By introducing auxiliary installation and temperature control mechanisms into the intelligent construction monitoring device, using electric telescopic rods, drive motors, semiconductor refrigeration plates and bidirectional fans, the problems of equipment installation and self-heating are solved, and flexibility and cost are improved.

CN119299813AInactive Publication Date: 2025-01-10GUANGDONG AIRPORT MANAGEMENT GRP CO LTD ENG CONSTR HEADQUARTERS +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411169799.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-25
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing intelligent construction monitoring device cannot take into account on-site monitoring, portable equipment installation and self-heating functions during monitoring. It is low in use and high in cost, making it difficult to meet the normal use needs.

Method used

A monitoring device based on BIM intelligent construction was designed, including an auxiliary installation mechanism, a monitoring mechanism and an auxiliary temperature control mechanism. It uses an electric telescopic rod and a driving motor for installation and adjustment, and uses a semiconductor refrigeration plate and a two-way fan to achieve self-heat dissipation of the equipment. Power self-sufficiency is achieved through solar panels and inverters.

Benefits of technology

It improves the flexibility and portability of the equipment, extends the service life, reduces power consumption and costs, and achieves the overall effect of taking into account on-site monitoring, portable equipment installation and self-heating functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119299813A_ABST
    Figure CN119299813A_ABST
Patent Text Reader

Abstract

The invention discloses a monitoring device for BIM-based intelligent construction and a use method thereof, and relates to the technical field of construction equipment.The monitoring device comprises a mounting frame and further comprises an auxiliary mounting mechanism, and the auxiliary mounting mechanism is mounted on one side of the mounting frame. The power storage bin is used for solar light resource storage processing, power resource consumption of equipment is reduced, a second positioning bolt is used for installing a second monitoring camera and a monitoring equipment installation frame, and real-time monitoring processing is conducted on the visual angle of the bottom of the monitoring equipment installation frame. The sealing outer covers on the two sides of the monitoring equipment mounting frame are matched with the mounting disc to be connected with the top connecting plate, so that the equipment mounting space is saved, and the portable effect in actual use is improved; the device is provided with the temperature control mechanism, integrates the functions of on-site monitoring, portable installation of the device and self-heat dissipation of the device during monitoring, improves the overall use flexibility, and facilitates manual remote management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction equipment, and in particular to a monitoring device for BIM-based intelligent construction and a method for using the same. Background Art

[0002] Intelligent construction refers to making full use of intelligent technology and related technologies in the construction process, improving the intelligence level of the construction process through the application of intelligent systems, reducing dependence on people, achieving the purpose of safe construction, and improving the cost-effectiveness and reliability of buildings. Other scholars have also defined it as "using advanced technologies such as building information models and the Internet of Things as means to meet the functional needs of engineering projects and the individual needs of different users, building a smart environment for project construction and operation, and implementing effective improvement and management of all processes in the entire life cycle of engineering projects through technological and management innovations. A management concept and model". In the field of intelligent construction, monitoring devices are needed for real-time monitoring and processing during the construction process.

[0003] Chinese patent announcement number CN 217116224 U discloses a monitoring device based on the field of BIM intelligent construction, which relates to the technical field of construction. The utility model includes a monitoring box and a mounting frame, the inner side wall of the mounting frame is rotatably connected to the monitoring box through an adjustment mechanism, the upper surface of the mounting frame is fixedly connected to a mounting plate through a clamping mechanism, a slot is provided on the lower surface of the mounting plate, the insertion rod is inserted into the slot and slidably connected to it, the insertion rod is inserted into the slot and slidably connected to it, the side wall of the insertion rod inserted into the slot is provided with a mounting slot, a wedge block is slidably connected in the mounting slot, the wedge block is inserted into the slot and slidably connected to it, a compression spring is arranged in the mounting slot, and the two ends of the compression spring are respectively connected to the side wall of the wedge block and the inner side wall of the mounting slot. The utility model solves the problem that most of the existing monitoring devices are fixedly installed during monitoring, and may have internal faults after long-term use, and need to be disassembled, which is not convenient for quick disassembly and maintenance.

[0004] However, the above scheme still has the following problems: it is unable to take into account on-site monitoring, portable equipment installation, and the self-heating function of the equipment during monitoring; the overall flexibility of use is low, it is inconvenient for manual remote management, and it cannot meet the needs of normal use; at the same time, it occupies a large amount of equipment for auxiliary use, and the overall use cost cannot be effectively controlled. Therefore, the present invention needs to design a monitoring device based on BIM intelligent construction and its use method to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a monitoring device based on BIM intelligent construction and a method of using the same to solve the problems raised in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a monitoring device for BIM-based intelligent construction, comprising an installation frame, and further comprising: An auxiliary installation mechanism, which is installed on one side of the installation frame and is used to assist the installation frame in installation; A monitoring mechanism, the monitoring mechanism is installed on the other side of the installation frame, a mounting plate is installed on the other side of the installation frame, one side of the mounting plate is fixedly connected to two connecting side plates, one end of each connecting side plate is fixedly connected to a sealing outer cover, a monitoring device mounting frame is fixedly connected between the two sealing outer covers, a driving motor is fixedly connected to the inside of the monitoring device mounting frame, a first monitoring camera is fixedly connected to the output end of the driving motor, and a lighting lamp is installed on one side of the first monitoring camera; An auxiliary temperature control mechanism, the auxiliary temperature control mechanism is installed inside the installation frame, the second support plate and the first support plate are installed inside the installation frame, a connecting transverse plate is fixedly connected between the first support plate and the second support plate, and one side of the connecting transverse plate is fixedly connected to the installation plate; An installation box is installed inside the installation frame and is located on one side of the second support plate. A fixing plate is fixedly connected inside the installation box. A semiconductor refrigeration plate is fixedly connected inside the fixing plate. A semiconductor refrigeration plate is fixedly connected to one side of the semiconductor refrigeration plate. A semiconductor heating end is fixedly connected to the other side of the semiconductor refrigeration plate. A first fan mounting bracket is fixedly connected to one side of the installation box. A first bidirectional fan is fixedly connected to the inside of the first fan mounting bracket.

