Multi-level production equipment operation management system and method and storage medium

Through the multi-level production equipment operation and management system, data interaction problems and resource waste caused by the independence of equipment management levels of large group companies are solved, standardization of equipment management and resource sharing are realized, and operational efficiency and skill level are improved.

CN119067611APending Publication Date: 2024-12-03JIANGSU XCMG CONSTRUCTION MACHINERY RESEARCH INSTITUTE LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411260392.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Due to the independent and closed levels of production equipment management of large group companies, it is difficult to interact with equipment data, waste of resources and insufficient sharing of maintenance knowledge, which limits the improvement of production equipment operation efficiency.

Method used

A multi-level production equipment operation and management system has been designed, including production equipment ledger module, operation knowledge module, performance management indicator module, resource sharing module, equipment inspection module, equipment maintenance module, equipment maintenance module and spare parts management module. Data interaction and resource sharing are achieved through automated office systems and single sign-on platforms.

Benefits of technology

It has achieved standardization and unified equipment management, improved resource utilization, promoted the sharing of maintenance knowledge and improved skill level, and improved the digital and intelligent management of production equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067611A_ABST
    Figure CN119067611A_ABST
Patent Text Reader

Abstract

The invention relates to a multi-level production equipment operation management system and method and a storage medium. A multi-level production equipment operation management system comprises a production equipment ledger module, an operation knowledge module and a performance management index module for a first level, and a resource sharing module between the first level and a second level, and an equipment point inspection module, an equipment maintenance module, an equipment repair module, a spare part management module and an operation management module which are used for a second level, and realize data interaction with the single sign-on platform and the automatic office system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of discrete manufacturing production equipment management, and in particular to a multi-level production equipment operation management method and system. Background Art

[0002] As the highest investment amount in smart factories, production equipment, its processing quality, efficiency, maintenance time, etc. determine product performance, manufacturing efficiency and cost, and thus directly determine product market competitiveness. At present, domestic production enterprises have basically established relatively complete equipment management methods and systems. However, for large group companies, the equipment purchase and holding volume is large, the equipment management of branches and subsidiaries is independent and closed, the equipment management process is inconsistent, and the equipment operation management system is complicated, which makes it difficult to transfer and analyze production equipment data. The idle equipment of each branch and subsidiary cannot be quickly adjusted internally, resulting in a waste of production resources; at the same time, high-skilled talents have not yet established a unified archive, the amount of equipment maintenance data is large, but it has not been solidified into knowledge, and the maintenance personnel's experience and typical maintenance cases cannot be shared within the group. The above problems directly limit the improvement of production equipment operation efficiency. Summary of the invention

[0003] The present application proposes a multi-level production equipment operation management system, method and storage medium.

[0004] According to a first aspect of an embodiment of the present disclosure, a multi-level production equipment operation management system is provided, characterized in that it includes a production equipment ledger module, an operation knowledge module and a performance management indicator module for the first level, a resource sharing module between the first level and the second level, and an equipment inspection module, an equipment maintenance module, an equipment repair module, a spare parts management module and an operation management module for the second level, wherein: the production equipment ledger module is configured to manage equipment information and perform information interaction with an automated office system, the equipment information includes equipment ledger information, equipment procurement information, equipment to fixed asset information, equipment transfer information, equipment scrapping information and equipment spare parts ledger information, wherein the production equipment ledger The module records equipment purchase information based on the purchase approval result of the automated office system, records equipment adjustment information based on the second-level application and the adjustment approval result of the automated office system, records equipment scrapping information based on the scrapping approval result of the automated office system, updates equipment conversion to fixed asset information based on equipment purchase information, equipment adjustment information and the asset approval result of the automated office system, and updates other equipment information based on equipment scrapping information; the operation knowledge module is configured to realize the upward migration of the operation knowledge of the production equipment from the second level to the first level, the operation knowledge includes equipment maintenance cases, predictive maintenance solutions and equipment intelligent upgrade cases, the operation knowledge module receives equipment maintenance cases from the second level, wherein The operation knowledge module extracts knowledge from equipment maintenance cases to construct a maintenance knowledge graph, performs maintenance knowledge recommendations based on the maintenance knowledge graph, and generates predictive maintenance plans based on equipment maintenance cases and the maintenance knowledge graph; the performance management indicator module is configured to perform a vertical comparison between the first-level operation indicators and the second-level indicator data, wherein the operation indicators include one or more of equipment comprehensive efficiency, equipment total productivity, average failure time, and equipment online rate, wherein the performance management module establishes unified operation indicators at the first level, calculates the indicator data received from the second level based on the application scenario, and issues abnormal reminders based on the data analysis of the calculation results; the resource sharing module is configured to implement the second level. Resource sharing between the first level and the second level, the shared resources include adjustable equipment resource pool, idle spare parts resource pool and high-skilled talent pool, wherein the resource sharing module prepares the adjustable equipment resource pool based on the equipment adjustment information of the production equipment ledger module and the idle spare parts resource pool based on the equipment spare parts ledger information of the production equipment ledger module; the equipment inspection module is configured to determine the inspection standard, generate the inspection plan, execute the inspection process, record the inspection results and handle the inspection problems; the equipment maintenance module is configured to record the maintenance ledger, determine the maintenance standard, generate the maintenance plan, execute the maintenance process and record the maintenance results; the equipment repair module is configured to handle the repair application, assign the repair work order, execute the repair process and record the repair evaluation;The spare parts management module is configured to manage spare parts information, process spare parts procurement applications, manage spare parts inventory and process spare parts requisition applications; the operation management module is configured to collect real-time data, fault data and sensor data of equipment operation, judge the equipment status based on the collected information and the maintenance record data recorded by the equipment maintenance module, and automatically report repairs in response to abnormal equipment status, wherein the equipment inspection module, equipment maintenance module, equipment maintenance module and spare parts management module perform data interaction with the production equipment ledger management module, including updating the equipment information based on the inspection results, maintenance results, maintenance evaluation and spare parts information.;

[0005] According to the second aspect of an embodiment of the present disclosure, a multi-level production equipment operation management method is provided, including using the operation management system as described in the first aspect of an embodiment of the present disclosure to interact with a single sign-on platform and an automated office system to achieve operation management of the production equipment.

