Pipeline transportation device under complex geographical conditions

By designing a pipeline transportation device for complex geographical conditions, the problem of high cost and low efficiency of pipeline transportation in mountainous and hilly environments is solved, efficient and safe pipeline transportation is achieved, and construction costs are reduced.

CN119489736APending Publication Date: 2025-02-21CRSC ENG GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411820428.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-02-21

AI Technical Summary

Technical Problem

Under complex geographical conditions such as mountains and hills, pipeline transportation devices need to be frequently transported, resulting in increased construction costs, reduced transportation efficiency and increased labor costs.

Method used

A pipeline transportation device suitable for complex geographical conditions is designed, which includes a pipe arc bearing member, bearing connecting pipe, artificial auxiliary rod, power device, ball bearing and caster transmission device, which drives the casters forward through the motor and utilizes Artificial auxiliary rods provide stability when turning or crossing obstacles.

Benefits of technology

The device can efficiently transport pipelines under complex geographical conditions, reduce construction costs, improve transportation efficiency and safety, reduce labor costs, and smoothly transport subsequent pipelines on installed pipe sections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119489736A_ABST
    Figure CN119489736A_ABST
Patent Text Reader

Abstract

The invention discloses a pipeline transportation device under complex geographical conditions and a using method thereof, and belongs to the field of pipeline installation. The device comprises a pipeline arc-shaped bearing piece, a bearing connecting pipe, a manual auxiliary rod, a power device, a ball bearing, a bearing bearing device, a square connecting plate, a trundle fixing plate, a trundle and a trundle transmission device. The pipeline arc-shaped bearing part is of an arc-shaped structure, a bearing connecting pipe is vertically arranged in the center of the bottom of the pipeline arc-shaped bearing part, the lower portion of the bearing connecting pipe is connected with a ball bearing, the ball bearing is fixed above a bearing carrying device, the bearing carrying device is channel steel, and four trundle transmission devices are symmetrically arranged on the two sides of the channel steel and connected with four trundle transmission devices respectively. And a power device is arranged in the bearing carrying device. The pipeline transportation device is suitable for transportation of 6-8m long pipelines with the pipe diameter of DN 250mm-DN 350mm in construction in complex environments such as mountainous regions and hills, is convenient, quick and safe to use, and can reduce the transportation cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a pipeline transportation device under complex geographical conditions such as mountains and hills and a use method thereof, belonging to the field of pipeline installation. Background Art

[0002] At present, the construction and transportation of coalbed methane long-distance pipelines in complex environmental conditions such as mountains and hills involves secondary transportation of pipes, which is often restricted by geographical conditions. For example, the construction access road is narrow, and the temporarily widened access road cannot meet the needs of large-scale transportation vehicles and cranes. This has the following disadvantages: 1. Widening the temporary access road requires additional labor, materials, and machinery, which increases the cost of construction measures; 2. Even if the access road allows construction machinery to pass, secondary transportation can only be carried out by construction machinery, which is not cost-effective and the reduced transportation efficiency leads to serious idleness, resulting in increased labor costs; 3. The undulating ground increases the risk of transportation. Ultimately, it increases the overall construction cost.

[0003] Therefore, there is an urgent need to provide a transportation device that can get rid of the dependence of secondary handling on geographical conditions and large-scale transportation machinery, reduce transportation costs, improve labor productivity, and be safe and reliable. These are technical problems that need to be solved. Summary of the invention

[0004] The present invention aims to provide a pipeline transportation device suitable for use in complex geographical conditions such as mountains and hills and a method for using the same. The device is easy to assemble and disassemble, quick to use, and improves transportation efficiency.

[0005] The present invention is mainly designed for pipeline transportation under complex geographical conditions. The pipeline to be installed is placed on the device, and the built-in motor of the device is controlled to drive the front and rear casters to move forward at a constant speed. The artificial auxiliary rods on the left and right sides are used as stability controls when turning or crossing obstacles during transportation. One pipe is transported and welded, and the pipeline installation operation is completed in this cycle.

