Auxiliary wiring robot for field verification of current transformer

By designing the current transformer on-site verification auxiliary wiring robot, using components such as jaw cylinders, tightening devices and magnetic devices, the safety hazards and high labor intensity of manual wiring are solved, and a fast, safe and automated wiring process is achieved, and the calibration efficiency and reliability are improved.

CN119567284AActive Publication Date: 2025-03-07STATE GRID SHANDONG ELECTRIC POWER CO MARKETING SERVICE CENT (MEASURING CENT)
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411740501.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-03-07
Estimated Expiration
2044-11-29

AI Technical Summary

Technical Problem

In the field verification of current transformers, manual wiring has problems such as high safety hazards, high labor intensity and complex tasks, and it is difficult to popularize all power grids.

Method used

Design a current transformer on-site verification auxiliary wiring robot, using components such as jaw cylinders, tightening devices and magnetic devices to realize automatic selection of pre-wiring, status monitoring and precise movement, ensuring fast and safe wiring.

Benefits of technology

By automating the wiring process, the efficiency and quality of on-site operation are improved, the time and errors of manual operations are reduced, and the safety and reliability of the wiring process are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119567284A_ABST
    Figure CN119567284A_ABST
Patent Text Reader

Abstract

The invention discloses a current transformer on-site verification auxiliary wiring robot, which comprises a clamping jaw cylinder, a tensioning device and a pre-wiring line, and is characterized in that the upper part of the clamping jaw cylinder is provided with two clamping jaws capable of moving in opposite directions, the clamping jaws are respectively connected with an extension block, and the upper part of the extension block is provided with a semicircular gap; a mounting frame is connected to the upper portion of the clamping jaw air cylinder, a hexagonal sleeve is arranged on the upper portion of the mounting frame, a circular sleeve is welded to the lower portion of the hexagonal sleeve, a rotating sleeve is welded to the lower portion of the circular sleeve, and a through hole allowing the rotating sleeve to penetrate through is formed in the mounting frame. According to the invention, through integrated application of the magnetic device, the camera and other components, automatic selection and state monitoring of pre-wiring are realized. In the process, the magnetic device utilizes the electromagnet to adsorb the pre-connection wire, the camera is responsible for capturing the state information of the pre-connection wire, and through accurate control of the clamping jaw air cylinder, the advantage of accurate movement and positioning of the pre-connection wire is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of wiring robots, and in particular relates to an auxiliary wiring robot for on-site verification of current transformers. Background Art

[0002] With the implementation of power grid transformation, a large number of current sensors and transmitters are widely used in power systems. As a necessary metering device for electric energy settlement, the transformer plays an important role in the power system. Its accuracy and reliability are directly related to whether the power system can operate safely and stably. According to relevant laws and regulations such as "JJG313-2010 Verification Procedure for Current Transformers for Measurement", the power department should enforce on-site verification of electric energy metering devices, including transformers, electric energy meters and secondary circuits, to protect the interests of both the supply and demand sides of electric energy. The on-site verification of the current transformer is to connect the wiring port of the current transformer to be tested with the port of the standard current transformer, and then verify the current transformer to be tested at high altitude through the verification circuit composed of instruments such as current booster, voltage stabilizer, load box, and verification instrument.

[0003] At present, there are two main methods to connect the wiring port of the current transformer under test with the standard current transformer port: one is to manually connect the transformer input and output ports with bolts, and the other is to use copper clamps to clamp the transformer ports. However, both methods require the construction of scaffolding or the use of cranes to enable workers to reach the high-altitude platform to complete the wiring. The biggest disadvantage is that the safety hazard is large, the labor intensity is high, the task is complex, and it is difficult to popularize all power grids. Therefore, we propose a current transformer on-site verification auxiliary wiring robot. Summary of the invention

[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a current transformer on-site verification auxiliary wiring robot, which is provided with a mechanical arm to drive the clamping claw cylinder to grab the pre-wired wire, the pressure plate first contacts the pull rod to press the spring downward, and the pull rod drives the tension sleeve to move down along the tension seat cone, so that the outer dimensions of the tension sleeve return to their original position. Then the cylinder drives the clamping claw to grab the card slot on the tension seat, remove one end of the pre-wired wire from the fixture storage device and send it to the pre-connection position of the current transformer, achieving the purpose of fast and safe wiring.

