Management system, method and device for personnel entry and exit information, computer equipment, readable storage medium and program product

By promoting a personnel entry and exit information management system with multiple functional modules at the power construction site, the problem of insufficient management efforts in traditional technology is solved, the efficiency and quality of construction management is improved, risks and losses are reduced, and the stable operation of construction projects is ensured.

CN119515330AInactive Publication Date: 2025-02-25CHINA SOUTHERN POWER GRID INTERNET SERVICE CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411717523.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-02-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In traditional technology, the management of information on entry and exit of construction personnel at power construction sites is weak, which makes it difficult to effectively supervise and manage, affecting the stable operation of construction projects.

Method used

It provides a management system for personnel entry and exit information, including a display interface and a database server, including a personnel entry module, attendance registration module, asset use record module, salary settlement module and personnel exit module, which is used to collect and manage construction personnel entry and exit information, attendance data, asset usage status and salary settlement information.

Benefits of technology

Through systematic management, the efficiency and quality of construction personnel entering and exiting the site are improved, management is enhanced, risks and losses brought about during the construction process are reduced, and the stable operation of construction projects is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515330A_ABST
    Figure CN119515330A_ABST
Patent Text Reader

Abstract

The invention relates to a personnel entry and exit information management system, method, device and equipment, a storage medium and a program product, and relates to the technical field of computers. By adopting the system, the management strength of the entry and exit conditions of constructors can be enhanced. The system comprises a personnel entering module which is used for carrying out registration and entry when construction personnel enter a site; the attendance registration module is used for checking attendance of the construction personnel; the asset use recording module is used for recording company asset use conditions of the constructors in the working period and generating asset use information; the salary settlement module is used for calling data in the database server and generating salary settlement information through comparison and confirmation of personal information of the construction personnel; and the personnel back-off module is used for calling the target data, judging the target data, if the target data is judged to be back-off, generating confirmation information, after feedback information of the confirmation information is received, clearing the personal basic information in the database server, and generating back-off determination information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology, and in particular to a management system, method, apparatus, computer equipment, computer-readable storage medium and computer program product for personnel entry and exit information. Background Art

[0002] The power construction industry is a capital-intensive and labor-intensive industry, characterized by long investment time, high risk and high concentration of personnel. Especially in large-scale power construction sites, there are often a large number of construction workers and a large number of subcontracting units, which greatly increases the difficulty of management of the power construction site.

[0003] In traditional technologies, the entry and exit information of personnel is almost always recorded manually, and the construction personnel may not inform the construction manager when they leave, making it difficult to carry out effective supervision and management; therefore, the current management of the entry and exit of construction personnel in their daily work is still relatively weak, which is not conducive to the stable operation of construction projects. Summary of the invention

[0004] Based on this, it is necessary to provide a management system, method, device, computer equipment, computer-readable storage medium and computer program product for personnel entry and exit information in response to the above technical problems.

[0005] In a first aspect, the present application provides a management system for personnel entry and exit information, the system comprising: a display interface and a database server, the display interface being communicatively connected to the database server, the display interface comprising a personnel entry module, an attendance registration module, an asset usage record module, a salary settlement module, and a personnel exit module;

[0006] The personnel entry module is used to log in construction personnel when they enter the site, collect basic personal information, and send the logged-in target data and collected basic personal information to the database server for storage;

[0007] The attendance registration module is used to record the attendance of the construction personnel, generate attendance data, and send the attendance data to the database server for storage;

[0008] The asset usage record module is used to record the usage of company assets by the construction personnel during work, generate asset usage information, and send the asset usage information to the database server for storage;

[0009] The wage settlement module is used to retrieve the data in the database server, generate wage settlement information through comparison and confirmation of the personal information of the construction personnel, and send the wage settlement information to the database server for storage;

[0010] The personnel exit module is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared and confirmed exit information is generated.

[0011] In one of the embodiments, the personnel entry module is also used to evaluate the potential risks brought by the construction personnel, obtain risk assessment results, and formulate corresponding risk control measures based on the risk assessment results; the potential risks include safety risks, quality risks and schedule risks.

[0012] In one of the embodiments, the attendance registration module is also used to analyze the reported data of the construction personnel based on the attendance data to obtain the distribution information, qualification level information and work experience information of the construction personnel; and use data visualization technology to display the distribution information, the qualification level information and the work experience information in the form of charts.

[0013] In one of the embodiments, the asset usage record module is also used to obtain asset return record information, compare and analyze the asset return record information with the asset usage information to obtain a comparison analysis result, and generate an asset missing warning message when there is a missing asset in the comparison analysis result.

