Hoisting device for pier column reinforcement cage frame
By designing strip beams, ear hangings and connecting seat binding devices, the pier column steel cage frame has the same lifting force at multiple points, solving the deformation problems caused by the existing lifting devices, and improving the molding effect and lifting of prefabricated pier columns stability.
Patent Information
- Application Number
- CN202323397391.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-13
AI Technical Summary
During the transfer of factory-made prefabricated pier column steel cage frames, the existing hoisting device causes the pier column steel cage frame to deform, affecting the prefabricated molding effect.
A lifting device is designed, including strip beams, hanging ears and connecting seating devices, which are connected to the gantry hooks through the hanging ears, and connected to the pier column steel cage frame through the connecting seating device, and the connecting seating device is realized through strip beams. Extend the line support so that the pier column steel cage frame has the same lifting force state at multiple points.
Effectively prevent the deformation of the pier column steel cage, improve the forming effect of the prefabricated pier column, and ensure the stability and safety of the lifting process.
Smart Images

Figure CN222042372U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a hoisting device, in particular to a hoisting device for a pier column steel bar cage. Background Art
[0002] A pier is a lower load-bearing object used to support an upper structure in civil engineering. The cross-section of a pier is mostly circular, but there are also elliptical, square, curved, parabolic and other special piers. It is an important component in highway bridges, railway bridges, sidewalk bridges, flyovers, ramp bridges, overpasses and other projects. In order to optimize the construction environment, the piers are all prefabricated in factories. During the prefabrication process in factories, it is necessary to transport the pier steel cage between process locations. Therefore, the lifting device for the pier steel cage is an important construction device. In the existing lifting device for the pier steel cage, two gantry cranes are used. The hook of one of the gantry cranes is connected to one end of the pier steel cage, and the hook of the other gantry crane is connected to the other end of the pier steel cage. Since the pier steel cage is in a state of increasing length, when the pier steel cage is transported between process locations, it will cause the pier steel cage to deform, thereby affecting the forming effect of the prefabricated pier.
[0003] The utility model makes the pier column steel bar cage frame in a state of having the same lifting force at multiple points by means of the technical feature, and effectively explores and studies the technical problem of deformation of the pier column steel bar cage frame caused by using two gantry cranes and connecting the hook of one of the gantry cranes to one end of the pier column steel bar cage frame and the hook of the other gantry crane to the other end of the pier column steel bar cage frame.
[0004] The statements here only provide background technology related to the utility model and do not necessarily constitute prior art. The technical solution of the application of the present invention is made based on the technical briefing document provided by the applicant on September 9, 2023, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention
[0005] The object of the utility model is a hoisting device for a pier column steel bar cage.
[0006] In order to overcome the above technical disadvantages, the purpose of the utility model is to provide a hoisting device for a pier column reinforcement cage, thereby improving the forming effect of the prefabricated pier column.
[0007] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: comprising a bar beam used as an intermediate support body, a hanging ear arranged on the bar beam, and a connecting and binding seat device arranged on the bar beam.
[0008] Due to the design of the beams, hanging ears and connecting seat devices, the hook connection with the gantry crane is achieved through the hanging ears, the connection with the pier column steel bar cage is achieved through the connecting seat device, and the connecting seat device is supported as an extended line through the beam, so that the pier column steel bar cage is placed in a state of having the same lifting force at multiple points, thereby solving the technical problem of deformation of the pier column steel bar cage caused by using two gantries and connecting the hook of one of the gantry cranes to one end of the pier column steel bar cage and the hook of the other gantry crane to the other end of the pier column steel bar cage, thereby improving the forming effect of the prefabricated pier.
[0009] The utility model is designed to connect the bar beam, the hanging ear and the connection binding seat device to each other in a way that the pier column steel bar cage is in a state of having the same lifting force at multiple points.
[0010] The utility model is designed to connect the bar beam with the hanging ear and the connecting and binding seat device in a manner of supporting in the form of an extended line body.
[0011] The utility model designs a connection and binding seat device which includes a positioning seat, a surrounding rope, a lower clamping nut, an upper clamping nut and a supporting vertical column.