[0005] The present invention is implemented as follows: a current transformer on-site calibration auxiliary wiring robot includes a clamping claw cylinder, a tensioning device and a pre-wired connection. The upper part of the clamping claw cylinder is provided with two clamping claws that can move toward each other, and the clamping claws are respectively connected to extension blocks, and the upper part of the extension block is provided with a semicircular notch; the upper part of the clamping claw cylinder is connected to a mounting frame, and the upper part of the mounting frame is provided with a hexagonal sleeve, and the lower part of the hexagonal sleeve is welded with a circular sleeve, and the lower part of the circular sleeve is welded with a rotating sleeve, and the mounting frame is provided with a through hole for the rotating sleeve to pass through, and the mounting frame is connected by a plurality of first screws. The bolt is connected with a cylinder support block, the cylinder support block is fixedly connected with a first cylinder, the piston rod of the first cylinder extends into the interior of the rotating sleeve, the upper part of the cylinder support block is fixedly connected with a driving motor for driving the rotating sleeve to rotate, and the upper part of the piston rod is fixedly connected with a material taking device; the tensioning device includes a locking nut, a tensioning seat and a tensioning rod, the material taking device is used to absorb the tensioning rod and the locking nut in steps, the hexagonal sleeve can drive the locking nut to connect with the tensioning seat when rotating, the upper part of the tensioning device is covered with a tensioning sleeve, and the clamp is used to drive the extension block to clamp the tensioning seat. The mounting frame is connected with a magnetic device for absorbing pre-wired wiring.

[0006] Optionally, a spring is installed on the tensioning rod, the tensioning seat sleeve is arranged on the outside of the tensioning rod, and an end push plate is provided at the end of the tensioning rod.

[0007] Optionally, the end of the pre-wired connection is fixedly connected with a conductive connecting plate, a through hole is opened on the conductive connecting plate, the conductive connecting plate is sleeved on the tensioning seat, the outer side of the tensioning seat is provided with a thread for connecting a locking nut, and the tensioning seat is provided with a circular ring protrusion.

[0008] Optionally, the tensioning sleeve includes a cylinder body with a plurality of notches formed on the cylinder body, a fixed shaft being fixedly connected inside the notches, a flap being rotatably connected to the fixed shaft, a rectangular groove being formed on the flap, a torsion spring being sleeved on the fixed shaft inside the rectangular groove, and the torsion spring can cause the lower end of the flap to flip out of the cylinder body when not under force.

[0009] Optionally, the output shaft of the driving motor is fixedly connected to the first gear, the outer side of the rotating sleeve is fixedly connected to a plurality of connecting teeth, the material picking device includes a connecting column, the upper part of the connecting column is fixedly connected to an umbrella-shaped suction cup, the top of the umbrella-shaped suction cup is fixedly connected to a magnet block, and the upper part of the cylinder support block is provided with an annular track groove.

[0010] Optionally, the magnetic device includes a rectangular block, which is connected to the mounting frame by screws, a second cylinder is fixedly connected to the upper part of the rectangular block, a pre-wiring support seat is fixedly connected to the upper part of the telescopic rod of the second cylinder, an electromagnet is embedded in the interior of the pre-wiring support seat, a semicircular groove and a rectangular groove are provided on the pre-wiring support seat, a pressure sensor is embedded in the semicircular groove, and a camera is embedded in the interior of the rectangular groove.

[0011] Optionally, it also includes a walking lift, the lower part of which is provided with wheels, the upper part of which is connected to a turret, the upper part of which is connected to a vertical lifting arm, the top of which is connected to a lateral extension arm, and the end of which is connected to an equipment installation platform.

