Power electronic equipment parameter verification method and device based on power distribution management system, equipment and medium
By comparing equipment parameters and historical parameters in the distribution management system, identifying and rejecting redundant parameters, the problem of redundant parameters during the equipment parameter synchronization process is solved, and the stability of the power system and data synchronization efficiency are improved.
Patent Information
- Application Number
- CN202411511084.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2025-02-07
AI Technical Summary
In the power distribution management system of the power system, redundant parameters may be generated during the synchronization of equipment parameters, occupying database resources, resulting in data chaos and affecting system stability.
By receiving user data synchronization instructions, the device parameters to be synchronized are obtained and compared with historical device parameters. When the device parameters are consistent with the historical parameters, they are marked as redundant parameters and rejected into the target database.
Effectively identify and process redundant parameters, avoid occupying database resources, improve data synchronization efficiency, ensure the effectiveness of equipment parameters stored in databases, and improve the stability and reliability of the power system.
Smart Images

Figure CN119398755A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power systems, and in particular to a method, device, equipment and medium for verifying parameters of power electronic equipment based on a power distribution management system. Background Art
[0002] In the power system, the equipment parameter management of the distribution management system is crucial. With the rapid development of power electronics technology, a large number of power electronic equipment parameters are stored in the distribution management system. The parameters of these devices need to be updated and maintained regularly to ensure the stable operation of the power system. Traditional equipment parameter management methods mostly use manual updates, which is not only inefficient but also prone to errors. In order to improve management efficiency, it has become a trend to realize the automatic synchronization of equipment parameters.
[0003] However, during the synchronization of device parameters, redundant parameters may be generated due to various reasons (such as no change in device parameters, data transmission errors, etc.). If these redundant parameters are not processed, they will not only occupy valuable database resources, but also cause data confusion and affect the normal operation of the power system. Therefore, how to effectively identify and process redundant parameters during the synchronization of device parameters has become an urgent problem to be solved. Summary of the invention
[0004] The present invention provides a method, device, equipment and medium for verifying parameters of power electronic equipment based on a power distribution management system. The method ensures that valid equipment parameters are stored in a database by identifying and processing redundant parameters, thereby improving the stability and reliability of the power system and reducing the risk of system failure due to data errors.
[0005] An embodiment of the present invention provides a method for verifying parameters of a power electronic device based on a power distribution management system, comprising:
[0006] After receiving a data synchronization instruction from a user, obtaining a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device;
[0007] Parsing the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and using the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment;
[0008] For each of the target power distribution management systems, the target database corresponding to the target power distribution management system is called, and the first device parameters are compared with the historical device parameters. When it is determined that the first device parameters are consistent with the historical device parameters, the first device parameters are set as redundant parameters, and the redundant parameters are refused to enter the target database.
[0009] Furthermore, the first device parameters include a first device access parameter and a first device operating parameter; the first device access parameter includes a first device parameter for indicating the distribution device to which the device is connected and a first line parameter for indicating the distribution line to which the device is connected; the historical device parameters include historical device access parameters and historical device operating parameters; the historical device access parameters include historical device parameters for indicating the distribution device to which the device is connected and historical line parameters for indicating the distribution line to which the device is connected.
[0010] Further, the comparing the first device parameter with the historical device parameter, and when it is determined that the first device parameter is consistent with the historical device parameter, setting the first device parameter as a redundant parameter and refusing the redundant parameter to enter the target database includes:
[0011] comparing the first device access parameter with the historical device access parameter;
[0012] When it is determined that the first device access parameter is consistent with the historical device access parameter, comparing the first device operating parameter with the historical device operating parameter,
[0013] When it is determined that the first device operating parameter is consistent with the historical device operating parameter, the first device parameter is set as a redundant parameter, and the redundant parameter is refused to enter the target database.
[0014] Further, after determining that the first device access parameter is consistent with the historical device access parameter, the method further includes:
[0015] comparing the first device operating parameters with the historical device operating parameters;
[0016] When it is determined that the first device operating parameter is inconsistent with the historical device operating parameter, the historical device operating parameter is replaced by the first device operating parameter.
[0017] Furthermore, the power electronic equipment parameter verification method based on the power distribution management system further includes:
[0018] For each of the target power distribution management systems, calling a target database corresponding to the target power distribution management system, and comparing the first device access parameter with the historical device access parameter;
[0019] When it is determined that the first device access parameter is inconsistent with the historical device access parameter, the first device parameter is set as a redundant parameter, and the redundant parameter is refused to enter the target database.