[0014] In one of the embodiments, the wage settlement module is further used to send wage settlement data to the personnel exit module after the wage settlement is completed, and the personnel exit module confirms the exit status of the construction personnel based on the wage settlement data.

[0015] In a second aspect, the present application also provides a method for managing personnel entry and exit information, which is applied to a management system for personnel entry and exit information, and the method includes:

[0016] When construction personnel enter the site, they are logged in, their basic personal information is collected, and the logged-in target data and the collected basic personal information are sent to the database server for storage;

[0017] Perform attendance check on the construction personnel, generate attendance data, and send the attendance data to the database server for storage;

[0018] Recording the use of company assets by the construction personnel during work, generating asset use information, and sending the asset use information to the database server for storage;

[0019] Retrieving data from the database server, generating wage settlement information through comparison and confirmation of the personal information of the construction personnel, and sending the wage settlement information to the database server for storage;

[0020] The target data in the database server is retrieved and judged. If it is judged to be exit, confirmation information is generated. After receiving feedback information of the confirmation information, the personal basic information in the database server is cleared and confirmation exit information is generated.

[0021] In a third aspect, the present application also provides a device for managing personnel entry and exit information, including:

[0022] A personnel entry unit is used to log in construction personnel when they enter the site, collect basic personal information, and send the logged-in target data and the collected basic personal information to the database server for storage;

[0023] An attendance registration unit, used for recording the attendance of the construction personnel, generating attendance data, and sending the attendance data to the database server for storage;

[0024] An asset recording unit, used to record the use of company assets by the construction personnel during work, generate asset use information, and send the asset use information to the database server for storage;

[0025] A wage settlement unit, used to retrieve data in the database server, generate wage settlement information by comparing and confirming the personal information of the construction personnel, and send the wage settlement information to the database server for storage;

[0026] The personnel exit unit is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared and the confirmed exit information is generated.

[0027] In a fourth aspect, the present application further provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0028] When construction personnel enter the site, they are logged in, their basic personal information is collected, and the target data after login and the collected basic personal information are sent to the database server for storage; the construction personnel are checked for attendance, attendance data is generated, and the attendance data is sent to the database server for storage; the use of company assets by the construction personnel during work is recorded, asset usage information is generated, and the asset usage information is sent to the database server for storage; the data in the database server is retrieved, and wage settlement information is generated through comparison and confirmation with the personal information of the construction personnel, and the wage settlement information is sent to the database server for storage; the target data in the database server is retrieved, and the target data is judged. If it is judged to be exit, confirmation information is generated. After receiving the feedback information of the confirmation information, the basic personal information in the database server is cleared, and confirmation exit information is generated.

[0029] In a fifth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:

[0030] When construction personnel enter the site, they are logged in, their basic personal information is collected, and the target data after login and the collected basic personal information are sent to the database server for storage; the construction personnel are checked for attendance, attendance data is generated, and the attendance data is sent to the database server for storage; the use of company assets by the construction personnel during work is recorded, asset usage information is generated, and the asset usage information is sent to the database server for storage; the data in the database server is retrieved, and wage settlement information is generated through comparison and confirmation with the personal information of the construction personnel, and the wage settlement information is sent to the database server for storage; the target data in the database server is retrieved, and the target data is judged. If it is judged to be exit, confirmation information is generated. After receiving the feedback information of the confirmation information, the basic personal information in the database server is cleared, and confirmation exit information is generated.

[0031] In a sixth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0032] When construction personnel enter the site, they are logged in, their basic personal information is collected, and the target data after login and the collected basic personal information are sent to the database server for storage; the construction personnel are checked for attendance, attendance data is generated, and the attendance data is sent to the database server for storage; the use of company assets by the construction personnel during work is recorded, asset usage information is generated, and the asset usage information is sent to the database server for storage; the data in the database server is retrieved, and wage settlement information is generated through comparison and confirmation with the personal information of the construction personnel, and the wage settlement information is sent to the database server for storage; the target data in the database server is retrieved, and the target data is judged. If it is judged to be exit, confirmation information is generated. After receiving the feedback information of the confirmation information, the basic personal information in the database server is cleared, and confirmation exit information is generated.

