Electric power operation checking method and device and storage medium

By verifying the operation-related data of power operations, ensuring the safety and standardization of power operations, the problem of inability to effectively ensure the safety and standardization of power operations in the existing technology is solved, and efficient and accurate verification and management are achieved.

CN119579103APending Publication Date: 2025-03-07GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411656574.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-19
Publication Date
2025-03-07

AI Technical Summary

Technical Problem

The prior art cannot effectively ensure the safety and standardization of power operations, resulting in inefficiency and safety hazards.

Method used

By obtaining the operation correlation data of multiple power operations in the power operation list within the preset time period, establishing the correspondence between the power operation and the operation correlation data, determining the corresponding standard operation data for each power operation, verifying the operation correlation data based on the standard data, generating initial verification results, and determining the target verification results based on multiple initial verification results, and generating prompt information.

Benefits of technology

It improves the verification accuracy of power operations, enhances the safety and standardization of power operations, and reduces the error rate and cost of manual verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119579103A_ABST
    Figure CN119579103A_ABST
Patent Text Reader

Abstract

The invention discloses an electric power operation checking method and device and a storage medium. The method comprises the steps that operation associated data of multiple electric power operations in an electric power operation list in a preset time period are acquired, and the operation associated data comprise data generated by executing each electric power operation, actual operation starting time data, actual operation ending time data, operation plan starting time data and operation plan ending time data; for each power operation, determining standard operation data corresponding to the operation associated data of the power operation, and checking the operation associated data based on the standard operation data to obtain an initial checking result corresponding to the power operation; and determining a target check result corresponding to the power operation list based on the plurality of initial check results, generating prompt information based on the target check result, and displaying the prompt information. The checking accuracy of the electric power operation is improved, and the safety and normalization of the electric power operation are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of automated management technology, and in particular to a method, device and storage medium for verifying electric power operations. Background Art

[0002] As the scale of the power system continues to expand, the asset domain of the power grid management platform faces increasingly complex management requirements.

[0003] In order to ensure the safe and stable operation of the power grid, strict supervision and control of various operations in the asset domain are required. However, the current management method mainly relies on manual verification, which leads to low work efficiency and irregular management processes, which easily lead to safety hazards in power operations and cannot ensure the safety and standardization of power operations. Summary of the invention

[0004] The present invention provides a method, a device and a storage medium for verifying electric power operations, so as to solve the problem that the safety and standardization of electric power operations cannot be ensured.

[0005] According to one aspect of the present invention, there is provided a method for verifying electric power operations, the method comprising:

[0006] Obtaining operation-related data of multiple power operations in a power operation list within a preset time period, wherein the operation-related data includes data generated by executing each of the power operations, actual operation start time data, actual operation end time data, operation plan start time data, and operation plan end time data;

[0007] For each of the power operations, determine standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation;

[0008] A target verification result corresponding to the power operation list is determined based on the plurality of initial verification results, prompt information is generated based on the target verification result, and the prompt information is displayed.

[0009] According to another aspect of the present invention, there is provided a device for verifying electric power operations, the device comprising:

[0010] A data acquisition module, used to acquire operation-related data of multiple power operations in a power operation list within a preset time period, wherein the operation-related data includes data generated by executing each of the power operations, actual operation start time data, actual operation end time data, operation plan start time data, and operation plan end time data;

[0011] A verification module, configured to determine, for each of the power operations, standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation;

[0012] A prompt module is used to determine a target verification result corresponding to the power operation list based on the multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information.

[0013] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0014] at least one processor; and

[0015] a memory communicatively connected to the at least one processor; wherein,

[0016] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the power operation verification method described in any embodiment of the present invention.

[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for verifying power operations described in any embodiment of the present invention when executed.