[0020] Furthermore, types of power distribution management systems include power distribution geographic information systems, power distribution production management systems, power distribution monitoring and data acquisition systems, and power distribution energy management systems.
[0021] Further, after refusing the redundant parameters to enter the target database, the method further includes:
[0022] The redundant parameters are saved in a preset redundant parameter log file.
[0023] An embodiment of the present invention further provides a power electronic equipment parameter verification device based on a power distribution management system, comprising: a first equipment parameter acquisition module, a target power distribution management system determination module, and a data verification module;
[0024] After receiving a data synchronization instruction from a user, obtaining a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device;
[0025] Parsing the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and using the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment;
[0026] For each of the target power distribution management systems, the target database corresponding to the target power distribution management system is called, and the first device parameters are compared with the historical device parameters. When it is determined that the first device parameters are consistent with the historical device parameters, the first device parameters are set as redundant parameters, and the redundant parameters are refused to enter the target database.
[0027] The present application also provides a terminal device, including:
[0028] one or more processors;
[0029] A memory, coupled to the processor, for storing one or more programs;
[0030] When the one or more programs are executed by the one or more processors, the one or more processors implement the power electronic equipment parameter verification method based on the power distribution management system as described in the above-mentioned embodiment of the invention.
[0031] The present application also provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for verifying parameters of a power electronic device based on a power distribution management system as described in the above-mentioned embodiment of the invention is implemented.
[0032] The following beneficial effects are achieved by implementing the present invention:
[0033] The present invention provides a method, device, equipment and medium for verifying parameters of power electronic equipment based on a power distribution management system. The method receives a data synchronization instruction from a user, obtains a first device parameter to be synchronized, accesses and parses the data synchronization instruction, and obtains a target power distribution management system of the data to be synchronized; then, for each target power distribution management system, calls its corresponding target database, compares the first device parameter with the historical device parameter, and when it is determined that the first device parameter is consistent with the historical device parameter, marks the first device parameter as a redundant parameter, and refuses to enter the target database;
[0034] Therefore, the present application avoids the occupation of database resources by redundant data and reduces the storage cost of the database by identifying and processing redundant parameters, and adopts the means of automated verification of equipment parameters to avoid the tedious manual verification and effectively improve the efficiency of data synchronization. Secondly, by verifying the data, it ensures that the latest and valid equipment parameters are stored in the database, thereby improving the stability and reliability of the power system and reducing the risk of system failures caused by data errors. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the implementation manner will be briefly introduced below. Obviously, the drawings described below are only some implementation manners of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0036] Figure 1 It is a flowchart of a method for verifying parameters of power electronic equipment based on a power distribution management system provided in a certain embodiment of the present application;
[0037] Figure 2 It is a structural schematic diagram of a power electronic equipment parameter verification device based on a power distribution management system provided by a certain embodiment of the present application;
[0038] Figure 3 It is a structural diagram of a terminal device provided in a certain embodiment of the present application. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0040] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.
[0041] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.
[0042] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0043] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0044] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).
[0045] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0046] See also Figure 1 , is a flow chart of a method for verifying parameters of power electronic equipment based on a power distribution management system provided by an embodiment of the present invention, comprising:
[0047] S1. After receiving a data synchronization instruction from a user, obtain a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device;
[0048] In schematic form, it is assumed that a first power electronic device currently needs to perform data synchronization. At this time, the user will initiate a data synchronization instruction;
[0049] Specifically, in order to better illustrate the present application, a smart meter A is taken as an example of the first power electronic device, and the first device parameters of the smart meter A need to be synchronized to the databases of the power distribution management system X and the power distribution management system Y for subsequent management and monitoring;
[0050] It should be noted that, in a specific application process, the first power electronic device includes but is not limited to a rectifier, an inverter, a frequency converter, a switching power supply, an uninterruptible power supply (UPS), an induction heating device, and a reactive power compensation device.
