Embedded positioning device for constructional engineering
By using a main frame made of steel pipes in the construction project, equipped with a compass, ruler, and protractor, and combined with drilling rings for manual drilling, the accuracy of pre-embedded positioning and the stability of drilling quality were achieved, solving the problems of inaccurate positioning and unstable drilling, and improving the quality of the project.
Patent Information
- Application Number
- CN202420706723.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-04-08
AI Technical Summary
Existing pre-embedded positioning methods in construction projects are easily affected by human factors and the construction environment, leading to inaccurate positioning and unstable drilling quality.
The main frame is made of steel pipes and equipped with a compass, ruler and protractor for precise positioning and measurement. It is combined with a drilling ring for manual drilling to ensure accurate position and angle.
It improves the accuracy of pre-embedded positioning and drilling quality, enhances the practicality of the device and the quality of the project, and solves the problems of inaccurate positioning and unstable drilling that exist in traditional methods.
Smart Images

Figure CN221992702U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a pre-embedded positioning device for construction engineering. Background Art
[0002] In construction projects, the positioning accuracy of embedded parts is crucial to the quality and safety of the project. Embedded parts are usually installed before concrete pouring to fix subsequent components or equipment.
[0003] The following problems exist in the prior art: 1. Common pre-embedded positioning methods include manual measurement and marking, use of simple clamps or templates, etc., which are easily affected by human factors and construction environment, and the accuracy is therefore required to be solved; 2. Existing automatic pre-embedded positioning devices mostly use mechanical automatic drilling, which is affected by different construction environments, resulting in unstable drilling quality, and therefore the problem needs to be solved. Utility Model Content
[0004] The utility model provides a pre-embedded positioning device for construction engineering to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0006] A pre-buried positioning device for construction engineering comprises a main frame, a support rod is fixedly connected to the inner wall of the main frame, a compass is embedded on the top of the support rod, and a scale and a protractor are arranged on the top of the main frame.
[0007] The inner end of the support rod is fixedly connected with a drilling ring.
[0008] A further improvement of the technical solution of the utility model is that: the main frame is composed of four steel pipes, and the four steel pipes of the main frame are connected in sequence from head to tail.
[0009] The above technical solution is adopted. The main frame in this solution is made of steel pipes, which are harder, more durable and wear-resistant, thus extending the service life of the device. The ends are connected in sequence to make the device more solid.
[0010] A further improvement of the technical solution of the utility model is that the scale is fixedly connected above the steel pipe below, and the length of the scale is equal to the length of the steel pipe.
[0011] By adopting the above technical solution, the scale in the solution can be used to measure the distance between the embedded positions, and the length of the scale is equal to the length of the steel pipe. The ends of the scale do not protrude and will not affect the user's operation, and the scale is easy to carry and use.
[0012] A further improvement of the technical solution of the utility model is that the protractor is fan-shaped and is fixedly connected above the steel pipe on the right side.
[0013] By adopting the above technical solution, the protractor in the solution can be used to measure the angle between two pre-embedded positions, or to measure whether the pre-embedded positions are inclined.
[0014] A further improvement of the technical solution of the utility model is that: there are four support rods in total, and one end of the four support rods is respectively fixedly connected to the inner walls of the four steel pipes of the main frame, and the other ends of the four support rods are fixedly connected to the outer wall of the drilling ring.
[0015] By adopting the above technical solution, the support rods in the solution can play a role of fixed support for the drilling ring, and the support with four support rods can be more stable and firm.
[0016] A further improvement of the technical solution of the utility model is that the compass is embedded in the top of the upper support rod, and a transparent protective cover is buckled on the top of the compass.
[0017] By adopting the above technical solution, the compass in the solution is embedded on the support rod, which can make the compass not easily collided and can provide good protection for the compass. The transparent protective cover can protect the pointer inside the compass without affecting the user's viewing.
[0018] A further improvement of the technical solution of the utility model is that handrails are fixedly connected to the steel pipes on the left and right sides of the main frame, and reinforcing rods are fixedly connected to the bottoms of the upper ends of the two handrails.
[0019] By adopting the above technical solution, the armrest in the solution can facilitate the user to move the device, and the reinforcing rod can strengthen the armrest, making the armrest more firm and more stable when moving.
