Concrete pipeline mounting and hoisting device
Through innovative design of adjustment and protection devices, the problem of time-consuming and labor-intensive adjustment of existing lifting devices has been solved, enabling rapid adjustment of lifting devices and buffer protection of concrete pipes, thereby improving lifting efficiency and safety.
Patent Information
- Application Number
- CN202420509599.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-15
AI Technical Summary
The existing lifting device adjustment requires removing the device using a screw and then re-fixing it to another lifting point. This method is time-consuming and labor-intensive, increases the labor intensity of workers, and reduces work efficiency and convenience.
The adjustment device, including the cooperation of a slide, connecting rod, circular plate, fixing plate, screw and circular groove, enables the rapid adjustment of the L-shaped lifting tool. Combined with the protective pad, limit plate and spikes in the protective device, it provides buffer protection.
It enables quick adjustment of the lifting equipment position without disassembling the equipment, reducing the labor intensity of workers, improving lifting efficiency, and reducing the incidence of accidents through buffer protection, thereby enhancing the safety and stability of lifting operations.
Smart Images

Figure CN222007029U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of lifting devices, in particular to a concrete pipe installation and lifting device. Background Art
[0002] Lifting refers to the process of moving concrete pipes from one location to another using lifting equipment. In the lifting process of concrete pipes, the sling plays a key role. As a connecting device between the lifting equipment and the lifted object, it is used to fix the pipe on the lifting equipment for lifting. The seven-shaped sling adopts a multi-point lifting point design, which can effectively and evenly distribute the weight of the lifted object, improve the stability of the lifting, and thus reduce the risk of tilting and shaking.
[0003] The above-mentioned and existing related technologies often have the following defects: when the position of the sling needs to be adjusted, the existing sling adjustment requires removing the sling through a screw and then re-fixing it to another lifting point. This method is time-consuming and labor-intensive, not only wasting time for disassembling and reinstalling the sling, but also increasing the labor intensity of workers, thereby reducing work efficiency and convenience.
[0004] Therefore, the utility model provides a concrete pipe installation and lifting device. Utility Model Content
[0005] The purpose of the utility model is to solve the problem in the prior art that the existing hanger adjustment needs to be removed by a screw and then re-fixed to another hanging point. This method is time-consuming and labor-intensive, not only wasting time for disassembling and reinstalling the hanger, but also increasing the labor intensity of workers. A concrete pipe installation and lifting device is proposed to solve the problem that the existing hanger adjustment needs to be removed by a screw and then re-fixed to another hanging point. This method is time-consuming and labor-intensive, not only wasting time for disassembling and reinstalling the hanger, but also increasing the labor intensity of workers.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a concrete pipe installation and lifting device, including a hanger and an adjusting ring, the surface of the hanger is fixedly connected with a lifting ring, the surface of the adjusting ring is threadedly connected with a seven-shaped hanger, the surface of the adjusting ring is provided with an adjusting device, the adjusting device includes two connecting rods, the two connecting rods are fixedly connected with the adjusting ring, one end of the two connecting rods is fixedly connected with a circular plate, the surface of the hanger is provided with two sliding grooves, the two circular plates are slidably connected with the inner wall of the sliding groove, the arc surface of the connecting rod is fixedly connected with a fixing plate, the surface of the fixing plate is threadedly connected with a screw, the surface of the hanger is provided with a plurality of circular grooves, and the screw is slidably connected with the inner wall of the circular groove.
[0007] The effects achieved by the above components are: by setting up the adjustment device and utilizing the mutual cooperation between the slide groove, connecting rod, circular plate, fixed plate, screw and circular groove, the spacing and position between the seven-shaped spreaders can be quickly adjusted without disassembling the spreaders and reinstalling them, thereby simplifying the operating process, providing greater flexibility and convenience, and making it easy to adapt to the lifting of concrete pipes of different lengths, reducing time and reducing the labor intensity of workers, thereby improving work efficiency.
[0008] Preferably, a plurality of round balls are rotatably connected to the surfaces of the two circular plates, and the round balls are slidably connected to the inner wall of the slide groove.