[0012] The technical effects of the above four technical solutions are: highlighting the technical feature of making the pier column reinforcement cage frame be in a state of having the same lifting force at multiple points, and introducing the application in the technical field of lifting devices for pier column reinforcement cage frames.
[0013] The utility model is designed to further include a first accessory device, and the first accessory device is arranged between the connecting seat binding device and the bar beam, and the first accessory device is arranged to include a supporting cross column and a clamping nut.
[0014] The utility model is designed to further include a second accessory device, and the second accessory device is arranged on the connecting binding seat device, and the second accessory device is arranged as an adjusting nut.
[0015] The utility model is designed to further include a third accessory device, and the third accessory device is arranged on the bar beam, and the third accessory device is arranged as a warning light.
[0016] The technical effect of the above technical solution is that the integrated installation of other components is realized, thereby expanding the technical effect of the utility model.
[0017] The utility model is designed that a hanging ear, a supporting horizontal column and a warning light are respectively arranged on the bar beam, a positioning seat is arranged on the supporting horizontal column and a clamping nut is arranged between the positioning seat and the supporting horizontal column, a supporting vertical column is arranged on the positioning seat and a surrounding rope is arranged between the supporting vertical column and the positioning seat, and a lower clamping nut, an adjusting nut and an upper clamping nut are respectively arranged between the surrounding rope and the supporting vertical column.
[0018] The technical effect of the above technical scheme is that the basic technical scheme of the utility model is formed by the bar beam, the hanging ear, the supporting horizontal column, the clamping nut, the positioning seat, the surrounding rope, the lower clamping nut, the adjusting nut, the upper clamping nut, the supporting vertical column and the warning light, which solves the technical problem of the utility model.
[0019] The utility model is designed that a leakage window body is arranged at the middle contraction part of the beam part of the strip beam and a receiving groove body I is arranged at the lower end face of the lower extension part of the beam part, the end head of the upper end face of the upper extension part of the beam part is arranged to be connected with the hanging ear and the leakage window body is arranged to be connected with the warning light in an accommodating manner, the inner wall of the leakage window body is arranged to be connected with the warning light and the receiving groove body I is arranged to be connected with the supporting horizontal column in an accommodating manner, the front and rear inner walls of the receiving groove body I are arranged to be connected with the supporting horizontal column and the beam part is arranged to be an I-shaped beam-shaped body, the leakage window body is arranged to be a rectangular hole-shaped body and the receiving groove body I is arranged to be a long strip hole-shaped body with a ︹-shaped cross section, and the leakage window body and the receiving groove body I are arranged to be spaced and distributed along the transverse center line of the beam part.
[0020] The technical effect of the above technical solution is that it realizes the placement of a linear beam on the pier column reinforcement cage, meeting the requirements of the same lifting force state at multiple points.
[0021] The utility model is designed that the hanging ear is arranged to include a seat portion I and a plate portion and a hanging hole body is arranged in the plate portion, the outer end surface portion of the seat portion I is arranged to be connected to the inner end surface portion of the plate portion and the inner end surface portion of the seat portion I is arranged to be connected to the bar beam, the seat portion I is arranged to be a conical table-shaped body and the plate portion is arranged to be a rectangular sheet-shaped body, the plate portion is arranged to be spaced and distributed along the transverse center line of the seat portion I and the hanging hole body is arranged to be a hole-shaped body.
[0022] The technical effect of the above technical solution is: realizing multi-point connection with the hook of the gantry crane and increasing the connection area with the hook of the gantry crane.
[0023] The utility model is designed that a positioning seat is arranged to include a cylinder, a rod and a seat part II, and an accommodating groove body II is arranged on the lower end surface part of the seat part II, one of the end heads of the rod is arranged to be connected with the middle part of the cylinder and the other end head of the rod is arranged to be connected with the middle part of the upper end surface of the seat part II, the edge part of the upper end surface of the seat part II is arranged to be connected with the supporting vertical column and the edge part of the upper end surface of the seat part II is arranged to be connected in a contacting manner with a surrounding rope, the cylinder is arranged to be connected in a sleeve-type manner with the supporting horizontal column and the port part of the cylinder is arranged to be connected in a contacting manner with a clamping nut, the cylinder is arranged to be a tubular body and the rod is arranged to be a rod-shaped body, the seat part II is arranged to be a rectangular block body and the accommodating groove body II is arranged to be a slotted body with a C-shaped cross-section, and the accommodating groove body II is arranged to be arranged and distributed at intervals along the longitudinal center line of the seat part II.
