Rectangular channel formwork mounting and dismounting supporting system and construction method
By designing a rectangular channel template installation and disassembly support system, the cumbersome support system in the construction of existing canals has been solved, and the rapid installation and disassembly of channel templates and efficient production have been achieved, which has improved the project progress and molding quality.
Patent Information
- Application Number
- CN202411964876.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-02-18
AI Technical Summary
In the construction of existing canals, the support system is complicated and there are many parts, which leads to inconvenient molding and mold dismantling operations, affecting the progress of the project.
A rectangular channel template installation and disassembly support system is designed, including template system, support system, fastening system and accessories system. The template is made of plastic material and is fixed by a support frame and a fastening system. The accessories system enables rapid splicing and disassembly of the template through latches and handles.
It realizes rapid installation and disassembly of channel templates, reduces operating labor intensity, improves production efficiency, reduces energy losses, and improves channel forming quality.
Smart Images

Figure CN119466304A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of engineering construction equipment, and particularly relates to a support system for the installation and removal of rectangular channel formwork and a construction method thereof. Background Art
[0002] Special drainage channels need to be constructed for farmland irrigation, domestic sewage disposal, and lake drainage, by digging ditches on the ground. After digging the ditches, in order to prevent problems such as water flow seepage and filter mud accumulation, a cement layer needs to be poured at the dug area to isolate the soil layer, which is convenient for cleaning the channel later. Existing water channels usually have a U-shaped cross-section, with the upper side being the open side, and the side corresponding to the ditch contact side is poured with cement and concrete.
[0003] The bottom of the water channel is a horizontal plane, and the pouring can be directly completed. However, the two sides of the water channel are inclined or vertical sides. When pouring, a support needs to be built to set up the formwork, and then the pouring is carried out. After the concrete is completely dry, the formwork is removed to complete the operation. The existing support system for channel design is relatively cumbersome and requires a large number of parts, which causes great inconvenience to the formwork installation and removal operations and affects the project progress. Summary of the Invention
[0004] The purpose of the present invention is to provide a support system for the installation and removal of rectangular channel formwork and a construction method thereof, so as to solve the problems of a large number of formworks, cumbersome engineering, and long construction period in the construction of existing ditches.
[0005] To solve the above technical problems, the present invention is realized through the following technical solutions: A support system for the installation and removal of rectangular channel formwork includes a formwork system, a support system, a fastening system, and a fitting system; The formwork system includes a plurality of formworks made of plastic. The sides of the formworks are aligned and spliced with each other. After alignment, adjacent formworks are fixed through the fitting system to form the supports on both sides of the sidewall formation layer. The formworks are square and plate-shaped. The side facing the sidewall formation layer on the front is a smooth side, and the back has reinforcing ribs; The support system includes a support frame for fixing the formwork system. The support frame includes a first crossbar and vertical bars. The upper ends of the vertical bars are perpendicularly fixed to the first crossbar, and the lower ends extend to the bottom of the sidewall formation layer. The vertical bars are located on the back side of the formwork, and the formwork and the vertical bars are fixed through the fastening system.
[0006] Further, the vertical bars corresponding to a single support frame are four parallel bars. Two are located inside the channel, and the other two are located outside the channel. A second crossbar is connected between the two inner vertical bars, and the second crossbar is parallel to the first crossbar.
[0007] The first crossbar has an extension section corresponding to the outer vertical bar. There is a diagonal brace between the end of the first crossbar and the outer vertical bar. After the diagonal brace is spliced and fixed with the first crossbar and the vertical bar, a right triangle is formed.
[0008] Furthermore, the template includes a first frame located at the side of the template and a cross-shaped second frame located inside the first frame. The first frame and the second frame are both double-layer plate rib structures, the two layers of plate ribs are parallel to each other, and have a first connecting block. A square frame is provided at the connection between the first frame and the second frame, a round tube reinforcement portion is provided inside the square frame, and a second connecting block is provided between the round tube reinforcement portion and the inner wall of the square frame.
[0009] The first frame has a positioning hole, and the accessory system includes a plastic pin for connecting adjacent templates through the positioning hole. The pin has an inserting portion inserted into the positioning hole and a handle fixed to the end of the inserting portion.
[0010] The construction method of the rectangular channel formwork installation and disassembly support system includes the following steps: (1) Dig a ditch according to the project requirements, pour concrete horizontally at the bottom of the ditch to form a channel concrete bottom plate, and wait for the concrete of the channel concrete bottom plate to dry; (2) The support system is built in sequence along the length direction of the formed channel concrete bottom plate, and the support frames corresponding to the support system are evenly and equidistantly arranged; (3) Build the formwork, align the gaps of the formwork along the vertical bars of the support frame in sequence, fix the adjacent formworks through the accessory system, form side wall casting grooves on both sides of the channel concrete bottom plate, and pour concrete; (4) After the concrete in the side wall casting trough has dried, remove the formwork and support frame in turn.