[0012] Optionally, a safety guardrail is fixedly connected to the equipment mounting platform, a Y-axis screw conveyor is fixedly connected to the top of the safety guardrail, an X-axis screw conveyor is fixedly connected to the lower part of the slide of the Y-axis screw conveyor, and a linear cylinder is fixedly connected to the lower part of the slide of the X-axis screw conveyor.

[0013] Optionally, the lower end of the telescopic rod of the linear cylinder is fixedly connected to a rotary cylinder, the rotating end of the rotary cylinder is fixedly connected to the clamping cylinder, and the X-axis screw conveyor and the Y-axis screw conveyor are respectively connected to DC motors.

[0014] Optionally, a raised connection portion is welded to the right side of the equipment installation platform, and an equipment installation bracket is welded to the lower part of the equipment installation platform.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. Through the integrated application of components such as magnetic devices and cameras, automatic selection and status monitoring of pre-wiring are realized. In this process, the magnetic device uses electromagnets to absorb the pre-wiring, while the camera is responsible for capturing the status information of the pre-wiring, such as whether it is damaged or bent. In addition, the pressure sensor can also detect whether the pre-wiring has been correctly placed in the predetermined position. This combination not only ensures the quality of the pre-wiring, but also monitors the entire wiring process in real time, and promptly detects and handles potential problems. Ultimately, the beneficial effects of ensuring wiring quality and improving fault response speed are achieved.

[0017] 2. Precise movement and positioning of the pre-wires are achieved through precise control of the clamping claw cylinder. When the pre-wires need to be moved from the storage device to the pre-connection position of the current transformer, the clamping claw cylinder will first clamp the slot on the tensioner, and then the pre-wires will be accurately placed in the designated position through the coordinated action of the robotic arm. This process not only reduces the time of manual operation, but also greatly improves the accuracy of wiring and avoids errors caused by human factors. This realizes the automated wiring process and improves the efficiency and quality of on-site operations.

[0018] 3. Through the design of the tensioning device, the pre-wired wiring is stably clamped and released. In specific operation, when the tensioning rod is under pressure, it compresses the spring downward and drives the tension sleeve to move downward along the tapered part of the tensioning seat, thereby reducing the diameter of the tension sleeve and ensuring that the pre-wired wiring can be tightly and firmly clamped. The role of this step is to ensure that the pre-wired wiring will not loosen or fall off during the transmission process, and improve the safety and reliability of the wiring process. Ultimately, the beneficial effect of improving work efficiency and reducing the risk and cost of manual intervention is achieved.

[0019] Further features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the gripper cylinder and pre-wiring structure provided by the present invention;

[0021] Figure 2 It is a schematic diagram of the clamping jaw cylinder and the tensioning device provided by the present invention;

[0022] Figure 3 This is a schematic diagram of the clamping cylinder provided by the present invention after removing the extension block and the magnetic device;

[0023] Figure 4 This is a schematic diagram of the clamping cylinder provided by the present invention after the mounting frame is removed;

[0024] Figure 5 It is a schematic diagram of the cylinder support block and the material taking device provided by the present invention;

[0025] Figure 6 It is a schematic diagram of the material taking device provided by the present invention;

[0026] Figure 7 is a schematic diagram of a magnetic device provided by the present invention;

[0027] Figure 8 It is a schematic diagram of the traveling lifting vehicle provided by the present invention;

[0028] Fig. 9 It is a schematic diagram of the equipment installation platform provided by the present invention;

[0029] Fig.10 It is a side view of the equipment installation platform provided by the present invention;

[0030] Fig.11 It is a schematic diagram of the mutual inductor provided by the present invention being connected to a tray through a tensioning device and pre-wiring.

