A bim-based engineering construction simulation system and method
By embedding AI algorithms into the BIM simulation system, intelligent prediction and autonomous optimization of the construction process can be achieved, solving the problems of model-data separation and insufficient dynamic adaptability in construction simulation technology, and improving the accuracy and collaborative efficiency of construction.
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- HUAFENG TECH (NANJING) CO LTD
- Filing Date
- 2026-03-13
- Publication Date
- 2026-07-17
AI Technical Summary
Existing BIM-based construction simulation technologies suffer from problems such as the disconnect between the model and construction data, limited visualization dimensions, and insufficient dynamic adaptability. This makes it difficult to achieve intelligent pipeline optimization and the linkage visualization of construction organization plans, leading to construction conflicts, schedule delays, and cost overruns.
It adopts BIM model building units, multi-source data acquisition units, data fusion processing units, and multi-dimensional simulation units, and embeds AI algorithms to realize intelligent prediction, autonomous optimization, and dynamic closed-loop management of the construction process. It optimizes construction plans through graph neural networks, long short-term memory networks, and deep reinforcement learning algorithms, and combines 4D visualization technology to display construction progress and resource allocation.
It significantly improves the accuracy and adaptability of construction simulation, reduces the risks of pipeline collisions, schedule deviations and cost overruns, and improves the collaborative and communication efficiency of the construction process.
Smart Images

Figure CN122413892A_ABST