[0033] The above-mentioned management system, method, device, computer equipment, computer-readable storage medium and computer program product for personnel entry and exit information, the system includes a personnel entry module, an attendance registration module, an asset usage record module, a salary settlement module and a personnel exit module, and provides technical support measures such as data collection and management, asset usage records and salary settlement processing for the entry and exit of construction personnel, effectively improving the efficiency and quality of the entry and exit of construction personnel, enhancing the management of the entry and exit of relevant personnel, and reducing the risks and losses brought about during the construction process; in addition, the solution assists the entry and exit of construction personnel through reasonable technical selection and system design, enhances the management efficiency of personnel information and timely updates the entry and exit information of personnel, which can improve the efficiency of personnel entry and exit and the accuracy of personnel information, and is conducive to the stable operation of construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0035] FIG1 is an application environment diagram of a management system for personnel entry and exit information in one embodiment;

[0036] Figure 2 A flowchart of a method for managing personnel entry and exit information in one embodiment;

[0037] Figure 3 It is a structural block diagram of a device for managing personnel entry and exit information in one embodiment;

[0038] FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0040] In one embodiment, as shown in FIG1 , a management system 100 for personnel entry and exit information is provided, the system comprising: a display interface 101 and a database server 102, the display interface 101 is in communication connection with the database server 102, the display interface 101 comprises a personnel entry module 103, an attendance registration module 104, a project asset usage record module 105, a salary settlement module 106 and a personnel exit module 107;

[0041] The personnel entry module 103 is used to log in the construction personnel when they enter the site, collect their basic personal information, and send the logged-in target data and the collected basic personal information to the database server for storage;

[0042] The attendance registration module 104 is used to record the attendance of construction personnel, generate attendance data, and send the attendance data to the database server for storage;

[0043] The asset usage record module 105 is used to record the usage of company assets by construction personnel during work, generate asset usage information, and send the asset usage information to the database server for storage;

[0044] The wage settlement module 106 is used to retrieve the data in the database server, generate wage settlement information by comparing and confirming the personal information of the construction personnel, and send the wage settlement information to the database server for storage;

[0045] The personnel exit module 107 is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback message of the confirmation message, the personal basic information in the database server is cleared and the confirmation exit information is generated.

[0046] Specifically, referring to Figure 1, after the user enters the display interface 101 of the management system 100 for personnel entry and exit information, the user can log in the construction personnel when they enter the site through the personnel entry module 103 to collect personal basic information, and can also use the attendance registration module 104 to record the attendance of the construction personnel and generate attendance data. The asset usage record module 105 can also record the use of company assets by the construction personnel during work and generate asset usage information. The salary settlement module 106 can also retrieve the data in the database server 102, and generate salary settlement information by comparing and confirming the personal information of the construction personnel. Finally, the target data in the database server 102 can be retrieved through the personnel exit module 107, and the target data can be judged. If it is judged to be an exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared, and the confirmed exit information is generated.

[0047] In one embodiment, the personnel entry module 103 is also used to evaluate the potential risks brought by the construction personnel, obtain risk assessment results, and formulate corresponding risk control measures based on the risk assessment results; potential risks include safety risks, quality risks and schedule risks.

[0048] Among them, risk control measures can be to strengthen safety supervision, increase the frequency of quality inspections, and reasonably arrange work progress.

[0049] Specifically, the user can evaluate the potential risks brought by the construction personnel through the personnel entry module 103 and obtain the risk assessment results. The personnel entry module 103 then formulates corresponding risk control measures based on the risk assessment results; potential risks include safety risks, quality risks and schedule risks.

[0050] In one embodiment, the attendance registration module 104 is also used to analyze the construction personnel's reporting data based on the attendance data to obtain the construction personnel's distribution information, qualification level information and work experience information; and use data visualization technology to display the distribution information, qualification level information and work experience information in the form of charts.

[0051] Specifically, the attendance registration module 104 analyzes the construction personnel's application data based on the attendance data so that users can understand the distribution information, qualification level information and work experience information of the construction personnel. At the same time, the attendance registration module 104 can also analyze the problems and bottlenecks in the review process, propose improvement measures, and improve the review efficiency and quality. Then, based on the data analysis results, it provides decision-making support to the project management party, such as personnel deployment, training plan formulation, risk warning, etc.; in response to the display instructions issued by the user, the attendance registration module 104 uses data visualization technology to display the distribution information, qualification level information and work experience information in the form of charts, etc., to facilitate users' intuitive understanding and decision-making.

[0052] In one embodiment, the asset usage record module 105 is also used to obtain asset return record information, compare and analyze the asset return record information with the asset usage information, obtain the comparison analysis results, and generate asset missing warning information when there is a missing asset in the comparison analysis results.

[0053] Specifically, the user can obtain asset return record information through the asset usage record module 105, compare and analyze the asset return record information with the asset usage information, and obtain the comparison analysis results. When the asset usage record module 105 identifies that there are missing assets in the comparison analysis results, it generates an asset missing warning information.