[0031] In the figure: 1, extension block; 2, rotary cylinder; 3, clamping claw cylinder; 301, clamping claw; 4, mounting frame; 5, tensioning device; 51, tensioning rod; 52, spring; 53, locking nut; 54, tensioning seat; 55, end push plate; 56, tensioning sleeve; 561, notch; 562, flap; 563, cylinder; 564, fixed shaft; 565, torsion spring; 57, annular protrusion; 6, pre-wiring; 61, conductive connecting plate; 7, walking lifting vehicle; 8, magnetic device; 81, rectangular block; 82, pre-wiring support seat; 83, second cylinder; 84, semicircular groove; 85, rectangular groove; 86, pressure sensor; 87, camera head; 88, electromagnet; 9, turret; 10, vertical lifting arm; 11, horizontal extension arm; 12, equipment installation platform; 13, first bolt; 14, safety guardrail; 15, Y-axis screw conveyor; 16, X-axis screw conveyor; 17, equipment installation bracket; 18, raised connection part; 19, first gear; 20, DC motor; 21, linear cylinder; 22, hexagonal sleeve; 23, cylinder support block; 24, circular sleeve; 25, rotating sleeve; 26, connecting teeth; 27, material picking device; 271, connecting column; 272, umbrella-shaped suction cup; 28, piston rod; 29, annular track groove; 30, first cylinder; 31, drive motor. DETAILED DESCRIPTION

[0032] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.

[0033] like Figures 1 to 11 As shown, an embodiment of the present invention provides a current transformer on-site calibration auxiliary wiring robot.

[0034] The invention comprises a clamping cylinder 3, a tensioning device 5 and a pre-wire 6. The upper part of the clamping cylinder 3 is provided with two clamping jaws 301 which can move toward each other. The clamping jaws 301 are respectively connected with extension blocks 1. The upper part of the extension block 1 is provided with a semicircular notch. The upper part of the clamping cylinder 3 is connected with a mounting frame 4. The upper part of the mounting frame 4 is provided with a hexagonal sleeve 22. The lower part of the hexagonal sleeve 22 is welded with a circular sleeve 24. The lower part of the circular sleeve 24 is welded with a rotating sleeve 25. The mounting frame 4 is provided with a through hole for the rotating sleeve 25 to pass through. The mounting frame 4 is connected with a cylinder support block 23 through a plurality of first bolts 13. The cylinder support block 23 is fixedly connected with The first cylinder 30, the piston rod 28 of the first cylinder 30 extends into the interior of the rotating sleeve 25, the upper part of the cylinder support block 23 is fixedly connected with a driving motor 31 for driving the rotating sleeve 25 to rotate, and the upper part of the piston rod 28 is fixedly connected with a material taking device 27; the tensioning device 5 includes a locking nut 53, a tensioning seat 54 and a tensioning rod 51, and the material taking device 27 is used to absorb the tensioning rod 51 and the locking nut 53 in steps, and the hexagonal sleeve 22 can drive the locking nut 53 to connect with the tensioning seat 54 when rotating. The upper part of the tensioning device 5 is covered with a tensioning sleeve 56, and the clamping claw 301 is used to drive the extension block 1 to clamp the tensioning seat 54. The mounting frame 4 is connected with a magnetic device 8 for absorbing the pre-wired connection 6.

[0035] A spring 52 is installed on the tension rod 51 , a tension seat 54 is sleeved on the outside of the tension rod 51 , and an end push plate 55 is provided at the end of the tension rod 51 .

[0036] The end of the pre-wire 6 is fixedly connected with a conductive connecting plate 61, which has a through hole. The conductive connecting plate 61 is sleeved on the tensioning seat 54, and the outer side of the tensioning seat 54 is provided with a thread for connecting the locking nut 53, and the tensioning seat 54 is provided with a circular protrusion 57.

[0037] The tensioning sleeve 56 includes a cylinder 563, which is provided with a plurality of notches 561. A fixed shaft 564 is fixedly connected inside the notch 561. The fixed shaft 564 is rotatably connected with a flap 562. A rectangular groove is provided on the flap 562. A torsion spring 565 is sleeved on the fixed shaft 564 inside the rectangular groove. The torsion spring 565 can make the lower end of the flap 562 flip out of the cylinder 563 when it is not under force.

