Highway bridge construction drilling equipment with novel structure

By introducing liquid storage tanks, water pumps and filtration systems into highway and bridge construction drilling equipment, and using water injection and filtration technology, the problem of the equipment's lack of active cooling and dust reduction has been solved, the life of the drill pipe has been extended, dust pollution has been reduced, and the efficiency has been improved. Environmentally friendly.

CN221920814UActive Publication Date: 2024-10-29ULANQAB JINQIAO HIGHWAY ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420724043.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-10-29
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

Existing drilling equipment for highway and bridge construction lacks active cooling and dust reduction mechanisms, which results in a shortened service life of the drill pipe and serious dust emission during the construction process, affecting environmental protection.

Method used

A new type of drilling equipment for highway and bridge construction is designed. It uses components such as a liquid storage tank, a water pump, a cooling cylinder, an annular nozzle, a filter box, and a water suction pump to achieve active cooling and dust reduction through a water injection and filtration system. Use water to quickly reduce drill pipe temperature and collect dust.

Benefits of technology

It effectively extends the service life of the drill pipe, reduces construction dust, improves environmental protection, realizes water recycling, and reduces water waste and dust pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920814U_ABST
    Figure CN221920814U_ABST
Patent Text Reader

Abstract

The utility model discloses highway bridge construction drilling equipment with a novel structure, which belongs to the technical field of highway bridge construction drilling and comprises a bottom plate, a drill rod is arranged inside the bottom plate, a cooling cylinder is arranged outside the drill rod, a liquid storage tank is fixedly connected to the upper surface of the bottom plate, and a water delivery pump is arranged on the front side of the liquid storage tank. The bottom surface of the water delivery pump is fixedly connected with the upper surface of the bottom plate, the water inlet end of the water delivery pump penetrates through the liquid storage tank and extends into the liquid storage tank, the water outlet end of the water delivery pump fixedly communicates with a first hose, the end, away from the water delivery pump, of the first hose penetrates through the cooling cylinder and fixedly communicates with an annular spray pipe, and the upper surface of the liquid storage tank is fixedly connected with a filter tank. The highway bridge construction drilling equipment with the novel structure achieves the effects that the highway bridge construction drilling equipment has an active cooling and dust falling structure, the service life of a drill rod of the highway bridge construction drilling equipment is guaranteed, and construction flying dust of the highway bridge construction drilling equipment is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of highway bridge construction drilling, and in particular to highway bridge construction drilling equipment with a new structure. Background Art

[0002] Highway bridge construction is a major component of modern roads, which can ensure that vehicles can transport goods more quickly. During the construction of highway bridges, in order to install supporting facilities more stably, using street lights, isolation belts or enclosures, etc., it is necessary to use highway bridge construction drilling equipment to drill holes.

[0003] The utility model with the existing authorization announcement number CN211389548U discloses a drilling equipment for highway bridge construction, including a base plate and a box body, a shock-absorbing pad is fixedly connected to the front side of the top of the inner cavity of the box body, a first electric telescopic rod is fixedly connected to the bottom of the shock-absorbing pad, a first cross plate is fixedly connected to the bottom of the first electric telescopic rod, and a sliding rod is arranged through the top of the first cross plate.

[0004] The above technical solution is adopted to solve the problem that during the drilling process, the area supporting the drilling equipment is very small and the stability is poor, which can easily cause the drill rod to shake, resulting in inaccurate drilling position and reduced effect of the drilling equipment. However, according to the above technical solution, the existing highway bridge construction drilling equipment does not have an active cooling and dust reduction mechanism when in use. When the drill rod is working, the friction between the drill rod and the highway bridge is large, which will generate a large amount of dust. Not only is it prone to high temperature and heating, affecting the structural strength of the drill rod and causing increased wear of the drill rod, but the dust can easily pollute the working environment, greatly reducing the service life of the drill rod and the environmental friendliness of the highway bridge construction drilling process.

[0005] Therefore, we propose a highway bridge construction drilling equipment with a new structure to solve the above problems. Utility Model Content

[0006] The purpose of this application is to solve the problem in the prior art that the drilling equipment for highway bridge construction lacks an active cooling and dust reduction mechanism, which results in a reduced service life of the drill rod and a lot of dust during operation, and to propose a highway bridge construction drilling equipment with a new structure.