[0018] The technical solution of the embodiment of the present invention is to obtain the job-related data of multiple power operations in the power operation list within a preset time period, wherein the job-related data includes data generated by executing each of the power operations, actual job start time data, actual job end time data, job planned start time data and job planned end time data; establish a corresponding relationship between the power operation and the job-related data, and then, for each of the power operations, determine the standard operation data corresponding to the job-related data of the power operation, verify the job-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation, and accurately determine the initial verification result corresponding to each power operation; finally, determine the target verification result corresponding to the power operation list based on multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information, thereby solving the problem of being unable to ensure the safety and standardization of power operations, and achieving the beneficial effect of improving the verification accuracy of power operations and improving the safety and standardization of power operations.

[0019] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 is a flow chart of a method for verifying electric power operations provided according to Embodiment 1 of the present invention;

[0022] Figure 2 is a flow chart of a method for verifying electric power operations provided according to Embodiment 2 of the present invention;

[0023] Figure 3 This is a schematic diagram of the structure of a power operation verification device provided according to Embodiment 3 of the present invention;

[0024] Figure 4 It is a schematic diagram of the structure of an electronic device for implementing the method for verifying electric power operations according to an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] Embodiment 1

[0028] Figure 1 A flowchart of a method for checking power operations is provided for the first embodiment of the present invention. This embodiment is applicable to the case of checking power operations. The method can be performed by a device for checking power operations. The device for checking power operations can be implemented in the form of hardware and / or software. The device for checking power operations can be configured in an electronic device. Figure 1 As shown, the method includes:

[0029] S110, obtaining operation-related data of a plurality of electric power operations in a list of electric power operations within a preset time period.

[0030] Among them, power operations can be understood as operations such as operation, maintenance, installation, overhaul, modification, construction and commissioning of electrical equipment. Operation-related data includes data generated by executing each of the power operations, actual operation start time data, actual operation end time data, operation plan start time data and operation plan end time data.

[0031] Specifically, the job execution data and the actual start time data, actual end time data, planned start time data and planned end time data of multiple power operations in the power operation list within the preset time period are obtained. Among them, the preset time period can be pre-set as needed, such as 24 hours, and this embodiment does not limit it. Exemplarily, through the monitoring system and data acquisition device of the power system, the execution status of each power operation is recorded in real time, including changes in parameters such as current, voltage, and power, and abnormal data generated during the operation, such as equipment failures, current fluctuations, etc., are collected to obtain the job execution data. The planned start time and planned end time of each power operation recorded by the operation planning system and the actual start time and actual end time recorded at the operation site are obtained to obtain the operation time data.

[0032] Optionally, after obtaining the job-related data of multiple power jobs in the power job list within a preset time period, the method further includes: performing data cleaning processing on the job-related data, and updating the job-related data based on the cleaning result.

[0033] Specifically, outliers in the job-related data are identified and corrected, deleted or marked. Missing job-related data are filled or deleted according to data distribution and business logic. The job-related data is updated based on the cleaning results obtained by the cleaning process.

[0034] S120. For each of the power operations, determine standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation.

[0035] The standard operation data can be understood as the standard data corresponding to the target power operation. The initial verification result can be understood as the power operation verification result.

[0036] Specifically, standard operation data for each power operation is established in advance based on experience, execution specifications and historical data. Standard operation data includes key steps for executing power operations, expected time range, execution standards and safety requirements. Compare the operation-related data with the standard operation data. Check whether the operation-related data meets the requirements in the standard operation data. Record each verification result in detail, including operation items that meet the standards and operation items that do not meet the standards. For operation items that do not meet the standards, record specific problems, analyze the reasons for their non-compliance with the specifications and recommend improvement measures.

[0037] Optionally, the standard operation data includes standard operation duration data; the operation-related data is verified based on the standard operation data to obtain an initial verification result corresponding to the power operation, including: determining the planned operation duration data based on the operation plan start time data and the operation plan end time data; determining the initial verification result corresponding to the power operation by determining the planned operation duration data and the standard operation duration data.

