficiencies in efficiency, cost and other aspects of the overhead transmission line foundation selection scheme in the prior art, the present invention specifically discloses a method for selecting the foundation of an overhead transmission line, which selects the foundation of an overhead transmission line based on historical geological survey data, can improve the efficiency of foundation selection, and can reduce the investment in manpower, material resources and other costs. Further specifically explanatory, the present invention first determines the main geological parameters affecting the foundation selection based on sensitivity analysis; then obtains the surface data of the proposed area of the overhead transmission line based on the historical geological survey data of the main geological parameters and performs hierarchical zoning processing and legend setting, and draws a thematic geological distribution map; finally, the foundation selection is performed according to the thematic geological distribution map to obtain the foundation selection result, which can reduce cost investment and improve the efficiency of the foundation selection work. In summary, the technical solution disclosed in the present invention is based on the engineering geological survey data accumulated from a series of power transmission and transformation projects that have been built, simplifies the process of foundation selection, and can provide reliable guidance for the foundation selection of newly built overhead transmission lines, which has important significance and practical application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below; obviously, the drawings described below are some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0032] Figure 1 It is a flow chart of a method for selecting a foundation for an overhead power transmission line in an embodiment of the present invention.
[0033] Figure 2 It is a flowchart of data collection and information processing in an embodiment of the present invention.
[0034] Figure 3 It is a schematic diagram of a thematic geological distribution map of a certain area in a specific embodiment of the present invention.
[0035] Figure 4 It is a schematic diagram of a system for selecting a foundation for an overhead power transmission line in an embodiment of the present invention. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solutions and advantages of the present invention clearer, the technical solutions in the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments and technical solutions are only part of the embodiments of the present invention, not all of the embodiments.
[0037] All other embodiments obtained by those of ordinary skill in the art without creative work based on the technical solutions disclosed in the embodiments of the present invention belong to the scope of protection of the present invention. In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0038] See also Figure 1 In an embodiment of the present invention, a method for selecting a foundation for an overhead transmission line is provided, comprising the following steps:
[0039] Step 1: Perform parameter sensitivity analysis based on the overhead transmission line to be selected for foundation, and determine the main geological parameters that affect foundation selection;
[0040] Step 2, obtaining the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographical geological data, constructing and obtaining the basic geographical spatial historical data including the main geological parameters described in step 1, and constructing and obtaining the surface data of the area where the overhead transmission line is to be built based on the basic geographical spatial historical data;
[0041] Step 3, based on the surface data of the planned area for overhead transmission line construction obtained in step 2, the main geological parameters are graded and zoned, and legends are set, and a thematic geological distribution map is drawn;
[0042] Step 4: Perform basic type selection based on the thematic geological distribution map obtained in step 3 to obtain basic type selection results for overhead transmission lines.
[0043] In the technical solution provided by the embodiment of the present invention, historical geological survey data is fully utilized, and the precision and efficiency of basic selection are realized through scientific analysis and processing, which ultimately significantly improves the efficiency of selection work and greatly reduces the investment in manpower, material resources and other costs. Specifically, the technical solution of the embodiment of the present invention first accurately identifies and determines the main geological parameters that affect the basic selection of overhead transmission lines through sensitivity analysis technology. This step lays a solid foundation for the scientificity and accuracy of basic selection; then, using the historical geological survey data of these key geological parameters determined, a comprehensive surface data of the proposed area is constructed, and fine hierarchical zoning processing and legend setting are carried out, and then a detailed and intuitive thematic geological distribution map is drawn. This thematic geological distribution map not only fully reflects the geological characteristics of the proposed area, but also provides a clear and reliable basis for subsequent basic selection work; finally, based on the detailed information of the thematic geological distribution map, the present invention can quickly and accurately complete the basic selection of overhead transmission lines, which not only greatly reduces the cost investment in traditional selection methods, but also significantly improves the selection efficiency, making the entire selection process faster and more efficient.
[0044] In summary, the technical solution disclosed in the embodiment of the present invention relies on the rich engineering geological survey data accumulated from a series of power transmission and transformation projects that have been built. Through innovative data analysis and processing methods, it greatly simplifies the process of selecting the foundation of overhead power transmission lines and improves the scientificity and accuracy of the selection. The technical solution of the embodiment of the present invention not only provides reliable guidance for the selection of the foundation of newly built overhead power transmission lines, but also has important significance and practical application value for promoting the intelligent and efficient development of overhead power transmission line construction, and is expected to bring significant economic and social benefits to the power industry.
[0045] In one embodiment of the present invention, in step 1, a parameter sensitivity analysis is performed based on the overhead transmission line to be selected for foundation, and in the process of determining the main geological parameters affecting the foundation selection,
[0046] The main geological parameters to be determined include one or more of the thickness of the overburden, the basic quality grade of the bedrock, the slope, the vertical uplift force of the foundation and the groundwater parameters;
[0047] In further specific explanation, the steps of performing parameter sensitivity analysis based on the overhead transmission line to be selected may specifically include:
[0048] Step (1), statistically analyzing the applicable scope of various types of foundations in the area where the overhead transmission line is to be built, and determining the main influencing factors affecting the selection of foundations;
[0049] Step (2), quantify the influence of the main influencing factors on the foundation selection, and finally determine the main geological parameters that affect the foundation selection.
