Gallery-cabin connection and design method of pipe gallery type seabed data center
Through the corridor-cabin connection method of the pipe-shaped undersea data center, the problems of difficulty and high cost of maintenance of the subsea data center are solved, and low energy consumption, low cost and maintainability are achieved, which is suitable for large-scale promotion.
Patent Information
- Application Number
- CN202411222546.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-12-10
AI Technical Summary
In the construction of existing submarine data centers, the closed design of the data compartment leads to difficulties in maintenance and repair, and the high maintenance costs and complexity limits its application scale.
Using the corridor-cabin connection method of the underwater suspension pipe corridor-type submarine data center, a closed door, rubber water stop, pressure balance valve and humidity sensor are installed to ensure airtightness and ability Detachable, allowing personnel to enter for overhaul and maintenance.
It realizes low energy consumption, low cost, maintainability and capacity expansion of the submarine data compartment, ensures personnel safety and server security, reduces maintenance costs, and is suitable for large-scale promotion.
Smart Images

Figure CN119102249A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of underwater data center construction, and in particular to a corridor-cabin connection and design method of a corridor-type submarine data center. Background Art
[0002] At present, the construction of submarine data centers usually adopts an integrated module construction method, that is, all equipment, facilities and systems are pre-integrated into a complete modular unit, assembled and tested on land, and then the entire module is directly sunk to the seabed for installation.
[0003] Although this method simplifies the construction process, it also brings some problems. On the one hand, since the data cabin is completely closed, daily maintenance and repairs become extremely difficult. Usually, staff cannot directly enter the data cabin for maintenance work. On the other hand, since the data cabin is sunk in the deep sea, professional divers are usually required to perform underwater operations, which greatly increases the cost and complexity of maintenance. At the same time, the practice of directly dropping it onto the seabed after integrated construction limits its scale of application. The high maintenance cost and difficulty of operation make this practice difficult to promote on a large scale.
[0004] Therefore, a corridor-cabin construction method for submarine data centers is proposed. Due to the importance of servers in the submarine data cabin and their inaccessibility to water, a specific connection method needs to be designed to meet the airtightness requirements of the submarine data cabin, while also ensuring disassembly and maintainability. Summary of the invention
[0005] The purpose of the present invention is to solve the problem that there is currently no reliable connection design for the new corridor-cabin construction method of the submarine data center. A corridor-cabin connection and design method for a pipeline corridor-type submarine data center is proposed, which ensures the airtightness, disassembly and maintainability of the submarine data cabin, and can be widely used in the field of underwater data center construction.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A corridor-cabin connection method for a pipe gallery-type submarine data center includes an underwater suspended pipe gallery and a submarine data cabin, characterized in that the underwater suspended pipe gallery is provided with a closed door on the side, and a connecting channel is extended at the closed door, the connecting channel and the underwater suspended pipe gallery are a whole, and a drainage channel and an air pressure balance channel are provided to connect with the underwater suspended pipe gallery, the connecting channel is connected to the submarine data cabin through a rubber waterstop, the submarine data cabin is provided with a cabin door at the connection, the edge of the cabin door is provided with a sealing ring, a cabin door handle and a rotary locking mechanism; the cabin door is also provided with a pressure balance valve; a humidity sensor is provided in the connecting channel.
[0008] As a preferred technical solution of the present invention, the enclosed door adopts a pressure-resistant watertight door, and the pressure-resistant watertight door satisfies the requirement of preventing water from seeping into the interior of the underwater suspended pipe gallery in a seawater environment within a depth of 50m.
[0009] As a preferred technical solution of the present invention, the rubber waterstop is a GINA waterstop, which is connected to the submarine data cabin by hydraulic crimping. The GINA waterstop uses an OMEGA waterstop on the inner side of the connecting channel as a second waterproof measure.
[0010] As a preferred technical solution of the present invention, the hatch is a double-layer door panel structure, which is divided into an inner and outer layer. The outer door panel is on the outside of the submarine data cabin, and the inner door panel is on the inside of the submarine data cabin. The inner and outer door panels are both provided with a main sealing ring and an auxiliary sealing ring. The auxiliary sealing ring is arranged on the inner side of the main sealing ring. The hatch door activates the rotary locking mechanism by rotating the hatch door handle to press the hatch door tightly against the door frame, thereby squeezing and deforming the main sealing ring and the auxiliary sealing ring.