[0007] As a preferred embodiment of the present invention, the interior of the sealed outer cover is provided with equidistantly distributed heat dissipation holes, the top of the mounting plate is fixedly connected to a top connecting plate, one side of the top connecting plate is fixedly connected to a power storage bin, an inverter is installed inside the power storage bin, a solar panel is fixedly connected to the top of the power storage bin, the interior of the monitoring equipment mounting frame is provided with a mounting cavity for matching use, a buzzer is fixedly connected inside the mounting cavity and above the lighting lamp, a battery is fixedly connected inside the monitoring equipment mounting frame and on one side of the first monitoring camera, a battery is fixedly connected inside the monitoring equipment mounting frame and on a side of the lighting lamp away from the first monitoring camera, an indicator light is fixedly connected to the outside of the battery, a mounting groove is provided at the bottom of the monitoring equipment mounting frame, a mounting base plate is installed inside the mounting groove, a second monitoring camera is fixedly connected to the outside of the mounting base plate, and second positioning bolts extending to the interior of the monitoring equipment mounting frame are threadedly connected to the outside of the mounting base plate and around the second monitoring camera.

[0008] As a preferred embodiment of the present invention, the first fan mounting bracket is internally and located on all sides of the first two-way fan and is threadedly connected with a first positioning bolt extending to the interior of the semiconductor refrigeration end; the second fan mounting bracket is fixedly connected to the other side of the mounting box; the second fan mounting bracket is fixedly connected to the interior of the second two-way fan; the second fan mounting bracket is internally and located on all sides of the second two-way fan and is threadedly connected with a first positioning bolt extending to the interior of the semiconductor heating end; the outer side of the semiconductor heating end is fixedly connected with equidistantly distributed heat dissipating fins; the outer side of the semiconductor refrigeration end is fixedly connected with equidistantly distributed metal conductive sheets; a backup battery is provided inside the mounting frame and on one side of the mounting box; a gas quality sensor is fixedly connected to the side of the second support plate close to the mounting box; and a temperature sensor is fixedly connected to the side of the first support plate close to the backup battery.

[0009] As a preferred embodiment of the present invention, a protective outer frame is fixedly connected to one side of the installation frame close to the monitoring equipment mounting frame, an installation inner frame is fixedly connected to the interior of the protective outer frame, light-emitting lamps are fixedly connected to the interior of the protective outer frame and on both sides of the installation inner frame, and the installation inner frame and the protective outer frame are used to seal and install one side of the installation frame.

[0010] As a preferred embodiment of the present invention, a collection box is installed at the bottom of the installation frame, and the collection box is located below the monitoring equipment mounting frame. A ventilation channel is installed on the top of the installation frame, and a sealing cover is installed on the top of the ventilation channel. A placement box is fixedly connected to one side of the collection box, and a collection cavity is provided inside the collection box. A limiting groove is provided on one side of the collection box adjacent to the placement box.

[0011] As a preferred embodiment of the present invention, the auxiliary installation mechanism includes a connecting frame and a rotating frame, wherein the side of the installation frame away from the monitoring equipment mounting frame is fixedly connected to the connecting frame, the side of the connecting frame away from the installation frame is fixedly connected to the supporting vertical plate, the side of the supporting vertical plate away from the connecting frame is fixedly connected to two symmetrically distributed limit baffles, the inner part of the limit baffle is rotatably connected to a rotating roller, the rotating frame is installed on the outer side of the rotating roller and between the two limit baffles, and a limiting shaft is installed between the two limit baffles and above the rotating frame.

[0012] As a preferred embodiment of the present invention, two mounting clamps are fixedly connected to one side of the supporting vertical plate, and a fastening plate is fixedly connected to the two sides of the mounting clamps away from each other. A clamping groove for cooperating with a rotating roller is provided on the side of the mounting clamps away from the supporting vertical plate, and an electric telescopic rod is installed on the side of the rotating roller away from the clamping groove, and a connecting shaft is fixedly connected to the output end of the electric telescopic rod.

[0013] As a preferred embodiment of the present invention, a wireless signal transceiver is fixedly connected to the top of the installation frame and on one side of the ventilation channel, a main control board is fixedly connected to the inside of the wireless signal transceiver, a control chip is fixedly connected to the outside of the main control board, and the first monitoring camera, lighting, solar panel, power storage compartment, electric telescopic rod, semiconductor refrigeration sheet, semiconductor refrigeration end, semiconductor heating end, first two-way fan, second two-way fan, battery, indicator light, second monitoring camera, buzzer, temperature sensor, gas quality sensor, backup battery, light tube and wireless signal transceiver are all electrically connected to the control chip.

[0014] As a preferred embodiment of the present invention, a BIM intelligent construction management module is installed inside the control chip, and the BIM intelligent construction management module includes a BIM intelligent construction site monitoring unit, a sensor control unit and a temperature control unit. The BIM intelligent construction site monitoring unit, the sensor control unit and the temperature control unit are all communicatively connected to the control chip.