[0038] Specifically, the standard operation duration of each power operation is organized into a table form to facilitate subsequent verification and comparison. The planned start time data and planned end time data of each power operation are extracted from the operation-related data. According to the planned start time and the planned end time, the planned operation duration of each power operation is calculated. The planned operation duration of each power operation is compared with the corresponding standard operation duration to obtain a comparison result, and an initial verification result is generated based on the comparison result. Exemplarily, if the planned operation duration is within the range of the standard operation duration, it is in compliance with the standard, and an initial verification result is generated based on the comparison result. If the planned operation duration exceeds the standard operation duration, it is not in compliance with the standard, and a preliminary analysis of the possible reasons for not meeting the standard is performed, and an initial verification result is generated based on the comparison result and the reasons obtained by the analysis.

[0039] Optionally, the job-related data includes actual timing data for executing the power job; the standard job data includes standard timing data; the job-related data is verified based on the standard job data to obtain an initial verification result corresponding to the power job, including: obtaining ticket-related data of the power job list, comparing the actual timing data with the standard timing data, and determining the initial verification result corresponding to the power job based on the comparison result.

[0040] Specifically, the actual timing data of each power operation is extracted from the operation-related data, and the actual timing data of each power operation is compared with the standard timing data to check whether the execution order and time of the actual operation meet the standard requirements, such as whether the operation starts on time, whether the key steps are executed in sequence, and whether the time interval between steps meets the standard. And record the standard items and the items that do not meet the standards. For items that do not meet the standards, record the specific deviations, such as early or delayed execution, wrong step sequence, etc. Perform in-depth analysis of the comparison results to identify the reasons for the deviation of the operation timing. Based on the comparison results and analysis, determine the initial verification results corresponding to the power operation.

[0041] Optionally, the operation-related data also includes operation type data, and the operation-related data is verified based on the standard operation data to obtain an initial verification result corresponding to the power operation, including: when the operation type data includes emergency repair operations, determining the emergency repair operation plan duration data corresponding to the emergency repair operations, and determining the initial verification result corresponding to the power operation based on the emergency repair operation plan duration data and a preset emergency repair duration threshold.

[0042] Specifically, the operation type data of each power operation is extracted from the operation-related data. When the operation type data includes emergency repair operations, the planned duration data of the emergency repair operations are extracted from the operation-related data, which includes the estimated start time, estimated end time and planned duration of the entire emergency repair process of the emergency repair operations. The planned duration of the emergency repair operation is compared with the preset emergency repair duration threshold. Check whether the planned duration of the emergency repair operation exceeds the preset emergency repair duration threshold, and determine the initial verification result corresponding to the power operation based on the comparison result. In the case where the planned duration data of the emergency repair operation exceeds the preset emergency repair duration threshold, the specific deviation is recorded, such as exceeding the preset emergency repair duration threshold by 2 hours. The preset emergency repair duration threshold can be preset based on experience, and this embodiment does not limit it.

[0043] S130. Determine a target verification result corresponding to the power operation list based on the plurality of initial verification results, generate prompt information based on the target verification result, and display the prompt information.

[0044] Among them, the target verification result can be understood as the power operation list verification result.

[0045] Specifically, the initial verification results of all power operations are summarized to obtain comprehensive target verification results, and a comprehensive verification report is generated based on the target verification results. The report should include the verification results, problem summary and improvement suggestions for each operation. The prompt information is displayed in a preset display method. For example, text reports, chart displays, emails, and SMS notifications. The display channel is determined according to the urgency and importance of the prompt information and the preset display method of the recipient, such as: internal management system of the enterprise, email, SMS platform, and telephone notification.

[0046] Optionally, the job-related data also includes actual job start time data and actual job end time data; determining a target verification result corresponding to the power job list based on multiple initial verification results, including: determining actual job duration data based on the actual job start time data and the actual job end time data, and determining actual average job duration data corresponding to the power job list based on multiple actual job duration data; determining planned average job duration data corresponding to the power job list based on multiple planned job duration data, and determining the average duration difference between the actual average job duration data and the planned average job duration data; determining a target verification result corresponding to the power job list based on the average duration difference and multiple initial verification results.