[0011] As a preferred technical solution of the present invention, when the pressure difference between the inside and outside of the cabin door exceeds a threshold value ΔP, the pressure balancing valve will sound an alarm when the cabin door handle is rotated, and the threshold value ΔP is 0.05MPa.
[0012] As a preferred technical solution of the present invention, when the relative humidity of the connecting passage exceeds a threshold value M1, the humidity sensor will sound an alarm when the door handle is rotated, and the threshold value M1 is 60%.
[0013] A corridor-cabin connection design method for a pipe gallery-type submarine data center includes a non-seismic design, a seismic design, and a maintenance and repair design under seawater pressure. The method is characterized in that the maintenance and repair design includes, in addition to normal internal maintenance and repair, external structural maintenance and repair after the submarine data cabin is salvaged, and specifically includes the following steps:
[0014] S1, preparation stage;
[0015] The preparation stage includes, after reaching the predetermined service life T, locating the position of the seabed data cabin by means of a salvage crane ship, confirming that the remote hatch door locking and the sealed door locking functions of the remote control device are normal, dispatching salvage personnel to close the hatch door, and after checking the air tightness of the seabed data cabin, removing the inner connection between the connecting channel and the seabed data cabin, and then closing the sealed door, after checking the air tightness of the connecting channel to ensure that the sealed door is effective, removing the outer connection between the connecting channel and the seabed data cabin, and locking the hatch door and the sealed door by means of the remote control device;
[0016] S2, salvage the seabed data cabin;
[0017] The salvaging of the seabed data capsule includes determining that the salvage crane vessel is in good condition, using multiple steel cables to evenly distribute and fix the seabed data capsule, and stably connecting the seabed data capsule with the crane hook of the salvage crane vessel, then starting the crane, slowly lifting the seabed data capsule, using a video monitoring system to monitor the lifting process, lifting the salvage crane vessel onto the transport vessel, and unloading after arriving at a predetermined unloading location;
[0018] S3, maintenance and repair;
[0019] The maintenance and overhaul includes transporting the submarine data cabin to a designated factory, determining the extent of structural damage according to the corrosion, cracks, and wear of the submarine data cabin, formulating corresponding repair plans for different defect types for submarine data cabins that are not severely damaged and can continue to be used, repairing the submarine data cabin, and keeping records of the repair process; recycling the submarine data cabin that is severely damaged and cannot continue to be used, transferring the servers in the submarine data cabin to a new submarine data cabin, and keeping records of the recycling and transfer process;
[0020] S4. Return to the data center for installation;
[0021] The return to the data center for installation includes transporting the repaired or newly transferred submarine data cabin back to the submarine data center, locating it to the original position of the submarine data cabin, reconnecting the connection channel with the submarine data cabin through the rubber waterstop, opening the drainage channel and the air pressure balance channel to drain the seawater in the connection channel after the outer connection is reinstalled, and then reinstalling the inner connection, drying the connection channel to reduce the relative humidity to no more than the threshold value M2.
[0022] As a preferred technical solution of the present invention, in step S1, the inner connection and the outer connection are connected by detachable bolts, the bolts, nuts and gaskets of the outer connection are made of materials with high corrosion resistance and the cathodic protection method of sacrificial anode is used to protect the outer connection from corrosion.
[0023] As a preferred technical solution of the present invention, in step S4, the threshold M2 is 40%.
[0024] The beneficial effects of the present invention are as follows: a corridor-cabin connection and design method for a corridor-type submarine data center is provided, the connection channel of the underwater suspended corridor and the submarine data cabin are combined by a rubber water stop, the round-trip channel between the underwater suspended corridor and the submarine data cabin is connected, and the previous form of sinking a single submarine data cabin integrated module to the seabed is replaced, thereby meeting the advantages of low energy consumption, low cost and land saving of the submarine data cabin, and meeting the convenience requirements of personnel entering the submarine data cabin through the underwater suspended corridor for inspection, replacement, maintenance and expansion; the safety of personnel and servers during the opening process of the hatch of the submarine data cabin is guaranteed by a pressure balance valve and a humidity sensor; at the same time, the characteristic of the submarine data cabin integrated module being detachable for structural maintenance is retained by a detachable connection method. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the corridor-cabin connection of the pipeline corridor type submarine data center of the present invention.