[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0008] A highway bridge construction drilling device with a novel structure comprises a bottom plate, a drill rod is arranged inside the bottom plate, a cooling cylinder is arranged outside the drill rod, a liquid storage tank is fixedly connected to the upper surface of the bottom plate, a water pump is arranged on the front of the liquid storage tank, the bottom surface of the water pump is fixedly connected to the upper surface of the bottom plate, the water inlet end of the water pump passes through the liquid storage tank and extends to the inside of the liquid storage tank, the water outlet end of the water pump is fixedly connected to a first hose, and the end of the first hose away from the water pump passes through the cooling cylinder and is fixedly connected to an annular spray nozzle Tube, the upper surface of the liquid storage tank is fixedly connected with a filter box, the left end of the filter box is fixedly connected with a return pipe, the end of the return pipe away from the filter box penetrates the filter box and extends to the interior of the filter box, the interior of the filter box is clamped with a microporous filter plate, the upper surface of the filter box is fixedly connected with a water suction pump, the water outlet end of the water suction pump penetrates the filter box and extends to the interior of the filter box, the water inlet end of the water suction pump is fixedly connected with a second hose, the end of the second hose away from the water suction pump penetrates the cooling cylinder and extends to the interior of the cooling cylinder.

[0009] Preferably, an armrest is fixedly connected to the upper surface of the base plate, and four universal wheels are fixedly connected to the bottom surface of the base plate.

[0010] Preferably, the upper surface of the base plate is fixedly connected to a support frame, and the inner top wall of the support frame is fixedly connected to two electric push rods, the telescopic end of each electric push rod is fixedly connected to a sliding block, and each sliding block is slidably connected to the inside of the support frame, and the side surfaces of the two sliding blocks close to each other are commonly fixedly connected to a connecting plate, and a rotating motor is arranged above the connecting plate, and the output end of the rotating motor power passes through the connecting plate and is fixedly connected to the top end of the drill rod.

[0011] Preferably, two stabilizing seats are fixedly connected to the outer surface of the rotating motor, and the bottom surface of each of the stabilizing seats is fixedly connected to the upper surface of the connecting plate.

[0012] Preferably, three compression springs are fixedly connected to the bottom surface of the connecting plate, the bottom end of each compression spring is fixedly connected to the upper surface of the cooling cylinder, a telescopic rod is arranged inside each compression spring, the telescopic end of each telescopic rod is fixedly connected to the upper surface of the cooling cylinder, and the top end of each telescopic rod is fixedly connected to the bottom surface of the connecting plate.

[0013] Preferably, the left side surface of the liquid storage tank is fixedly connected with a liquid adding pipe, and the top end of the liquid adding pipe is clamped with a dust plug.

[0014] Preferably, a rubber ring is fixedly connected to the outer surface of the cooling cylinder, an exhaust pipe is fixedly connected to the upper surface of the filter box, a pulling frame is fixedly connected to the left side of the microporous filter plate, and the right side of the pulling frame contacts the left side of the filter box.

[0015] Preferably, a limiting frame is fixedly connected to the front side of the support frame, and an inner wall of the limiting frame is in contact with the outer surface of the second hose.

[0016] In summary, the technical effects and advantages of this application are:

[0017] 1. The water body pre-filled in the liquid storage tank can be drawn out by the suction force provided by the water delivery pump, and directly sprayed into the cooling cylinder through the first hose and the annular nozzle. By limiting the water body by the cooling cylinder, the water body can be directly applied to the position where the drill rod contacts the road surface. At this time, the high temperature generated by the drilling of the drill rod can be quickly reduced by the water body, and the dust generated by the drilling equipment for highway bridge construction can also be effectively suppressed from flying around, so that the highway bridge construction drilling equipment has an active cooling and dust reduction structure, which ensures the service life of the drill rod of the highway bridge construction drilling equipment and reduces the dust generated by the highway bridge construction drilling equipment during construction;

[0018] 2. The suction provided by the water suction pump and the second hose can be used to suck the dust-water mixture inside the cooling cylinder into the filter box to prevent excessive overflow of the cooling cylinder. After the water enters the filter box, it can be filtered through the microporous filter plate and then flow back to the storage tank through the reflux pipe for secondary use, while the dust remains on the microporous filter plate, which can recycle most of the water and reduce the water waste in the cooling process of the drill rod of the highway bridge construction drilling equipment. Most of the dust can be collected, which is convenient for the staff to centrally treat the dust and prevent the dust from polluting the construction site again. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a three-dimensional structural schematic diagram of the bottom plate of the utility model;

[0020] Figure 2 It is a three-dimensional structural schematic diagram of the liquid storage tank of the utility model;

[0021] Figure 3 This is a schematic diagram of the structure of the filter box of the utility model in a cutaway perspective view;

[0022] Figure 4 It is a schematic diagram of the structure of the support frame of the utility model in a sectional three-dimensional view.