[0051] In a preferred embodiment, the first device parameter includes a first device access parameter and a first device operation parameter; the first device access parameter includes a first device parameter for indicating the power distribution device to which the device is connected and a first line parameter for indicating the power distribution line to which the device is connected; the historical device parameter includes a historical device access parameter and a historical device operation parameter; the historical device access parameter includes a historical device parameter for indicating the power distribution device to which the device is connected and a historical line parameter for indicating the power distribution line to which the device is connected;
[0052] Specifically, the first device parameter is used to indicate the information of the power distribution device connected to the smart meter A, including the number of the power distribution cabinet and the number of the connection port;
[0053] Assume that the distribution cabinet to which smart meter A is connected is numbered DC001-A, and the connection port of smart meter A in the distribution cabinet is Port003;
[0054] It should be noted that the parameter information included in the first device parameter can be added or deleted according to actual conditions;
[0055] Specifically, the first line parameter is used to indicate the information of the power distribution line to which the smart meter A is connected, including the voltage level, current capacity and line number of the line;
[0056] Assume that the line number of the distribution line connected to smart meter A is L005-A, the voltage level of the line where smart meter A is located is 230V, and the current capacity of the line where smart meter A is located is 60A;
[0057] It should be noted that the parameter information included in the first line parameter can be added or deleted according to actual conditions;
[0058] Specifically, the first device operating parameters include the power currently measured by smart meter A, the current value currently measured by smart meter A, the voltage value currently measured by smart meter A, and the accumulated electric energy of smart meter A since installation;
[0059] Assume that the power currently measured by smart meter A is 1.2kW, the current value currently measured by smart meter A is 5A, the voltage value currently measured by smart meter A is 228V, and the accumulated electric energy value of smart meter A since installation is 12345.67kWh.
[0060] S2. Parse the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and use the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment;
[0061] In a preferred embodiment, the types of power distribution management systems include power distribution geographic information systems, power distribution production management systems, power distribution monitoring and data acquisition systems, and power distribution energy management systems;
[0062] Specifically, the data synchronization instruction is parsed to obtain the power distribution management system of the data to be synchronized, assuming that the power distribution management system of the data to be synchronized is the power distribution management system X and the power distribution management system Y;
[0063] Among them, the type of the power distribution management system X is a power distribution monitoring and data acquisition system; the type of the power distribution management system Y is a power distribution energy management system.
[0064] S3. For each of the target power distribution management systems, calling the target database corresponding to the target power distribution management system, comparing the first device parameter with the historical device parameter, and when it is determined that the first device parameter is consistent with the historical device parameter, setting the first device parameter as a redundant parameter, and refusing the redundant parameter to enter the target database;
[0065] In a preferred embodiment, the comparing the first device parameter with the historical device parameter, and when it is determined that the first device parameter is consistent with the historical device parameter, setting the first device parameter as a redundant parameter and refusing the redundant parameter to enter the target database includes:
[0066] comparing the first device access parameter with the historical device access parameter;
[0067] When it is determined that the first device access parameter is consistent with the historical device access parameter, comparing the first device operating parameter with the historical device operating parameter,
[0068] When it is determined that the first device operating parameter is consistent with the historical device operating parameter, setting the first device parameter as a redundant parameter and refusing the redundant parameter to enter the target database;
[0069] Specifically, the target database data_x corresponding to the target power distribution management system X is called, and the historical device parameters of the smart meter A pre-stored in the target database X are compared with the first device parameters to be synchronized of the smart meter A. If it is found that the first device parameters are consistent with the historical device parameters, it is determined that the first device parameters to be synchronized are redundant parameters (since the parameters are consistent, no update is required), and therefore the redundant parameters are rejected from entering the target database data_x;
[0070] Similarly, the target database data_y corresponding to the target power distribution management system Y is called, and the historical device parameters of the smart meter A pre-stored in the target database X are compared with the first device parameters to be synchronized with the smart meter A. If it is found that the first device parameters are consistent with the historical device parameters, it is determined that the first device parameters to be synchronized are redundant parameters (since the parameters are consistent, no update is required), and the redundant parameters are refused to enter the target database data_y.
[0071] In a preferred embodiment, after determining that the first device access parameter is consistent with the historical device access parameter, the method further includes:
[0072] comparing the first device operating parameters with the historical device operating parameters;
[0073] When it is determined that the first device operating parameter is inconsistent with the historical device operating parameter, replacing the historical device operating parameter with the first device operating parameter;
[0074] Indicatively, after determining that the first device access parameter of the smart meter A is consistent with the historical device access parameter, it can be determined that the access environment of the smart meter A (including the power distribution device and the power distribution line) has not changed, indicating that the access environment of the smart meter A remains stable, which provides a guarantee for the subsequent device operation parameter comparison, and the next comparison operation is performed accordingly;
[0075] Then, the first device operating parameter of the smart meter A is compared with the historical device operating parameter of the smart meter A. When it is determined that the first device operating parameter is inconsistent with the historical device operating parameter, it indicates that the operating state of the smart meter A has changed. Therefore, it is necessary to replace the historical device operating parameter with the first device operating parameter.
