Fabricated looping construction and installation process

The fabricated sleeve construction and installation process addresses the cumbersome on-site assembly of elevator door covers by using pre-installed plug-in panels and keel systems for quick and efficient installation of decorative panels.

CN119083673APending Publication Date: 2024-12-06CHINA CONSTR SIXTH ENG DIV DECORATION CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411143701.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Traditional elevator door covers require on-site assembly, which involves cumbersome measurement and correction processes due to the use of marble or stainless steel panels that need to be processed and bonded on-site.

Method used

A fabricated sleeve construction and installation process using plug-in panels, corner pieces, and a keel system, where panels are pre-installed on a concrete platform with a keel and angle brackets, allowing for quick assembly through plug-in and fixing portions without the need for on-site corrections.

Benefits of technology

Facilitates efficient and convenient installation of decorative panels by eliminating the need for on-site corrections and bonding, reducing the complexity of the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083673A_ABST
    Figure CN119083673A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of assembly type looping installation, and discloses an assembly type looping construction and installation technology which comprises a plurality of first insertion panels, a plurality of second insertion panels, a plurality of internal corner pieces and a plurality of external corner pieces which are used for forming a veneer. The first inserting panel, the second inserting panel, the internal corner piece and the external corner piece are each provided with an inserting part and a fixing part. According to the assembly type looping construction and installation technology, after the first insertion panel, the first foundation panel, the second insertion panel and the second foundation panel are arranged and the plain concrete platform is reserved, wall face fixing corner connectors, supporting fixing corner connectors and keels are pre-installed, and subsequent installation and assembly of veneers are facilitated; and the first inserting panel, the first basic panel, the second inserting panel and the second basic panel which are used for forming the veneer are matched through the inserting parts and the fixing parts to be assembled, the situation that each part is bonded after being subjected to position correction is not needed, assembling can be rapidly carried out, and the operation process is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled sleeve installation, in particular to an assembled sleeve construction and installation process. Background Art

[0002] Door covers are often used in decoration to hide wires, provide aesthetic decoration, and seal and waterproof. Traditional elevator door covers generally use marble or stainless steel as decorative panels and are assembled on site. Generally, a wooden base layer is made on the walls on both sides of the elevator door at the construction site, and then the marble or stainless steel material is processed into the required panels. The processed decorative panels are then pasted to the wooden base layer using industrial adhesives, and finally necessary finishing is performed.

[0003] Since this type of elevator door frame is assembled on-site, it is necessary to perform measurements and corrections during each veneer assembly and bonding operation, which makes the operation process cumbersome. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a fabricated sleeve construction and installation process to solve the problems mentioned in the above background.

[0005] The present invention provides the following technical solution: an assembled sleeve construction and installation process, comprising: a plurality of first plug-in panels, a plurality of second plug-in panels, a plurality of female corner pieces and a plurality of male corner pieces used to form a decorative panel, wherein the first plug-in panels, the second plug-in panels, the female corner pieces and the male corner pieces are all provided with a plug-in portion and a fixing portion;

[0006] Construction methods, including:

[0007] Step S1, leaving a plain concrete platform along the wall at the inner corners of the building floor and the building wall;

[0008] Step S2, drawing the sleeve interface line and the finishing surface line on the building floor and the building wall;

[0009] Step S3, installing the wall fixing angle bracket, the support fixing angle bracket and the keel in sequence;

[0010] Step S4, installing and assembling the decorative panel.

[0011] Preferably, the interiors of the plurality of first plug-in panels, the plurality of second plug-in panels, the plurality of female corner pieces, the plurality of male corner pieces, the plug-in parts and the fixing parts are all filled with a filling reinforcement layer.

[0012] Preferably, the filling and reinforcement layer is made of polytetrafluoroethylene or plain concrete.

[0013] Preferably, the first plug-in panel comprises a first base panel, and the plug-in portion and the fixing portion of the first plug-in panel are respectively arranged on two sides of the first base panel;

[0014] The second plug-in panel comprises two second base panels, the plug-in portion of the second plug-in panel is arranged between the two second base panels, and the fixing portion of the second plug-in panel is arranged on one side of one of the second base panels;

[0015] The female corner piece includes a female corner plate, and the plug-in portion and the fixing portion of the female corner piece are respectively arranged at two ends of the female corner plate;

[0016] The male corner piece includes two male base panels, the plug-in portion of the male corner piece is arranged on one side of one of the male base panels, and the fixing portion of the male corner piece is arranged on one side of the other male base panel.