[0015] A method for using a monitoring device for BIM-based intelligent construction includes the following specific steps: S1. During installation, the auxiliary installation mechanism is inserted into the building installation wall through two rotating frames, and the electric telescopic rod is operated, and the output end of the electric telescopic rod drives the connecting shaft to move to one side until the connecting shaft is also inserted into the wall for double positioning. During installation, the rotating frame can be manually turned to adjust the installation angle of the overall equipment, and the rotating roller after adjustment is limited and installed by installing the card plate and the fastening plate, and the two sides of the rotating frame are limited by the limit baffle. The first monitoring camera is driven to rotate by the output end of the driving motor to expand the monitoring range during use, and the inner frame and the protective outer frame are installed to seal and install one side of the installation frame, and the outer side is illuminated by the light-emitting lamp during use. The residue on the surface of the overall equipment is recycled through the collection box and the collection cavity, and the limit groove is used for later cleaning. The second positioning bolt is used to install the second monitoring camera and the monitoring equipment mounting frame, and the bottom viewing angle of the monitoring equipment mounting frame is monitored in real time. The inside of the sealed outer cover is provided with a heat dissipation through-hole to assist in the heat dissipation of the inside of the monitoring equipment mounting frame, and the buzzer is used to warn the inside of the monitoring equipment mounting frame; S2. During normal operation, the first two-way fan runs to blow air and assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan and the semiconductor refrigeration plate both run to cool the semiconductor refrigeration end. The first two-way fan blows air to accelerate the heat dissipation of the monitoring mechanism. The first two-way fan and the semiconductor heating end are limitedly installed by the first positioning bolt, and the first fan mounting frame and the semiconductor refrigeration end are limitedly installed by the first positioning bolt. In conjunction with subsequent disassembly and maintenance, the semiconductor refrigeration plate will generate heat simultaneously during operation, and the heat is discharged through the semiconductor heating end and the heat dissipation fins. The sealing cover is opened, and the second two-way fan is operated to discharge the hot gas from the inside of the installation frame through the ventilation channel. The control chip controls the operation of the first monitoring camera, the lighting, the solar panel, the battery storage compartment, the electric telescopic rod, the semiconductor refrigeration plate, the semiconductor refrigeration end, the semiconductor heating end, the first two-way fan, the second two-way fan, the battery, the indicator light, the second monitoring camera, the buzzer, the temperature sensor, the gas quality sensor, the backup battery, the light-emitting lamp and the wireless signal transceiver.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention is provided with an auxiliary installation mechanism and a monitoring mechanism. When installing, the auxiliary installation mechanism is inserted into the building installation wall through two rotating frames, and the electric telescopic rod is operated, and the output end of the electric telescopic rod drives the connecting shaft to move to one side until the connecting shaft is also inserted into the wall, so as to perform double positioning. When installing, the overall equipment installation angle can be adjusted by manually turning the rotating frame, thereby improving the overall flexibility of use. The storage battery provides the power resources required for the operation of the monitoring mechanism, the solar panel is used for recycling and utilizing solar light resources, the inverter is used for converting and processing solar light resources, and the storage bin is used for storing and processing solar light resources, thereby achieving self-sufficiency of power resources, saving power resource consumption of the equipment, and facilitating effective control of costs. The second positioning bolt is used to install the second monitoring camera and the monitoring equipment mounting frame, and the bottom viewing angle of the monitoring equipment mounting frame is monitored in real time. A heat dissipation through-hole is opened inside the sealed outer cover to cooperate with the auxiliary heat dissipation inside the monitoring equipment mounting frame, and a buzzer is used to perform early warning processing on the inside of the monitoring equipment mounting frame. The sealed outer covers on both sides of the monitoring equipment mounting frame are connected with the mounting plate and the top connecting plate, thereby saving equipment installation space and improving the portability effect during actual use. 2. The present invention is provided with a temperature control mechanism. During normal operation, the first two-way fan runs to perform air blowing treatment to assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan and the semiconductor refrigeration plate both run to perform cooling treatment through the semiconductor refrigeration end. The first two-way fan performs air blowing treatment to accelerate heat dissipation of the monitoring mechanism, thereby extending the service life of the equipment. The first two-way fan and the semiconductor heating end are limitedly installed through the first positioning bolt, and the first fan mounting frame and the semiconductor refrigeration end are limitedly installed through the first positioning bolt. In conjunction with subsequent disassembly and maintenance, on-site monitoring, portable equipment installation, and self-heating function of the equipment during monitoring are achieved, thereby improving the overall flexibility of use and facilitating manual remote management. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention from a first viewing angle; Figure 2 A second perspective schematic diagram of the overall structure of the present invention; Figure 3 A third perspective schematic diagram of the overall structure of the present invention; Figure 4 A schematic diagram of the installation frame structure of the present invention from a first viewing angle; Figure 5 A second viewing angle schematic diagram of the installation frame structure of the present invention; Figure 6 A schematic diagram of the installation frame structure of the present invention from a third viewing angle; Figure 7 A schematic diagram of the monitoring mechanism of the present invention from a first viewing angle; Figure 8 A second viewing angle schematic diagram of the monitoring mechanism of the present invention; Fig. 9 A third perspective schematic diagram of the monitoring mechanism of the present invention; Fig.10 It is a schematic diagram of the auxiliary installation mechanism of the present invention from a first viewing angle; Fig.11 A schematic diagram of the auxiliary installation mechanism of the present invention from a second viewing angle; Fig.12 It is a schematic diagram of the auxiliary temperature control mechanism of the present invention from a first viewing angle; Fig.13 This is a schematic diagram of the auxiliary temperature control mechanism of the present invention from a second viewing angle.

[0018] In the figure: 1. Installation frame; 2. Collection box; 3. Placement box; 4. Monitoring equipment mounting frame; 41. Sealed outer cover; 42. Connecting side plate; 43. Mounting plate; 44. Top connecting plate; 45. First monitoring camera; 46. Lighting lamp; 47. Solar panel; 48. Power storage compartment; 49. Mounting cavity; 5. Connecting frame; 51. Supporting vertical plate; 52. Limiting baffle; 53. Rotating frame; 54. Electric telescopic rod; 55. Mounting card; 56. Fastening plate; 57. Rotating roller; 58. Limiting shaft; 59. Connecting shaft; 6. Installation box; 61. Fixing plate; 62. Semiconductor cooling sheet; 63. Semiconductor cooling end; 64. Semiconductor heating end; 65. First fan mounting frame; 66. First bidirectional fan; 67. Second fan mounting frame; 68. Second bidirectional fan; 69. First positioning bolt; 7. Battery; 8. Indicator light; 9. Mounting slot; 10. Mounting base plate; 11. Second monitoring camera; 12. Second positioning bolt; 13. Buzzer; 14. Heat dissipation through hole; 15. Metal conductive sheet; 16. Heat dissipation fin; 17. First support plate; 18. Temperature sensor; 19. Connecting cross plate; 20. Second support plate; 21. Gas quality sensor; 22. Collecting chamber; 23. Limiting slot; 24. Backup battery; 25. Mounting inner frame; 26. Protective outer frame; 27. Light-emitting lamp tube; 28. Ventilation channel; 29. ​​Sealing cover; 30. Wireless signal transceiver. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] See also Figure 1-Figure 13 The present invention provides a technical solution: a monitoring device for BIM-based intelligent construction, including an installation frame 1, and also including: An auxiliary installation mechanism, which is installed on one side of the installation frame 1 and is used to assist the installation frame 1 in installation; Monitoring mechanism, the monitoring mechanism is installed on the other side of the installation frame 1, and a mounting plate 43 is installed on the other side of the installation frame 1. One side of the mounting plate 43 is fixedly connected to two connecting side plates 42, and one end of the connecting side plates 42 is fixedly connected to a sealing cover 41, and a monitoring device mounting frame 4 is fixedly connected between the two sealing covers 41. The interior of the monitoring device mounting frame 4 is fixedly connected to a driving motor, and the output end of the driving motor is fixedly connected to a first monitoring camera 45, and a lighting lamp 46 is installed on one side of the first monitoring camera 45; Auxiliary temperature control mechanism, the auxiliary temperature control mechanism is installed inside the installation frame 1, the second support plate 20 and the first support plate 17 are installed inside the installation frame 1, a connecting transverse plate 19 is fixedly connected between the first support plate 17 and the second support plate 20, and one side of the connecting transverse plate 19 is fixedly connected to the installation plate 43; The installation box 6 is installed inside the installation frame 1 and is located on one side of the second support plate 20. A fixing plate 61 is fixedly connected inside the installation box 6. A semiconductor refrigeration plate 62 is fixedly connected inside the fixing plate 61. A semiconductor refrigeration plate 62 is fixedly connected on one side of the semiconductor refrigeration plate 62. A semiconductor refrigeration end 63 is fixedly connected on one side of the semiconductor refrigeration plate 62. A semiconductor heating end 64 is fixedly connected on the other side of the semiconductor refrigeration plate 62. A first fan mounting bracket 65 is fixedly connected on one side of the installation box 6. A first bidirectional fan 66 is fixedly connected inside the first fan mounting bracket 65.