[0020] A further improvement of the technical solution of the utility model is that universal wheels are installed at the bottom of the main frame, and there are six universal wheels in total, and the six universal wheels are evenly arranged at the bottom of the front and rear steel pipes of the main frame.
[0021] By adopting the above technical solution, the universal wheels in the solution can make the device convenient to transfer to other places, and the six universal wheels can make the device more stable when placed and moved.
[0022] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:
[0023] 1. The utility model provides a pre-embedded positioning device for construction projects, which adopts a compass, a ruler and a protractor. The compass can control the direction, the ruler can measure the distance, and the protractor can measure the angle, so that the pre-embedded position is more precise and accurate, which solves the problem that the traditional pre-embedded positioning device for construction projects is not accurate enough, and greatly improves the practicability and accuracy of the device.
[0024] 2. The utility model provides a pre-embedded positioning device for construction projects, which adopts a drilling ring. After accurately determining the drilling position, the user can pre-embed the hole in the drilling ring. The drilling ring makes the position more accurate, and manual drilling is used to make the depth and quality of the hole reach a more stable range, solving the problem that the quality of the hole is unstable due to the influence of different construction environments in traditional automatic pre-embedded positioning devices. The practicability of the device is greatly improved, and the quality of the project is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 It is a structural front view of the pre-buried positioning device for construction engineering according to an embodiment of the utility model;
[0027] Figure 2 It is a bottom view of the structure of the pre-buried positioning device for construction engineering according to an embodiment of the utility model;
[0028] Figure 3 It is a top view of the structure of the pre-buried positioning device for construction engineering according to an embodiment of the utility model;
[0029] Figure 4 yes Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0030] Figure 5 yes Figure 2 A schematic diagram of the enlarged structure at B in the middle;
[0031] Figure 6 yes Figure 3 Schematic diagram of the enlarged structure at point C in the middle.
[0032] In the figure: 1. main frame; 2. support rod; 3. drilling ring; 4. compass; 5. handrail; 6. ruler; 7. protractor; 8. reinforcement rod; 9. universal wheel. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0034] Example 1
[0035] like Figure 1-6 As shown, the utility model provides a pre-buried positioning device for construction engineering, including a main frame 1, a support rod 2 is fixedly connected to the inner wall of the main frame 1, and a compass 4 is embedded on the top of the support rod 2, and a scale 6 and a protractor 7 are provided on the top of the main frame 1.
[0036] The inner end of the support rod 2 is fixedly connected with a drilling ring 3 .
[0037] In this embodiment, a compass 4, a ruler 6 and a protractor 7 are used. The compass 4 can control the direction, the ruler 6 can measure the distance, and the protractor 7 can measure the angle, so that the pre-embedded position is more precise and accurate, which solves the problem that the traditional pre-embedded positioning device of the construction project is not accurate enough, and greatly improves the practicality and accuracy of the device. By using a drilling ring 3, after the drilling position is accurately determined, the user can pre-embed the drilling in the drilling ring 3. The drilling ring 3 is provided to make the position more precise, and manual drilling is used to make the depth and quality of the drilling reach a more stable range, which solves the problem that the traditional automatic pre-embedded positioning device mostly uses mechanical automatic drilling, and the quality of the drilling is unstable due to the influence of different construction environments, which greatly improves the practicality of the device and improves the quality of the project.
[0038] Example 2
[0039] like Figure 1-6 As shown, based on Example 1, the utility model provides a technical solution: preferably, the main frame 1 is composed of four steel pipes, and the four steel pipes of the main frame 1 are connected end to end in sequence, and the scale 6 is fixedly connected to the top of the lower steel pipe, and the length of the scale 6 is equal to the length of the steel pipe, and the protractor 7 is fan-shaped, and the protractor 7 is fixedly connected to the top of the steel pipe on the right.
[0040] In this embodiment, the main frame is made of steel pipe, which is harder, more durable and wear-resistant, extending the service life of the device. The end to end are connected in sequence to make the device more solid. The ruler 6 can be used to measure the distance between the embedded positions, and the length of the ruler 6 is equal to the length of the steel pipe. The end and end do not protrude and will not affect the user's operation. It is convenient to carry and use. The protractor 7 can be used to measure the angle between two embedded positions, or to measure whether the embedded position is tilted.