[0006] According to the third aspect of an embodiment of the present disclosure, a non-transitory computer-readable storage medium storing computer-executable instructions is provided, which, when executed by a processor, enables the processor to implement the multi-level production equipment operation management method described in the second aspect of an embodiment of the present disclosure.

[0007] According to a fourth aspect of an embodiment of the present disclosure, a computer program product is provided, comprising computer program instructions, which, when executed by a processor, implement the multi-level production equipment operation management method according to the second aspect of an embodiment of the present disclosure.

[0008] The advantage of the embodiments disclosed herein is that a multi-terminal application that can be used at different levels of the group / enterprise can be developed once, maximizing its development efficiency and value, and achieving standardization and unification of group production equipment management at a high level. Since a parallel and interactive equipment management method and system has been established between the group and the enterprise at a lower level, the division of labor is clearer. The group focuses on shared control requirements such as production equipment indicator analysis and control, knowledge sharing, and equipment transformation capability upgrades, while the enterprise focuses on the use and operation of equipment resources. The group and the enterprise divide the work and work together to better improve the digitalization and intelligence level of production equipment management.

[0009] Another advantage of the embodiments disclosed herein is that a production resource sharing platform is constructed, including online query and allocation of idle adjustable equipment and high-value long-cycle production equipment spare parts, and secondment and sharing of high-skilled talents, providing a fast query platform for resource sharing at the manufacturing end at different levels, improving the utilization rate of production resources, giving play to the advantages of concentrated talents, and realizing lean management of production resources.

[0010] Another advantage of the embodiments disclosed herein is that by centrally collecting the maintenance data, maintenance cases, and equipment upgrade cases of production equipment from various enterprises, and by scoring and constructing a knowledge graph through the group's senior experts, the production equipment operation and maintenance experience and data can be modeled; thereby sharing within the group, building a social platform for equipment operation and maintenance knowledge, quickly improving the skills of maintenance personnel, and aligning the production equipment operation and management levels of branches and subsidiaries.

[0011] It should be appreciated that the above advantages do not need to be all realized in one or some specific embodiments, but may be partially dispersed in different embodiments according to the present disclosure. The embodiments according to the present disclosure may have one or some of the above advantages, or may have other advantages alternatively or additionally. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The foregoing and other features and advantages of the present disclosure will become apparent from the following description of the embodiments of the present disclosure in conjunction with the accompanying drawings. The accompanying drawings are incorporated herein and form a part of the specification, and are further used to explain the principles of the present disclosure and enable those skilled in the art to make and use the present disclosure. Among them:

[0013] Figure 1 A schematic block diagram of a multi-level production equipment operation management system according to an embodiment of the present disclosure is shown;

[0014] Figure 2 A schematic diagram showing equipment ledger information in a multi-level production equipment operation management system according to an embodiment of the present disclosure is shown;

[0015] Figure 3 A schematic diagram showing spare parts ledger information of a multi-level production equipment operation management system according to an embodiment of the present disclosure is shown;

[0016] Figure 4 A schematic block diagram of a resource sharing module of a multi-level production equipment operation management system according to an embodiment of the present disclosure is shown;

[0017] Figure 5 An exemplary configuration of a computing device that can implement an embodiment according to the present disclosure is shown.

[0018] Note that in the embodiments described below, sometimes the same reference numerals are used in common between different drawings to represent the same parts or parts with the same functions, and their repeated descriptions are omitted. In some cases, similar numbers and letters are used to represent similar items, so once an item is defined in one drawing, it does not need to be further discussed in subsequent drawings.

[0019] For ease of understanding, the position, size, range, etc. of each structure shown in the drawings and the like may not represent the actual position, size, range, etc. Therefore, the present disclosure is not limited to the position, size, range, etc. disclosed in the drawings and the like. DETAILED DESCRIPTION

[0020] Various exemplary embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present disclosure.

[0021] The following description of at least one exemplary embodiment is in fact merely illustrative and is in no way intended to limit the present disclosure and its application or use. That is, the structures and methods herein are shown in an exemplary manner to illustrate different embodiments of the structures and methods in the present disclosure. However, those skilled in the art will appreciate that they merely illustrate exemplary ways of the present disclosure that can be implemented, rather than exhaustive ways. In addition, the drawings need not be drawn to scale, and some features may be enlarged to illustrate the details of specific components.

[0022] Technologies, methods, and apparatus known to ordinary technicians in the relevant field may not be discussed in detail, but where appropriate, such technologies, methods, and apparatus should be considered part of the authorization specification.

[0023] In the field of discrete manufacturing production equipment management, due to the large number of equipment owned by large group companies, the management between different levels is independent and closed, resulting in poor interoperability of equipment management processes and difficulty in data interaction of production equipment. In order to solve this problem, the present disclosure provides a multi-level production equipment operation management method and system, which strengthens the group unified management and control capabilities of production equipment and enables intelligent operation and maintenance of production equipment for branches and subsidiaries.

[0024] First reference Figure 1 , Figure 1 A schematic block diagram of a multi-level production equipment operation management system 10 according to an embodiment of the present disclosure is shown. The multi-level production equipment operation management system 10 is mainly divided into a first level 10-1 and a second level 10-2, and implements data interaction with an automated office system 20 and a single sign-on platform 30. In some embodiments, the first level is the group level, and the second level is the branch and subsidiary level. It should be understood that as the structure of the group company using the production equipment operation management system 10 becomes more complex, the number of levels will increase, such as three or more levels. At this time, the relationship between two adjacent levels in the multi-level production equipment operation management system 10 can be reflected as multiple Figure 1 The system shown, or Figure 1The modules contained in the two levels of the system shown are respectively split or combined and divided into corresponding multiple levels.

[0025] Specifically, at the group level as the first level 10-1, it is mainly divided into components such as a production equipment ledger module 110, an operation knowledge module 120, and a performance management indicator module 130. In some embodiments, the production equipment ledger module 110 is configured to manage equipment information and perform information interaction with an automated office system, wherein the equipment information includes but is not limited to equipment ledger information, equipment procurement information, equipment transfer to fixed assets information, equipment transfer information, equipment scrapping information, and equipment spare parts ledger information.