[0021] It can be understood that when the present invention is in use, the first monitoring camera 45 is driven to rotate by the output end of the driving motor to expand the monitoring range during use. During normal operation, the first two-way fan 66 is operated to blow air to assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan 66 and the semiconductor refrigeration plate 62 are both operated to perform cooling through the semiconductor refrigeration end 63, and the first two-way fan 66 is used to blow air to accelerate heat dissipation of the monitoring mechanism, thereby extending the service life of the equipment. Example

[0022] See also Figure 1-Figure 8 The present invention provides a technical solution: the inside of the sealed outer cover 41 is provided with heat dissipation holes 14 which are evenly distributed; the top of the mounting plate 43 is fixedly connected with a top connecting plate 44; one side of the top connecting plate 44 is fixedly connected with a power storage bin 48; an inverter is installed inside the power storage bin 48; a solar panel 47 is fixedly connected to the top of the power storage bin 48; a mounting cavity 49 for matching use is provided inside the monitoring device mounting frame 4; a buzzer 13 is fixedly connected inside the mounting cavity 49 and above the lighting lamp 46; the inside of the monitoring device mounting frame 4 and above the first monitoring camera A battery 7 is fixedly connected to one side of the head 45, and a battery 7 is fixedly connected to the inside of the monitoring device mounting frame 4 and on the side of the lighting 46 away from the first monitoring camera 45. An indicator light 8 is fixedly connected to the outside of the battery 7. A mounting groove 9 is provided at the bottom of the monitoring device mounting frame 4, and a mounting base plate 10 is installed inside the mounting groove 9. A second monitoring camera 11 is fixedly connected to the outside of the mounting base plate 10, and second positioning bolts 12 extending to the inside of the monitoring device mounting frame 4 are threadedly connected on the outside of the mounting base plate 10 and around the second monitoring camera 11.

[0023] It can be understood that the present invention uses the second positioning bolt 12 to install the second monitoring camera 11 and the monitoring equipment mounting frame 4, and performs real-time monitoring of the bottom viewing angle of the monitoring equipment mounting frame 4. The sealed outer cover 41 is provided with a heat dissipation through-hole 14 to cooperate with the auxiliary heat dissipation of the inside of the monitoring equipment mounting frame 4. The buzzer 13 is used to perform fill light processing on the inside of the monitoring equipment mounting frame 4. The battery 7 is used to provide the power resources required for the operation of the monitoring mechanism. The sealed outer covers 41 on both sides of the monitoring equipment mounting frame 4 are connected with the mounting plate 43 and the top connecting plate 44, which saves equipment installation space and improves the portability effect during actual use. The solar panel 47 is used for recycling and utilizing solar light resources, the inverter is used for converting and processing solar light resources, and the battery storage bin 48 is used for storing and processing solar light resources, thereby achieving self-sufficiency in power resources and saving power resource consumption of the equipment.

[0024] See also Figure 1-Figure 6 , Figure 12-13 The present invention provides a technical solution: the first fan mounting frame 65 is internally connected to the first two-way fan 66 and is located around the first positioning bolt 69 extending to the inside of the semiconductor refrigeration end 63, the second fan mounting frame 67 is fixedly connected to the other side of the installation box 6, the second two-way fan 68 is fixedly connected to the inside of the second fan mounting frame 67, the first positioning bolt 69 extending to the inside of the semiconductor heating end 64 is threadedly connected to the inside of the second fan mounting frame 67 and is located around the second two-way fan 68, the semiconductor heating end 64 is fixedly connected to the outside of the semiconductor heating end 64 with equidistantly distributed heat dissipation fins 16, the outside of the semiconductor refrigeration end 63 is fixedly connected to the metal conductive sheets 15, the inside of the installation frame 1 and located on one side of the installation box 6 is provided with a backup battery 24, the second support plate 20 is fixedly connected to the side of the installation box 6 with a gas quality sensor 21, and the first support plate 17 is fixedly connected to the side of the backup battery 24 with a temperature sensor 18.

[0025] It can be understood that the present invention uses the first positioning bolt 69 to limit the installation of the first two-way fan 66 and the semiconductor heating end 64, and uses the first positioning bolt 69 to limit the installation of the first fan mounting bracket 65 and the semiconductor refrigeration end 63. In conjunction with subsequent disassembly and maintenance, the semiconductor refrigeration plate 62 will simultaneously generate heat during operation, and the heat is discharged through the semiconductor heating end 64 and the heat dissipation fins 16. The sealing cover 29 is opened, and the second two-way fan 68 is operated to discharge the hot gas from the inside of the installation frame 1 through the ventilation channel 28, thereby achieving both cooling of the auxiliary installation mechanism and heat dissipation of the auxiliary temperature control mechanism, thereby extending the service life of the equipment.

[0026] See also Figure 1-Figure 6The present invention provides a technical solution: a protective outer frame 26 is fixedly connected to one side of the installation frame 1 close to the monitoring device installation frame 4, a mounting inner frame 25 is fixedly connected inside the protective outer frame 26, light-emitting lamps 27 are fixedly connected inside the protective outer frame 26 and on both sides of the mounting inner frame 25, a collecting box 2 is installed at the bottom of the installation frame 1, the collecting box 2 is located below the monitoring device installation frame 4, a ventilation channel 28 is installed at the top of the installation frame 1, a sealing cover 29 is installed at the top of the ventilation channel 28, a placement box 3 is fixedly connected to one side of the collecting box 2, a collecting cavity 22 is provided inside the collecting box 2, and a limiting groove 23 is provided on the side of the collecting box 2 adjacent to the placement box 3.