[0026] Reference numerals in the figure: 1- underwater suspended pipe gallery, 2- enclosed door, 3- seabed data cabin, 4- cabin door, 5- connecting channel, 6- rubber water stop, 7- humidity sensor, 8- drainage channel, 9- air pressure balance channel. DETAILED DESCRIPTION
[0027] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments given here are only used to illustrate and explain the present invention and cannot be used to limit the present invention. It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention, but the present invention may also have other embodiments and variations thereof, and therefore, the protection scope of the present invention is not limited by the specific embodiments disclosed below.
[0028] like Figure 1 As shown, the present invention provides a corridor-cabin connection method for a corridor-type submarine data center, including an underwater suspended corridor and a submarine data cabin, characterized in that the underwater suspended corridor 1 is provided with a closed door 2 on the side, and a connecting channel 5 is extended at the closed door 2, the connecting channel 5 and the underwater suspended corridor 1 are a whole, and a drainage channel 8 and an air pressure balance channel 9 are provided to connect with the underwater suspended corridor 1, the connecting channel 5 is connected with the submarine data cabin 3 through a rubber waterstop 6, the submarine data cabin 3 is provided with a cabin door 4 at the connection, and the edge of the cabin door 4 is provided with a sealing ring, a cabin door handle and a rotary locking mechanism; the cabin door 4 is also provided with a pressure balance valve; a humidity sensor 7 is provided in the connecting channel.
[0029] The enclosed door 2 is a pressure-resistant watertight door, which can prevent water from seeping into the underwater suspended pipe gallery in a seawater environment with a depth of less than 50 m.
[0030] The rubber waterstop 6 is a GINA waterstop, which is connected to the submarine data cabin by hydraulic crimping. The GINA waterstop uses an OMEGA waterstop on the inner side of the connecting channel as a second waterproof measure.
[0031] The hatch door 4 is a double-layer door panel structure, which is divided into an inner and outer layer. The outer door panel is on the outside of the submarine data cabin 3, and the inner door panel is on the inside of the submarine data cabin 3. The inner and outer door panels are both provided with a main sealing ring and an auxiliary sealing ring. The auxiliary sealing ring is arranged on the inner side of the main sealing ring. The hatch door 4 activates the rotary locking mechanism by rotating the hatch door handle to press the hatch door tightly against the door frame, thereby squeezing and deforming the main sealing ring and the auxiliary sealing ring.
[0032] When the pressure difference between the inside and outside of the hatch exceeds a threshold value of 0.05 MPa, the pressure balancing valve will sound an alarm when the hatch handle is rotated.
[0033] When the relative humidity of the connecting passage exceeds a threshold value of 60%, the humidity sensor will sound an alarm when the door handle is rotated.