[0041] Example 3
[0042] like Figure 1-6 As shown, on the basis of Example 1 and Example 2, the utility model provides a technical solution: preferably, there are four support rods 2, and one ends of the four support rods 2 are respectively fixedly connected to the inner walls of the four steel pipes of the main frame 1, and the other ends of the four support rods 2 are fixedly connected to the outer wall of the drilling ring 3, the compass 4 is embedded in the top of the upper support rod 2, and the top of the compass 4 is buckled with a transparent protective cover, handrails 5 are fixedly connected to the steel pipes on the left and right sides of the main frame 1, and the bottoms of the upper ends of the two handrails 5 are fixedly connected with reinforcing rods 8, universal wheels 9 are installed at the bottom of the main frame 1, and there are six universal wheels 9, and the six universal wheels 9 are evenly arranged at the bottom of the front and rear steel pipes of the main frame 1.
[0043] In this embodiment, the support rod 2 can play a role of fixing and supporting the drilling ring 3. Four support rods 2 can provide a more stable and firm support. The compass 4 is embedded in the support rod 2, which makes the compass 4 not easily collided and can provide a good protection for the compass 4. The transparent protective cover can protect the pointer inside the compass 4 without affecting the user's viewing. The armrest 5 can facilitate the user to move the device. The reinforcing rod 8 can strengthen the armrest 5, making the armrest 5 more firm and more stable when moving. The universal wheel 9 allows the device to be conveniently transferred to other places, and the six universal wheels 9 can make the device more stable when placed and moved.
[0044] The following is a detailed description of the working principle of the embedded positioning device for construction projects.
[0045] like Figure 1-6 As shown, the device is placed stably on the ground, the direction is determined by the compass 4, and the distance is measured by the ruler 6 to determine the position of the embedded drill hole. After determination, the hole is drilled in the drilling ring 3. After drilling, the user moves the device through the handrail 5 and measures the position of the next embedded drill hole through the ruler 6 and the protractor 7, and so on.
[0046] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.
Claims
1. A pre-embedded positioning device for construction engineering, comprising a main frame (1), characterized in that: A support rod (2) is fixedly connected to the inner wall of the main frame (1), and a compass (4) is provided on the top of the support rod (2); a scale (6) and a protractor (7) are provided on the top of the main frame (1); The inner end of the support rod (2) is fixedly connected with a drilling ring (3).
2. A pre-embedded positioning device for construction engineering according to claim 1, characterized in that: The main frame (1) is composed of four steel pipes, and the four steel pipes of the main frame (1) are connected end to end in sequence.
3. A pre-embedded positioning device for construction engineering according to claim 1, characterized in that: The scale (6) is fixedly connected to the top of the steel pipe below, and the length of the scale (6) is equal to the length of the steel pipe.
4. A pre-embedded positioning device for construction engineering according to claim 1, characterized in that: The protractor (7) is fan-shaped and is fixedly connected above the steel pipe on the right side.
5. A pre-embedded positioning device for construction engineering according to claim 1, characterized in that: There are four support rods (2) in total, and one end of the four support rods (2) is respectively fixedly connected to the inner walls of four steel pipes of the main frame (1), and the other ends of the four support rods (2) are fixedly connected to the outer wall of the drilling ring (3).
6. A pre-embedded positioning device for construction engineering according to claim 1, characterized in that: The compass (4) is embedded in the top of the upper support rod (2), and a transparent protective cover is buckled on the top of the compass (4).
7. A pre-embedded positioning device for construction engineering according to claim 2, characterized in that: Handrails (5) are fixedly connected to the steel pipes on the left and right sides of the main frame (1), and reinforcing rods (8) are fixedly connected to the bottoms of the upper ends of the two handrails (5).
8. The pre-embedded positioning device for construction engineering according to claim 1, characterized in that: Universal wheels (9) are installed at the bottom of the main frame (1), and there are six universal wheels (9) in total. The six universal wheels (9) are evenly arranged at the bottom of the front and rear steel pipes of the main frame (1).