[0023] In the figure: 1. bottom plate; 2. drill rod; 3. cooling cylinder; 4. liquid storage tank; 5. water supply pump; 6. first hose; 7. annular nozzle; 8. filter box; 9. return pipe; 10. microporous filter plate; 11. water suction pump; 12. second hose; 13. handrail; 14. universal wheel; 15. support frame; 16. electric push rod; 17. sliding block; 18. connecting plate; 19. rotating motor; 20. stabilizing seat; 21. compression spring; 22. telescopic rod; 23. liquid adding pipe; 24. dust plug; 25. rubber ring; 26. exhaust pipe; 27. pulling frame; 28. limit frame. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0025] Reference Figure 1-4 The highway bridge construction drilling equipment with a novel structure includes a base plate 1, a drill rod 2 is arranged inside the base plate 1, a cooling cylinder 3 is arranged outside the drill rod 2, a liquid storage tank 4 is fixedly connected to the upper surface of the base plate 1, a handrail 13 is fixedly connected to the upper surface of the base plate 1, and four universal wheels 14 are fixedly connected to the bottom surface of the base plate 1. The universal wheels 14 can facilitate the movement of the device to the working position, and the handrails 13 can facilitate the staff to cooperate with the universal wheels 14 to push the device, thereby improving the mobility of the device.

[0026] A water pump 5 is provided on the front of the liquid storage tank 4. The bottom surface of the water pump 5 is fixedly connected to the upper surface of the bottom plate 1. The upper surface of the bottom plate 1 is fixedly connected to a support frame 15. Two electric push rods 16 are fixedly connected to the inner top wall of the support frame 15. The telescopic end of each electric push rod 16 is fixedly connected to a sliding block 17. Each sliding block 17 is slidably connected to the inside of the support frame 15. The side surfaces of the two sliding blocks 17 close to each other are commonly fixedly connected to a connecting plate 18. A rotating motor 19 is provided above the connecting plate 18. The output end of the power of the rotating motor 19 passes through the connecting plate 18 and is fixedly connected to the top of the drill rod 2. The power provided by the rotating motor 19 cooperates with the connecting plate 18 to drive the drill rod 2 to rotate, thereby ensuring the smooth progress of the highway bridge drilling construction. The power provided by the electric push rod 16 cooperates with the support frame 15 to push the sliding block 17 up and down, thereby driving the connecting plate 18 and the drill rod 2 to move up and down, thereby ensuring the smooth progress of the drilling depth adjustment work.

[0027] The water inlet end of the water pump 5 passes through the liquid storage tank 4 and extends to the interior of the liquid storage tank 4. The water outlet end of the water pump 5 is fixedly connected to a first hose 6. The end of the first hose 6 away from the water pump 5 passes through the cooling cylinder 3 and is fixedly connected to an annular nozzle 7. The outer surface of the rotating motor 19 is fixedly connected to two stabilizing seats 20. The bottom surface of each stabilizing seat 20 is fixedly connected to the upper surface of the connecting plate 18. The stabilizing seat 20 can increase the stability of the rotating motor 19, so that the rotating motor 19 can smoothly drive the drill rod 2 to rotate, thereby ensuring the stable operation of the rotating motor 19.

[0028] Three compression springs 21 are fixedly connected to the bottom surface of the connecting plate 18, and the bottom end of each compression spring 21 is fixedly connected to the upper surface of the cooling cylinder 3. A telescopic rod 22 is arranged inside each compression spring 21, and the telescopic end of each telescopic rod 22 is fixedly connected to the upper surface of the cooling cylinder 3, and the top of each telescopic rod 22 is fixedly connected to the bottom surface of the connecting plate 18. The compression springs 21 cooperate with the telescopic rod 22 to limit the position of the cooling cylinder 3, so that the cooling cylinder 3 can be sleeved on the outside of the drill rod 2 without contacting the drill rod 2, and when the drill rod 2 drills downward and the cooling cylinder 3 contacts the bottom surface, the compression springs 21 and the telescopic rod 22 are forced to shrink, which will not affect the effect of the cooling cylinder 3 in gathering water.