[0047] Specifically, the actual start time data and actual end time data of each power operation are extracted from the operation-related data. According to the actual start time and the actual end time, the actual operation duration of each power operation is calculated. The actual operation duration of all power operations is added up, and then divided by the total number of power operations to obtain the actual average operation duration data. The planned operation duration of all power operations is added up, and then divided by the total number of power operations to obtain the planned average operation duration data. And determine the average duration difference between the actual average operation duration data and the planned average operation duration data. Combine the average duration difference with the initial verification results to analyze the prevalence and causes of operation duration deviations. Exemplarily, identify frequent operation duration deviations in power operations and analyze the causes. Evaluate the impact of operation duration deviations on resource allocation, cost control and operation efficiency. Propose improvement measures, such as optimizing operation processes, improving operation efficiency, and strengthening operation monitoring.

[0048] The technical solution of the embodiment of the present invention is to obtain the job-related data of multiple power operations in the power operation list within a preset time period, wherein the job-related data includes data generated by executing each of the power operations, actual job start time data, actual job end time data, job planned start time data and job planned end time data; establish a corresponding relationship between the power operation and the job-related data, and then, for each of the power operations, determine the standard operation data corresponding to the job-related data of the power operation, verify the job-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation, and accurately determine the initial verification result corresponding to each power operation; finally, determine the target verification result corresponding to the power operation list based on multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information, thereby solving the problem of being unable to ensure the safety and standardization of power operations, and achieving the beneficial effect of improving the verification accuracy of power operations and improving the safety and standardization of power operations.

[0049] Embodiment 2

[0050] Figure 2 A flowchart of a method for verifying electric power operations provided in Embodiment 2 of the present invention, this embodiment is a further optimization of the method for determining the target verification result corresponding to the electric power operation list based on multiple initial verification results in the above embodiment. Optionally, before determining the target verification result corresponding to the electric power operation list based on multiple initial verification results, it also includes: obtaining job ticket data corresponding to each of the electric power operations, verifying the job-related data based on the job ticket data to obtain the job ticket verification result corresponding to the electric power operation, and updating the initial verification result corresponding to the electric power operation based on the job ticket verification result; wherein the job ticket data includes a work ticket and an operation ticket.

[0051] like Figure 2 As shown, the method includes:

[0052] S210: Obtain operation-related data of a plurality of electric power operations in an electric power operation list within a preset time period.

[0053] S220. For each of the power operations, determine standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation.

[0054] S230, obtaining the work ticket data corresponding to each of the power operations, verifying the work-related data based on the work ticket data to obtain the work ticket verification result corresponding to the power operation, and updating the initial verification result corresponding to the power operation based on the work ticket verification result.

[0055] The job ticket data includes a work ticket and an operation ticket.

[0056] Specifically, the work ticket and operation ticket corresponding to each of the power operations. Extract the work ticket data in the work ticket and operation ticket, compare the work ticket data with the operation-related data, and determine the work ticket verification result corresponding to the power operation based on the comparison result. Update the initial verification result corresponding to the power operation based on the work ticket verification result.

[0057] Optionally, the job-related data is verified based on the job ticket data to obtain a job ticket verification result corresponding to the power operation, including: when the job ticket data includes a work ticket, determining the job time authority data corresponding to the work ticket, and generating a job ticket verification result corresponding to the power operation based on the job time authority data and the job planned start time data; when the job type data includes an operation ticket, obtaining the planned operation duration data corresponding to the operation ticket and a preset operation duration threshold to generate a job ticket verification result corresponding to the power operation.