[0024] The technical effect of the above technical solution is: to achieve the connection of the pier column steel bar cage with increased area, to achieve the fixation of the trough body with the pier column steel bar cage, and to improve the connection stability performance of the pier column steel bar cage.
[0025] The utility model is designed that the support vertical column is set as a bare column bolt and the lower end surface of the support vertical column is set to be connected with a positioning seat, the support vertical column is set to be connected with a surrounding rope through-type, and the support vertical column is respectively set to be connected with a lower clamping nut, an adjusting nut and an upper clamping nut in a threaded manner.
[0026] The utility model is designed that a surrounding rope is arranged to include a rope portion, a loop portion I and a loop portion II, and one end of the rope portion is arranged to be connected to the loop portion I, the other end of the rope portion is arranged to be connected to the loop portion II, and the loop portion I and the loop portion II are respectively arranged to be sleeve-type connected to a supporting vertical column, one end surface portion of the loop portion I is arranged to be contact-type connected to a positioning seat, and the other end surface portion of the loop portion I is arranged to be contact-type connected to a lower clamping nut, one end surface portion of the loop portion II is arranged to be contact-type connected to an adjusting nut, and the other end surface portion of the loop portion II is arranged to be contact-type connected to an upper clamping nut, the rope portion is arranged to be connected to the vertical steel bars on the pier column steel bar cage, and the rope portion is arranged to be a textile rope-shaped body, and the loop portion I and the loop portion II are respectively arranged to be annular gaskets.
[0027] The utility model is designed that the lower clamping nut, the adjusting nut and the upper clamping nut are respectively arranged as hexagonal nuts, and the lower clamping nut, the adjusting nut and the upper clamping nut are respectively arranged to be threadedly connected with the supporting vertical column, and the lower end surface portion of the lower clamping nut, the upper end surface portion of the adjusting nut and the lower end surface portion of the upper clamping nut are respectively arranged to be contact-connected with the surrounding rope.
[0028] The technical effects of the above three technical solutions are: achieving the bundling and fixing of the pier column steel bar cage and optimizing the connection operation with the pier column steel bar cage.
[0029] The utility model is designed that the supporting cross column is arranged as a plain column bolt and the end surface portion of the supporting cross column is arranged to be connected with the bar beam, the supporting cross column is arranged to be connected with the positioning seat in a through-type manner and the supporting cross column is arranged to be connected with the clamping nut in a threaded manner.
[0030] The utility model is designed that the clamping nut is arranged to include a nut part I and a nut part II, and the nut part I and the nut part II are respectively arranged to be threadedly connected to the supporting cross column, the inner end surface part of the nut part I and the inner end surface part of the nut part II are respectively arranged to be contact-connected with the positioning seat, and the nut part I and the nut part II are respectively arranged to be hexagonal nuts.
[0031] The technical effects of the above two technical solutions are: the position of the positioning seat can be adjusted to meet the needs of setting lifting points at different positions on the pier column reinforcement cage.
[0032] The utility model is designed that the warning light is a single-body warning light with a self-contained rechargeable power source, the warning light is connected to the bar in a sinking manner, and the shell of the warning light is connected to the bar.
[0033] The technical effect of the above technical solution is that: the lifting state and lifting movement trajectory of the pier column steel bar cage are marked, and the lifting safety performance of the pier column steel bar cage is improved.
[0034] The utility model is designed that the bar beams and the hanging ears are arranged in a manner of supporting the whole frame, the surrounding ropes, the lower clamping nuts, the adjusting nuts, the upper clamping nuts and the supporting vertical columns are arranged in a manner of supporting the whole frame, and the bar beams, the hanging ears, the positioning seats, the surrounding ropes, the lower clamping nuts, the adjusting nuts, the upper clamping nuts and the supporting vertical columns are arranged in a manner of longitudinal position adjustment, and the bar beams, the hanging ears, the positioning seats, the surrounding ropes, the lower clamping nuts, the adjusting nuts, the upper clamping nuts and the supporting vertical columns and the warning lights are arranged in a manner of releasing a lifting position signal.