[0076] In order to better illustrate the present application, specifically, assuming that in the target power distribution management system Y, the accumulated electric energy value of smart meter A since its installation in the historical equipment operating parameters is 12117.95 kWh, and the accumulated electric energy value of smart meter A since its installation in the first equipment operating parameters is 12345.67 kWh, and the first equipment operating parameters are inconsistent with the historical equipment operating parameters, it means that the operating state of smart meter A has changed, and therefore the historical equipment operating parameters need to be replaced by the first equipment operating parameters.
[0077] In a preferred embodiment, the power electronic equipment parameter verification method based on the power distribution management system further includes:
[0078] For each of the target power distribution management systems, calling a target database corresponding to the target power distribution management system, and comparing the first device access parameter with the historical device access parameter;
[0079] When it is determined that the first device access parameter is inconsistent with the historical device access parameter, setting the first device parameter as a redundant parameter and refusing the redundant parameter to enter the target database;
[0080] Specifically, after determining that the first device access parameter of the smart meter A is inconsistent with the historical device access parameter, it means that the access environment (including the power distribution device and the power distribution line) of the smart meter A has changed, so the subsequent device operation parameter comparison operation cannot be performed, and the first device parameter needs to be set as a redundant parameter, and the redundant parameter is refused to enter the target database;
[0081] In order to better illustrate the present application, specifically, it is assumed that in the target power distribution management system X, the line number of the distribution line to which the smart meter A is connected in the historical device access parameters is L007-B, and the line number of the distribution line to which the smart meter A is connected in the first device access parameters is L005-A, and the two are inconsistent. Therefore, it is necessary to set the first device parameters as redundant parameters and refuse to allow the redundant parameters to enter the target database.
[0082] In a preferred embodiment, after refusing the redundant parameters to enter the target database, the method further comprises:
[0083] Saving the redundant parameters in a preset redundant parameter log file;
[0084] Specifically, when a device or system fails, redundant parameters may become key clues for diagnosing the problem. By viewing the redundant parameter log file, users can more easily identify the status before and after the failure occurs, thereby locating and solving the problem more quickly.
[0085] See also Figure 2 , is a power electronic equipment parameter verification device based on a power distribution management system provided by an embodiment of the present invention, comprising: a first equipment parameter acquisition module, a target power distribution management system determination module and a data verification module;
[0086] After receiving a data synchronization instruction from a user, obtaining a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device;
[0087] Parsing the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and using the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment;
[0088] For each of the target power distribution management systems, the target database corresponding to the target power distribution management system is called, and the first device parameters are compared with the historical device parameters. When it is determined that the first device parameters are consistent with the historical device parameters, the first device parameters are set as redundant parameters, and the redundant parameters are refused to enter the target database.
[0089] See also Figure 3 , a certain embodiment of the present application further provides a terminal device, including:
[0090] one or more processors;
[0091] A memory, coupled to the processor, for storing one or more programs;
[0092] When the one or more programs are executed by the one or more processors, the one or more processors implement the power electronic equipment parameter verification method based on the power distribution management system as described above.
[0093] The processor is used to control the overall operation of the terminal device to complete all or part of the steps of the above-mentioned power electronic equipment parameter verification method based on the power distribution management system. The memory is used to store various types of data to support the operation of the terminal device, and these data may include, for example, instructions for any application or method used to operate on the terminal device, and data related to the application. The memory can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or optical disk.
[0094] In an exemplary embodiment, the terminal device can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the power electronic equipment parameter verification method based on the distribution management system as described in any of the above embodiments, and achieve the same technical effect as the above method.
[0095] In another exemplary embodiment, a computer-readable storage medium including a computer program is also provided, and when the computer program is executed by a processor, the steps of the power electronic equipment parameter verification method based on the power distribution management system as described in any of the above embodiments are implemented. For example, the computer-readable storage medium can be the above-mentioned memory including the computer program, and the above-mentioned computer program can be executed by the processor of the terminal device to complete the power electronic equipment parameter verification method based on the power distribution management system as described in any of the above embodiments, and achieve the technical effect consistent with the above method.