[0058] Specifically, in the case where the job ticket data includes a work ticket, determine the job time authority data corresponding to the work ticket (for example: the validity period of the operator's qualifications, the valid period of the job permit, etc.) and obtain the job plan start time data specified in the work ticket, and compare the job time authority data with the job plan start time data, for example: check whether the operator's qualifications are within the validity period, and whether the time period of the job permit covers the job plan start time. Based on the comparison results, generate a job ticket verification result corresponding to the work ticket. In the case where the job type data includes an operation ticket, obtain the planned operation duration data corresponding to the operation ticket, compare the planned operation duration data in the operation ticket with the preset operation duration threshold, check whether the operation duration is within the preset operation duration threshold, and generate a job ticket verification result corresponding to the operation ticket based on the comparison results.

[0059] Exemplarily, the work ticket data for a specified time period is exported: the work end time minus the permitted work time, if it exceeds 12 hours, then a work ticket verification result corresponding to the power operation is generated. If the time when the work requirements are met on site is earlier than the planned start time, then a work ticket verification result corresponding to the power operation is generated. The operation end time of the operation ticket minus the operation start time, if it is less than 2 minutes, then a work ticket verification result corresponding to the power operation is generated. If the operation start time is earlier than the operation ticket issuance time, then a work ticket verification result corresponding to the power operation is generated. If the safety technology briefing time is later than the work ticket filling time, then a work ticket verification result corresponding to the power operation is generated. If the issuance time, counter-signing time, and work ticket reception time are later than the planned start time, then a work ticket verification result corresponding to the power operation is generated.

[0060] S240: Determine a target verification result corresponding to the power operation list based on the multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information.

[0061] The technical solution of the embodiment of the present invention obtains the job ticket data corresponding to each of the power operations, comprehensively and accurately collects the job ticket data directly related to the power operation, and then verifies the job-related data based on the job ticket data to obtain the job ticket verification result corresponding to the power operation. By verifying the job-related data, inconsistencies, errors or omissions between the data can be found, thereby ensuring the safety and compliance of the power operation. The initial verification result corresponding to the power operation is updated based on the job ticket verification result. The updated verification result not only records the historical status of the operation, but also provides data support for subsequent decision-making and analysis. The data update mechanism helps to maintain the timeliness and accuracy of information, and provides strong support for the management and optimization of power operations.

[0062] As an optional example of an embodiment of the present invention, the power operation verification method of this embodiment specifically includes the following steps:

[0063] Step 1. Obtain operation-related data of multiple power operations in a power operation list within a preset time period.

[0064] The planned operation duration data is determined based on the operation plan start time data and the operation plan end time data, and the planned operation duration data and the standard operation duration data are determined to determine the initial verification result corresponding to the power operation. Log in to the power grid management platform asset domain -> personal risk control module -> operation management -> operation plan library, set the time selection window, and export the operation-related data of multiple power operations in the power operation list within the preset time period. Exemplarily, operations that exceed 7 days are sorted and warned. The proportion of operations with operation durations exceeding 7 days, 30 days, and 300 days in this time period is counted. The planned operation duration data is determined based on the operation plan start time data and the operation plan end time data, and the planned operation duration data is used to filter and warn power operations that are less than the standard operation duration data, and operations that are less than 0.1 days are filtered and warned. The actual operation duration data is determined based on the actual operation start time data and the actual operation end time data, and the actual operation duration data is less than the standard operation duration data. The power operation is filtered and warned, and the actual operation durations are less than 0, less than 0.1, less than 0.5, etc. are filtered and automatically counted and warned. For the preset types of work tickets with a planned operation duration of more than 15 days, screening and warning are carried out, wherein the preset types of work tickets can be pre-set based on experience, such as live work tickets and low-voltage distribution network work tickets, etc., and this embodiment does not specifically limit them. For the second-level hot work tickets with a planned operation duration of more than 120 hours, screening and warning are carried out.

[0065] Step 2. Determine the actual operation duration data based on the actual operation start time data and the actual operation end time data, determine the actual average operation duration data corresponding to the power operation list based on multiple actual operation duration data; determine the planned average operation duration data corresponding to the power operation list based on multiple planned operation duration data, and determine the average duration difference between the actual average operation duration data and the planned average operation duration data; determine the target verification result corresponding to the power operation list based on the average duration difference and multiple initial verification results. Use the actual average operation duration data as the actual span duration, use the planned average operation duration data as the planned average span duration, and calculate the ratio of the planned average span duration to the actual span duration.