[0026] In some embodiments, Figure 2 As shown, the equipment ledger information includes factory information, factory information, classification information, basic information, asset information, controller information, user information, etc. For example, factory information involves the company, production area, workshop, etc. of the production equipment, factory information includes the equipment name, purchase time, manufacturer, etc. of the production equipment, classification information includes asset attributes of the production equipment, standard equipment and other related information, basic information includes installation year, model, specification, etc., asset information includes fixed asset code, etc., controller information includes controller type and other information, user information includes equipment responsible person, etc.

[0027] Additionally or alternatively, the equipment ledger information may also include equipment usage status, such as in use, idle, sealed, etc., to describe whether the production equipment is currently accessible or usable. Additionally or alternatively, the equipment ledger information may also include equipment maintenance status, such as spare parts replacement, spare parts missing, maintenance, etc., to describe the current maintenance progress of the production equipment for which the maintenance work order is submitted or the spare parts information required for maintenance. Based on this equipment ledger information, the current status of the production equipment can be reflected instantly between the first level 10-1 and the second level 10-2.

[0028] Return to reference Figure 1 In some embodiments, the equipment purchase information mainly includes the equipment name, model, brand, key specification parameters, quantity and other information, which is used to record the newly purchased equipment to update the equipment ledger information. Specifically, the production equipment ledger module 110 initiates an application for equipment purchase to the automated office system 20, and the automated office system 20 handles the approval process for the purchase application. In response to receiving the approval result of the equipment purchase application, the production equipment ledger module 110 confirms the execution of the purchase of the new equipment and records the relevant equipment purchase information in the production equipment ledger module 110.

[0029] In some embodiments, the equipment-to-fixed-asset information is mainly based on the records of newly purchased equipment or old equipment transferred from other branches and subsidiaries being converted into fixed assets ( Figure 1 Similarly, the automated office system 20 handles the approval process for equipment to fixed assets, and after the process is approved, returns the asset approval result to the production equipment operation management system 10, triggering the production equipment ledger module 110 to add and / or modify the equipment ledger, where the equipment user department can update the equipment information. Alternatively, the production equipment ledger module 110 can comprehensively judge the changes in production equipment based on equipment procurement information, equipment transfer information and combined with the asset approval results of the automated office system 20, thereby updating the equipment to fixed asset information.

[0030] In some embodiments, the equipment adjustment information is mainly based on the records of the adjustment and transfer of production equipment between different levels or different departments at the same level. In particular, the equipment adjustment first applies for and reviews the idle equipment through the second level 10-2, and the reviewed equipment enters the adjustable equipment resource pool of the resource sharing module 140. At this time, each branch and subsidiary of the second level 10-2 can search the equipment in the adjustable equipment resource pool and view detailed equipment information; through technical parameter screening, find equipment that can meet the use requirements. It should be understood that the equipment demander performs a keyword search in the adjustable equipment resource pool, queries the relevant specifications, models, technical parameters and other information according to the required equipment, and screens and obtains suitable adjustable equipment.

[0031] Additionally or alternatively, an interface is established with the automated office system 20 through the production equipment operation management system 10, and a specific subsidiary or department of the second level 10-2 as the equipment recipient initiates an equipment transfer application. The second level 10-2 selects from the adjustable resource pool of the production equipment management and operation system 10, such as clicking the equipment transfer button, and the production equipment operation management system 10 sends the key equipment information (including but not limited to equipment number, equipment name, company to which it belongs, company to which it is transferred, equipment model, key parameters, service life, original value of equipment, equipment and other fields) to the automated office system 20 through the system interface, and the latter automatically generates the equipment transfer application process based on the above information, and sends the transfer approval result back to the production operation management system 10 after the approval is completed.

[0032] Additionally or alternatively, in response to receiving the adjustment approval result, the production equipment ledger module 110 records the equipment adjustment information based on the application of the second level 10-2 and the adjustment approval result of the automated office system 20. The multiple subsidiaries that initiated the adjustment application complete the equipment transfer accordingly, and update the equipment information in the production equipment operation management system 10, including the unit to which the equipment belongs, the location of the equipment, the equipment purchase method (purchase, adjustment) information, etc. That is, the production equipment ledger module 110 can support the rapid initiation of the equipment adjustment process, improve the efficiency of equipment adjustment, and shorten the adjustment cycle.

[0033] In some embodiments, the equipment scrapping information mainly records the disposal of scrapped equipment by the production equipment ledger module 110. The production equipment operation management system 10 initiates a scrapping approval process to the automated office system 20, and records the equipment scrapping information based on the scrapping approval result of the automated office system 20. The production equipment ledger module 110 updates the stored equipment information based on the equipment scrapping information, including the disposal price of the scrapped equipment, etc., thereby completing the equipment disposal process.

[0034] In some embodiments, Figure 3 As shown in the figure, the equipment spare parts ledger information mainly includes basic information, inventory information, procurement information, warehousing information, outbound information, etc. For example, basic information includes equipment spare parts number, spare parts name, etc., inventory information includes inventory time, inventory location, etc., procurement information includes supplier, purchase time, etc., warehousing information includes warehousing time, warehousing handler, etc., outbound information includes outbound time, outbound handler, etc.

[0035] Return to reference Figure 1 , the operation knowledge module 120 is configured to realize the upward movement of the operation knowledge of the production equipment from the second level 10-2 to the first level 10-1. Specifically, the operation knowledge mainly includes equipment maintenance cases, maintenance knowledge recommendations, predictive maintenance solutions, equipment intelligent upgrade cases, etc. The upward movement of the operation knowledge can include the operation knowledge module 120 receiving equipment maintenance cases from the second level 10-2 (such as the equipment maintenance module 170, etc.). Among them, the equipment maintenance cases are mainly based on the summary and screening of the process of repairing the production equipment. First, the equipment user discovers the equipment failure and reports it through the system 10. The system 10 fills in the description of the equipment failure to form a maintenance work order. Subsequently, after receiving the maintenance work order, the equipment maintenance personnel start to repair the corresponding repair equipment and fill in the maintenance content and the cause of the failure. After the maintenance is completed, the equipment repair personnel will evaluate the entire maintenance process. In a non-limiting embodiment, the evaluation of the maintenance process can include multi-dimensional scoring of maintenance quality, efficiency, and cleanliness of the maintenance site, such as setting a full score of 5 points. The production equipment operation management system 10 weights these scores and obtains the average to obtain the maintenance evaluation score. A corresponding threshold value (such as 3.5 points corresponding to a full score of 5 points) is set for the maintenance evaluation score. At this time, the first level 10-1 extracts the data of the maintenance work order whose maintenance evaluation score exceeds the threshold value (i.e., score ≥ 3.5 points) from the second level 10-2 to the first level 10-1, such as storing it in the shared maintenance database in the operation knowledge module 120.