[0096] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A method for verifying parameters of power electronic equipment based on a power distribution management system, characterized in that: include: After receiving a data synchronization instruction from a user, obtaining a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device; Parsing the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and using the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment; For each of the target power distribution management systems, the target database corresponding to the target power distribution management system is called, and the first device parameters are compared with the historical device parameters. When it is determined that the first device parameters are consistent with the historical device parameters, the first device parameters are set as redundant parameters, and the redundant parameters are refused to enter the target database.
2. The power electronic equipment parameter verification method based on the power distribution management system according to claim 1, characterized in that: The first device parameters include first device access parameters and first device operation parameters; the first device access parameters include first device parameters for indicating the distribution device to which the device is connected and first line parameters for indicating the distribution line to which the device is connected; the historical device parameters include historical device access parameters and historical device operation parameters; the historical device access parameters include historical device parameters for indicating the distribution device to which the device is connected and historical line parameters for indicating the distribution line to which the device is connected.
3. The power electronic equipment parameter verification method based on the power distribution management system according to claim 2, characterized in that: The comparing the first device parameter with the historical device parameter, and when it is determined that the first device parameter is consistent with the historical device parameter, setting the first device parameter as a redundant parameter and refusing the redundant parameter to enter the target database, includes: comparing the first device access parameter with the historical device access parameter; When it is determined that the first device access parameter is consistent with the historical device access parameter, comparing the first device operating parameter with the historical device operating parameter, When it is determined that the first device operating parameter is consistent with the historical device operating parameter, the first device parameter is set as a redundant parameter, and the redundant parameter is refused to enter the target database.
4. The power electronic equipment parameter verification method based on the power distribution management system according to claim 3, characterized in that: After determining that the first device access parameter is consistent with the historical device access parameter, the method further includes: comparing the first device operating parameters with the historical device operating parameters; When it is determined that the first device operating parameter is inconsistent with the historical device operating parameter, the historical device operating parameter is replaced by the first device operating parameter.
5. The power electronic equipment parameter verification method based on the power distribution management system according to claim 2, characterized in that: Also includes: For each of the target power distribution management systems, calling a target database corresponding to the target power distribution management system, and comparing the first device access parameter with the historical device access parameter; When it is determined that the first device access parameter is inconsistent with the historical device access parameter, the first device parameter is set as a redundant parameter, and the redundant parameter is refused to enter the target database.
6. The power electronic equipment parameter verification method based on the power distribution management system according to claim 1, characterized in that: Types of distribution management systems include distribution geographic information systems, distribution production management systems, distribution monitoring and data acquisition systems, and distribution energy management systems.
7. The power electronic equipment parameter verification method based on the power distribution management system according to claim 1, characterized in that: After refusing the redundant parameters to enter the target database, the method further includes: The redundant parameters are saved in a preset redundant parameter log file.
8. A power electronic equipment parameter verification device based on a power distribution management system, characterized in that: include: A first equipment parameter acquisition module, a target power distribution management system determination module, and a data verification module; After receiving a data synchronization instruction from a user, obtaining a first device parameter to be synchronized to a target power distribution management system database; wherein the first device parameter belongs to a first power electronic device; Parsing the data synchronization instruction to obtain the power distribution management system of the data to be synchronized, and using the power distribution management system of the data to be synchronized as the target power distribution management system; wherein each of the target power distribution management systems pre-stores the historical equipment parameters of the first power electronic equipment; For each of the target power distribution management systems, the target database corresponding to the target power distribution management system is called, and the first device parameters are compared with the historical device parameters. When it is determined that the first device parameters are consistent with the historical device parameters, the first device parameters are set as redundant parameters, and the redundant parameters are refused to enter the target database.
9. A device, characterized in that: include: one or more processors; A memory, coupled to the processor, for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the power electronic equipment parameter verification method based on the power distribution management system as described in any one of claims 1 to 7.
10. A medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the power electronic device parameter verification method based on the power distribution management system as described in any one of claims 1 to 7 is implemented.
Citation Information
Cited By
Real-time synchronization and dynamic abnormity verification platform for unuploaded data of road network charging exit
CN121171032A
Real-time synchronization and dynamic exception checking platform for un-uploaded data of road network toll exit
CN121171032B