[0017] Preferably, the first base panel, the second base panel, the female corner panel and the male base panel are made of aluminum plate, steel plate or acrylic plate;

[0018] The first base panel, the second base panel, the female corner panel and the male base panel are all provided with corrugated support plates inside;

[0019] The surfaces of the first base panel, the second base panel, the female corner panel and the male base panel are all coated with a protective layer.

[0020] Preferably, the plug-in portion is provided with a plug-in convex strip, and the fixing portion is provided with a plug-in groove for docking with the plug-in convex strip.

[0021] Preferably, in step S1:

[0022] The width of the plain concrete platform is 70 mm, and the height of the plain concrete platform is 35 mm.

[0023] Preferably, in step S3:

[0024] The keel is made of square steel with a width of 40mm and a height of 20mm. The wall fixing angle brackets and support fixing angle brackets are installed on the building wall with expansion bolts. After installing the fixing angle brackets, the keel is welded to the surface of the wall fixing angle brackets to ensure that all keels are on the same horizontal plane.

[0025] Preferably, in step S4:

[0026] Determine the number of the first plug-in panel, the second plug-in panel, the female corner fittings and the male corner fittings according to the size of the sleeve, and install connecting angle codes at the bottom of the first plug-in panel, the second plug-in panel, the female corner fittings and the male corner fittings respectively. Use female corner fittings for transition at the female corners and use male corner fittings for transition at the male corners.

[0027] Preferably, in step S4:

[0028] The connecting angle code is installed on the supporting fixing angle code by using dovetail screws, and the first plug-in panel, the second plug-in panel, the female corner piece and the male corner piece are all installed on the keel by using dovetail screws.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] The present invention, by arranging the first plug-in panel, the first base panel, the second plug-in panel, and the second base panel, after leaving a plain concrete platform, pre-installs the wall fixing angle code, the support fixing angle code and the keel, so as to facilitate the subsequent installation and assembly of the decorative panel, and the first plug-in panel, the first base panel, the second plug-in panel, and the second base panel used to form the decorative panel are all assembled by the cooperation of the plug-in part and the fixing part, and it is not necessary to correct the position of each component and then bond it, so it can be assembled quickly, and the operation process is convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is the construction flow chart of the present invention;

[0032] Figure 2 This is a schematic diagram of the structure of the decorative panel of the present invention;

[0033] Figure 3 This is a schematic diagram of the wall fixing angle bracket, support fixing angle bracket and keel structure of the present invention;

[0034] Figure 4 It is a schematic diagram of the top-sectional structure of the wall surface fixing angle code position of the present invention;

[0035] Figure 5 This is a schematic diagram of the side section structure of the support fixing angle code of the present invention;

[0036] Figure 6 This is a schematic diagram of the assembly structure of the first plug-in panel and the second plug-in panel of the present invention;

[0037] Figure 7 This is a schematic diagram of the installation structure of the female corner piece of the present invention;

[0038] Figure 8 This is a schematic diagram of the installation structure of the male corner piece of the present invention;

[0039] Fig. 9 This is a schematic diagram of the structure of the first plug-in panel of the present invention;

[0040] Fig.10 This is a schematic diagram of the structure of the second plug-in panel of the present invention;

[0041] Fig.11 It is a schematic diagram of the structure of the female corner piece of the present invention;

[0042] Fig.12 It is a schematic diagram of the structure of the male corner piece of the present invention.

[0043] In the figure: 1, decorative panel; 2, first plug-in panel; 201, first base panel; 3, second plug-in panel; 301, second base panel; 4, female corner piece; 401, female corner plate; 5, male corner piece; 501, male base panel; 6, plug-in part; 7, fixing part; 8, plug-in convex strip; 9, plug-in groove; 10, wall fixing angle code; 11, supporting fixing angle code; 12, keel; 13, expansion bolt; 14, dovetail screw; 15, building floor; 16, building wall; 17, plain concrete platform; 18, connecting angle code; 19, corrugated support plate. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] See also Figure 1-12 , an assembled sleeve construction and installation process, comprising: a plurality of first plug-in panels 2, a plurality of second plug-in panels 3, a plurality of female corner pieces 4 and a plurality of male corner pieces 5 for forming a decorative panel 1, wherein the first plug-in panels 2, the second plug-in panels 3, the female corner pieces 4 and the male corner pieces 5 are all provided with a plug-in portion 6 and a fixing portion 7;

[0046] Construction methods, including:

[0047] Step S1, leaving a plain concrete platform 17 along the wall at the inner corner of the building floor 15 and the building wall 16;

[0048] Step S2, drawing the sleeve interface line and the finish surface line on the building floor 15 and the building wall 16;

[0049] Step S3, installing the wall fixing angle bracket 10, the support fixing angle bracket 11 and the keel 12 in sequence;

[0050] Step S4, installing and assembling the decorative panel 1.