[0006] The present invention provides a pipeline transportation device under complex geographical conditions, comprising a pipeline arc-shaped bearing member, a bearing connecting pipe, an artificial auxiliary rod, a power device, a ball bearing, a bearing bearing device, a square connecting plate, a caster fixing plate, a caster, and a caster transmission device; The arc-shaped pipe bearing member is an arc-shaped structure, which is convenient for bearing the pipe. A bearing connecting pipe is vertically arranged at the bottom center of the pipe arc-shaped bearing member. The lower part of the bearing connecting pipe is connected to the ball bearing. An artificial auxiliary rod is horizontally and vertically arranged in the middle of the bearing connecting pipe. The ball bearing is fixed above the bearing bearing device. The bearing bearing device is a channel steel. Four groups of caster transmission devices are symmetrically arranged on both sides of the channel steel, which are respectively connected to the four groups of casters. A power device is arranged inside the bearing bearing device. The power device includes a motor and a motor transmission shaft. The power device is connected to the caster transmission device, and the caster transmission device includes a belt. The transmission relationship of the present invention is: the motor in the channel steel is connected to the caster through a belt, and the belt connects the shaft of the caster with the motor transmission shaft; the two shafts are in the horizontal direction and the belt is in the vertical direction.

[0007] In addition, the present invention can also be operated by an automatic control device, which includes a remote control, a controller and a battery. The remote control adopts PS2CTRL, and the controller adopts an STM32 main control board (with a built-in signal receiving device and a multi-function module). The battery provides power for the signal receiver and the controller. The control principle is: when the receiver receives the signal, it will transmit the signal to the decoder for decoding and conversion into a control signal. According to the different signals, the built-in multi-function module of the controller controls the speed, forward rotation and reverse rotation of the motor to control the device to move forward, backward, stop and adjust the running speed, thereby realizing the movement of the device.

[0008] The device is used on the installed pipeline; the casters are placed on the installed pipeline for movement.

[0009] Furthermore, the outer side of the caster is connected to the motor drive shaft through a belt, and the inner side of the caster is fixedly connected to the square connecting plate through a caster fixing plate.

[0010] Furthermore, a threaded connector is provided at the end of the artificial auxiliary rod, and the threaded connector is used to connect the auxiliary rod with the extension rod for easy assembly and disassembly. The length of the artificial auxiliary rod can be adjusted according to the construction site conditions, and the auxiliary rod can be extended by threaded connection.

[0011] Furthermore, the bearing bearing device is 16# channel steel.

[0012] Furthermore, the casters are heavy-duty casters.

[0013] Furthermore, the diameter of the pipeline transported by the device is DN250mm~DN350mm, and the length is 6~8m.

[0014] Furthermore, the thickness of the caster fixing plate is 6 mm.

[0015] Furthermore, four ends of the square connecting plate are provided with through holes, and belts pass through the through holes to respectively connect the transmission shaft at the upper part of the square connecting plate and the caster shaft at the lower part of the square connecting plate.

[0016] Furthermore, the bearing support device and the square connecting plate are fixedly connected; preferably, the two are welded into one.

[0017] Furthermore, the caster fixing plate is fixedly connected to the square connecting plate; preferably, the two are welded into one.

[0018] The present invention provides a method for using the pipeline transportation device under the above-mentioned complex geographical conditions, comprising the following steps: (1) To transport a long pipeline, two pipeline transport devices are required to be used together. Before transportation, the two pipeline transport devices are placed above the installed pipeline. (2) Then, use a lifting tool to lift the pipeline to be transported onto the pipeline arc-shaped bearing member. The specific design position is: a pipeline transport device is set at the front and rear ends of the bottom of the pipeline to be transported, and the distance between each pipeline transport device and the end of the pipeline to be transported is 300 mm (that is, the distance between the front pipeline transport device and the front end of the pipeline to be transported is 300 mm, and the distance between the rear pipeline transport device and the rear end of the pipeline to be transported is 300 mm); (3) During transportation, the overall stability of the transport device needs to be intervened by manual auxiliary rods to ensure stable transportation, and the pipeline is driven forward by controlling the power device when transporting it; (4) Transport one and install one, then continue on.