[0050] In one embodiment of the present invention, in step 2, the step of obtaining the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographical geological data, and constructing the basic geographical spatial historical data including the main geological parameters described in step 1 may specifically include:
[0051] According to the main geological parameters, the exploration data and geographical geological data of the existing power transmission and transformation projects in the area where the overhead transmission line is to be built are collected and processed informatically to obtain the basic geographical spatial data of the area where the overhead transmission line is to be built;
[0052] Further example illustratively, such as Figure 2 As shown, the steps of information processing specifically include:
[0053] Step 1), obtaining vector data, remote sensing image data (DOM), digital elevation model data (DEM) and paper data; further, scanning and digitizing the paper data, image correction and registration, and vectorization processing are performed in sequence to obtain processed vectorized data;
[0054] Step 2), based on the vector data after data processing, the remote sensing image data and digital elevation model data after coordinate conversion, and the processed vectorized data, a database is built and stored in the database to obtain the stored data;
[0055] Step 3) establishes the main geological parameter layers based on the stored data, and performs color matching and legend settings to realize information visualization processing and obtain information visualization results; interpretatively, the information visualization results are used for basic selection statistical analysis of the proposed project.
[0056] By way of further example and explanation, the basic geospatial data may include: vector geographic elements (water systems, transportation, boundaries and political divisions, etc.), remote sensing image data (DOM), digital elevation model data (DEM) and historical geological survey data (cover thickness, basic quality grade of bedrock), etc.
[0057] In one embodiment of the present invention, in step 2, in the step of obtaining the surface data of the planned construction area of the overhead transmission line based on the basic geographic spatial historical data,
[0058] Based on the historical geological survey parameters and point information in the basic geographic spatial data, the surface data of the planned construction area of the overhead transmission line is obtained by an interpolation method (for example, Kriging, inverse distance, etc.);
[0059] Explanatoryly, since historical geological survey data are often limited, it is difficult to densely cover the areas along the transmission lines; therefore, the technical solution disclosed in the embodiment of the present invention combines the interpolation method to obtain the surface data of the area where the overhead transmission line is to be built (such as the thickness of the covering layer, the basic quality grade of the bedrock, groundwater parameters and other data).
[0060] In one embodiment of the present invention, in step 3, in the step of performing hierarchical and zoning processing on the main geological parameters, the results of performing hierarchical and zoning processing on the main geological parameters affecting foundation selection are shown in Table 1.
[0061] Table 1. Hierarchical partitioning results
[0062]
[0063]
[0064] In one embodiment of the present invention, in the step of drawing a thematic geological distribution map, GIS (Geographic Information System) software can be used to draw a base map of a certain scale, and finally the layers are superimposed to form a thematic geological distribution map.
[0065] In one embodiment of the present invention, step 4 specifically includes:
[0066] The foundation is selected based on the thematic geological distribution map obtained in step 3; according to the characteristics and applicability of the foundation in the "General Design of Transmission Line Integration", bored pile foundations are selected for ridges and mountain tops; excavated foundations are selected for slopes and ridges with a cover layer less than 0.8m, and excavated or excavated foundations are selected when the cover layer is 0.8m to 1.4m; bored pile foundations are selected when the cover layer is thicker (greater than 1.4m); cast-in-place piles, steps or slab foundations are selected for flat land, rice fields and other locations.
[0067] See also Figure 3 In a specific embodiment of the present invention, a method for selecting a foundation for an overhead transmission line is provided, comprising:
[0068] 1) Drawing of thematic geological distribution maps; among which,
[0069] The proposed area has complex and diverse landforms, with mountains, hills, basins and valleys in the south, undulating hills and hillocks in the middle, and mainly plains in the north. The total area of the pilot mapping area is 12,340 square kilometers, with mountains and hills accounting for about 80% of the total area. The drawing of thematic geological distribution maps has gone through data collection, data processing, and drawing. Figure 3 In this phase, a total of 2,946 exploration points of existing projects in the region were collected, and regional bedrock quality grades and cover thickness layers were constructed based on the exploration points.
[0070] 2) Project overview; among which:
[0071] The new 220kV line is about 10.9km long and is erected with double-circuit angle steel towers. The foundation forms mainly include plate foundation, rock anchor foundation, and artificial excavation foundation.
[0072] 3) Basic selection; among them,
[0073] Based on the preliminary survey data and regional geological maps, the following Figure 3 A thematic geological distribution map of a certain area is shown in the figure, and a preliminary basic selection is made based on it, and basic selection is made for 52 points in the project; further explanatory, after subsequent analysis, the basic selection of 45 points is consistent with the actual selection, and the degree of consistency can reach 86.54%, which proves that the technical solution disclosed in the embodiment of the present invention is generally feasible.