[0051] In a specific embodiment, the interiors of the plurality of first plug-in panels (2), the plurality of second plug-in panels (3), the plurality of female corner pieces (4), the plurality of male corner pieces (5), the plug-in portion (6) and the fixing portion (7) are all filled with a filling reinforcement layer. By arranging the filling reinforcement layer in the decorative panel 1, the flatness and firmness of the decorative panel 1 are improved. The filling reinforcement layer is made of polytetrafluoroethylene or plain concrete.

[0052] In a specific embodiment, see Figure 2-12The first plug-in panel 2 includes a first base panel 201, the plug-in portion 6 and the fixing portion 7 of the first plug-in panel 2 are respectively arranged on both sides of the first base panel 201, the second plug-in panel 3 includes two second base panels 301, the plug-in portion 6 of the second plug-in panel 3 is arranged between the two second base panels 301, and the fixing portion 7 of the second plug-in panel 3 is arranged on one side of one of the second base panels 301. The female corner piece 4 includes a female corner plate 401, and the plug-in portion 6 and the fixing portion 7 of the female corner piece 4 are respectively arranged at both ends of the female corner plate 401. The male corner piece 5 includes two male base panels 501, the plug-in portion 6 of the male corner piece 5 is arranged on one side of one of the male base panels 501, and the fixing portion 7 of the male corner piece 5 is arranged on one side of the other male base panel 501. The plug-in portion 6 is provided with a plug-in convex strip 8, and the fixing portion 7 is provided with a plug-in groove 9 for docking with the plug-in convex strip 8.

[0053] In a specific embodiment, the first base panel (201), the second base panel (301), the female corner panel (401) and the male base panel (501) are made of aluminum plates, steel plates or acrylic plates;

[0054] Wherein, the first base panel (201), the second base panel (301), the female corner panel (401) and the male base panel (501) are all provided with a corrugated support plate (19) inside;

[0055] The surfaces of the first base panel (201), the second base panel (301), the negative corner panel (401) and the positive base panel (501) are all coated with a protective layer, and the color of the protective layer is coated according to specific requirements.

[0056] In step S1 : the width of the plain concrete platform 17 is 70 mm, and the height of the plain concrete platform 17 is 35 mm.

[0057] In step S3: the keel 12 is made of square steel, the width of the square steel is 40 mm, the height of the square steel is 20 mm, the wall fixing angle code 10 and the support fixing angle code 11 are both installed on the building wall 16 using expansion bolts 13. After installing the fixing angle code, the keel 12 is welded to the surface of the wall fixing angle code 10 to ensure that all keels 12 are in the same horizontal plane.

[0058] In step S4: determine the number of the first plug-in panel 2, the second plug-in panel 3, the female corner piece 4 and the male corner piece 5 according to the size of the sleeve, install the connecting angle code 18 at the bottom of the first plug-in panel 2, the second plug-in panel 3, the female corner piece 4 and the male corner piece 5 respectively, and use the female corner piece 4 for transition at the female corner and the male corner piece 5 for transition at the male corner.

[0059] In step S4 , the connecting angle code 18 is installed on the supporting fixing angle code 11 using dovetail screws 14 , and the first plug-in panel 2 , the second plug-in panel 3 , the female corner piece 4 and the male corner piece 5 are all installed on the keel 12 using dovetail screws 14 .

[0060] Leave a plain concrete platform 17, and wait for the plain concrete platform 17 to solidify and take shape, then use expansion bolts 13 to install the wall fixing angle code 10 and the support fixing angle code 11 on the building wall 16, and then weld the keel 12 to facilitate the subsequent installation and assembly of the decorative panel 1, and select the number of the first plug-in panel 2, the first base panel 201, the second plug-in panel 3, and the second base panel 301 used to form the decorative panel 1 according to the position of the sleeve. The first plug-in panel 2, the first base panel 201, the second plug-in panel 3, and the second base panel 301 are all matched through the plug-in part 6 and the fixing part 7. When connecting, the plug-in convex strip 8 of the plug-in part 6 of the adjacent component is plugged into the plug-in groove 9 of the fixing part 7 for assembly. There is no need to correct the position of each component and then glue it, so it can be assembled quickly, and the operation process is convenient.