[0011] The present invention has the following beneficial effects: the channel formwork has a rapid installation and disassembly support process and has high production efficiency; the formwork and the support frame have light weight and can be directly installed upon arrival at the site; the labor intensity of the operators is low, which is conducive to civilized production and continuous production.
[0012] This system can replace the use of wooden formwork, which is beneficial to the protection of green plants. No construction machinery is required on site, which reduces energy loss.
[0013] This system does not require the installation of tension screws, reduces the plugging process after demolding, and improves the overall molding quality of the channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below.
[0015] Figure 1 : Schematic diagram of the structure of the present invention.
[0016] Figure 2 : Schematic diagram of the disassembly structure of the support frame of the present invention.
[0017] Figure 3 : Schematic diagram of the template splicing state structure of the present invention.
[0018] Figure 4 : Schematic diagram of the back structure of the template of the present invention.
[0019] In the accompanying drawings, the list of components represented by each reference numeral is as follows: template 1, reinforcing edge 10, support frame 2, first cross bar 21, vertical bar 3, second cross bar 22, diagonal support bar 4, first frame 11, second frame 12, first connecting block 13, square frame 5, round tube reinforcement part 51, second connecting block 52, positioning hole 14, pin 6, plug-in part 61, handle 62. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0021] like Figure 1-2 As shown: the rectangular channel formwork installation and disassembly support system includes the formwork system, support system, fastening system and accessory system; The formwork system includes a plurality of formworks 1 made of plastic material, the sides of which are aligned and spliced with each other, and adjacent formworks 1 are aligned and fixed by an accessory system to form supports on both sides of the channel side wall formation layer. The formwork 1 is square and has a plate structure. The front side corresponding to the side wall formation layer is a smooth side, and the back side has a reinforcing edge 10. The formwork mainly adopts a plastic structure, the formwork thickness is 8cm, and the dimensions are 200c*60cm, 200*40cm, 200*20cm, and 200*10cm, and can be flexibly assembled according to different side wall heights of the channel. After the formwork supports on both sides of the side wall formation layer are erected, a casting trough for pouring concrete is formed.
[0022] The support system includes a support frame 2 for fixing the formwork system. The support frame 2 includes a first crossbar 21 and a vertical bar 3. The upper end of the vertical bar 3 is vertically fixed to the first crossbar 21, and the lower end extends to the bottom of the side wall forming layer. The vertical bar 3 is located on the back side of the formwork 1, and the formwork 1 and the vertical bar 3 are fixed by the fastening system. The first crossbar is located on the upper side of the forming channel and is horizontally erected. The fastening system uses steel wire to tie the formwork and the support system to control the wall thickness of the side wall; Taking a 100*100cm channel as an example, the horizontal and vertical bars are both 4*4cm square tubes, the ends are fixed by welding, the thickness of the side wall formation layer is about 20cm, and the inner diameter of the channel is about 72cm.
[0023] The vertical bars 3 corresponding to the single support frame 2 are four parallel to each other, two of which are located on the inner side of the channel, and the other two are located on the outer side of the channel. A second crossbar 22 is connected between the two inner vertical bars 3, and the second crossbar 22 is parallel to the first crossbar 21. The second crossbar is located at the bottom of the channel and plays a role of bottom support. The first crossbar 21 has an extension section corresponding to the outer vertical bar, and a diagonal brace 4 is provided between the end of the first crossbar 21 and the outer vertical bar 3. The diagonal brace 4 is spliced and fixed with the first crossbar 21 and the vertical bar 3 to form a right triangle. The diagonal brace is a 4*4cm angle iron, which plays a role in strengthening the support of the external vertical bar. The extension section length of the first crossbar is about 30cm, and the total length of the first crossbar is 220cm.
[0024] like Figure 3-4 As shown: the corresponding back side of the template 1 includes a first frame 11 located at the side of the template 1, and a cross-shaped second frame 12 located inside the first frame 11. The first frame 11 and the second frame 12 are both double-layer plate rib structures, the two layers of plate ribs are parallel to each other, and have a first connecting block 13. The first frame 11 and the second frame 12 are connected at a square frame 5, and the square frame 5 has a circular tube reinforcement portion 51 inside, and a second connecting block 52 is provided between the circular tube reinforcement portion 51 and the inner wall of the square frame 5.