[0038] The output shaft of the driving motor 31 is fixedly connected to the first gear 19, the outer side of the rotating sleeve 25 is fixedly connected to a plurality of connecting teeth 26, the material picking device 27 includes a connecting column 271, the upper part of the connecting column 271 is fixedly connected to an umbrella-shaped suction cup 272, the top of the umbrella-shaped suction cup 272 is fixedly connected to a magnet block, and an annular track groove 29 is opened on the upper part of the cylinder support block 23.

[0039] The magnetic device 8 includes a rectangular block 81, which is connected to the mounting frame 4 by screws. A second cylinder 83 is fixedly connected to the upper part of the rectangular block 81, and a pre-wiring support seat 82 is fixedly connected to the upper part of the telescopic rod of the second cylinder 83. An electromagnet 88 is embedded in the pre-wiring support seat 82. A semicircular groove 84 and a rectangular groove 85 are provided on the pre-wiring support seat 82. A pressure sensor 86 is embedded in the semicircular groove 84, and a camera 87 is embedded in the rectangular groove 85.

[0040] It also includes a traveling lifting vehicle 7, the lower part of which is provided with wheels, the upper part of which is connected to a turret 9, the upper part of which is connected to a vertical lifting arm 10, the top of which is connected to a lateral extension arm 11, and the end of which is connected to an equipment installation platform 12.

[0041] A safety guardrail 14 is fixedly connected to the equipment installation platform 12, a Y-axis screw conveyor 15 is fixedly connected to the top of the safety guardrail 14, an X-axis screw conveyor 16 is fixedly connected to the lower part of the slide of the Y-axis screw conveyor 15, and a linear cylinder 21 is fixedly connected to the lower part of the slide of the X-axis screw conveyor 16.

[0042] The lower end of the telescopic rod of the linear cylinder 21 is fixedly connected to the rotary cylinder 2, and the rotating end of the rotary cylinder 2 is fixedly connected to the clamping cylinder 3. The X-axis screw conveyor 16 and the Y-axis screw conveyor 15 are respectively connected to the DC motor 20.

[0043] A protruding connection portion 18 is welded to the right side of the equipment installation platform 12 , and an equipment installation bracket 17 is welded to the lower part of the equipment installation platform 12 .

[0044] Working principle: When in use, prepare multiple sets of workpieces such as tensioning device 5, pre-wired wire 6, locking nut 53 and tensioning sleeve 56, and place them on the storage device of the equipment installation platform 12;

[0045] At this time, the X-axis screw conveyor 16 and the Y-axis screw conveyor 15 can drive the clamping cylinder 3 to move, the first cylinder 30 can drive the piston rod 28 to extend, and the umbrella-shaped suction cup 272 on the material taking device 27 can absorb the locking nut 53 on the storage device and place it inside the hexagonal sleeve 22;

[0046] When the magnetic device 8 is moved to the storage device, it can absorb the pre-wire 6 through the electromagnet 88 and confirm the position through the camera 87 and the pressure sensor 86, so that the opening on the conductive connecting plate 61 is aligned with the opening of the locking nut 53.

[0047] The connecting column 271 and the magnet on the material taking device 27 can absorb the tensioning device 5 on the storage device. The piston rod 28 drives the tensioning device 5 to enter the interior of the rotating sleeve 25 during the downward movement. At this time, the driving motor 31 can drive the first gear 19 to rotate, and then drive the circular sleeve 24 and the rotating sleeve 25 to rotate, so as to lock the locking nut 53 to the tensioning seat 54 through the thread.

[0048] The tensioning state of the tensioning sleeve 56 is controlled by compressing the spring 52 through the tensioning rod 51 , and the clamping jaws 301 on the clamping jaw cylinder 3 move toward each other under the command of the control system, and clamp the tensioning seat 54 through the semicircular notch on the extension block 1 .