[0027] It can be understood that the present invention seals and installs one side of the installation frame 1 by installing the inner frame 25 and the protective outer frame 26, and performs external lighting treatment during use by the light-emitting lamp 27, thereby improving flexibility during use, recovering the residue on the surface of the entire equipment by the collection box 2 and the collection cavity 22, facilitating later cleaning by the limit groove 23, and facilitating the storage of equipment and items by the placement box 3, thereby improving the overall aesthetics during use.

[0028] See also Figure 1-Figure 3 , Figure 10-11 The present invention provides a technical solution: the auxiliary installation mechanism includes a connecting frame 5 and a rotating frame 53, the connecting frame 5 is fixedly connected to the side of the installation frame 1 away from the monitoring device mounting frame 4, the supporting vertical plate 5 is fixedly connected to the side of the connecting frame 5 away from the installation frame 1, and two symmetrically distributed limit baffles 52 are fixedly connected to the side of the supporting vertical plate 51 away from the connecting frame 5, and the internal rotation of the limit baffle 52 is connected to a rotating roller 57, and the rotating frame 53 is installed on the outer side of the rotating roller 57 and between the two limit baffles 52, and a limit shaft 58 is installed between the two limit baffles 52 and above the rotating frame 53, and two installation card plates 55 are fixedly connected to one side of the supporting vertical plate 51, and the two installation card plates 55 are fixedly connected to the side away from each other with a fastening plate 56, and the installation card plates 55 are provided with a card slot for matching the rotating roller 57 on the side away from the supporting vertical plate 51, and an electric telescopic rod 54 is installed on the side of the rotating roller 57 away from the card slot, and the output end of the electric telescopic rod 54 is fixedly connected with a connecting shaft 59.

[0029] It can be understood that the present invention inserts the auxiliary installation mechanism into the building installation wall through two rotating frames 53 during installation, operates the electric telescopic rod 54, and drives the connecting shaft 59 to move to one side through the output end of the electric telescopic rod 54 until the connecting shaft 59 is also inserted into the wall, thereby performing double positioning. During installation, the rotating frame 53 can be manually turned to adjust the installation angle of the entire equipment, thereby improving the overall flexibility of use. The adjusted rotating roller 57 is limitedly installed by installing the clamping plate 55 and the fastening plate 56, and the two sides of the rotating frame 53 are limited by the limiting baffle 52. The limiting shaft 58 is used to limit the maximum turning angle of the rotating frame 53.

[0030] See also Figure 1-Figure 13 The present invention provides a technical solution: a wireless signal transceiver 30 is fixedly connected to the top of the installation frame 1 and located on one side of the ventilation channel 28, a main control board is fixedly connected to the inside of the wireless signal transceiver 30, a control chip is fixedly connected to the outside of the main control board, a first monitoring camera 45, a lighting lamp 46, a solar panel 47, a power storage bin 48, an electric telescopic rod 54, a semiconductor refrigeration sheet 62, a semiconductor refrigeration end 63, a semiconductor heating end 64, a first two-way fan 66, a second two-way fan 68, a battery 7, an indicator light 8, a second monitoring camera 11, a buzzer 13, a temperature sensor 18, a gas quality sensor 21, a backup battery 24, a light tube 27 and a wireless signal transceiver 30 are all electrically connected to the control chip.

[0031] It can be understood that the present invention uses a control chip to control the operation of the first monitoring camera 45, the lighting lamp 46, the solar panel 47, the power storage bin 48, the electric telescopic rod 54, the semiconductor refrigeration plate 62, the semiconductor refrigeration end 63, the semiconductor heating end 64, the first two-way fan 66, the second two-way fan 68, the battery 7, the indicator light 8, the second monitoring camera 11, the buzzer 13, the temperature sensor 18, the gas quality sensor 21, the backup battery 24, the light tube 27 and the wireless signal transceiver 30, so as to facilitate the unified management of the equipment. The temperature sensor 18 and the gas quality sensor 21 measure the environmental parameters, convert them into signals and send them to the control chip, the control chip receives the signals and processes them, and generates corresponding control signals according to the preset control algorithm. Example

[0032] See also Figure 1-Figure 13 , the present invention provides a technical solution: a BIM intelligent construction management module is installed inside the control chip, the BIM intelligent construction management module includes a BIM intelligent construction site monitoring unit, a sensor control unit and a temperature control unit, and the BIM intelligent construction site monitoring unit, the sensor control unit and the temperature control unit are all communicatively connected with the control chip; The BIM intelligent construction site monitoring unit is used to control the operating data of the first monitoring camera 45 and the second monitoring camera 11 for remote supervision. By driving the motor, the output end of the driving motor drives the first monitoring camera 45 to rotate, thereby expanding the monitoring range during use. The second positioning bolt 12 installs the second monitoring camera 11 and the monitoring equipment mounting frame 4, and performs real-time monitoring and processing of the bottom viewing angle of the monitoring equipment mounting frame 4.

[0033] It can be understood that the present invention uses a sensor control unit to control the real-time monitoring data of the temperature sensor 18 and the gas quality sensor 21 devices; The temperature control unit is used to monitor the temperature change of the working site in real time through the temperature sensor 18. During normal operation, the first two-way fan 66 is operated to blow air and assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan 66 and the semiconductor refrigeration plate 62 are both operated to perform cooling through the semiconductor refrigeration end 63. The first two-way fan 66 performs blowing to accelerate the heat dissipation of the monitoring mechanism, thereby extending the service life of the equipment. The first two-way fan 66 and the semiconductor heating end 64 are limitedly installed through the first positioning bolt 69, and the first fan mounting frame 65 and the semiconductor refrigeration end 63 are limitedly installed through the first positioning bolt 69. In conjunction with subsequent disassembly and maintenance, the semiconductor refrigeration plate 62 will generate heat simultaneously during operation, and the heat is discharged through the semiconductor heating end 64 and the heat dissipation fins 16. The sealing cover 29 is opened, and the second two-way fan 68 is operated to discharge the hot gas from the inside of the installation frame 1 through the ventilation channel 28, thereby ensuring that the auxiliary installation mechanism is refrigerated while the auxiliary temperature control mechanism is also cooled, thereby extending the service life of the equipment. Example