[0034] A corridor-cabin connection design method for a pipe gallery-type submarine data center includes non-seismic design, seismic design, and maintenance and repair design under seawater pressure. In addition to normal internal maintenance and repair, the maintenance and repair design also includes maintenance and repair of the outer layer of the structure after the submarine data cabin is salvaged, and specifically includes the following steps:
[0035] S1, preparation stage;
[0036] After reaching the predetermined service life of 25 years, the position of the submarine data cabin is located by a salvage crane ship, and it is determined that the remote hatch locking and airtight door locking functions of the remote control equipment are normal. The salvage personnel are dispatched to close the hatch, and after checking the air tightness of the submarine data cabin, the inner connection between the connecting channel and the submarine data cabin is removed, and then the airtight door is closed. After checking the air tightness of the connecting channel to ensure that the airtight door is effective, the outer connection between the connecting channel and the submarine data cabin is removed, and the hatch and the airtight door are locked by the remote control equipment; the inner connection and the outer connection are connected by detachable bolts, and the bolts, nuts, and gaskets of the outer connection are made of materials with high corrosion resistance, and the outer connection is protected against corrosion by the cathodic protection method of sacrificial anodes;
[0037] S2, salvage the seabed data cabin;
[0038] Determine that the salvage crane is in good condition, use multiple steel cables to evenly distribute and fix the seabed data cabin, and stably connect it to the crane hook of the salvage crane, then start the crane, slowly lift the seabed data cabin, use a video monitoring system to monitor the lifting process, lift the salvage crane onto the transport ship, and unload it after arriving at the predetermined unloading location;
[0039] S3, maintenance and repair;
[0040] After the submarine data cabin is transported to the designated factory, the extent of structural damage is determined based on the corrosion, cracks, and wear of the submarine data cabin. For the submarine data cabin that has a minor structural damage and can continue to be used, a corresponding repair plan is formulated for different defect types, the submarine data cabin is repaired, and the repair process is recorded and archived; for the submarine data cabin that has a major structural damage and cannot continue to be used, the submarine data cabin is recycled, the server in the submarine data cabin is transferred to a new submarine data cabin, and the recycling and transfer process is recorded and archived;
[0041] When the structural damage is intact without cracks or corrosion, use high-pressure cleaning to remove surface dirt, sediment and biological attachments; when the structure is corroded, repair the damaged coating area, first remove the old coating, apply a new anti-corrosion coating, and use sacrificial anode cathodic protection on the corroded metal surface to prevent corrosion; when the structure is cracked or worn, use higher strength materials to repair and ensure the sealing and firmness of the junction between the new and old materials;
[0042] S4. Return to the data center for installation;
[0043] The repaired or newly transferred submarine data cabin is transported back to the submarine data center and positioned at the original position of the submarine data cabin. The connecting channel is reconnected with the submarine data cabin through the rubber water stop. After the outer connection is reinstalled, the drainage channel and the air pressure balance channel are opened to drain the seawater in the connecting channel. Then the inner connection is reinstalled, and the connecting channel is dried to reduce the relative humidity to no more than 40%.
[0044] In summary, the corridor-cabin connection and design method of the corridor-type submarine data center of the present invention has the characteristics of strong airtightness, detachability and maintainability in the field of underwater data center construction.
[0045] It should be understood that the above-mentioned embodiments are one or more embodiments of the present invention, and there are many other embodiments and variations thereof based on the present invention; the variations and modifications made by ordinary technicians in this industry through the present invention without making pioneering innovations all fall within the scope of protection of the present invention.
Claims
1. A corridor-cabin connection method for a pipe gallery-type submarine data center, comprising an underwater suspended pipe gallery and a submarine data cabin, characterized in that: The underwater suspended pipe gallery is provided with a closed door on the side, and a connecting channel is extended from the closed door. The connecting channel and the underwater suspended pipe gallery are an integral whole, and a drainage channel and an air pressure balance channel are provided to connect with the underwater suspended pipe gallery. The connecting channel is connected to the seabed data cabin through a rubber waterstop. The seabed data cabin is provided with a hatch at the connection, and a sealing ring, a hatch handle and a rotary locking mechanism are provided at the edge of the hatch; the hatch is also provided with a pressure balance valve; a humidity sensor is provided in the connecting channel.
2. The corridor-cabin connection method of the pipe gallery type submarine data center according to claim 1 is characterized in that: The enclosed door is a pressure-resistant watertight door, which satisfies the requirement of preventing water from seeping into the interior of the underwater suspended pipe gallery in a seawater environment within a depth of 50 m.
3. The corridor-cabin connection method of the pipe gallery type submarine data center according to claim 1 is characterized in that: The rubber waterstop is a GINA waterstop, which is connected to the submarine data cabin by hydraulic crimping. The GINA waterstop uses an OMEGA waterstop on the inner side of the connecting channel as a second waterproof measure.