[0009] The effect achieved by the above components is that the sliding of the circular plate drives the round ball to rotate, and the round ball slides along the inner wall of the slide groove, so that the round ball can reduce the friction between the circular plate and the slide groove, thereby pushing the seven-shaped sling more quickly and smoothly.
[0010] Preferably, one end of the screw rod is rotatably connected to a rope, and the other end of the rope is fixedly connected to the adjusting ring.
[0011] The effect achieved by the above components is that the movement of the screw rod drives the rope to move, and the rope can prevent the screw rod from being lost due to the screw rod being out of contact with the fixing plate.
[0012] Preferably, a flexible pad is glued to the other end of the screw rod, the flexible pad is made of rubber, and one end of the circular groove is in a trumpet-shaped structure.
[0013] The effect achieved by the above components is: the movement of the screw will drive the flexible pad to move until the flexible pad rests against the inner wall of the circular groove. The flexible pad protects the circular groove and prevents the screw from directly contacting the circular groove and causing wear and damage to the circular groove. One end of the circular groove is a trumpet-shaped structure, and the inclined surface can guide the screw to move along the inclined surface direction, so that it can enter the groove smoothly, thereby improving the smoothness and accuracy of the screw entering the circular groove, thereby improving the convenience of workers' operation.
[0014] Preferably, a protective device is provided on the surface of the figure-seven sling, and the protective device includes a plurality of spikes, and the spikes are fixedly connected to the figure-seven sling. A protective pad is placed on the surface of the figure-seven sling, and the spikes are located inside the protective pad. A limiting plate is fixedly connected to the surface of the figure-seven sling, and the protective pad is made of rubber.
[0015] The effect achieved by the above components is: by setting up protective devices and utilizing the mutual cooperation between protective pads, limit plates and spikes, the concrete pipes can be effectively buffered and protected when they are lifted, avoiding damage caused by collision between the concrete pipes and the figure-seven hoisting devices, reducing the incidence of accidents during the lifting process, and improving the safety and stability of the lifting work.
[0016] Preferably, a plurality of diamond-shaped holes are provided on the surface of the protective pad.
[0017] The effect achieved by the above components is: diamond-shaped holes are opened on the surface of the protective pad. When it is hit, the protective pad will be squeezed and the diamond-shaped holes will be deformed. When the concrete pipe is out of contact with the seven-shaped hanger, the protective pad is made of rubber and has a certain flexibility. Therefore, the diamond-shaped holes improve the rebound effect of the anti-slip pad when it is used and speed up the rebound speed of the protective pad.
[0018] Preferably, the surface of the spike is fixedly connected to two thorns, and the thorns are located inside the protective pad.
[0019] The effect achieved by the above components is: pressing the protective pad, the spikes and spurs will be inserted into the protective pad, the spikes and spurs can fix the protective pad to avoid the displacement of the protective pad during use, the spurs can further fix the protective pad to improve the stability of the protective pad during use, and at the same time, the protective pad can be torn off, which is convenient for regular replacement of the protective pad.
[0020] In summary:
[0021] 1. In the utility model, by setting an adjustment device and utilizing the cooperation between the slide groove, the connecting rod, the circular plate, the fixing plate, the screw rod and the circular groove, the spacing and position between the seven-shaped hangers can be quickly adjusted without disassembling the hangers and then reinstalling them, which simplifies the operation process, provides greater flexibility and convenience, and makes it easy to adapt to the lifting of concrete pipes of different lengths, thereby reducing time and reducing the labor intensity of workers, thereby improving work efficiency.
[0022] 2. In the utility model, by setting up a protective device and utilizing the mutual cooperation between the protective pad, the limit plate and the spikes, the concrete pipe can be effectively buffered and protected when the concrete pipe is hoisted, avoiding damage caused by collision between the concrete pipe and the seven-shaped hoisting device, thereby reducing the incidence of accidents during the hoisting process and improving the safety and stability of the hoisting work. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0024] Figure 2 It is a rear-view stereoscopic structural schematic diagram of the utility model;
[0025] Figure 3 It is a structural schematic diagram of the regulating device of the utility model;
[0026] Figure 4 For the utility model Figure 1 A magnified image of point A;
[0027] Figure 5 This is a schematic diagram of the structure of the protective pad of the utility model after it is removed;
[0028] Figure 6 It is a three-dimensional structural schematic diagram of the spike of the utility model.
