Prefabricating mold and prefabricating method for elevator shaft and sump
Through prefabricated molds and prefabricated methods, the construction process of elevator shafts and water collection pits is simplified, the problem of high construction difficulty is solved, and efficient and low-cost construction results are achieved.
Patent Information
- Application Number
- CN202411419734.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-12-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of elevator shafts and water collection pits, the positioning and construction are difficult, resulting in challenges in project safety, efficiency and quality.
Prefabricated molds and corresponding prefabricated methods are adopted, including rectangular frame-shaped prefabricated formwork and support frames, and prefabricated parts are formed by assembling and pouring concrete, and lifting them into the foundation pit by tower cranes or cranes, simplifying the construction process.
It improves construction efficiency, shortens construction period, ensures project quality, and saves labor costs.
Smart Images

Figure CN119188970A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of elevator shaft and sump construction technology, and in particular to an elevator shaft and sump prefabrication mold and a prefabrication method. Background Art
[0002] With the vigorous development of my country's construction industry, construction projects with abundant groundwater face many difficulties in the construction of elevator shafts and sumps, such as high difficulty in positioning and construction, which poses severe challenges to the safety, efficiency and quality of the projects.
[0003] How to improve the construction efficiency of elevator shafts, sumps and other structures and ensure project safety and quality has become the key and difficulty faced by this industry during its development. Summary of the invention
[0004] In order to improve the construction efficiency of elevator shafts, sump pits and the like and ensure the safety and quality of the project, the present invention provides a prefabricated mold and a prefabrication method for an elevator shaft and a sump pit.
[0005] In the first aspect, the present invention provides a prefabricated mold for an elevator shaft and a sump, which adopts the following technical solution: A prefabricated mold for an elevator shaft and a sump, comprising a prefabricated template and a support frame. The prefabricated template comprises an outer mold and an inner mold in the shape of a rectangular frame. The inner mold is located inside the outer mold, and the height of the inner mold is less than that of the outer mold. A lower bottom mold is fixedly connected to the bottom of the outer mold, and an upper bottom mold is fixedly connected to the bottom of the inner mold. The support frame is rigidly supported inside the inner mold.
[0006] By adopting the above technical solution, the use of the mold is simple, easy to operate, and low in cost. It can guarantee the quality of the elevator shaft and the sump to a great extent, greatly improve the construction efficiency and shorten the construction period, and save labor.
[0007] Optionally, the support frame adopts a structure of steel pipes and fasteners.
[0008] Optionally, the supporting frame is in the shape of a full-height scaffolding.
[0009] In a second aspect, the present invention provides a method for prefabricating an elevator shaft and a sump, which adopts the following technical solution: A method for prefabricating an elevator shaft and a sump, comprising the following steps: S1. Prepare prefabricated formwork, crane or tower crane and auxiliary materials according to the construction drawings; S2. Assemble prefabricated formwork according to construction drawings; S3. The support frame is erected according to the size of the prefabricated formwork and the specification requirements; S4. Tie up the steel bars and lifting rings according to the construction drawings; S5, pouring concrete to form a precast part; S6. Use a tower crane or crane to lift the prefabricated parts together with the prefabricated formwork into the foundation pit.
[0010] In summary, the present invention includes at least one of the following beneficial technical effects: 1. Simple, easy to operate and low cost; 2. The quality of elevator shafts and sump can be guaranteed to a great extent; 3. Greatly improve construction efficiency, shorten construction period, and save labor. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a three-dimensional diagram of the elevator shaft and sump prefabricated mold according to an embodiment of the present invention.
[0012] Figure 2 This is a cross-sectional view of the elevator shaft and sump prefabricated mold according to an embodiment of the present invention. Figure 1 .
[0013] Figure 3 This is a cross-sectional view of the elevator shaft and sump prefabricated mold according to an embodiment of the present invention. Figure 2 .
[0014] Figure 4 It is a flow chart of the elevator shaft and sump prefabrication method according to an embodiment of the present invention.
[0015] Explanation of the accompanying reference numerals: 1. Prefabricated template; 10. External mold; 11. Internal mold; 12. Lower bottom mold; 13. Upper bottom mold; 2. Support frame; 3. Prefabricated part; 4. Lifting ring. DETAILED DESCRIPTION
[0016] The following is combined with Figure 1 -Attached Figure 4 The present invention is described in further detail.