4. The corridor-cabin connection method of the pipe gallery type submarine data center according to claim 1 is characterized in that: The hatch door is a double-layer door panel structure, divided into an inner and outer layer, the outer door panel is on the outside of the submarine data cabin, and the inner door panel is on the inside of the submarine data cabin. The inner and outer door panels are both provided with a main sealing ring and an auxiliary sealing ring, and the auxiliary sealing ring is arranged on the inner side of the main sealing ring. The hatch door activates the rotary locking mechanism by rotating the hatch door handle to press the hatch door tightly against the door frame, thereby squeezing and deforming the main sealing ring and the auxiliary sealing ring.
5. The corridor-cabin connection method of the pipe gallery type submarine data center according to claim 1 is characterized in that: When the pressure difference between the inside and outside of the door exceeds a threshold value ΔP, the pressure balancing valve will sound an alarm when the door handle is rotated, and the threshold value ΔP is 0.05 MPa.
6. The corridor-cabin connection method of the pipe gallery type submarine data center according to claim 1 is characterized in that: When the relative humidity of the connecting passage exceeds a threshold value M1, the humidity sensor will sound an alarm when the door handle is rotated, and the threshold value M1 is 60%.
7. A corridor-cabin connection design method for a pipe gallery-type submarine data center, including non-seismic design, seismic design and maintenance and repair design under seawater pressure, characterized in that: The maintenance and overhaul design includes, in addition to normal internal maintenance and overhaul, external structural maintenance and overhaul after the seabed data cabin is salvaged, specifically including the following steps: S1, preparation stage; The preparation stage includes, after reaching the predetermined service life T, locating the position of the seabed data cabin by means of a salvage crane ship, confirming that the remote hatch door locking and the sealed door locking functions of the remote control device are normal, dispatching salvage personnel to close the hatch door, and after checking the air tightness of the seabed data cabin, removing the inner connection between the connecting channel and the seabed data cabin, and then closing the sealed door, after checking the air tightness of the connecting channel to ensure that the sealed door is effective, removing the outer connection between the connecting channel and the seabed data cabin, and locking the hatch door and the sealed door by means of the remote control device; S2, salvage the seabed data cabin; The salvaging of the seabed data capsule includes determining that the salvage crane vessel is in good condition, using multiple steel cables to evenly distribute and fix the seabed data capsule, and stably connecting the seabed data capsule with the crane hook of the salvage crane vessel, then starting the crane, slowly lifting the seabed data capsule, using a video monitoring system to monitor the lifting process, lifting the salvage crane vessel onto the transport vessel, and unloading after arriving at a predetermined unloading location; S3, maintenance and repair; The maintenance and overhaul includes transporting the submarine data cabin to a designated factory, determining the extent of structural damage according to the corrosion, cracks, and wear of the submarine data cabin, formulating corresponding repair plans for different defect types for submarine data cabins that are not severely damaged and can continue to be used, repairing the submarine data cabin, and keeping records of the repair process; recycling the submarine data cabin that is severely damaged and cannot continue to be used, transferring the servers in the submarine data cabin to a new submarine data cabin, and keeping records of the recycling and transfer process; S4. Return to the data center for installation; The return to the data center for installation includes transporting the repaired or newly transferred submarine data cabin back to the submarine data center, locating it to the original position of the submarine data cabin, reconnecting the connection channel with the submarine data cabin through the rubber waterstop, opening the drainage channel and the air pressure balance channel to drain the seawater in the connection channel after the outer connection is reinstalled, and then reinstalling the inner connection, drying the connection channel to reduce the relative humidity to no more than the threshold value M2.
8. The corridor-cabin connection design method of the pipe gallery type submarine data center according to claim 2 is characterized in that: In step S1, the inner connection and the outer connection are connected by detachable bolts, the bolts, nuts and gaskets of the outer connection are made of materials with high corrosion resistance and the cathodic protection method of sacrificial anode is used to protect the outer connection from corrosion.
9. The corridor-cabin connection design method of the pipe gallery type submarine data center according to claim 2 is characterized in that: In step S4, the threshold M2 is 40%.
Citation Information
Cited By
Data center cluster design and construction method of barrel type foundation
CN119981144A
A method for designing and constructing a data center cluster of barrel foundations
CN119981144B
Submarine data center and construction method thereof
CN121593614A