[0035] The utility model is designed that the center line of the bar beam, the center line of the hanging ear, the center line of the supporting horizontal column, the center line of the positioning seat and the center line of the warning light are arranged on the same straight line, two hanging ears and two warning lights are respectively arranged on the bar beam, a supporting horizontal column, a clamping nut and a positioning seat are arranged to form a group of pressure plate components, and multiple groups of pressure plate components are arranged to be arranged and distributed at intervals along the transverse center line of the beam portion, a surrounding rope, a lower clamping nut, an adjusting nut, an upper clamping nut and a supporting vertical column are arranged to form a group of surrounding components, and multiple groups of surrounding components are arranged to be arranged and distributed at intervals along the longitudinal center line of the seat portion II, the rope portion is arranged to be distributed corresponding to the accommodating groove body II, the collar portion I is arranged to be connected to the seat portion II, the nut portion I and the nut portion II are respectively arranged to be connected to the cylinder portion, and the seat portion I is arranged to be connected to the beam portion.
[0036] In the present technical scheme, the bar beam and the hanging ear are basic components and are also necessary technical features of the present utility model; the supporting cross column, clamping nut, positioning seat, surrounding rope, lower clamping nut, adjusting nut, upper clamping nut, supporting vertical column and warning light are functional components and are features for realizing other technical effects of the present utility model; the design of the technical features of the beam part, leakage window body, accommodating trough body I, seat part I, plate part, hanging hole body, nut part I, nut part II, cylinder part, rod part, seat part II, accommodating trough body II, rope part, collar part I and collar part II are technical features that comply with the Patent Law and its implementing rules.
[0037] In the present technical solution, the important technical features are the beams, hanging ears and connecting binding seat devices that enable the pier column reinforcement cage to be in a state of identical lifting force at multiple points. In the technical field of lifting devices for pier column reinforcement cages, the present technical solution has novelty, creativity and practicality. The terms in the present technical solution can be explained and understood using the patent literature in the technical field. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 It is a schematic diagram of the utility model.
[0040] Figure 2 for Figure 1 Right view of
[0041] Beam-1, hanging ear-2, supporting horizontal column-3, clamping nut-4, positioning seat-5, wrapping rope-6, lower clamping nut-7, adjusting nut-8, upper clamping nut-9, supporting vertical column-90, warning light-91, beam part-11, leakage window body-12, accommodating trough body I-13, seat part I-21, plate part-22, hanging hole body-23, nut part I-41, nut part II-42, cylinder part-51, rod part-52, seat part II-53, accommodating trough body II-54, rope part-61, ring part I-62, ring part II-63. DETAILED DESCRIPTION
[0042] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not precluding the existence or addition of one or more other elements or combinations thereof.
[0043] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0045] In addition, the technical features involved in the different embodiments of the utility model described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following embodiments are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the field.
[0046] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0047] Figure 1 This is the first embodiment of the utility model, which is described in detail in conjunction with the accompanying drawings. It includes a bar beam 1, a hanging ear 2, a supporting cross column 3, a clamping nut 4, a positioning seat 5, a wrapping rope 6, a lower clamping nut 7, an adjusting nut 8, an upper clamping nut 9, a supporting vertical column 90 and a warning light 91, and the bar beam 1 is respectively provided with a hanging ear 2, a supporting cross column 3 and a warning light 91, a positioning seat 5 is provided on the supporting cross column 3, and a clamping nut 4 is provided between the positioning seat 5 and the supporting cross column 3, a supporting vertical column 90 is provided on the positioning seat 5, and a wrapping rope 6 is provided between the supporting vertical column 90 and the positioning seat 5, and a lower clamping nut 7, an adjusting nut 8 and an upper clamping nut 9 are respectively provided between the wrapping rope 6 and the supporting vertical column 90.