[0036] In some embodiments, in response to receiving equipment maintenance cases such as equipment maintenance cases from the second level 10-2, the operation knowledge module 120 extracts knowledge from the equipment maintenance cases to construct a maintenance knowledge graph. The knowledge extraction may include: filtering equipment maintenance cases received from the second level 10-2 (such as the equipment maintenance module 170, etc.) according to specified conditions; obtaining entity nodes and attributes such as fault descriptions, maintenance processes, and fault causes of different production equipment and maintenance personnel; and constructing a maintenance knowledge graph by establishing relationships between these entity nodes and attributes, thereby realizing rapid retrieval of maintenance knowledge.

[0037] In some embodiments, the operation knowledge module 120 can also automatically match and give maintenance recommendations according to the repair content during the production equipment maintenance process to improve the equipment maintenance efficiency. Additionally or alternatively, the operation knowledge module 120 can perform expert scoring on the aforementioned summarized equipment maintenance cases, and set threshold conditions for expert scoring (such as filtering cases with scores higher than 4 out of 5) to generate a case library, and select maintenance personnel corresponding to the case library as high-skilled maintenance personnel shared at the first level 10-1, thereby helping to improve the overall skill level of maintenance personnel.

[0038] In some embodiments, the operation knowledge module 120 can also generate a predictive maintenance plan based on equipment maintenance cases and maintenance knowledge graphs. It can be understood that predictive maintenance is mainly used for production equipment that has not failed.

[0039] Furthermore, the performance management indicator module 130 of the first level 10-1 is configured to perform a vertical comparison between the operating indicators of the first level 10-1 and the indicator data of the second level 10-2. Generally, enterprises will establish unified operating indicators at the group level, which include indicator definitions, data sources, calculation methods, etc. The specific implementation steps are that the performance management indicator module 130 calculates the operating indicator data in multiple application scenarios such as equipment inspection, maintenance, and repair, and stores it in the database of the first level 10-1, automatically captures the corresponding indicator data periodically (such as monthly, quarterly, and annually), and performs data analysis on the second level 10-2 in units of each branch and subsidiary; compares these indicator data with the current indicator plan, and displays and reminds data anomalies for units that do not meet the standards, thereby improving the operational control efficiency and quality of production equipment.

[0040] In some embodiments, the operation indicators include but are not limited to equipment overall efficiency, equipment total productivity, average failure time and equipment online rate, and these operation indicators can be further subdivided into equipment inspection timeliness rate, equipment maintenance completion rate, equipment designated time maintenance ratio, etc. The calculation methods are as follows.

[0041] Timely rate of equipment inspection:

[0042]

[0043] Where: L1 is the equipment inspection timeliness rate; N D Timely inspection quantity of equipment; N A The planned quantity for inspection.

[0044] Equipment maintenance completion rate:

[0045]

[0046] Where: L2 is the equipment maintenance completion rate; N B The number of equipment maintenance completed; N C The number of maintenance plans.

[0047] When the specified time is 4 hours, the equipment 4h maintenance ratio is:

[0048]

[0049] Where: L3 is the proportion of equipment maintenance within 4 hours; N E N is the number of equipment repairs completed within 4 hours; F The number of repairs reported for all equipment.

[0050] Furthermore, for abnormal display of production equipment operation indicators, at the first level 10-1 such as the group level, the following conditions must be met:

[0051]

[0052] or

[0053] Where: L i is the monthly value of the group-level production equipment operation index; L iE It is the monthly indicator of the group-level production equipment operation index; The annual cumulative value of the group-level production equipment operation indicators; L YE Annual cumulative indicators of group-level production equipment operation indicators.

[0054] In this case, if there are abnormalities in the group's production equipment operation indicators, the corresponding second level 10-2, that is, the enterprise-level abnormality display needs to meet the following requirements:

[0055]

[0056] Where: L qi It is the monthly value of the enterprise's production equipment operation index; It is the annual cumulative value of the enterprise’s production equipment operation indicators.

[0057] Additionally, for the above-mentioned abnormal indicator data, such as the enterprise's production equipment operation indicators being lower than the group indicators, it is necessary to conduct data analysis on the enterprise where the abnormality occurs and formulate a subsequent rectification plan. The system will continue to track and evaluate the subsequent operating results for the next three months, thereby achieving efficient production equipment operation management.

[0058] Furthermore, if Figure 1 As shown, a resource sharing module 140 is also included between the first level 10-1 and the second level 10-2. It can be configured to realize resource sharing between the first level 10-1 and the second level 10-2, and the shared resources include an adjustable equipment resource pool, an idle spare parts resource pool and a high-skilled talent pool. It should be understood that compared with the functions of the operation knowledge module 120 and the performance management indicator module 130, the resource sharing module 140 is mainly used to realize the sharing of physical resources such as production equipment, equipment spare parts and high-skilled talents within the entire system, such as being loaned out by one enterprise in the second level 10-2 and transferred in by another enterprise (that is, when one enterprise uses it, other enterprises cannot use it at the same time), and has resource exclusivity; while the knowledge sharing of the operation knowledge module 120 and the performance indicators of the performance management indicator module 130 are virtual resource sharing contents, and any branch, subsidiary or department of the second level 10-2 can be applied simultaneously, so it does not involve the interaction of equipment transfer in / out between two or more units.

[0059] In some embodiments, in response to the status of production equipment and / or equipment spare parts being set to adjustable, the equipment managers and / or users of the second level 10-2 can quickly query the adjustable equipment / spare parts information, such as the equipment / spare parts name, company, key specifications, contacts and telephone numbers, equipment / spare parts photos and other key information, thereby improving the efficiency of equipment resource adjustment and sharing.