[0034] See also Figure 1-Figure 13 The present invention provides a technical solution: a method for using a monitoring device for BIM intelligent construction, comprising the following specific steps: S1. During installation, the auxiliary installation mechanism is inserted into the building installation wall through the two rotating frames 53, and the electric telescopic rod 54 is operated. The connecting shaft 59 is driven to move to one side through the output end of the electric telescopic rod 54 until the connecting shaft 59 is also inserted into the wall for double positioning. During installation, the rotating frame 53 can be manually turned to adjust the installation angle of the entire equipment, thereby improving the overall flexibility of use. The rotating roller 57 after adjustment is limited by installing the card plate 55 and the fastening plate 56, and the two sides of the rotating frame 53 are limited by the limit baffle 52. The maximum angle of the rotating frame 53 is limited by the limit shaft 58. The first monitoring camera 45 is driven to rotate by the output end of the driving motor to expand the monitoring range during use. The inner frame 25 and the protective outer frame 26 are installed to seal one side of the installation frame 1. The light-emitting lamp 27 is used to illuminate the outside during use, thereby improving the flexibility during use. The surface residue of the entire equipment is collected by the collection box 2 and the collection cavity 22. Recycling is carried out, and the later cleaning is convenient through the limit groove 23. The storage box 3 is convenient for storing equipment and items, which improves the overall aesthetics during use. The battery 7 provides the power resources required for the operation of the monitoring mechanism. The solar panel 47 is used for recycling and utilization of solar light resources, the inverter is used for solar light resource conversion and processing, and the storage bin 48 is used for solar light resource storage and processing, which realizes self-sufficiency of power resources, facilitates effective cost control, and saves power resource consumption of the equipment. The second positioning bolt 12 is used to install the second monitoring camera 11 and the monitoring equipment mounting frame 4, and the bottom viewing angle of the monitoring equipment mounting frame 4 is monitored in real time. The inside of the sealed outer cover 41 is provided with a heat dissipation through-hole 14 to cooperate with the auxiliary heat dissipation of the inside of the monitoring equipment mounting frame 4. The buzzer 13 performs early warning processing on the inside of the monitoring equipment mounting frame 4. The sealed outer covers 41 on both sides of the monitoring equipment mounting frame 4 are connected with the mounting plate 43 and the top connecting plate 44, which saves equipment installation space and improves the portability effect during actual use; S2. During normal operation, the first two-way fan 66 operates to blow air and assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan 66 and the semiconductor refrigeration plate 62 both operate to perform cooling through the semiconductor refrigeration end 63. The first two-way fan 66 performs blowing to accelerate heat dissipation of the monitoring mechanism, thereby extending the service life of the equipment. The first two-way fan 66 and the semiconductor heating end 64 are limitedly installed through the first positioning bolt 69, and the first fan mounting frame 65 and the semiconductor refrigeration end 63 are limitedly installed through the first positioning bolt 69. In conjunction with subsequent disassembly and maintenance, the semiconductor refrigeration plate 62 generates heat simultaneously during operation, and the heat is discharged through the semiconductor heating end 64 and the heat dissipation fins 16. The sealing cover 29 is opened, and the second two-way fan 68 operates to dissipate the hot gas through the ventilation channel 28. The exhaust gas is discharged from the inside of the installation frame 1, which ensures that the auxiliary installation mechanism is cooled while the auxiliary temperature control mechanism is also cooled, thereby extending the service life of the equipment. The control chip controls the first monitoring camera 45, the lighting lamp 46, the solar panel 47, the power storage compartment 48, the electric telescopic rod 54, the semiconductor refrigeration sheet 62, the semiconductor refrigeration end 63, the semiconductor heating end 64, the first two-way fan 66, the second two-way fan 68, the battery 7, the indicator light 8, the second monitoring camera 11, the buzzer 13, the temperature sensor 18, the gas quality sensor 21, the backup battery 24, the light tube 27 and the wireless signal transceiver 30 to operate, which is convenient for unified management of the equipment, and realizes on-site monitoring, portable installation of equipment, and self-heating of the equipment during monitoring, thereby improving the overall flexibility of use and facilitating manual remote management.