[0048] In this embodiment, a leakage window body 12 is provided in the middle contraction portion of the beam portion 11 of the strip beam 1 and a receiving groove body Ⅰ13 is provided on the lower end face of the lower extension portion of the beam portion 11, the end head of the upper end face of the upper extension portion of the beam portion 11 is arranged to be connected to the hanging ear 2 and the leakage window body 12 is arranged to be connected to the warning light 91 in an accommodating manner, the inner wall of the leakage window body 12 is arranged to be connected to the warning light 91 and the receiving groove body Ⅰ13 is arranged to be connected to the supporting cross column 3 in an accommodating manner, the front and rear inner walls of the receiving groove body Ⅰ13 are arranged to be connected to the supporting cross column 3 and the beam portion 11 is arranged to be an I-beam body, the leakage window body 12 is arranged to be a rectangular hole body and the receiving groove body Ⅰ13 is arranged to be a long strip hole body with a ︹-shaped cross section, and the leakage window body 12 and the receiving groove body Ⅰ13 are respectively arranged to be spaced apart and distributed along the transverse center line of the beam portion 11.
[0049] Through the bar beam 1, a supporting connection point for the hanging ear 2, the supporting cross column 3 and the warning light 91 is formed, the connection with the hanging ear 2 is realized by the beam part 11, the connection with the supporting cross column 3 is realized by the accommodating groove body Ⅰ13, and the connection with the warning light 91 is realized by the leakage window body 12. Its technical purpose is to serve as a supporting carrier for the hanging ear 2, the supporting cross column 3 and the warning light 91.
[0050] In this embodiment, the ear 2 is configured to include a seat portion Ⅰ21 and a plate portion 22 and a hanging hole body 23 is provided in the plate portion 22, the outer end surface portion of the seat portion Ⅰ21 is configured to be connected to the inner end surface portion of the plate portion 22 and the inner end surface portion of the seat portion Ⅰ21 is configured to be connected to the beam 1, the seat portion Ⅰ21 is configured to be a conical table-shaped body and the plate portion 22 is configured to be a rectangular sheet-shaped body, the plate portion 22 is configured to be arranged and distributed at intervals along the transverse center line of the seat portion Ⅰ21 and the hanging hole body 23 is configured to be a hole-shaped body.
[0051] A supporting connection point for the bar beam 1 is formed by the hanging ear 2, the connection with the bar beam 1 is realized by the seat part Ⅰ21, and the connection with the hook of the gantry crane is realized by the plate part 22 and the hanging hole body 23. Its technical purpose is to be used as a component for connecting with the hook of the gantry crane.
[0052] In this embodiment, the support cross column 3 is set as a bare column bolt and the end surface of the support cross column 3 is set to be connected with the beam 1, the support cross column 3 is set to be through-connected with the positioning seat 5 and the support cross column 3 is set to be threadedly connected with the clamping nut 4.
[0053] By supporting the cross column 3, a supporting connection point for the bar beam 1, the clamping nut 4 and the positioning seat 5 is formed. The support cross column 3 realizes the connection with the bar beam 1, the connection with the clamping nut 4, and the connection with the positioning seat 5. Its technical purpose is to serve as one of the components for connecting the positioning seat 5 and the bar beam 1.
[0054] In this embodiment, the clamping nut 4 is configured to include a nut portion I41 and a nut portion II42, and the nut portion I41 and the nut portion II42 are respectively configured to be threadedly connected to the supporting cross column 3, the inner end surface portion of the nut portion I41 and the inner end surface portion of the nut portion II42 are respectively configured to be contact-connected to the positioning seat 5, and the nut portion I41 and the nut portion II42 are respectively configured to be hexagonal nuts.
[0055] By clamping the nut 4, a supporting connection point for the supporting cross column 3 and the positioning seat 5 is formed. The nut part I 41 and the nut part II 42 realize the connection with the supporting cross column 3 and the connection with the positioning seat 5. Its technical purpose is to serve as the second component for connecting the positioning seat 5 and the beam 1.