[0049] Subsequently, the material taking device 27 contacts and presses down the tensioning rod 51, compressing the spring 52, causing the tensioning sleeve 56 to slide down along the conical surface of the tensioning seat 54, thereby restoring to the initial non-expanded state, that is, the flap 562 rotates under the action of the conical surface to be parallel to the cylinder 563, so that it no longer flips outward.

[0050] The tension rod 51 and the spring 52 are designed as a combination. In the pre-connection position, the tension sleeve 56 is sent to the pre-connection thread groove of the current transformer, the tension seat 54 is pressed on the transformer, the clamping cylinder 3 is released, and the spring 52 gradually resets during the cylinder return process, tightening the tension rod 51, and the tension rod 51 tightens the tension sleeve 56, so that the tension sleeve 56 expands and connects tightly with the inner groove of the transformer, playing the role of pre-wiring.

[0051] The expansion state of the tension sleeve 56 means that the flap 562 is flipped outwards of the outer cylinder 563 under the action of the torsion spring 565 .

[0052] After the connection of the pre-wire 6 is completed, the control system instructs each component to reset in order to proceed to the next cycle. The traveling lifting vehicle 7 returns to the initial position to wait for the next current transformer verification task.

[0053] Through the above steps, the current transformer on-site verification auxiliary wiring robot realizes the automatic grasping, positioning and connection of the pre-wired wire 6, greatly improving the efficiency and reliability of on-site verification. The design of the robot fully considers the actual needs of on-site use, and ensures the safety and convenience of operation through precise mechanical structure and intelligent control system.

[0054] This allows the robot to move flexibly on flat ground and reach the predetermined current transformer position without the need for additional transportation. A turret 9 is connected to the upper part of the walking lift 7, and the turret 9 can achieve 360-degree rotation, further enhancing the robot's operating range. A vertical lifting arm 10 is connected to the upper part of the turret 9, and the vertical lifting arm 10 can move up and down to meet the calibration requirements of current transformers at different heights. A lateral extension arm 11 is connected to the top of the vertical lifting arm 10, and the lateral extension arm 11 is responsible for the horizontal extension movement, which expands the robot's operating radius. The end of the lateral extension arm 11 is connected to an equipment installation platform 12, which is used to install the gripper cylinder 3 and other necessary actuators and sensors, ensuring that all operating components can be moved to the desired position with the equipment.

[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A current transformer on-site verification auxiliary wiring robot, comprising a clamping cylinder (3), a tensioning device (5) and a pre-wiring (6), characterized in that: The upper part of the clamping jaw cylinder (3) is provided with two clamping jaws (301) that can move towards each other, and the clamping jaws (301) are respectively connected to extension blocks (1), and the upper part of the extension block (1) is provided with a semicircular notch; The upper part of the clamping cylinder (3) is connected to a mounting frame (4), the upper part of the mounting frame (4) is provided with a hexagonal sleeve (22), the lower part of the hexagonal sleeve (22) is welded with a circular sleeve (24), the lower part of the circular sleeve (24) is welded with a rotating sleeve (25), the mounting frame (4) is provided with a through hole for the rotating sleeve (25) to pass through, the mounting frame (4) is connected to a cylinder support block (23) through a plurality of first bolts (13), the cylinder support block (23) is fixedly connected to a first cylinder (30), the piston rod (28) of the first cylinder (30) extends into the interior of the rotating sleeve (25), the upper part of the cylinder support block (23) is fixedly connected to a driving motor (31) for driving the rotating sleeve (25) to rotate, and the upper part of the piston rod (28) is fixedly connected to a material taking device (27); The tensioning device (5) comprises a locking nut (53), a tensioning seat (54) and a tensioning rod (51); the material taking device (27) is used to suck the tensioning rod (51) and the locking nut (53) step by step; the hexagonal sleeve (22) can drive the locking nut (53) to connect with the tensioning seat (54) when rotating; the upper part of the tensioning device (5) is covered with a tensioning sleeve (56); the clamping claw (301) is used to drive the extension block (1) to clamp the tensioning seat (54); The mounting frame (4) is connected to a magnetic device (8) for absorbing the pre-wired wiring (6).

2. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: A spring (52) is installed on the tensioning rod (51), the tensioning seat (54) is sleeved on the outside of the tensioning rod (51), and an end push plate (55) is provided at the end of the tensioning rod (51).

3. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: The end of the pre-wire (6) is fixedly connected to a conductive connecting plate (61), a through hole is provided on the conductive connecting plate (61), the conductive connecting plate (61) is sleeved on a tensioning seat (54), a thread for connecting a locking nut (53) is provided on the outer side of the tensioning seat (54), and a circular protrusion (57) is provided on the tensioning seat (54).

4. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: The tension sleeve (56) comprises a cylinder (563), a plurality of notches (561) are provided on the cylinder (563), a fixed shaft (564) is fixedly connected inside the notch (561), a flap (562) is rotatably connected to the fixed shaft (564), a rectangular groove is provided on the flap (562), a torsion spring (565) is sleeved on the fixed shaft (564) inside the rectangular groove, and the torsion spring (565) can make the lower end of the flap (562) flip out to the outside of the cylinder (563) when no force is applied.

5. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: The output shaft of the driving motor (31) is fixedly connected to a first gear (19), the outer side of the rotating sleeve (25) is fixedly connected to a plurality of connecting teeth (26), the material taking device (27) comprises a connecting column (271), the upper part of the connecting column (271) is fixedly connected to an umbrella-shaped suction cup (272), the top of the umbrella-shaped suction cup (272) is fixedly connected to a magnet block, and the upper part of the cylinder support block (23) is provided with an annular track groove (29).

6. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: The magnetic device (8) comprises a rectangular block (81), the rectangular block (81) is connected to the mounting frame (4) by screws, the upper part of the rectangular block (81) is fixedly connected to a second cylinder (83), the upper part of the telescopic rod of the second cylinder (83) is fixedly connected to a pre-wiring support seat (82), an electromagnet (88) is embedded in the pre-wiring support seat (82), a semicircular groove (84) and a rectangular groove (85) are provided on the pre-wiring support seat (82), a pressure sensor (86) is embedded in the semicircular groove (84), and a camera (87) is embedded in the rectangular groove (85).

7. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: The invention also comprises a walking lift vehicle (7), the lower part of which is provided with wheels, the upper part of which is connected to a turret (9), the upper part of which is connected to a vertical lifting arm (10), the top of which is connected to a lateral extension arm (11), and the end of which is connected to an equipment installation platform (12).

8. The current transformer on-site verification auxiliary wiring robot according to claim 7, characterized in that: A safety guardrail (14) is fixedly connected to the equipment installation platform (12); a Y-axis screw conveyor (15) is fixedly connected to the top of the safety guardrail (14); an X-axis screw conveyor (16) is fixedly connected to the lower part of the slide of the Y-axis screw conveyor (15); and a linear cylinder (21) is fixedly connected to the lower part of the slide of the X-axis screw conveyor (16).

9. The current transformer on-site verification auxiliary wiring robot according to claim 8, characterized in that: The lower end of the telescopic rod of the linear cylinder (21) is fixedly connected to a rotary cylinder (2), the rotating end of the rotary cylinder (2) is fixedly connected to a clamping cylinder (3), and the X-axis screw conveyor (16) and the Y-axis screw conveyor (15) are respectively connected to a DC motor (20).

10. The current transformer on-site verification auxiliary wiring robot according to claim 1, characterized in that: A raised connection portion (18) is welded to the right side of the equipment installation platform (12), and an equipment installation bracket (17) is welded to the lower part of the equipment installation platform (12).

Citation Information

Patent Citations

  • Low-voltage current transformer comprehensive testing device and method

    CN104730383A

  • Current transformer field verification auxiliary wiring robot

    CN107290704A

  • Novel tensioning device for power cable installation

    CN111585208A

  • Primary wiring device for current transformer test

    CN118465664A

  • Automatic wiring device

    WO2023227289A1