[0060] In a non-limiting embodiment, taking a production device as an example, Figure 4As shown, the production equipment in the idle state is recorded as idle equipment 1110. In response to receiving the approval result 2010 of the equipment adjustable application 1120 from the automated office system 20, the resource sharing module 140 classifies the idle equipment 1110 into the adjustable equipment resource pool. Specifically, in response to the adjustment application for idle equipment initiated by the second level 10-2 being approved by the automated office system 20, the production equipment ledger module 110 adds the approved idle equipment to the adjustable equipment resource pool. At this time, the resource sharing module 140 may contain multiple adjustable equipment 1410, 1420 and 1430 at the same time, such as equipment 1 to n based on attributes such as equipment number. Different branches of the second level 10-2 can access the corresponding resources in the resource sharing module 140 as users of the equipment, such as based on searching the equipment information in the adjustable resource pool to determine the required equipment, and initiate the equipment adjustment process for the required equipment. Furthermore, in response to the automated office system 20 automatically generating an equipment transfer application based on the key information of the required equipment and returning the approval result, the second level 10 - 2 completes the handover of the required equipment, and the operation management system 10 updates the corresponding equipment information recorded in the production equipment ledger module 110 .

[0061] In some embodiments, the production equipment that can enter the adjustable equipment resource pool in the resource sharing module 140 and the equipment spare parts that enter the idle spare parts resource pool should meet at least one of the following conditions: (equipment / spare parts) usage status is idle; the time of maintaining the idle status exceeds the first time threshold; and there is no application plan within the second time threshold after the current time. The first time threshold is used to evaluate whether the idle time of the production equipment is long enough, such as to ensure that the original user will not temporarily need to recover it; the second time threshold is used to evaluate whether the future application plan of the production equipment is long enough from the current time, such as to ensure that the current demand for the equipment can be met before the scheduled future plan. Further, the resource sharing module 140 can also prepare and / or adjust the adjustable equipment resource pool based on the equipment adjustment information stored in the production equipment ledger module 110, and prepare and / or idle spare parts resource pool based on the equipment spare parts ledger information stored in the production equipment ledger module 110.

[0062] Specifically, in a non-limiting embodiment, the conditions for setting the state of the required production equipment as adjustable may include: the equipment usage state is idle; the equipment is idle for a period of time greater than or equal to 1 month; and the equipment has no application plan in the next 24 months, that is:

[0063]

[0064] Where: T i is the state of production equipment; T Xis the idle time of production equipment, unit: month; T P Future equipment reuse plan, unit: month. At this time, the production equipment (and / or spare parts) that meet the above three conditions are available for adjustment, and the corresponding equipment and / or spare parts information can be automatically sent to the equipment management personnel who have the use demand for the adjustable equipment, and confirm that these equipment / spare parts are shared in the adjustable resource pool.

[0065] Additionally or alternatively, the high-skilled talent pool in the resource sharing module 140 mainly stores information related to high-skilled talents at multiple levels and in various departments. For example, high-skilled talents can be classified and summarized according to process types, and participate in activities such as production equipment investment and technical transformation, processing technology improvement, and skilled personnel training, so as to achieve the sharing of high-skilled talents, experience and knowledge of the group, and improve the group's investment decisions and the level of skilled personnel.

[0066] Furthermore, at the branch and subsidiary level as the second level 10 - 2 , it is mainly divided into components such as an equipment inspection module 150 , an equipment maintenance module 160 , an equipment repair module 170 , a spare parts management module 180 and an operation management module 190 .

[0067] In some embodiments, the equipment inspection module 150 is configured to determine the inspection standard, generate the inspection plan, execute the inspection process, record the inspection results and handle the inspection problems. Equipment management personnel can use a mobile terminal to record the inspection, where based on the mapping relationship between the QR code and the equipment ledger information, the mobile terminal can quickly obtain the equipment information by scanning the QR code, and perform the inspection items for the production equipment with reference to the determined inspection standard; after completing the inspection process, use the mobile terminal to take a photo of the equipment and upload it to the system 10 as a record of the inspection results. In particular, for abnormal inspection situations, corresponding inspection problems need to be handled, such as the section chief responsible for the corresponding equipment confirming whether to report the repair, and triggering the maintenance process if necessary.

[0068] In some embodiments, the equipment maintenance module 160 is configured to record maintenance records, determine maintenance standards, generate maintenance plans, execute maintenance processes, and record maintenance results. Specifically, the equipment maintenance record is similar to the recording and storage methods in the production equipment record module 110, such as recording whether the equipment manager determines whether the equipment is maintained. Equipment maintenance standards may include standards in multiple aspects such as daily cleaning, daily inspections, regular lubrication, fastening of connectors, replacement of wearing parts, professional maintenance, etc., which can be bound to attribute information such as equipment numbers and stored in the equipment maintenance record. In a non-limiting embodiment, the equipment maintenance module 160 generates a maintenance plan for the next cycle at a specified time in the operating cycle (such as generating a monthly plan on the last three days of each month), and the equipment manager can modify and confirm the plan, and the inspection operator performs it according to the maintenance plan and standard operations. In addition, the operator can also use a mobile terminal to record pictures before and after the operation as a record of maintenance execution.

[0069] Additionally or alternatively, the equipment inspection module 150 and the equipment maintenance module 160 located at the second level 10-2 perform real-time data interaction and update with the production equipment ledger module 110 located at the first level 10-1. In a non-limiting embodiment, in response to receiving the equipment usage status information from the production equipment ledger management module 110, the equipment inspection module 150 and the equipment maintenance module 160 respectively generate an inspection plan and a maintenance plan for the production equipment in use with the equipment usage status being in use.

[0070] In some embodiments, the equipment maintenance module 170 is configured to process repair applications, allocate maintenance work orders, execute maintenance processes, and record maintenance evaluations. In a non-limiting embodiment, when a production equipment fails, the equipment user / equipment manager reports the repair and generates a corresponding repair application. The superior manager of the section or department where the production equipment is located uses the system 10 to process these repair applications, such as confirmation by the section team leader, etc. The processed repair application enters the repair list, and a maintenance work order is generated accordingly. The distribution of the maintenance work order can be performed by, for example, the maintenance team leader to perform maintenance work or by the maintenance personnel to grab the order according to their own work situation. After completing the work order distribution, the maintenance personnel perform the maintenance process. At this time, in response to the equipment maintenance module 170 executing the maintenance process, the production equipment ledger management module 110 updates the equipment maintenance status of the production equipment corresponding to the maintenance process, wherein the equipment maintenance status is set by the maintenance personnel according to the equipment inspection results and the spare parts inventory to spare parts replacement, lack of spare parts, maintenance, etc. Alternatively, if the maintenance personnel assigned to the maintenance work order find that the equipment cannot be repaired, the maintenance transfer order can be performed, which is executed after confirmation by the maintenance team leader. After the maintenance is completed, the equipment users can conduct a maintenance evaluation on the repaired production equipment, thereby achieving closed-loop management of the maintenance process.