[0025] The first frame 11 has a positioning hole 14 , and the accessory system includes a plastic pin 6 for connecting adjacent templates 1 through the positioning hole 14 . The pin 6 has an inserting portion 61 inserted into the positioning hole 14 and a handle 62 fixed to the end of the inserting portion 61 .
[0026] The construction method of the rectangular channel formwork installation and disassembly support system includes the following steps: (1) Dig a ditch according to the project requirements, pour concrete horizontally at the bottom of the ditch to form a channel concrete bottom plate, and wait for the concrete of the channel concrete bottom plate to dry; (2) The support system is built in sequence along the length direction of the formed channel concrete bottom plate, and the support frames corresponding to the support system are evenly and equidistantly arranged; (3) Build the formwork, align the gaps of the formwork along the vertical bars of the support frame in sequence, fix the adjacent formworks through the accessory system, form side wall casting grooves on both sides of the channel concrete bottom plate, and pour concrete; (4) After the concrete in the side wall casting trough has dried, remove the formwork and support frame in turn.
[0027] This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can better understand and utilize the present invention.
Claims
1. Rectangular channel formwork installation and disassembly support system, characterized by: Including formwork system, support system, fastening system and accessories system; The template system comprises a plurality of templates (1) made of plastic material, the sides of the templates (1) are aligned and spliced with each other, and adjacent templates (1) are aligned and fixed by a fitting system to form support for both sides of the channel side wall forming layer, the template (1) is square and has a plate structure, the front side corresponding to the side wall forming layer is a smooth side, and the back side has a reinforcing edge (10); The support system comprises a support frame (2) for fixing the formwork system, the support frame (2) comprising a first crossbar (21) and a vertical bar (3), the upper end of the vertical bar (3) being vertically fixed to the first crossbar (21), and the lower end extending to the bottom of the side wall forming layer, the vertical bar (3) being located on the back side of the formwork (1), and the formwork (1) and the vertical bar (3) being fixed by a fastening system.
2. According to claim 1, the rectangular channel formwork installation and disassembly support system is characterized by: The vertical rods (3) corresponding to a single support frame (2) are four mutually parallel rods, two of which are located inside the channel, and the other two of which are located outside the channel.
3. According to claim 2, the rectangular channel formwork installation and disassembly support system is characterized by: A second cross bar (22) is connected between the two inner vertical bars (3), and the second cross bar (22) and the first cross bar (21) are parallel to each other.
4. According to claim 2, the rectangular channel formwork installation and disassembly support system is characterized by: The first crossbar (21) has an extension section corresponding to the outer vertical bar, and an oblique support bar (4) is provided between the end of the first crossbar (21) and the outer vertical bar (3). The oblique support bar (4) is spliced and fixed with the first crossbar (21) and the vertical bar (3) to form a right triangle.
5. According to claim 1, the rectangular channel formwork installation and disassembly support system is characterized by: The corresponding back side of the template (1) comprises a first frame (11) located at the side of the template (1), and a cross-shaped second frame (12) located inside the first frame (11); the first frame (11) and the second frame (12) are both double-layer plate rib structures, the two layers of plate ribs are parallel to each other, and have a first connecting block (13).
6. According to claim 5, the rectangular channel formwork installation and disassembly support system is characterized by: A square frame (5) is provided at the connection between the first frame (11) and the second frame (12); a circular tube reinforcement portion (51) is provided inside the square frame (5); and a second connection block (52) is provided between the circular tube reinforcement portion (51) and the inner wall of the square frame (5).
7. According to claim 5, the rectangular channel formwork installation and disassembly support system is characterized by: The first frame (11) has a positioning hole (14), and the accessory system comprises a plug (6) made of plastic material, which is used to connect adjacent templates (1) through the positioning hole (14), and the plug (6) has an inserting portion (61) inserted into the positioning hole (14) and a handle (62) fixed to the end of the inserting portion (61).
8. A construction method for a rectangular channel formwork installation and disassembly support system, characterized in that: It includes the following steps; (1) Dig a ditch according to the project requirements, pour concrete horizontally at the bottom of the ditch to form a channel concrete bottom plate, and wait for the concrete of the channel concrete bottom plate to dry; (2) The support system is built in sequence along the length direction of the formed channel concrete bottom plate, and the support frames corresponding to the support system are evenly and equidistantly arranged; (3) Build the formwork, align the gaps of the formwork along the vertical bars of the support frame in sequence, fix the adjacent formworks through the accessory system, form side wall casting grooves on both sides of the channel concrete bottom plate, and pour concrete; (4) After the concrete in the side wall casting trough has dried, remove the formwork and support frame in turn.