[0054] For example, if the outgoing personnel used the company's assets, such as equipment, tools, and certificates, during their work, they need to make an asset return record, recording the name, quantity, status, and other information of the returned assets to ensure that the assets are intact and returned in a timely manner to avoid asset loss.

[0055] In one embodiment, the wage settlement module 106 is further used to send wage settlement data to the personnel exit module after the wage settlement is completed, and the personnel exit module 107 confirms the exit status of the construction personnel based on the wage settlement data.

[0056] Specifically, when personnel leave the site, the wage settlement module calculates the wages, bonuses, and subsidies to be paid according to the company's wage regulations and the work situation of the personnel leaving the site, and after the wage settlement is completed, sends the wage settlement data to the personnel exit module, which then confirms the exit of the construction personnel based on the wage settlement data, thereby ensuring the accuracy and timeliness of the wage settlement and effectively avoiding disputes.

[0057] In one embodiment, Figure 2 As shown, a method for managing personnel entry and exit information is provided, and the method is applied to the management system 100 of personnel entry and exit information in FIG. 1 as an example for description, including the following steps:

[0058] Step S201, when construction personnel enter the site, they log in, collect their basic personal information, and send the logged-in target data and the collected basic personal information to the database server for storage.

[0059] Step S202, check the attendance of construction personnel, generate attendance data, and send the attendance data to a database server for storage.

[0060] Step S203, recording the use of company assets by construction personnel during work, generating asset use information, and sending the asset use information to a database server for storage.

[0061] Step S204, retrieve the data in the database server, generate wage settlement information through comparison and confirmation of the personal information of the construction personnel, and send the wage settlement information to the database server for storage.

[0062] Step S205, retrieve the target data in the database server and judge the target data. If it is judged to be exit, generate confirmation information. After receiving the feedback information of the confirmation information, clear the personal basic information in the database server and generate confirmation exit information.

[0063] Specifically, the management system for personnel entry and exit information logs in construction personnel when they enter the site, collects their basic personal information, and sends the logged-in target data and the collected basic personal information to the database server for storage; then the construction personnel are checked on attendance, attendance data is generated, and the attendance data is sent to the database server for storage; then the construction personnel's use of company assets during work is recorded, asset usage information is generated, and the asset usage information is sent to the database server for storage; then the data in the database server is retrieved, and the wage settlement information is generated through comparison and confirmation with the construction personnel's personal information, and the wage settlement information is sent to the database server for storage; finally, the target data in the database server is retrieved and the target data is judged. If it is judged to be an exit, a confirmation message is generated. After receiving the feedback message of the confirmation message, the basic personal information in the database server is cleared, and confirmed exit information is generated.

[0064] Regarding the specific limitations of the above steps, please refer to the relevant embodiments of the management system for personnel entry and exit information, which will not be repeated here.

[0065] In the above-mentioned personnel entry and exit information management method, reasonable technical selection and system design are used to assist construction personnel in entering and exiting the site, thereby enhancing the management efficiency of personnel information and timely updating personnel entry and exit information, which can improve the efficiency of personnel entry and exit and the accuracy of personnel information, and is conducive to the stable operation of the construction project.

[0066] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0067] Based on the same inventive concept, the embodiment of the present application also provides a personnel entry and exit information management device for implementing the personnel entry and exit information management method involved in the above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in the one or more personnel entry and exit information management device embodiments provided below can refer to the limitations of the personnel entry and exit information management method above, and will not be repeated here.

[0068] In an exemplary embodiment, Figure 3 As shown, a device for managing personnel entry and exit information is provided, including:

[0069] The personnel entry unit 301 is used to log in the construction personnel when they enter the site, collect their basic personal information, and send the logged-in target data and the collected basic personal information to the database server for storage;

[0070] The attendance registration unit 302 is used to record the attendance of the construction personnel, generate attendance data, and send the attendance data to the database server for storage;

[0071] The asset recording unit 303 is used to record the use of the company's assets by the construction personnel during work, generate asset use information, and send the asset use information to the database server for storage;

[0072] The wage settlement unit 304 is used to retrieve the data in the database server, generate wage settlement information through comparison and confirmation of the personal information of the construction personnel, and send the wage settlement information to the database server for storage;

[0073] The personnel exit unit 305 is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared and the confirmed exit information is generated.