[0019] Furthermore, during the transportation process of step (3), when the front-end pipeline transportation device encounters a flange (the installed pipeline needs a flange connection at the position where the valve is installed), the front-end of the pipeline to be transported is first lifted by a small hydraulic jack, and then the front-end pipeline transportation device is moved in the opposite direction to a position 1 meter away from the front-end of the pipeline to be transported (that is, the device is about 1 meter away from the front end of the pipeline and 0.7 meters away from the flange), and then it is placed and continued to be pushed forward; after the end of the pipe extends out of the flange by 1 meter, the front-end pipeline transportation device is then crossed over the flange or obstacle by an artificial auxiliary rod, and the front-end pipeline transportation device is returned to a position 0.3 meters away from the front end of the pipeline to be transported, and it is pushed forward, and the pipeline to be transported gradually moves forward; when the rear-end pipeline transportation device encounters a flange or obstacle, the rear-end pipeline to be transported is lifted by a small hydraulic jack, and the rear-end pipeline transportation device is crossed over the flange or obstacle by an artificial auxiliary rod, and then it is placed under the pipeline to be transported and continued to move forward, thereby completing the transportation of the pipeline.

[0020] The transport device of the present invention is suitable for transporting long pipes with a diameter between DN250mm and DN350mm (generally referring to a length of 6 to 8m) in complex environments such as mountains and hills and under narrow construction access roads. It is not only convenient, fast and safe to use, but also can reduce transportation costs.

[0021] Beneficial effects of the present invention: (1) The pipeline transportation device provided by the present invention can be used to transport pipelines that need to be installed later on the already installed pipe section, and can pass smoothly even if there are flanges, elbows, etc.; (2) The device runs on the installed pipeline, so it is less affected by terrain conditions, which improves transportation efficiency. In addition, the transportation process is safe and reliable, which improves the effectiveness of engineering construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the pipeline transportation device under complex geographical conditions of the present invention.

[0023] In the figure: 1. pipe arc bearing member, 2. bearing connecting pipe, 3. manual auxiliary rod, 4. threaded connector, 5. ball bearing, 6. bearing bearing device, 7. power device, 8. caster, 9. installed pipeline, 10. square connecting plate, 11. caster transmission device, 12. caster fixing plate. DETAILED DESCRIPTION

[0024] The present invention is further illustrated by the following examples, but is not limited to the following examples. Example

[0025] like Figure 1 As shown, the pipeline transportation device under complex geographical conditions includes a pipeline arc-shaped bearing member 1, a bearing connecting pipe 2, an artificial auxiliary rod 3, a power device 7, a ball bearing 5, a bearing bearing device 6, a square connecting plate 10, a caster fixing plate 12, a caster 8, and a caster transmission device 11; The arc-shaped pipe bearing member 1 is an arc-shaped structure, which is convenient for bearing the pipe. A bearing connecting pipe 2 is vertically arranged at the bottom center of the arc-shaped pipe bearing member 1. The lower part of the bearing connecting pipe 2 is connected to a ball bearing 5. An artificial auxiliary rod 3 is horizontally and vertically arranged in the middle of the bearing connecting pipe 2. The ball bearing 5 is fixed above the bearing bearing device 6. The bearing bearing device 6 is a channel steel. Four groups of caster transmission devices 11 are symmetrically arranged on both sides of the channel steel, which are respectively connected to four groups of casters 8; a power device 7 is arranged inside the bearing bearing device, and the power device includes a motor and a motor transmission shaft. The power device 7 is connected to the caster transmission device 11, and the caster transmission device 11 includes a belt. The transmission relationship of the present invention is: the motor in the channel steel is connected to the caster through a belt, and the belt connects the shaft of the caster with the motor transmission shaft; the two shafts are in the horizontal direction and the belt is in the vertical direction.

[0026] In addition, the present invention can also be operated by an automatic control device, which includes a remote control, a controller and a battery. The remote control adopts PS2CTRL, and the controller adopts an STM32 main control board (with a built-in signal receiving device and a multi-function module). The battery provides power for the signal receiver and the controller. The control principle is: when the receiver receives the signal, it will transmit the signal to the decoder for decoding and conversion into a control signal. According to the different signals, the built-in multi-function module of the controller controls the speed, forward rotation and reverse rotation of the motor to control the device to move forward, backward, stop and adjust the running speed, thereby realizing the movement of the device.

[0027] The device is used on the installed pipeline 9; the casters are placed on the installed pipeline for movement; Furthermore, the outer side of the caster 8 is connected to the motor drive shaft via a belt, and the inner side of the caster is fixedly connected to the square connecting plate via a caster fixing plate.

[0028] Furthermore, a threaded connector 4 is provided at the end of the artificial auxiliary rod 3, and the threaded connector 4 is used to connect the auxiliary rod with the extension rod for easy assembly and disassembly. The length of the artificial auxiliary rod can be adjusted according to the construction site conditions, and the auxiliary rod can be extended by threaded connection.