[0074] The following are device embodiments of the present invention, which can be used to implement the method embodiments of the present invention. For details not disclosed in the device embodiments, please refer to the method embodiments of the present invention.
[0075] See also Figure 4 In an embodiment of the present invention, a system for selecting a foundation for an overhead transmission line is provided, comprising:
[0076] An analysis module is used to perform parameter sensitivity analysis based on the overhead transmission line to be selected for foundation and determine the main geological parameters that affect the foundation selection;
[0077] A data processing module is used to obtain the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographical geological data, construct and obtain the basic geographical spatial historical data including the main geological parameters, and construct and obtain the surface data of the area where the overhead transmission line is to be built based on the basic geographical spatial historical data;
[0078] A drawing module, for performing hierarchical and zoning processing and legend setting on the main geological parameters based on the surface data of the area where the overhead transmission line is to be built, and drawing a thematic geological distribution map;
[0079] The selection module is used to perform basic selection based on the thematic geological distribution map to obtain basic selection results for overhead transmission lines.
[0080] In one embodiment of the present invention, a computer device is provided, the computer device comprising a processor and a memory, the memory being used to store a computer program, the computer program comprising program instructions, and the processor being used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or may be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions in a computer storage medium to implement a corresponding method flow or a corresponding function; the processor described in the embodiment of the present invention can be used to perform the operation of the overhead transmission line basic selection method.
[0081] In one embodiment of the present invention, a storage medium is provided, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the method for selecting the foundation of the overhead transmission line in the above embodiment.
[0082] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, optical storage, etc.) that contain computer-usable program code.
[0083] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0084] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0085] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0086] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for selecting the foundation of overhead transmission lines. It is characterized in that The following steps are involved: Conduct parameter sensitivity analysis based on the overhead transmission line to be selected for foundation and determine the main geological parameters that affect foundation selection; Acquire the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographic geological data, construct and obtain the basic geographic spatial historical data including the main geological parameters, and construct and obtain the surface data of the area where the overhead transmission line is to be built based on the basic geographic spatial historical data; Based on the surface data of the proposed area for the overhead transmission line, the main geological parameters are graded and zoned, and legends are set, and a thematic geological distribution map is drawn; The foundation selection is carried out based on the thematic geological distribution map to obtain the foundation selection result of the overhead transmission line.
2. A method for selecting a foundation for an overhead power transmission line according to claim 1, It is characterized in that The main geological parameters include one or more of the thickness of the covering layer, the basic quality grade of the bedrock, the slope, the vertical uplift force of the foundation and the groundwater parameters.
3. A method for selecting a foundation for an overhead power transmission line according to claim 1, It is characterized in that The basic geographic spatial historical data includes vector geographic elements, remote sensing image data, digital elevation model data and historical geological survey data.
4. A method for selecting a foundation for an overhead power transmission line according to claim 3, It is characterized in that The step of constructing and obtaining the surface data of the planned area for overhead transmission line construction based on the basic geographic space historical data comprises: Based on the existing historical geological survey parameters and point information in the basic geographic spatial data, the surface data of the planned construction area of the overhead transmission line is constructed and obtained through interpolation method.
5. A system for selecting the foundation of overhead power transmission lines, It is characterized in that include: An analysis module is used to perform parameter sensitivity analysis based on the overhead transmission line to be selected for foundation and determine the main geological parameters that affect the foundation selection; A data processing module is used to obtain the survey data of the existing projects in the area where the overhead transmission line is to be built and the public geographical geological data, construct and obtain the basic geographical spatial historical data including the main geological parameters, and construct and obtain the surface data of the area where the overhead transmission line is to be built based on the basic geographical spatial historical data; A drawing module, for performing hierarchical and zoning processing and legend setting on the main geological parameters based on the surface data of the area where the overhead transmission line is to be built, and drawing a thematic geological distribution map; The selection module is used to perform basic selection based on the thematic geological distribution map to obtain basic selection results for overhead transmission lines.
6. An overhead power transmission line foundation selection system according to claim 5, It is characterized in that The main geological parameters include one or more of the thickness of the covering layer, the basic quality grade of the bedrock, the slope, the vertical uplift force of the foundation and the groundwater parameters.
7. The overhead power transmission line foundation selection system according to claim 5, It is characterized in that The basic geographic spatial historical data includes vector geographic elements, remote sensing image data, digital elevation model data and historical geological survey data.
8. An overhead power transmission line foundation selection system according to claim 7, It is characterized in that In the data processing module, the step of constructing and obtaining the surface data of the planned construction area of the overhead transmission line based on the basic geographic spatial historical data specifically includes: Based on the existing historical geological survey parameters and point information in the basic geographic spatial data, the surface data of the planned construction area of the overhead transmission line is constructed and obtained through interpolation method.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the method for selecting a foundation for an overhead transmission line according to any one of claims 1 to 4 is implemented.
10. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method for selecting a foundation for an overhead transmission line according to any one of claims 1 to 4 is implemented.
Citation Information
Cited By
Power transmission line foundation intelligent optimization design platform based on multi-target algorithm
CN120256835A