[0066] Step 3. Screen and issue warnings for power operations whose actual end time data is later than the planned end time data.

[0067] Step 4. When the operation ticket data includes a work ticket, determine the emergency repair operation plan duration data corresponding to the emergency repair operation, and determine the initial verification result corresponding to the power operation based on the emergency repair operation plan duration data and a preset emergency repair duration threshold.

[0068] Specifically, the work tickets for emergency repair operations are screened, and the work ticket data within the preset time period is exported. Exemplarily, the planned duration data of the repair operation is compared with the preset repair duration threshold, and the time of the permitted work is subtracted. If the planned duration data of the repair operation exceeds the preset repair duration threshold by more than 12 hours, it is screened and warned. If the actual start time data of the operation is earlier than the planned start time data of the operation, it is screened and warned. If the actual operation duration data is less than 2 minutes, it is screened and warned. If the actual start time data of the operation is earlier than the operation ticket issuance time, it is screened and warned. If the safety technology briefing time is later than the work ticket filling time, it is screened and warned. If the issuance time, counter-signature time, and work ticket reception time are later than the planned start time, it is screened and warned.

[0069] Step 5. In the asset domain - work ticket management module - work ticket query of the power grid management platform, set and select the work ticket type and time period, and export the corresponding work ticket data (must include the identification information of all work supervisors). If the work supervisor identification is not in the work supervisor list provided by the company, it will be screened and warned.

[0070] Step 6. In the power grid management platform asset domain - operation ticket management module - operation ticket query, set and select the operation ticket type and time period, and export the corresponding work ticket data (including the operator ID and guardian ID). For example, if the operator ID and guardian ID are not in the preset list provided by the company, they will be screened and warned.

[0071] Step 7. In the power grid management platform asset domain - work ticket management module - work ticket query, set and select the work ticket type and time period, and export the corresponding work ticket data (including all work permit personnel identification information). For example, if the work permit person identification is not in the preset list provided by the company, it will be screened and warned.

[0072] Step 8. In the power grid management platform asset domain - work ticket management module - work ticket query, set and select the work ticket type and time period, and export the corresponding work ticket data (including all work co-signer identification information). For example, if the work co-signer identification is not in the preset list provided by the company, it will be screened and warned.

[0073] Step 9. In the power grid management platform asset domain - work ticket management module - work ticket query, set and select the work ticket type and time period, and export the corresponding work ticket data (including all work executor identification information). For example, if the work executor identification is in the list of co-signers provided by the company, it will be screened and warned.

[0074] The technical solution of the embodiment of the present invention significantly improves the verification efficiency and reduces the error rate of manual operation through automated procedures, thereby ensuring the accuracy of timing verification; reduces the workload of manual verification, reduces labor costs, and promptly discovers and solves timing problems to avoid losses; standardizes the timing of job files, improves the management level, and provides accurate timing data.

[0075] Embodiment 3

[0076] Figure 3 This is a schematic diagram of the structure of a power operation verification device provided by the third embodiment of the present invention. Figure 3 As shown, the device includes: a data acquisition module 310 , a verification module 320 and a prompt module 330 .

[0077] Among them, the data acquisition module 310 is used to obtain the job-related data of multiple power operations in the power operation list within a preset time period, wherein the job-related data includes data generated by executing each of the power operations, actual job start time data, actual job end time data, job planned start time data and job planned end time data; the verification module 320 is used to determine, for each of the power operations, the standard operation data corresponding to the job-related data of the power operation, and verify the job-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation; the prompt module 330 is used to determine the target verification result corresponding to the power operation list based on multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information.