[0029] Legend: 1. Lifting ring; 2. Hanger; 3. Figure-7 sling; 4. Adjusting ring; 5. Adjusting device; 51. Slide groove; 52. Connecting rod; 53. Round plate; 54. Fixing plate; 55. Screw; 56. Round groove; 57. Rope; 58. Round ball; 59. Flexible pad; 6. Protective device; 61. Protective pad; 62. Limiting plate; 63. Spike; 64. Protrusion; 65. Diamond hole. DETAILED DESCRIPTION
[0030] Reference Figure 1 and Figure 2 As shown, the utility model provides a technical solution: a concrete pipe installation and lifting device, including a hanger 2 and an adjusting ring 4, the surface of the hanger 2 is fixedly connected with a lifting ring 1, the surface of the adjusting ring 4 is threadedly connected with a seven-shaped hanger 3, the surface of the adjusting ring 4 is provided with an adjusting device 5, and the surface of the seven-shaped hanger 3 is provided with a protective device 6.
[0031] The specific settings and functions of the adjusting device 5 and the protective device 6 are described in detail below.
[0032] Reference Figure 3 and Figure 4As shown, in this embodiment: the adjusting device 5 includes two connecting rods 52, the two connecting rods 52 are fixedly connected to the adjusting ring 4, one end of the two connecting rods 52 is fixedly connected to a circular plate 53, the surface of the hanger 2 is provided with two slide grooves 51, the two circular plates 53 are slidably connected to the inner wall of the slide groove 51, the arc surface of the connecting rod 52 is fixedly connected to a fixing plate 54, the surface of the fixing plate 54 is threadedly connected to a screw 55, the surface of the hanger 2 is provided with a plurality of circular grooves 56, the screw 55 is slidably connected to the inner wall of the circular groove 56, and by setting the adjusting device 5, using The mutual cooperation among the slide groove 51, the connecting rod 52, the circular plate 53, the fixing plate 54, the screw rod 55 and the circular groove 56 can quickly adjust the spacing and position between the seven-shaped hangers 3 without disassembling the hangers and reinstalling them, simplifying the operation process, providing greater flexibility and convenience, making it easy to adapt to different lengths of concrete pipes for lifting, reducing time and reducing the labor intensity of workers, thereby improving work efficiency. The surfaces of the two circular plates 53 are rotatably connected with a plurality of round balls 58, and the round balls 58 are slidably connected to the inner wall of the slide groove 51, and the circular plates 53 slide The movement of the screw 55 will drive the ball 58 to rotate, and the ball 58 will slide along the inner wall of the slide groove 51. The ball 58 can reduce the friction between the circular plate 53 and the slide groove 51, so as to push the seven-shaped hanger 3 more quickly and smoothly. One end of the screw 55 is rotatably connected with a rope 57, and the other end of the rope 57 is fixedly connected to the adjusting ring 4. The movement of the screw 55 will drive the rope 57 to move. The rope 57 can prevent the screw 55 from being lost due to the loss of the screw 55 caused by the disengagement of the screw 55 from the fixing plate 54. The other end of the screw 55 is glued with a flexible pad 59, and the flexible pad 59 is made of rubber material. The circular groove 56 has a trumpet-shaped structure at one end, and the movement of the screw 55 will drive the flexible pad 59 to move until the flexible pad 59 is against the inner wall of the circular groove 56. The flexible pad 59 protects the circular groove 56 and prevents the screw 55 from directly contacting the circular groove 56 and causing wear and damage to the circular groove 56. One end of the circular groove 56 has a trumpet-shaped structure, and the inclined surface can guide the screw 55 to move along the inclined surface direction, so that it can smoothly enter the groove, thereby improving the smoothness and accuracy of the screw 55 entering the circular groove 56, thereby improving the convenience of workers' operation.