[0071] Additionally or alternatively, in response to the equipment inspection module 150 determining that the equipment has a fault during the inspection process, and / or the equipment maintenance module 160 determining that the equipment has a fault during the equipment maintenance process, a repair application is automatically initiated to the equipment maintenance module 170, and a predictive maintenance plan is generated. It should be understood that the predictive maintenance plan does not belong to conventional maintenance requirements, but is a preventive equipment status maintenance.

[0072] In some embodiments, the spare parts management module 180 is configured to manage spare parts information, process spare parts purchase applications, manage spare parts inventory, and process spare parts requisition applications. Spare parts information mainly includes but is not limited to spare parts material coding, spare parts storage location management, safety inventory rules and other basic spare parts information and rules. Spare parts purchase applications can be initiated by users of equipment spare parts (such as equipment users or maintenance personnel), or can be based on regular analysis of spare parts inventory data, and the spare parts purchase process can be triggered when the safety inventory boundary is reached. In a non-limiting embodiment, the spare parts purchase process includes applying for purchase approval to the automated office system 20 in response to the spare parts inventory of the second level 10-2 reaching the safety inventory boundary; in response to receiving the approval indication from the automated office system 20, the spare parts management module 180 implements spare parts purchase. The management of spare parts inventory may include performing spare parts quality inspection on purchased spare parts, wherein the qualified newly added spare parts data is updated to the spare parts inventory, and the unqualified newly added spare parts are returned; high-value, long-term unused spare parts are transferred within the second level 10-2, wherein the transfer process is also approved by the automated office system 20 to improve the utilization rate of spare parts. In addition, the management of spare parts inventory also includes spare parts inventory counting, such as periodically counting the number of spare parts, such as the spare parts manager comprehensively obtaining conclusions such as spare parts surplus, shortage and compliance, and the surplus and shortage situations need to be analyzed and reported.

[0073] Additionally or alternatively, the spare parts requisition application can be initiated by the equipment maintenance personnel during the equipment maintenance process, or by the user unit in the second level 10-2 to requisition spare parts according to the spare parts inventory quantity, thereby improving the maintenance response speed. In a non-limiting embodiment, in response to processing a repair application, the equipment maintenance module 170 determines the equipment spare parts required for the repair application, and initiates a spare parts requisition application to the spare parts management module 180, wherein in response to the shortage of the required equipment spare parts in the spare parts inventory, the spare parts management module 180 initiates the spare parts procurement process; in response to the required equipment spare parts in the spare parts inventory meeting the requirements, the spare parts management module 180 initiates the spare parts outbound process; and in response to the spare parts procurement process or the spare parts outbound process, the spare parts management module 180 updates the spare parts information and spare parts inventory.

[0074] In some embodiments, the operation management module 190 is configured to collect real-time data, fault data, and sensor data of equipment operation, determine the equipment status based on the collected information and the maintenance record data recorded by the equipment maintenance module 170, and automatically report repairs in response to abnormal equipment status. In particular, determining that the equipment has a fault includes but is not limited to the occurrence of a fault code in the equipment, the equipment oil monitoring parameters exceeding the threshold range, and the equipment processing parameters exceeding the threshold range, wherein the equipment oil monitoring parameters are such as temperature, pressure, flow, contaminants, lubrication performance, etc., and the equipment processing parameters are such as welding current, voltage, etc.

[0075] Additionally or alternatively, in terms of authority management, enterprises at the second level 10-2 can only view their own equipment data, but can view and select equipment, spare parts and high-skilled talent information in the shared resource pool; groups at the first level 10-1 can view data and information at lower levels such as this level and the second level 10-2, and record and coordinate low-level equipment interaction information.

[0076] Additionally, continue to refer to Figure 1 , the production equipment operation management system 10 performs data interaction with the automated office system 20. In a non-limiting embodiment, the automated office system 20 is mainly responsible for the approval process corresponding to the production equipment operation management system 10, including but not limited to: equipment procurement, equipment transfer, equipment adjustment, equipment scrapping, etc. between the first level 10-1 and the second level 10-2 or within the second level 10-2, and provides functions such as approval templates, approval interfaces, and approval result returns to achieve unified management of approval processes and improve standardization and efficiency of approvals.

[0077] Additionally, data interaction is performed between the production equipment operation management system 10 and the single sign-on platform 30. In a non-limiting embodiment, the single sign-on platform 20 refers to the first level 10-1 and the second level 10-2 both logging into the production equipment operation management system 10 from the single sign-on platform 20 to achieve public information exchange between the two levels. In order to improve the efficiency of information integration, the public information that the single sign-on platform 20 can provide includes but is not limited to: company information, organizational structure information, personnel information, authority control information, qualification management information, security management information, and log management information, etc., so as to achieve the same source of organizational personnel data and the same authority for each production management system (such as the production execution system (MES: Manufacturing Execution System), enterprise resource planning (ERP: Enterprise Resource Planning), office automation (OA: Office Automation), etc.), which makes it easy to realize data sharing between systems and build a production operation portal.

[0078] The present disclosure also provides a non-transitory computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, enables the processor to implement the multi-level production equipment operation management method according to any of the aforementioned embodiments of the present disclosure.

[0079] The present disclosure also provides a computer program product, including computer executable instructions, which, when executed by a processor, enable the processor to implement the multi-level production equipment operation management method according to any of the aforementioned embodiments of the present disclosure.

[0080] Figure 5 An exemplary configuration of a computing device that can implement an embodiment of the present disclosure is shown. The computing device includes one or more processors 501, an input / output interface 505 connected to the processor 501 via a bus 504, and memories 502 and 503 connected to the bus 504. In some embodiments, the memory 502 may be a read-only memory (ROM), and the memory 503 may be a random access memory (RAM).