[0029] Furthermore, the bearing bearing device 6 is 16# channel steel.

[0030] Furthermore, the caster 8 is an extra heavy-duty caster.

[0031] Furthermore, the diameter of the pipeline to be transported by the device is DN250mm~DN350mm, and the length is 6~8m.

[0032] Furthermore, the thickness of the caster fixing plate 12 is 6 mm.

[0033] Furthermore, four ends of the square connecting plate 10 are provided with through holes, and belts pass through the through holes to respectively connect the transmission shaft at the upper part of the square connecting plate and the caster shaft at the lower part of the square connecting plate.

[0034] Furthermore, the bearing support device 6 and the square connecting plate 10 are welded into one body.

[0035] Furthermore, the caster fixing plate 12 and the square connecting plate 10 are welded into one body.

[0036] The specific manufacturing method of the above device is: (1) Take a piece of carbon steel plate and make it into a pipe arc bearing member with a width of 300 mm, a radius of 230 mm, and a thickness of 4 mm to carry the transport pipeline. The bearing member is fully welded to the upper end of the bearing connecting pipe, and a ball bearing is inserted into the lower end of the bearing connecting pipe and fully welded to it; (2) Weld DN25 galvanized steel pipes on both sides of the bearing connecting pipe at an appropriate height (preferably a height suitable for human operation) as manual auxiliary rods during transportation. When not needed, this auxiliary rod can be removed from the middle part through a threaded connector; (3) The bottom circumference of the ball bearing is welded to the bearing bearing device (16# channel steel) so that the upper part of the bearing can rotate circumferentially; (4) Take a piece of carbon steel plate and make it into a structure with a length of 400 mm, a width of 187 mm and a thickness of 10 mm as a square connecting plate; (5) The two sides (i.e., the two ends of the bottom of the channel steel) of the bearing bearing device (16# channel steel) are welded to the square connecting plate. The extra-heavy casters are welded to the square connecting plate through a fixed steel plate with a thickness of 6 mm. Two casters are respectively provided on both sides of the square connecting plate, and the spacing between the two casters is 200~300 mm.

[0037] When in use, the device is directly placed on the installed pipeline. It is flexible and convenient to use and can be used in emergency situations under complex geographical conditions. It has low production cost and is easy to carry. The following takes a 6m long pipeline as an example to specifically illustrate the use process of the pipeline transportation device of the present invention: (1) Place the pipeline transport device of the present invention above the installed pipeline 9, and place the pipeline to be transported (6m long pipeline) on the pipeline transport device. The two pipeline transport devices are respectively located 300mm from the front and rear ends of the pipeline to be transported (i.e., the distance between the front pipeline transport device and the front end of the pipeline to be transported is 300mm, and the distance between the rear pipeline transport device and the rear end of the pipeline to be transported is 300mm); (2) After the pipeline transport device is set up, turn on the motor and the pipeline moves forward; (3) When the front-end pipeline transport device encounters a flange (the installed pipeline needs a flange connection at the location where the valve is installed), first use a small hydraulic jack to lift the front end of the pipeline to be transported, and then move the front-end pipeline transport device in the opposite direction to a position 1 meter away from the front end of the pipeline to be transported (that is, the device is about 1 meter away from the front end of the pipeline and 0.7 meters away from the flange), and continue to push it forward after placing it; after the pipe end extends 1 meter out of the flange, the front-end pipeline transport device is moved over the flange or obstacle through the manual auxiliary rod, and the front-end pipeline transport device is returned to the position 0.3 meters away from the front end of the pipeline to be transported, and it is pushed forward continuously. At this time, the pipeline to be transported gradually moves forward; when the rear-end pipeline transport device encounters a flange or obstacle, the rear-end pipeline to be transported is lifted by a small hydraulic jack, and the rear-end pipeline transport device is moved over the flange or obstacle through the manual auxiliary rod, and then it is placed under the pipeline to be transported and continues to move forward, thus completing the transportation of the pipeline.