[0035] Working principle of the present invention: During installation, the auxiliary installation mechanism is inserted into the building installation wall through the two rotating frames 53, and the electric telescopic rod 54 is operated, and the connecting shaft 59 is driven to move to one side through the output end of the electric telescopic rod 54 until the connecting shaft 59 is also inserted into the wall, and double positioning is performed. During installation, the rotating frame 53 can be manually turned to adjust the installation angle of the entire equipment, which improves the overall flexibility of use. The adjusted rotating roller 57 is limited and installed by installing the clamping plate 55 and the fastening plate 56, and the two sides of the rotating frame 53 are limited by the limiting baffle 52, and the maximum angle of the rotating frame 53 is limited by the limiting shaft 58; The driving motor is driven to rotate, and the output end of the driving motor is rotated to drive the first monitoring camera 45 to rotate, thereby expanding the monitoring range during use. The inner frame 25 and the protective outer frame 26 are installed to seal one side of the installation frame 1, and the light-emitting lamp 27 is used to illuminate the outer side during use, thereby improving the flexibility during use. The collection box 2 and the collection chamber 22 are used to recycle the residue on the surface of the entire device, the limiting groove 23 is used to facilitate later cleaning, and the placement box 3 is used to facilitate the storage of the device and items, thereby improving the overall aesthetics during use; The storage battery 7 provides the power resources required for the operation of the monitoring mechanism; The solar panel 47 is used for recycling solar energy, the inverter is used for converting solar energy, and the storage tank 48 is used for storing solar energy, which realizes the self-sufficiency of electric power, facilitates effective cost control, and saves the electric power consumption of the equipment. The second positioning bolt 12 is used to install the second monitoring camera 11 and the monitoring device mounting frame 4, and the bottom viewing angle of the monitoring device mounting frame 4 is monitored in real time. The inside of the sealed outer cover 41 is provided with a heat dissipation through hole 14 to assist in heat dissipation inside the monitoring device mounting frame 4. The buzzer 13 performs early warning processing inside the monitoring device mounting frame 4. The sealed outer covers 41 on both sides of the monitoring device mounting frame 4 are connected with the mounting plate 43 and the top connecting plate 44, which saves equipment installation space and improves the portability effect during actual use. During normal operation, the first two-way fan 66 operates to blow air and assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan 66 and the semiconductor refrigeration sheet 62 both operate to perform cooling through the semiconductor refrigeration end 63. The first two-way fan 66 performs blowing to accelerate heat dissipation of the monitoring mechanism, thereby extending the service life of the equipment. The first two-way fan 66 and the semiconductor heating end 64 are limitedly installed through the first positioning bolt 69, and the first fan mounting frame 65 and the semiconductor refrigeration end 63 are limitedly installed through the first positioning bolt 69. In conjunction with subsequent disassembly and maintenance, the semiconductor refrigeration sheet 62 generates heat simultaneously during operation, and the heat is discharged through the semiconductor heating end 64 and the heat dissipation fins 16. The sealing cover 29 is opened, and the second two-way fan 68 is operated to discharge the hot gas from the inside of the installation frame 1 through the ventilation channel 28, thereby ensuring that the auxiliary installation mechanism is cooled while the auxiliary temperature control mechanism is also cooled, thereby extending the service life of the equipment. The control chip controls the operation of the first monitoring camera 45, the lighting lamp 46, the solar panel 47, the power storage compartment 48, the electric telescopic rod 54, the semiconductor refrigeration sheet 62, the semiconductor refrigeration end 63, the semiconductor heating end 64, the first two-way fan 66, the second two-way fan 68, the battery 7, the indicator light 8, the second monitoring camera 11, the buzzer 13, the temperature sensor 18, the gas quality sensor 21, the backup battery 24, the light tube 27 and the wireless signal transceiver 30, so as to facilitate the unified management of the equipment, realize the on-site monitoring, the portable installation of the equipment, and the self-heating function of the equipment during monitoring, improve the overall flexibility of use, and facilitate manual remote management.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A monitoring device for BIM-based intelligent construction, comprising a mounting frame (1), characterized in that: Also includes: An auxiliary installation mechanism, the auxiliary installation mechanism is installed on one side of the installation frame (1), and the auxiliary installation mechanism is used to assist the installation frame (1) in installation; A monitoring mechanism, the monitoring mechanism is installed on the other side of the installation frame (1), a mounting plate (43) is installed on the other side of the installation frame (1), one side of the mounting plate (43) is fixedly connected to two connecting side plates (42), one end of each connecting side plate (42) is fixedly connected to a sealing outer cover (41), a monitoring device mounting frame (4) is fixedly connected between the two sealing outer covers (41), a driving motor is fixedly connected inside the monitoring device mounting frame (4), an output end of the driving motor is fixedly connected to a first monitoring camera (45), and a lighting lamp (46) is installed on one side of the first monitoring camera (45); an auxiliary temperature control mechanism, the auxiliary temperature control mechanism being installed inside the installation frame (1), a second support plate (20) and a first support plate (17) being installed inside the installation frame (1), a connecting transverse plate (19) being fixedly connected between the first support plate (17) and the second support plate (20), and one side of the connecting transverse plate (19) being fixedly connected to the installation plate (43); An installation box (6), the installation box (6) is installed inside the installation frame (1) and is located on one side of the second support plate (20); a fixing plate (61) is fixedly connected inside the installation box (6); a semiconductor cooling plate (62) is fixedly connected inside the fixing plate (61); a semiconductor cooling end (63) is fixedly connected to one side of the semiconductor cooling plate (62); a semiconductor heating end (64) is fixedly connected to the other side of the semiconductor cooling plate (62); a first fan mounting frame (65) is fixedly connected to one side of the installation box (6); and a first bidirectional fan (66) is fixedly connected inside the first fan mounting frame (65).

2. The monitoring device for BIM-based intelligent construction according to claim 1, characterized in that: The sealed outer cover (41) is provided with heat dissipation holes (14) distributed at equal intervals inside, the top of the mounting plate (43) is fixedly connected to a top connecting plate (44), one side of the top connecting plate (44) is fixedly connected to a power storage bin (48), an inverter is installed inside the power storage bin (48), the top of the power storage bin (48) is fixedly connected to a solar panel (47), the monitoring device mounting frame (4) is provided with a mounting cavity (49) for use therewith, a buzzer (13) is fixedly connected inside the mounting cavity (49) and located above the lighting lamp (46), the monitoring device mounting frame (4) is provided with a mounting cavity (49) for use therewith, a buzzer (13) is fixedly connected inside the mounting cavity (49) and located above the lighting lamp (46), and the monitoring device mounting frame (4) is provided with a mounting cavity (49) and located above the first monitoring camera (45). A storage battery (7) is fixedly connected to the side of the monitoring device mounting frame (4), the storage battery (7) is fixedly connected to the inside of the monitoring device mounting frame (4) and located on the side of the lighting lamp (46) away from the first monitoring camera (45), and the outside of the storage battery (7) is fixedly connected to an indicator light (8), a mounting groove (9) is provided at the bottom of the monitoring device mounting frame (4), a mounting base plate (10) is installed inside the mounting groove (9), a second monitoring camera (11) is fixedly connected to the outside of the mounting base plate (10), and second positioning bolts (12) extending into the inside of the monitoring device mounting frame (4) are threadedly connected to the outside of the mounting base plate (10) and located around the second monitoring camera (11).

3. The monitoring device for BIM-based intelligent construction according to claim 2 is characterized in that: The first fan mounting frame (65) is threadedly connected inside and around the first two-way fan (66) with first positioning bolts (69) extending into the semiconductor cooling end (63); the second fan mounting frame (67) is fixedly connected to the other side of the mounting box (6); the second two-way fan (68) is fixedly connected inside the second fan mounting frame (67); the first positioning bolts (69) extending into the semiconductor heating end (64) are threadedly connected inside and around the second two-way fan (68); the semiconductor heating end (64) is fixedly connected with equidistantly distributed heat dissipation fins (16); the semiconductor cooling end (63) is fixedly connected with equidistantly distributed metal conductive sheets (15); the mounting frame (1) is provided with a backup battery (24) inside and on one side of the mounting box (6); the second support plate (20) is fixedly connected to a gas quality sensor (21) on a side close to the mounting box (6); and the first support plate (17) is fixedly connected to a temperature sensor (18) on a side close to the backup battery (24).