[0078] The technical solution of the embodiment of the present invention is to obtain the job-related data of multiple power operations in the power operation list within a preset time period, wherein the job-related data includes data generated by executing each of the power operations, actual job start time data, actual job end time data, job planned start time data and job planned end time data; establish a corresponding relationship between the power operation and the job-related data, and then, for each of the power operations, determine the standard operation data corresponding to the job-related data of the power operation, verify the job-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation, and accurately determine the initial verification result corresponding to each power operation; finally, determine the target verification result corresponding to the power operation list based on multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information, thereby solving the problem of being unable to ensure the safety and standardization of power operations, and achieving the beneficial effect of improving the verification accuracy of power operations and improving the safety and standardization of power operations.

[0079] Optionally, the standard operation data includes standard operation duration data; accordingly, the verification module includes:

[0080] A duration determination unit, configured to determine the planned operation duration data based on the operation plan start time data and the operation plan end time data;

[0081] The initial result determination unit is used to determine the planned operation duration data and the standard operation duration data to determine the initial verification result corresponding to the power operation.

[0082] Optionally, the job-related data further includes actual job start time data and actual job end time data; accordingly, the prompt module includes:

[0083] an average duration determining unit, configured to determine actual operation duration data based on the actual operation start time data and the actual operation end time data, and to determine actual average operation duration data corresponding to the power operation list based on a plurality of the actual operation duration data;

[0084] an average duration difference determination unit, configured to determine the planned average operation duration data corresponding to the power operation list based on the plurality of planned operation duration data, and determine the average duration difference between the actual average operation duration data and the planned average operation duration data;

[0085] A target result determination unit is used to determine a target verification result corresponding to the power operation list based on the average duration difference and a plurality of the initial verification results.

[0086] Optionally, the job-related data includes actual timing data for executing the power job; the standard job data includes standard timing data; accordingly, the verification module is specifically used to: obtain the ticket-related data of the power job list, compare the actual timing data with the standard timing data, and determine the initial verification result corresponding to the power job based on the comparison result.

[0087] Optionally, the job-related data also includes job type data, and the verification module is specifically used to: when the job type data includes emergency repair work, determine the emergency repair work plan duration data corresponding to the emergency repair work, and determine the initial verification result corresponding to the power work based on the emergency repair work plan duration data and a preset emergency repair duration threshold.

[0088] Optionally, the device also includes: an initial result update module, which is used to obtain job ticket data corresponding to each of the power operations before determining the target verification result corresponding to the power operation list based on multiple initial verification results, verify the job-related data based on the job ticket data to obtain the job ticket verification result corresponding to the power operation, and update the initial verification result corresponding to the power operation based on the job ticket verification result; wherein the job ticket data includes a work ticket and an operation ticket.

[0089] Optionally, the initial result updating module includes:

[0090] A first verification result determination unit is used to determine, when the operation ticket data includes a work ticket, operation time authority data corresponding to the work ticket, and generate an operation ticket verification result corresponding to the power operation based on the operation time authority data and the operation plan start time data;

[0091] The second verification result determination unit is used to obtain the planned operation duration data and the preset operation duration threshold corresponding to the operation ticket to generate the operation ticket verification result corresponding to the power operation when the operation type data includes the operation ticket.

[0092] Optionally, the device further includes: a data cleaning module, configured to perform data cleaning processing on the job-related data of multiple power jobs in the power job list within the preset time period after obtaining the job-related data, and update the job-related data based on the cleaning result.

[0093] The power operation verification device provided in the embodiment of the present invention can execute the power operation verification method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0094] Embodiment 4

[0095] Figure 4 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0096] like Figure 4As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0097] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0098] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the method of checking power operations.

[0099] In some embodiments, the method of checking power operation can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method of checking power operation described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to perform the method of checking power operation in any other appropriate manner (for example, by means of firmware).