Claims

1. A pipeline transportation device under complex geographical conditions, characterized by: It includes a pipe arc bearing member, a bearing connecting pipe, an artificial auxiliary rod, a power device, a ball bearing, a bearing bearing device, a square connecting plate, a caster fixing plate, a caster, and a caster transmission device; The arc-shaped pipe bearing member is an arc-shaped structure, which is convenient for bearing the pipe. A bearing connecting pipe is vertically arranged at the bottom center of the pipe arc-shaped bearing member. The lower part of the bearing connecting pipe is connected to the ball bearing. An artificial auxiliary rod is horizontally and vertically arranged in the middle of the bearing connecting pipe. The ball bearing is fixed above the bearing bearing device. The bearing bearing device is a channel steel. Four sets of caster transmission devices are symmetrically arranged on both sides of the channel steel, which are respectively connected to the four sets of casters; a power device is arranged inside the bearing bearing device, and the power device includes a motor and a motor drive shaft. The power device is connected to the caster transmission device, and the caster transmission device includes a belt; the casters are placed on the installed pipeline for movement.

2. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: The motor and the caster in the bearing bearing device are connected through a belt, and the belt connects the shaft of the caster with the drive shaft of the motor; the two shafts are in the horizontal direction and the belt is in the vertical direction.

3. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: It also includes an automatic control device, which includes a remote control, a controller and a battery. The remote control uses PS2CTRL, the controller uses an STM32 main control board, and the battery provides power for the signal receiver and the controller. When the receiver receives the signal, it transmits the signal to the decoder for decoding and conversion into a control signal. According to different signals, the built-in multi-functional module of the controller controls the speed, forward rotation and reverse rotation of the motor, thereby realizing the actions of moving forward, backward, stopping and adjusting the running speed.

4. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: The outer side of the caster is connected to the motor drive shaft through a belt, and the inner side of the caster is fixedly connected to the square connecting plate through a caster fixing plate.

5. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: A threaded connector is provided at the end of the artificial auxiliary rod, and the threaded connector is used to connect the auxiliary rod with the extension rod for use, so as to facilitate assembly and disassembly.

6. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: The caster is a heavy-duty caster, and the thickness of the caster fixing plate is 6 mm.

7. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: The diameter of the pipe to be transported is DN250mm~DN350mm and the length is 6~8m.

8. The pipeline transportation device under complex geographical conditions according to claim 1, characterized in that: The four ends of the square connecting plate are provided with through holes, and belts pass through the through holes to respectively connect the transmission shaft at the upper part of the square connecting plate and the caster shaft at the lower part of the square connecting plate; the bearing bearing device is fixedly connected to the square connecting plate; and the caster fixing plate is fixedly connected to the square connecting plate.

9. A method for using the pipeline transportation device under complex geographical conditions according to any one of claims 1 to 8, characterized in that The following steps are involved: (1) To transport a long pipeline, two pipeline transport devices are required to be used together. Before transportation, the two pipeline transport devices are placed above the installed pipeline. (2) Then, use a lifting tool to lift the pipeline to be transported onto the pipeline arc-shaped bearing member. The specific design position is: a pipeline transport device is set at the front and rear ends of the bottom of the pipeline to be transported, and the distance between each pipeline transport device and the end of the pipeline to be transported is 300 mm; (3) During transportation, the overall stability of the transport device needs to be intervened by manual auxiliary rods to ensure stable transportation, and the pipeline is driven forward by controlling the power device when transporting it; (4) Transport one and install one, then continue on.

10. The method for using the pipeline transportation device under complex geographical conditions according to claim 9, characterized in that: During the transportation process of step (3), when the front-end pipeline transportation device encounters a flange, the front-end of the pipeline to be transported is first lifted by a small hydraulic jack, and then the front-end pipeline transportation device is moved in the opposite direction to a position 1 meter away from the front-end of the pipeline to be transported, and then the front-end pipeline transportation device is placed and continued to be pushed forward; after the end of the pipe is extended 1 meter beyond the flange, the front-end pipeline transportation device is again moved over the flange or obstacle by means of an artificial auxiliary rod, and the front-end pipeline transportation device is returned to a position 0.3 meters away from the front-end of the pipeline to be transported, and the pipeline to be transported is continued to be pushed forward, at which time the pipeline to be transported gradually moves forward; when the rear-end pipeline transportation device encounters a flange or an obstacle, the rear-end pipeline transportation device is lifted by a small hydraulic jack, and the rear-end pipeline transportation device is moved over the flange or obstacle by means of an artificial auxiliary rod, and then the rear-end pipeline transportation device is placed under the pipeline to be transported and continued to move forward, thereby completing the transportation of the pipeline.