Cooling equipment for metal building material welding
By designing a cooling equipment for welding of metal building materials with introduction device and arc-shaped phase change box, the problems of uncontrollable cooling rate and material embrittlement in traditional welding cooling technology are solved, efficient and uniform welding cooling is achieved, and welding quality and structural performance are improved.
Patent Information
- Application Number
- CN202510355612.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-25
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2045-03-25
AI Technical Summary
Traditional welding cooling technology has problems such as uncontrollable cooling rate, deformation and cracks caused by thermal stress gradients, water cooling can easily cause local embrittlement of materials, and insufficient air-cooled cooling stability, making it difficult to ensure welding quality and structural performance.
A cooling equipment for welding metal building materials was designed. The introduction device was used to drive the gasified nitrogen into the heat dissipation shell through the ventilation duct. The nitrogen was cooled overall through the side of the welding device. Combined with the arc-shaped phase change box and the piston tube system, the gas flow rate was dynamically adjusted to different areas and improved heat dissipation efficiency.
It realizes efficient cooling on the sides of the welding device, reduces the temperature difference in the welding area, avoids material embrittlement and deformation, and improves welding quality and structural performance.