[0100] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0101] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0102] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0103] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0104] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0105] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0106] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0107] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for verifying electric power operations, characterized in that: include: Obtaining operation-related data of multiple power operations in a power operation list within a preset time period, wherein the operation-related data includes data generated by executing each of the power operations, actual operation start time data, actual operation end time data, operation plan start time data, and operation plan end time data; For each of the power operations, determine standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation; A target verification result corresponding to the power operation list is determined based on the plurality of initial verification results, prompt information is generated based on the target verification result, and the prompt information is displayed.

2. The method according to claim 1, characterized in that The standard operation data includes standard operation duration data; the checking the operation-related data based on the standard operation data to obtain an initial checking result corresponding to the power operation includes: Determine the planned operation duration data based on the operation plan start time data and the operation plan end time data; Determine the planned operation duration data and the standard operation duration data to determine an initial verification result corresponding to the power operation.

3. The method according to claim 2, characterized in that The job-related data also includes job actual start time data and job actual end time data; Determining a target verification result corresponding to the power operation list based on the plurality of initial verification results includes: Determine actual operation duration data based on the actual operation start time data and the actual operation end time data, and determine actual average operation duration data corresponding to the power operation list based on a plurality of the actual operation duration data; Determine the planned average operation duration data corresponding to the power operation list based on the plurality of planned operation duration data, and determine the average duration difference between the actual average operation duration data and the planned average operation duration data; A target verification result corresponding to the electric power operation list is determined based on the average duration difference and a plurality of the initial verification results.

4. The method according to claim 1, characterized in that The operation-related data includes actual time series data of executing the power operation; the standard operation data includes standard time series data; and the checking of the operation-related data based on the standard operation data to obtain an initial checking result corresponding to the power operation includes: Obtain the ticket-related data of the power operation list, compare the actual time series data with the standard time series data, and determine the initial verification result corresponding to the power operation based on the comparison result.

5. The method according to claim 1, characterized in that The operation-related data further includes operation type data, and the operation-related data is checked based on the standard operation data to obtain an initial check result corresponding to the power operation, including: In the case where the operation type data includes emergency repair operations, emergency repair operation planned duration data corresponding to the emergency repair operations is determined, and an initial verification result corresponding to the power operation is determined based on the emergency repair operation planned duration data and a preset emergency repair duration threshold.

6. The method according to claim 1, characterized in that Before determining a target verification result corresponding to the power operation list based on the plurality of initial verification results, the method further includes: Obtain the job ticket data corresponding to each of the electrical operations, verify the job-related data based on the job ticket data to obtain the job ticket verification result corresponding to the electrical operation, and update the initial verification result corresponding to the electrical operation based on the job ticket verification result; wherein the job ticket data includes a work ticket and an operation ticket.

7. The method according to claim 6, characterized in that The checking of the operation-related data based on the operation ticket data to obtain an operation ticket checking result corresponding to the power operation includes: In the case where the work ticket data includes a work ticket, determining work time authority data corresponding to the work ticket, and generating a work ticket verification result corresponding to the power work based on the work time authority data and the work plan start time data; In the case where the operation type data includes an operation ticket, the planned operation duration data corresponding to the operation ticket and the preset operation duration threshold are acquired to generate an operation ticket verification result corresponding to the power operation.

8. The method according to claim 1, characterized in that: After obtaining the operation association data of the plurality of electric power operations in the electric power operation list within the preset time period, the method further includes: Perform data cleaning on the job-related data, and update the job-related data based on the cleaning result.

9. A device for checking electric power operation, characterized in that: include: A data acquisition module, used to acquire operation-related data of multiple power operations in a power operation list within a preset time period, wherein the operation-related data includes data generated by executing each of the power operations, actual operation start time data, actual operation end time data, operation plan start time data, and operation plan end time data; A verification module, configured to determine, for each of the power operations, standard operation data corresponding to the operation-related data of the power operation, and verify the operation-related data based on the standard operation data to obtain an initial verification result corresponding to the power operation; A prompt module is used to determine a target verification result corresponding to the power operation list based on the multiple initial verification results, generate prompt information based on the target verification result, and display the prompt information.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the power operation verification method according to any one of claims 1 to 8 when executed.