[0081] Processor 501 may be any kind of processor, and may include, but is not limited to, one or more general-purpose processors or special-purpose processors (such as special-purpose processing chips). Memories 502 and 503 may be any non-transitory storage device that can implement data storage, and may include, but is not limited to, disk drives, optical storage devices, solid-state memories, floppy disks, flexible disks, hard disks, magnetic tapes or any other magnetic media, compressed disks or any other optical media, cache memories and / or any other storage chips or modules, and / or any other media from which a computer can read data, instructions and / or codes.

[0082] The bus 504 may include, but is not limited to, an Industry Standard Architecture (ISA) bus, a Micro Channel Architecture (MCA) bus, an Enhanced ISA (EISA) bus, a Video Electronics Standards Association (VESA) local bus, and a Peripheral Component Interconnect (PCI) bus.

[0083] In some embodiments, the input / output interface 505 is connected to an input unit 506 configured by an input device such as a keyboard and a mouse for a user to input an operation command, an output unit 507 that outputs a processing operation screen and an image of a processing result to a display device, a storage unit 508 including a hard disk drive and the like for storing programs and various data, and a communication unit 509 including a local area network (LAN) adapter and the like and performing communication processing via a network represented by the Internet. In addition, a drive 510 that reads and writes data from and on a removable storage medium 511 is connected.

[0084] Various aspects, embodiments, implementations or features of the foregoing embodiments may be used alone or in any combination. Various aspects of the foregoing embodiments may be implemented by software, hardware or a combination of hardware and software.

[0085] For example, the foregoing embodiments may be embodied as computer readable code on a computer readable medium. A computer readable medium is any data storage device that can store data that can thereafter be read by a computer system. Examples of computer readable media include read-only memory, random access memory, CD-ROM, DVD, magnetic tape, hard drive, solid state drive, and optical data storage device. The computer readable medium may also be distributed in a network coupled computer system so that the computer readable code is stored and executed in a distributed manner.

[0086] For example, the aforementioned embodiments may be in the form of hardware circuits. The hardware circuits may include any combination of combinational logic circuits, clock storage devices (such as floppy disks, flip-flops, latches, etc.), finite state machines, memories such as static random access memories or embedded dynamic random access memories, custom designed circuits, programmable logic arrays, etc.

[0087] In one embodiment, hardware circuits according to the present disclosure may be implemented by coding and designing one or more integrated circuits using a hardware description language (HDL) such as Verilog or VHDL, or in combination using discrete circuits.

[0088] The terms used herein are only for describing specific exemplary embodiments and are not intended to limit the present disclosure. Unless the context clearly indicates otherwise, the singular forms of "one" and "the" used herein are intended to include plural forms as well. It should also be understood that when the word "including" is used in this article, it indicates the existence of the indicated features, wholes, steps, operations, units and / or components, but does not exclude the existence or increase of one or more other features, wholes, steps, operations, units and / or components and / or their combinations. In addition, in the description of the present disclosure, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or order. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "multiple" is two or more.

[0089] References to "embodiments" or similar expressions in this specification refer to specific features, structures, or characteristics described in conjunction with the embodiment as being included in at least one specific embodiment of the present disclosure. Therefore, the appearance of "in an embodiment of the present disclosure" and similar expressions in this specification does not necessarily refer to the same embodiment.

[0090] Those skilled in the art will appreciate that the present disclosure may be implemented in various forms, such as a complete hardware embodiment, a complete software embodiment (including firmware, resident software, microprogram code, etc.), or a combination of software and hardware, which will be referred to below as a "circuit," "module," "unit," or "system." In addition, the present disclosure may also be implemented in any tangible media form as a computer program product having a computer-usable program code stored thereon.

[0091] The relevant description of the present disclosure is described with reference to the flowcharts and / or block diagrams of the systems, devices, methods and computer program products according to the specific embodiments of the present disclosure. It can be understood that each block in each flowchart and / or block diagram, and any combination of blocks in the flowchart and / or block diagram, can be implemented using computer program instructions. These computer program instructions can be executed by a machine composed of a processor of a general-purpose computer or a special computer or other programmable data processing device, and the instructions are processed by a computer or other programmable data processing device to implement the functions or operations described in the flowchart and / or block diagram.

[0092] The accompanying drawings show the flowcharts and block diagrams of the architecture, functions and operations that can be implemented by the systems, devices, methods and computer program products according to various embodiments of the present disclosure. Therefore, each block in the flowchart or block diagram may represent a module, segment, or part of the program code, which includes one or more executable instructions to implement the specified logical function. It should also be noted that in some other embodiments, the functions described in the blocks may not be performed in the order shown in the figure. For example, two blocks connected to each other in the figure may in fact be executed simultaneously, or in some cases according to the functions involved, they may be executed in the opposite order of the icons. It should also be noted that each block diagram and / or flowchart block, as well as the combination of blocks in the block diagram and / or flowchart, can be implemented by a system based on dedicated hardware, or by a combination of dedicated hardware and computer instructions to perform specific functions or operations.