[0029] A filter box 8 is fixedly connected to the upper surface of the liquid storage tank 4, and a return pipe 9 is fixedly connected to the left end of the filter box 8. The end of the return pipe 9 away from the filter box 8 passes through the filter box 8 and extends to the inside of the filter box 8. A liquid adding pipe 23 is fixedly connected to the left side of the liquid storage tank 4. A dust plug 24 is clamped on the top of the liquid adding pipe 23. The liquid adding pipe 23 can facilitate the staff to replenish water to the inside of the liquid storage tank 4. The dust plug 24 can prevent external impurities from entering the inside of the liquid storage tank 4 through the liquid adding pipe 23, thereby ensuring the purity of the water inside the liquid storage tank 4.

[0030] A microporous filter plate 10 is snapped onto the interior of the filter box 8, a water suction pump 11 is fixedly connected to the upper surface of the filter box 8, the water outlet end of the water suction pump 11 passes through the filter box 8 and extends to the interior of the filter box 8, a rubber ring 25 is fixedly connected to the outer surface of the cooling cylinder 3, an exhaust pipe 26 is fixedly connected to the upper surface of the filter box 8, a pulling frame 27 is fixedly connected to the left side of the microporous filter plate 10, and the right side of the pulling frame 27 is in contact with the left side of the filter box 8. The elastic force of the rubber ring 25 itself and the elastic force of the compression spring 21 can further close the gap between the cooling cylinder 3 and the ground, making it more difficult for the water to flow out too much. The exhaust pipe 26 can discharge the excess gas inside the filter box 8 to the outside to ensure the internal air pressure balance of the filter box 8. The pulling frame 27 can facilitate the staff to pull the microporous filter plate 10 out for cleaning or replacement.

[0031] The water inlet end of the water suction pump 11 is fixedly connected to the second hose 12. The end of the second hose 12 away from the water suction pump 11 passes through the cooling cylinder 3 and extends to the interior of the cooling cylinder 3. The front of the support frame 15 is fixedly connected to a limiting frame 28. The inner wall of the limiting frame 28 contacts the outer surface of the second hose 12. The limiting frame 28 can limit the position of the second hose 12 to prevent the second hose 12 from swinging at will and affecting the operation of the drill rod 2.

[0032] The working principle of the utility model is as follows: when in use, the water supply pump 5, the water suction pump 11, the electric push rod 16 and the rotating motor 19 are first connected to the power supply. When the device needs to be used to drill holes during the construction of a highway bridge, the rotating motor 19 cooperates with the connecting plate 18 to drive the drill rod 2 to rotate, thereby ensuring the smooth progress of the highway bridge drilling construction. The power provided by the electric push rod 16 cooperates with the support frame 15 to push the sliding block 17 up and down, thereby driving the connecting plate 18 and the drill rod 2 to move up and down, thereby ensuring the smooth progress of the drilling depth adjustment work. When the drill rod 2 contacts the road or bridge pavement, the cooling cylinder 3 will contact the pavement before the drill rod 2. When the drill rod 2 drills downward, the connecting plate 18 will force the compression spring 21 to contract, thereby limiting the position of the cooling cylinder 3 without affecting the rotation of the drill rod 2 and ensuring the water gathering effect of the cooling cylinder 3.

[0033] When the drill rod 2 generates high temperature and dust due to high-speed drilling, the suction force provided by the water pump 5 can be used to draw out the water previously filled in the liquid storage tank 4, and directly spray it into the cooling cylinder 3 through the first hose 6 and the annular nozzle 7. By limiting the water body by the cooling cylinder 3 and the rubber ring 25, the water body can be directly applied to the position where the drill rod 2 contacts the road surface. At this time, the high temperature generated by the drilling of the drill rod 2 can be quickly reduced by the water body, and the dust generated by the drilling equipment for highway bridge construction can also be effectively suppressed from flying everywhere. The highway bridge construction drilling equipment has an active cooling and dust reduction structure, which ensures the service life of the drill rod 2 of the highway bridge construction drilling equipment, and also reduces the highway bridge construction. The construction dust of the drilling equipment is eliminated, and the suction provided by the water suction pump 11 cooperates with the second hose 12 to suck the dust-water mixture inside the cooling cylinder 3 into the filter box 8 to prevent excessive overflow of the cooling cylinder 3. After the water enters the filter box 8, it can be filtered by the microporous filter plate 10 and then flow back to the storage tank 4 through the reflux pipe 9 for reuse, while the dust remains on the microporous filter plate 10, so that most of the water can be recycled when the drill rod 2 is cooled and dust is reduced, reducing the water waste during the cooling process of the drill rod 2 of the highway bridge construction drilling equipment, and most of the dust can be collected, which is convenient for the staff to centrally treat the dust and prevent the dust from polluting the construction site again.