4. The monitoring device for BIM-based intelligent construction according to claim 3 is characterized in that: A protective outer frame (26) is fixedly connected to one side of the installation frame (1) close to the monitoring device installation frame (4); an installation inner frame (25) is fixedly connected to the interior of the protective outer frame (26); light-emitting lamps (27) are fixedly connected to the interior of the protective outer frame (26) and on both sides of the installation inner frame (25); the installation inner frame (25) and the protective outer frame (26) are used to seal and install one side of the installation frame (1).

5. The monitoring device for BIM-based intelligent construction according to claim 1, characterized in that: A collection box (2) is installed at the bottom of the installation frame (1), and the collection box (2) is located below the monitoring device installation frame (4). A ventilation channel (28) is installed at the top of the installation frame (1), and a sealing cover (29) is installed at the top of the ventilation channel (28). A placement box (3) is fixedly connected to one side of the collection box (2), a collection cavity (22) is provided inside the collection box (2), and a limiting groove (23) is provided on one side of the collection box (2) adjacent to the placement box (3).

6. The monitoring device for BIM-based intelligent construction according to claim 4, characterized in that: The auxiliary installation mechanism comprises a connecting frame (5) and a rotating frame (53); the connecting frame (5) is fixedly connected to a side of the installation frame (1) away from the monitoring device installation frame (4); the supporting vertical plate (51) is fixedly connected to a side of the connection frame (5) away from the installation frame (1); two symmetrically distributed limit baffles (52) are fixedly connected to a side of the supporting vertical plate (51) away from the connection frame (5); a rotating roller (57) is rotatably connected inside the limit baffle (52); the rotating frame (53) is installed on the outside of the rotating roller (57) and between the two limit baffles (52); and a limit shaft (58) is installed between the two limit baffles (52) and above the rotating frame (53).

7. The monitoring device for BIM-based intelligent construction according to claim 6, characterized in that: Two mounting clamps (55) are fixedly connected to one side of the support upright plate (51); a fastening plate (56) is fixedly connected to the two mounting clamps (55) on the sides away from each other; a clamping slot for cooperating with a rotating roller (57) is provided on the side of the mounting clamps (55) away from the support upright plate (51); an electric telescopic rod (54) is installed on the side of the rotating roller (57) away from the clamping slot; and a connecting shaft (59) is fixedly connected to the output end of the electric telescopic rod (54).

8. The monitoring device for BIM-based intelligent construction according to claim 6, characterized in that: A wireless signal transceiver (30) is fixedly connected to the top of the installation frame (1) and located on one side of the ventilation channel (28); a main control board is fixedly connected to the interior of the wireless signal transceiver (30); a control chip is fixedly connected to the outside of the main control board; the first monitoring camera (45), the lighting lamp (46), the solar panel (47), the power storage bin (48), the electric telescopic rod (54), the semiconductor cooling sheet (62), the semiconductor cooling end (63), the semiconductor heating end (64), the first bidirectional fan (66), the second bidirectional fan (68), the storage battery (7), the indicator light (8), the second monitoring camera (11), the buzzer (13), the temperature sensor (18), the gas quality sensor (21), the backup battery (24), the light tube (27) and the wireless signal transceiver (30) are all electrically connected to the control chip.

9. The monitoring device for BIM-based intelligent construction according to claim 8, characterized in that: A BIM intelligent construction management module is installed inside the control chip, and the BIM intelligent construction management module includes a BIM intelligent construction site monitoring unit, a sensor control unit and a temperature control unit. The BIM intelligent construction site monitoring unit, the sensor control unit and the temperature control unit are all communicatively connected to the control chip.

10. A method for using a monitoring device for BIM-based intelligent construction, used to implement a monitoring device for BIM-based intelligent construction as claimed in any one of claims 1 to 9, characterized in that: The specific steps include: S1. During installation, the auxiliary installation mechanism is inserted into the building installation wall through two rotating frames (53), and the electric telescopic rod (54) is operated. The output end of the electric telescopic rod (54) drives the connecting shaft (59) to move to one side until the connecting shaft (59) is also inserted into the wall, and double positioning is performed. During installation, the rotating frame (53) can be manually moved to adjust the installation angle of the entire device. The adjusted rotating roller (57) is limited and installed by installing the clamping plate (55) and the fastening plate (56). The two sides of the rotating frame (53) are limited by the limit baffle (52). The driving motor is operated, and the output end of the driving motor is rotated to drive the first monitoring camera (45) to rotate, thereby expanding the use time. Monitoring range, installing an inner frame (25) and a protective outer frame (26) to seal and install one side of the installation frame (1), using a light-emitting lamp (27) to illuminate the outside during use, recycling the residue on the surface of the entire device through the collection box (2) and the collection cavity (22), facilitating later cleaning through the limit groove (23), installing the second monitoring camera (11) and the monitoring device mounting frame (4) with a second positioning bolt (12), performing real-time monitoring of the bottom viewing angle of the monitoring device mounting frame (4), opening a heat dissipation through hole (14) inside the sealed outer cover (41) to assist in heat dissipation inside the monitoring device mounting frame (4), and using a buzzer (13) to perform early warning processing on the inside of the monitoring device mounting frame (4); S2. During normal operation, the first two-way fan (66) operates to blow air and assist in heat dissipation of the monitoring mechanism. When the temperature is too high, the first two-way fan (66) and the semiconductor cooling plate (62) both operate to perform cooling through the semiconductor cooling end (63). The first two-way fan (66) performs blowing air and accelerates heat dissipation of the monitoring mechanism. The first two-way fan (66) and the semiconductor heating end (64) are limitedly installed through the first positioning bolt (69). The first fan mounting frame (65) and the semiconductor cooling end (63) are limitedly installed through the first positioning bolt (69). In cooperation with subsequent disassembly and maintenance, the semiconductor cooling plate (62) generates heat synchronously when it operates. The heat is dissipated through the semiconductor heating end (64) and the heat dissipation fins. (16) is discharged, the sealing cover (29) is opened, and the hot gas is discharged from the interior of the installation frame (1) through the ventilation channel (28) by the operation of the second two-way fan (68), and the control chip controls the operation of the first monitoring camera (45), the lighting lamp (46), the solar panel (47), the power storage bin (48), the electric telescopic rod (54), the semiconductor cooling sheet (62), the semiconductor cooling end (63), the semiconductor heating end (64), the first two-way fan (66), the second two-way fan (68), the battery (7), the indicator light (8), the second monitoring camera (11), the buzzer (13), the temperature sensor (18), the gas quality sensor (21), the backup battery (24), the light tube (27) and the wireless signal transceiver (30).