[0074] The specific definition of the management device for personnel entry and exit information can be found in the definition of the management method for personnel entry and exit information above, which will not be repeated here. Each module in the above-mentioned management device for personnel entry and exit information can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0075] In an exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be shown in FIG4. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit, and an input device. The processor, the memory, and the input / output interface are connected via a system bus, and the communication interface, the display unit, and the input device are connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner may be implemented through WIFI, a mobile cellular network, near field communication (NFC) or other technologies. When the computer program is executed by the processor, a method for managing personnel entry and exit information is implemented. The display unit of the computer device is used to form a visually visible picture, which may be a display screen, a projection device, or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.

[0076] Those skilled in the art will understand that the structure shown in FIG. 4 is merely a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0077] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.

[0078] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0079] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0080] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0081] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0082] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0083] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A management system for personnel entry and exit information, characterized in that: The system comprises: a display interface and a database server, wherein the display interface is in communication connection with the database server, and the display interface comprises a personnel entry module, an attendance registration module, an asset use record module, a salary settlement module and a personnel exit module; The personnel entry module is used to log in construction personnel when they enter the site, collect basic personal information, and send the logged-in target data and collected basic personal information to the database server for storage; The attendance registration module is used to record the attendance of the construction personnel, generate attendance data, and send the attendance data to the database server for storage; The asset usage record module is used to record the usage of company assets by the construction personnel during work, generate asset usage information, and send the asset usage information to the database server for storage; The wage settlement module is used to retrieve the data in the database server, generate wage settlement information through comparison and confirmation of the personal information of the construction personnel, and send the wage settlement information to the database server for storage; The personnel exit module is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared and confirmed exit information is generated.

2. The system according to claim 1, characterized in that The personnel entry module is also used to evaluate the potential risks brought by the construction personnel, obtain risk assessment results, and formulate corresponding risk control measures based on the risk assessment results; the potential risks include safety risks, quality risks and schedule risks.

3. The system according to claim 1, characterized in that The attendance registration module is further used to analyze the construction personnel's application data according to the attendance data to obtain the construction personnel's distribution information, qualification level information and work experience information; The distribution information, the qualification level information and the work experience information are displayed in the form of charts using data visualization technology.

4. The system according to claim 1, characterized in that The asset usage record module is also used to obtain asset return record information, compare and analyze the asset return record information with the asset usage information to obtain a comparison analysis result, and generate an asset missing warning message when there is a missing asset in the comparison analysis result.

5. The system according to claim 1, characterized in that The wage settlement module is also used to send wage settlement data to the personnel exit module after the wage settlement is completed, and the personnel exit module confirms the exit status of the construction personnel based on the wage settlement data.

6. A method for managing personnel entry and exit information, characterized in that: A management system for personnel entry and exit information, the method comprising: When construction personnel enter the site, they are logged in, their basic personal information is collected, and the logged-in target data and the collected basic personal information are sent to the database server for storage; Perform attendance check on the construction personnel, generate attendance data, and send the attendance data to the database server for storage; Recording the use of company assets by the construction personnel during work, generating asset use information, and sending the asset use information to the database server for storage; Retrieving data from the database server, generating wage settlement information through comparison and confirmation of the personal information of the construction personnel, and sending the wage settlement information to the database server for storage; The target data in the database server is retrieved and judged. If it is judged to be exit, confirmation information is generated. After receiving feedback information of the confirmation information, the personal basic information in the database server is cleared and confirmation exit information is generated.

7. A management device for personnel entry and exit information, characterized in that: The device comprises: A personnel entry unit is used to log in construction personnel when they enter the site, collect basic personal information, and send the logged-in target data and collected basic personal information to the database server for storage; An attendance registration unit, used for recording the attendance of the construction personnel, generating attendance data, and sending the attendance data to the database server for storage; An asset recording unit, used to record the use of company assets by the construction personnel during work, generate asset use information, and send the asset use information to the database server for storage; A wage settlement unit, used to retrieve data in the database server, generate wage settlement information by comparing and confirming the personal information of the construction personnel, and send the wage settlement information to the database server for storage; The personnel exit unit is used to retrieve the target data in the database server and judge the target data. If it is judged as exit, a confirmation message is generated. After receiving the feedback information of the confirmation message, the personal basic information in the database server is cleared and the confirmed exit information is generated.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to claim 6 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to claim 6 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to claim 6 are implemented.

Citation Information

Patent Citations

  • System capable of performing construction site entrance and exit management

    CN107610261A

  • Civil aviation professional engineering general contract project management system based on BIM technology

    CN112508417A

  • Construction project platform management method and system

    CN117649317A

  • Labor service management system and method based on big data

    CN118941257A