[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated sleeve construction and installation process, It is characterized in that The assembled sleeve comprises: a plurality of first plug-in panels (2), a plurality of second plug-in panels (3), a plurality of female corner pieces (4) and a plurality of male corner pieces (5) for forming a decorative panel (1); the first plug-in panels (2), the second plug-in panels (3), the female corner pieces (4) and the male corner pieces (5) are all provided with a plug-in portion (6) and a fixing portion (7); Construction methods, including: Step S1, leaving a plain concrete platform (17) along the wall at the inner corner of the building floor (15) and the building wall (16); Step S2, drawing the sleeve interface line and the finished surface line on the building floor (15) and the building wall (16); Step S3, installing the wall fixing angle bracket (10), the support fixing angle bracket (11) and the keel (12) in sequence; Step S4, installing and assembling the decorative panel (1).

2. According to the prefabricated sleeve construction and installation process of claim 1, It is characterized in that The interiors of the plurality of first plug-in panels (2), the plurality of second plug-in panels (3), the plurality of female corner pieces (4), the plurality of male corner pieces (5), the plug-in portion (6) and the fixing portion (7) are all filled with a filling reinforcement layer.

3. According to the prefabricated sleeve construction and installation process of claim 2, It is characterized in that The filling reinforcement layer is made of polytetrafluoroethylene or plain concrete.

4. According to the prefabricated sleeve construction and installation process of claim 3, It is characterized in that The first plug-in panel (2) comprises a first base panel (201), and the plug-in portion (6) and the fixing portion (7) of the first plug-in panel (2) are respectively arranged on two sides of the first base panel (201); The second plug-in panel (3) comprises two second base panels (301), the plug-in portion (6) of the second plug-in panel (3) is arranged between the two second base panels (301), and the fixing portion (7) of the second plug-in panel (3) is arranged on one side of one of the second base panels (301); The female corner piece (4) comprises a female corner plate (401), and the plug-in portion (6) and the fixing portion (7) of the female corner piece (4) are respectively arranged at two ends of the female corner plate (401); The male corner piece (5) comprises two male base panels (501), the plug-in portion (6) of the male corner piece (5) is arranged on one side of one of the male base panels (501), and the fixing portion (7) of the male corner piece (5) is arranged on one side of the other male base panel (501).

5. According to the prefabricated sleeve construction and installation process of claim 4, It is characterized in that The first base panel (201), the second base panel (301), the female corner panel (401) and the male base panel (501) are made of aluminum plates, steel plates or acrylic plates; The first base panel (201), the second base panel (301), the female corner panel (401) and the male base panel (501) are all provided with a corrugated support plate (19) inside; The surfaces of the first base panel (201), the second base panel (301), the female corner panel (401) and the male base panel (501) are all coated with a protective layer.

6. A prefabricated sleeve construction and installation process according to any one of claims 1 to 5, It is characterized in that The plug-in portion (6) is provided with a plug-in convex strip (8), and the fixing portion (7) is provided with a plug-in groove (9) for docking with the plug-in convex strip (8).

7. According to claim 6, a prefabricated sleeve construction and installation process, It is characterized in that In step S1: The width of the plain concrete platform (17) is 70 mm, and the height of the plain concrete platform (17) is 35 mm.

8. According to claim 7, a prefabricated sleeve construction and installation process, It is characterized in that In step S3: The keel (12) is made of square steel, the width of the square steel is 40 mm, and the height of the square steel is 20 mm. The wall fixing angle bracket (10) and the support fixing angle bracket (11) are both installed on the building wall (16) by using expansion bolts (13). After installing the fixing angle bracket, the keel (12) is welded to the surface of the wall fixing angle bracket (10) to ensure that all keels (12) are in the same horizontal plane.

9. The assembled sleeve construction and installation process according to claim 8, It is characterized in that In step S4: The number of the first plug-in panel (2), the second plug-in panel (3), the female corner piece (4) and the male corner piece (5) is determined according to the size of the sleeve, and the connecting corner code (18) is respectively installed at the bottom of the first plug-in panel (2), the second plug-in panel (3), the female corner piece (4) and the male corner piece (5), and the female corner piece (4) is used for transition at the female corner, and the male corner piece (5) is used for transition at the male corner.

10. The assembled sleeve construction and installation process according to claim 9, It is characterized in that In step S4: The connecting angle bracket (18) is installed on the supporting fixing angle bracket (11) using dovetail screws (14), and the first plug-in panel (2), the second plug-in panel (3), the female corner piece (4) and the male corner piece (5) are all installed on the keel (12) using dovetail screws (14).

Citation Information

Cited By

  • Assembled casing construction and installation process