[0034] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A highway bridge construction drilling device with a novel structure, comprising a base plate (1), characterized in that: A drill rod (2) is arranged inside the bottom plate (1), a cooling cylinder (3) is arranged outside the drill rod (2), a liquid storage tank (4) is fixedly connected to the upper surface of the bottom plate (1), a water pump (5) is arranged on the front of the liquid storage tank (4), the bottom surface of the water pump (5) is fixedly connected to the upper surface of the bottom plate (1), the water inlet end of the water pump (5) passes through the liquid storage tank (4) and extends to the inside of the liquid storage tank (4), the water outlet end of the water pump (5) is fixedly connected to a first hose (6), the end of the first hose (6) away from the water pump (5) passes through the cooling cylinder (3) and is fixedly connected to an annular nozzle (7), the upper surface of the liquid storage tank (4) is fixedly connected to A filter box (8) is provided, the left end of the filter box (8) is fixedly connected to a return pipe (9), the end of the return pipe (9) away from the filter box (8) passes through the filter box (8) and extends to the interior of the filter box (8), a microporous filter plate (10) is clamped inside the filter box (8), the upper surface of the filter box (8) is fixedly connected to a water suction pump (11), the water outlet end of the water suction pump (11) passes through the filter box (8) and extends to the interior of the filter box (8), the water inlet end of the water suction pump (11) is fixedly connected to a second hose (12), the end of the second hose (12) away from the water suction pump (11) passes through the cooling cylinder (3) and extends to the interior of the cooling cylinder (3).

2. The highway bridge construction drilling equipment with a novel structure according to claim 1 is characterized in that: The upper surface of the base plate (1) is fixedly connected to an armrest (13), and the bottom surface of the base plate (1) is fixedly connected to four universal wheels (14).

3. The highway bridge construction drilling equipment with a novel structure according to claim 1 is characterized in that: The upper surface of the base plate (1) is fixedly connected to a support frame (15), and the inner top wall of the support frame (15) is fixedly connected to two electric push rods (16), and the telescopic end of each electric push rod (16) is fixedly connected to a sliding block (17), and each sliding block (17) is slidably connected to the inside of the support frame (15), and the side surfaces of the two sliding blocks (17) close to each other are fixedly connected to a connecting plate (18), and a rotating motor (19) is arranged above the connecting plate (18), and the output end of the power of the rotating motor (19) passes through the connecting plate (18) and is fixedly connected to the top of the drill rod (2).

4. The highway bridge construction drilling equipment with a novel structure according to claim 3 is characterized in that: Two stabilizing seats (20) are fixedly connected to the outer surface of the rotating motor (19), and the bottom surface of each stabilizing seat (20) is fixedly connected to the upper surface of the connecting plate (18).

5. The highway bridge construction drilling equipment with a novel structure according to claim 3 is characterized by: Three compression springs (21) are fixedly connected to the bottom surface of the connecting plate (18), the bottom end of each compression spring (21) is fixedly connected to the upper surface of the cooling cylinder (3), a telescopic rod (22) is arranged inside each compression spring (21), the telescopic end of each telescopic rod (22) is fixedly connected to the upper surface of the cooling cylinder (3), and the top end of each telescopic rod (22) is fixedly connected to the bottom surface of the connecting plate (18).

6. The highway bridge construction drilling equipment with a novel structure according to claim 1 is characterized by: The left side of the liquid storage box (4) is fixedly connected to a liquid adding pipe (23), and the top end of the liquid adding pipe (23) is clamped with a dust plug (24).

7. The highway bridge construction drilling equipment with a novel structure according to claim 1 is characterized by: The outer surface of the cooling cylinder (3) is fixedly connected to a rubber ring (25), the upper surface of the filter box (8) is fixedly connected to an exhaust pipe (26), the left side of the microporous filter plate (10) is fixedly connected to a pulling frame (27), and the right side of the pulling frame (27) is in contact with the left side of the filter box (8).

8. The highway bridge construction drilling equipment with a novel structure according to claim 3 is characterized by: The front side of the support frame (15) is fixedly connected to a limiting frame (28), and the inner wall of the limiting frame (28) is in contact with the outer surface of the second hose (12).