[0017] The embodiment of the present invention discloses an elevator shaft, a sump prefabrication mold and a prefabrication method. Figure 1-Figure 3 The prefabricated mold for the elevator shaft and the sump includes a prefabricated template 1 and a supporting frame 2. After the concrete solidifies, a prefabricated part 3 is formed. During the steel bar binding stage, a lifting ring 4 is installed on the prefabricated part 3 so that the prefabricated part 3 and the prefabricated template 1 can be lifted into the foundation pit together through the lifting ring 4 later.
[0018] Reference Figure 1-Figure 3The prefabricated template 1 includes an outer template 10, an inner template 11, a lower bottom template 12 and an upper bottom template 13. The outer template 10 is assembled into a rectangular frame shape by four templates, and the templates can be fixed by anchors; the inner template 11 is located inside the outer template 10, and the inner template 11 is assembled into a rectangular frame shape by four templates, and the templates can be fixed by anchors, and the template height of the inner template 11 is less than the template height of the outer template 10; the lower bottom template 12 is located below the outer template 10 and is fixed to the outer template 10 by anchors; the upper bottom template 13 is located below the inner template 11 and is fixed to the inner template 11 by anchors.
[0019] Reference Figure 1-Figure 3 The support frame 2 is supported inside the inner mold 11. The support frame 2 is constructed by multiple steel pipes with fasteners. The support frame 2 is in the form of a full-floor scaffolding to prevent the inner mold 11 from deforming during concrete pouring and molding.
[0020] The elevator shaft and sump prefabrication method of the embodiment of the present invention comprises the following steps: S1. Prepare prefabricated formwork 1, crane or tower crane and auxiliary materials according to the construction drawings; S2, assembling prefabricated formwork 1 according to the construction drawings; S3, the support frame 2 is erected according to the size and specification requirements of the prefabricated template 1; S4. Tie up the steel bars and lifting rings according to the construction drawings 4; S5, pouring concrete to form prefabricated part 3; S6. Use a tower crane or a crane to hoist the prefabricated component 3 together with the prefabricated formwork 1 into the foundation pit.
[0021] The elevator shaft and sump prefabricated mold and prefabrication method of the embodiment of the present invention are simple, easy to operate, and low in cost. They can ensure the quality of the elevator shaft and sump to a great extent, greatly improve construction efficiency and shorten construction period, and save labor.
[0022] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated mold for an elevator shaft and a sump, characterized in that: The invention comprises a prefabricated template (1) and a support frame (2); the prefabricated template (1) comprises an outer mold (10) and an inner mold (11) in the shape of a rectangular frame; the inner mold (11) is located inside the outer mold (10); the inner mold (11) is smaller in height than the outer mold (10); a lower bottom mold (12) is fixedly connected to the bottom of the outer mold (10); an upper bottom mold (13) is fixedly connected to the bottom of the inner mold (11); and the support frame (2) is rigidly supported inside the inner mold (11).
2. The elevator shaft and sump prefabricated mold according to claim 1 is characterized in that: The support frame (2) adopts a structural form of steel pipes and fasteners.
3. The elevator shaft and sump prefabricated mold according to claim 2 is characterized in that: The supporting frame (2) is in the shape of a full-length scaffolding.
4. A method for prefabricating an elevator shaft or a sump using a prefabricated mold according to any one of claims 1 to 3, characterized in that: The following steps are involved: S1. Prepare prefabricated formwork (1), crane or tower crane and auxiliary materials according to the construction drawings; S2, assembling prefabricated formwork (1) according to the construction drawings; S3, the support frame (2) is erected according to the size and specification requirements of the prefabricated formwork (1); S4. Tie the steel bars and lifting rings according to the construction drawings (4); S5, pouring concrete to form a prefabricated part (3); S6. The prefabricated component (3) and the prefabricated formwork (1) are hoisted into the foundation pit using a tower crane or a crane.
Citation Information
Patent Citations
Special mould for prefabricated laminated elevator shaft
CN111805711A
Square PC well chamber prefabricated formwork and construction assembling and disassembling method
CN115476425A
Special mold for prefabricated laminated elevator shaft
CN212471900U
Suspension formwork construction device for water collecting well and elevator shaft
CN213204948U
A prefabricated box culvert steel formwork system
CN221021556U
Cited By
Fabricated formwork construction method suitable for unfavorable geology bottom plate well pit
CN120946105A