[0093] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements to market technologies, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A multi-level production equipment operation management system, characterized in that: It includes the production equipment ledger module, operation knowledge module and performance management indicator module for the first level, the resource sharing module between the first level and the second level, and the equipment inspection module, equipment maintenance module, equipment repair module, spare parts management module and operation management module for the second level, among which: The production equipment ledger module is configured to manage equipment information and perform information interaction with the automated office system, wherein the equipment information includes equipment ledger information, equipment purchase information, equipment conversion to fixed assets information, equipment transfer information, equipment scrapping information and equipment spare parts ledger information, wherein the production equipment ledger module records equipment purchase information based on the purchase approval result of the automated office system, records equipment transfer information based on the second-level application and the transfer approval result of the automated office system, records equipment scrapping information based on the scrapping approval result of the automated office system, updates equipment conversion to fixed assets information based on the equipment purchase information, equipment transfer information and the asset approval result of the automated office system, and updates other equipment information based on the equipment scrapping information; The operation knowledge module is configured to realize the upward movement of the operation knowledge of the production equipment from the second level to the first level, wherein the operation knowledge includes equipment maintenance cases, predictive maintenance solutions and equipment intelligent upgrade cases, and the operation knowledge module receives the equipment maintenance cases from the second level, wherein the operation knowledge module extracts knowledge from the equipment maintenance cases to construct a maintenance knowledge graph, performs maintenance knowledge recommendation based on the maintenance knowledge graph, and generates a predictive maintenance solution based on the equipment maintenance cases and the maintenance knowledge graph; The performance management indicator module is configured to perform a longitudinal comparison between the first-level operation indicators and the second-level indicator data, wherein the operation indicators include one or more of equipment comprehensive efficiency, equipment total productivity, mean failure time, and equipment online rate, wherein the performance management module establishes unified operation indicators at the first level, calculates the indicator data received from the second level based on application scenarios, and issues abnormal reminders based on data analysis of the calculation results; The resource sharing module is configured to realize resource sharing between the first level and the second level, and the shared resources include an adjustable equipment resource pool, an idle spare parts resource pool and a high-skilled talent pool, wherein the resource sharing module prepares an adjustable equipment resource pool based on the equipment adjustment information of the production equipment ledger module and prepares an idle spare parts resource pool based on the equipment spare parts ledger information of the production equipment ledger module; The equipment inspection module is configured to determine inspection standards, generate inspection plans, execute inspection processes, record inspection results, and handle inspection issues; The equipment maintenance module is configured to record maintenance records, determine maintenance standards, generate maintenance plans, execute maintenance processes, and record maintenance results; The equipment maintenance module is configured to process repair requests, assign maintenance work orders, execute maintenance procedures, and record maintenance evaluations; The spare parts management module is configured to manage spare parts information, process spare parts purchase applications, manage spare parts inventory, and process spare parts requisition applications; The operation management module is configured to collect real-time data on equipment operation, fault data and sensor data, determine the equipment status based on the collected information and the maintenance record data recorded by the equipment maintenance module, and automatically report repairs in response to abnormal equipment status. The equipment inspection module, equipment maintenance module, equipment repair module and spare parts management module perform data interaction with the production equipment inventory management module, including updating the equipment information based on the inspection results, maintenance results, repair evaluation and spare parts information.

2. The operation management system according to claim 1, characterized in that: Equipment ledger information includes equipment usage status, where the equipment usage status includes one of: in use, idle, and sealed. In response to receiving equipment usage status information from the production equipment inventory management module, the equipment inspection module and the equipment maintenance module respectively generate inspection plans and maintenance plans for production equipment in use with equipment usage status, and the resource sharing module prepares an adjustable equipment resource pool for idle production equipment based on the equipment usage status.

3. The operation management system according to claim 1, characterized in that: In response to the equipment inspection module and the equipment maintenance module respectively determining that the equipment has a fault during the inspection process and the equipment maintenance process, a repair application is automatically initiated to the equipment maintenance module, and a predictive maintenance plan is generated.

4. The operation management system according to claim 1 or 3, characterized in that: In response to processing the repair application, the equipment maintenance module determines the equipment spare parts required for the repair application and initiates a spare parts requisition application to the spare parts management module, wherein In response to the shortage of required equipment spare parts in the spare parts inventory, the spare parts management module initiates a spare parts procurement process; In response to the required equipment spare parts in the spare parts inventory meeting the requirements, the spare parts management module initiates the spare parts outbound process; as well as In response to the spare parts purchasing process or the spare parts outbound process, the spare parts management module updates the spare parts information and spare parts inventory.

5. The operation management system according to claim 4, characterized in that: The equipment ledger information also includes the equipment maintenance status, where the equipment maintenance status includes one of spare parts replacement, spare parts missing, and maintenance. In response to the equipment maintenance module executing the maintenance process, the production equipment ledger management module updates the equipment maintenance status of the production equipment corresponding to the maintenance process.

6. The operation management system according to claim 4, characterized in that: The spare parts procurement process includes: In response to the spare parts inventory at the second level reaching the safety stock boundary, apply to the automated office system for purchase approval; In response to receiving the approval indication from the automated office system, implement spare parts procurement; Perform spare parts quality inspection, update qualified new spare parts data to spare parts inventory, and perform return processing for unqualified new spare parts.

7. The operation management system according to claim 3, characterized in that: The determination of whether the equipment is faulty includes one or more of the following: a fault code appears on the equipment, an oil monitoring parameter of the equipment exceeds a threshold range, and a processing parameter of the equipment exceeds a threshold range.

8. The operation management system according to claim 1, characterized in that: The equipment inventory information includes one or more of factory information, factory information, classification information, basic information, asset information, controller information, and user information.

9. The operation management system according to claim 1 or 8, characterized in that: The production equipment ledger module responds to the idle equipment adjustment application initiated by the second level being approved by the automated office system, and adds the approved idle equipment to the adjustable equipment resource pool; The second level is based on searching the equipment information in the adjustable resource pool to determine the required equipment and initiate the equipment adjustment process for the required equipment; as well as In response to the automated office system automatically generating an equipment transfer application based on key information of the required equipment and returning an approval result, the second level completes the handover of the required equipment, and the operation management system updates the equipment information.

10. The operation management system according to claim 1, characterized in that: The operation management module extracts knowledge from equipment maintenance cases to construct a maintenance knowledge graph, including: Filter equipment maintenance cases received from the equipment maintenance module according to specified conditions; Acquire entity nodes including one or more of production equipment and maintenance personnel, and attributes including one or more of fault description, maintenance process, and fault cause; and A maintenance knowledge graph is constructed by establishing a relationship between the entity nodes and the attributes, thereby realizing rapid retrieval of maintenance knowledge.

11. The operation management system according to claim 1, characterized in that: The production equipment entering the adjustable equipment resource pool and the equipment spare parts entering the idle spare parts resource pool meet at least one of the following conditions: The usage status is idle; The usage state remains idle for a period exceeding a first time threshold; and No schedule is applied within a second time threshold after the current time.

12. The operation management system according to claim 1, characterized in that: Perform data interaction with the single sign-on platform to achieve public information exchange between the first and second levels.

13. The operation management system according to claim 1, characterized in that: Perform data interaction with the automated office system to implement approval processes between the first and second levels and within the second level.

14. A multi-level production equipment operation management method, comprising: The operation management system according to any one of claims 1 to 13 is used to interact with the single sign-on platform and the automated office system to realize the operation management of the production equipment.

15. A non-transitory computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, enable the processor to implement the multi-level production equipment operation management method according to claim 14. 16 . A computer program product, comprising computer executable instructions, which, when executed by a processor, enable the processor to implement the multi-level production equipment operation management method according to claim 14 .

Citation Information

Cited By

  • Equipment management method and device, production system, computer equipment and medium

    CN119937478A