[0033] Reference Figure 5 and Figure 6As shown, specifically, the protective device 6 includes a plurality of spikes 63, the spikes 63 are fixedly connected to the seven-shaped sling 3, a protective pad 61 is placed on the surface of the seven-shaped sling 3, the spikes 63 are located inside the protective pad 61, the surface of the seven-shaped sling 3 is fixedly connected to the limiting plate 62, the protective pad 61 is made of rubber, by setting the protective device 6, utilizing the mutual cooperation between the protective pad 61, the limiting plate 62 and the spikes 63, when the concrete pipe is hoisted, the concrete pipe can be effectively buffered and protected to avoid damage caused by collision between the concrete pipe and the seven-shaped sling 3, the incidence of accidents during the hoisting process can be reduced, and the safety and stability of the hoisting work can be improved. The surface of the protective pad 61 is provided with a plurality of diamond holes 65, and the surface of the protective pad 61 is provided with diamond holes 65, which will be hit. When the protective pad 61 is squeezed, the diamond hole 65 will be deformed. When the concrete pipe is out of contact with the seven-shaped hanger 3, the protective pad 61 is made of rubber and has a certain flexibility. Therefore, the diamond hole 65 improves the rebound effect of the anti-slip pad when in use and accelerates the rebound speed of the protective pad 61. The surface of the spike 63 is fixedly connected to two spikes 64, and the spike 64 is located in the protective pad 61. Press the protective pad 61. At this time, the spike 63 and the spike 64 will be inserted into the protective pad 61. The spike 63 and the spike 64 can fix the protective pad 61 to avoid the displacement of the protective pad 61 during use. The spike 64 can further fix the protective pad 61 to improve the stability of the protective pad 61 during use. At the same time, the protective pad 61 can be torn off, which is convenient for regular replacement of the protective pad 61.
[0034] Working principle: when the spacing between the seven-shaped spreaders 3 needs to be adjusted, the screw 55 is first rotated. The screw 55 moves with the help of the thread in the fixing plate 54 and slides along the inner wall of the circular groove 56. The movement of the screw 55 drives the rope 57 to move. The rope 57 can prevent the screw 55 from being lost due to the loss of the screw 55 caused by the loss of the screw 55 from the fixing plate 54, so that the screw 55 is out of contact with the circular groove 56, and then the seven-shaped spreader 3 is pushed, and the seven-shaped spreader 3 drives the adjustment ring 4 to move. The adjusting ring 4 will drive the connecting rod 52 to move, and the connecting rod 52 will drive the circular plate 53 to slide along the inner wall of the slide groove 51. The sliding of the circular plate 53 will drive the ball 58 to rotate, and the ball 58 will slide along the inner wall of the slide groove 51. The ball 58 can reduce the friction between the circular plate 53 and the slide groove 51, so as to push the seven-shaped hanger 3 more quickly and smoothly. After adjusting the position of the seven-shaped hanger 3, the screw 55 is rotated again, and the screw 55 will slide along the inner wall of the circular groove 56. One end of 6 is a trumpet-shaped structure, and the inclined surface can guide the screw rod 55 to move along the inclined surface direction so that it can enter the groove smoothly, thereby improving the smoothness and accuracy of the screw rod 55 entering the circular groove 56, thereby improving the convenience of workers' operation. The movement of the screw rod 55 will drive the flexible pad 59 to move until the flexible pad 59 is against the inner wall of the circular groove 56. The flexible pad 59 can protect the circular groove 56 and prevent the screw rod 55 from directly contacting the circular groove 56 and causing the circular groove 56 to be worn or damaged. By setting the adjustment device 5, the mutual cooperation between the slide groove 51, the connecting rod 52, the circular plate 53, the fixing plate 54, the screw rod 55 and the circular groove 56 can be used to quickly adjust the spacing and position of the seven-shaped hangers 3 without disassembling the hangers and reinstalling them, simplifying the operation process, providing greater flexibility and convenience, making it easy to adapt to concrete pipes of different lengths for lifting, reducing time and reducing the labor intensity of workers, thereby improving work efficiency.
[0035] When the concrete pipe is hoisted, the protective device 6 is needed to protect the concrete pipe. First, the protective pad 61 is slid along the surface of the limiting plate 62 and placed on the surface of the seven-shaped hanger 3, and then the protective pad 61 is pressed. At this time, the spikes 63 and the thorns 64 will be inserted into the protective pad 61. The spikes 63 and the thorns 64 can fix the protective pad 61 to avoid the displacement of the protective pad 61 during use. The thorns 64 can further fix the protective pad 61 to improve the stability of the protective pad 61 during use. At the same time, the protective pad 61 can be torn off, which can facilitate the regular replacement of the protective pad 61. The limiting plate 62 facilitates the installation of the protective pad 61. When the concrete pipe is hoisted, the two sides of the concrete pipe The end will hit the protective pad 61. At this time, a diamond hole 65 is opened on the surface of the protective pad 61. When hit, the protective pad 61 will be squeezed and the diamond hole 65 will be deformed. When the concrete pipe is out of contact with the seven-shaped hanger 3, the protective pad 61 is made of rubber and has a certain flexibility. Therefore, the diamond hole 65 improves the rebound effect of the anti-slip pad when used, and accelerates the rebound speed of the protective pad 61. By setting the protective device 6 and utilizing the mutual cooperation between the protective pad 61, the limit plate 62 and the spike 63, when lifting the concrete pipe, the concrete pipe can be effectively buffered and protected to avoid damage caused by collision between the concrete pipe and the seven-shaped hanger 3, the incidence of accidents during lifting can be reduced, and the safety and stability of the lifting work can be improved.
[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
Claims
1. A concrete pipe installation and lifting device, comprising a hanger (2) and an adjusting ring (4), wherein the surface of the hanger (2) is fixedly connected with a lifting ring (1), the surface of the adjusting ring (4) is threadedly connected with a seven-shaped lifting device (3), and the surface of the adjusting ring (4) is provided with an adjusting device (5), characterized in that: The adjusting device (5) comprises two connecting rods (52), the two connecting rods (52) are fixedly connected to the adjusting ring (4), one end of the two connecting rods (52) is fixedly connected to a circular plate (53), the surface of the hanger (2) is provided with two sliding grooves (51), the two circular plates (53) are slidably connected to the inner wall of the sliding groove (51), the arc surface of the connecting rod (52) is fixedly connected to a fixing plate (54), the surface of the fixing plate (54) is threadedly connected to a screw rod (55), the surface of the hanger (2) is provided with a plurality of circular grooves (56), and the screw rod (55) is slidably connected to the inner wall of the circular groove (56).
2. A concrete pipe installation and lifting device according to claim 1, characterized in that: A plurality of round balls (58) are rotatably connected to the surfaces of the two circular plates (53), and the round balls (58) are slidably connected to the inner wall of the slide groove (51).
3. A concrete pipe installation and lifting device according to claim 1, characterized in that: One end of the screw rod (55) is rotatably connected to a rope (57), and the other end of the rope (57) is fixedly connected to the adjustment ring (4).
4. A concrete pipe installation and lifting device according to claim 1, characterized in that: The other end of the screw rod (55) is glued with a flexible pad (59), and the flexible pad (59) is made of rubber. One end of the circular groove (56) is in a trumpet-shaped structure.
5. The concrete pipe installation and lifting device according to claim 1, characterized in that: The surface of the seven-shaped sling (3) is provided with a protective device (6), the protective device (6) comprises a plurality of spikes (63), the spikes (63) are fixedly connected to the seven-shaped sling (3), a protective pad (61) is placed on the surface of the seven-shaped sling (3), the spikes (63) are located inside the protective pad (61), the surface of the seven-shaped sling (3) is fixedly connected to a limiting plate (62), and the protective pad (61) is made of rubber.
6. A concrete pipe installation and lifting device according to claim 5, characterized in that: A plurality of diamond-shaped holes (65) are provided on the surface of the protective pad (61).
7. A concrete pipe installation and lifting device according to claim 5, characterized in that: Two protruding spikes (64) are fixedly connected to the surface of the spike (63), and the protruding spikes (64) are located inside the protective pad (61).
Citation Information
Cited By
Hoisting device for water conservancy and hydropower engineering building
CN223632943U
Building concrete hoisting device
CN223792752U