[0056] In this embodiment, the positioning seat 5 is configured to include a barrel 51, a rod 52 and a seat Ⅱ53, and a receiving groove body Ⅱ54 is arranged on the lower end surface of the seat Ⅱ53, one of the ends of the rod 52 is arranged to be connected to the middle part of the barrel 51 and the other end of the rod 52 is arranged to be connected to the middle part of the upper end surface of the seat Ⅱ53, the edge part of the upper end surface of the seat Ⅱ53 is arranged to be connected to the supporting vertical column 90 and the edge part of the upper end surface of the seat Ⅱ53 is arranged to be contact-connected with the surrounding rope 6, the barrel 51 is arranged to be sleeve-connected with the supporting horizontal column 3 and the end part of the barrel 51 is arranged to be contact-connected with the clamping nut 4, the barrel 51 is arranged to be a tubular body and the rod 52 is arranged to be a rod-shaped body, the seat Ⅱ53 is arranged to be a rectangular block body and the receiving groove body Ⅱ54 is arranged to be a slotted body with a C-shaped cross-section, and the receiving groove body Ⅱ54 is arranged to be arranged and distributed at intervals along the longitudinal center line of the seat Ⅱ53.
[0057] Through the positioning seat 5, a support connection point for the supporting horizontal column 3, the clamping nut 4, the surrounding rope 6 and the supporting vertical column 90 is formed. The connection with the supporting horizontal column 3 and the clamping nut 4 is realized by the cylinder 51. The connection with the surrounding rope 6 and the support vertical column 90 is realized by the seat II 53. The connection between the cylinder 51 and the seat II 53 is realized by the rod 52. The connection with the vertical steel bars on the pier column steel cage is realized by the accommodating groove II 54. The technical purpose is to be used as one of the components for connecting the pier column steel cage.
[0058] In this embodiment, the support column 90 is set as a bare column bolt and the lower end surface of the support column 90 is set to be connected to the positioning seat 5, the support column 90 is set to be through-connected with the surrounding rope 6 and the support column 90 is respectively set to be threadedly connected with the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9.
[0059] By supporting the vertical column 90, a support connection point for the positioning seat 5, the surrounding rope 6, the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9 is formed. The support vertical column 90 realizes the connection with the positioning seat 5, the connection with the surrounding rope 6, the connection with the lower clamping nut 7, the connection with the adjusting nut 8, and the connection with the upper clamping nut 9. Its technical purpose is to serve as the second component for connecting the pier column steel bar cage.
[0060] In this embodiment, the encircling rope 6 is configured to include a rope portion 61, a loop portion I 62 and a loop portion II 63 and one end of the rope portion 61 is configured to be connected to the loop portion I 62, the other end of the rope portion 61 is configured to be connected to the loop portion II 63 and the loop portion I 62 and the loop portion II 63 are respectively configured to be sleeve-connected to the supporting vertical column 90, one end surface portion of the loop portion I 62 is configured to be contact-connected to the positioning seat 5 and the other end surface portion of the loop portion I 62 is configured to be contact-connected to the lower clamping nut 7, one end surface portion of the loop portion II 63 is configured to be contact-connected to the adjusting nut 8 and the other end surface portion of the loop portion II 63 is configured to be contact-connected to the upper clamping nut 9, the rope portion 61 is configured to be encirclingly connected to the vertical steel bars on the pier column steel bar cage and the rope portion 61 is configured to be a textile rope-shaped body, and the loop portion I 62 and the loop portion II 63 are respectively configured to be annular gaskets.
[0061] By wrapping the rope 6, support connection points for the positioning seat 5, the lower clamping nut 7, the adjusting nut 8, the upper clamping nut 9 and the supporting vertical column 90 are formed. The connection with the positioning seat 5 and the lower clamping nut 7 are realized by the ring part I 62. The connection with the adjusting nut 8 and the upper clamping nut 9 are realized by the ring part II 63. The connection with the supporting vertical column 90 is realized by the ring part I 62 and the ring part II 63. The connection with the vertical steel bars on the pier column steel cage is realized by the rope part 61. The technical purpose is to be used as the third component for connecting the pier column steel cage.
[0062] In this embodiment, the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9 are respectively set as hexagonal nuts and the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9 are respectively set to be threadedly connected with the supporting vertical column 90, and the lower end surface portion of the lower clamping nut 7, the upper end surface portion of the adjusting nut 8 and the lower end surface portion of the upper clamping nut 9 are respectively set to be contact-connected with the surrounding rope 6.
[0063] A supporting connection point for the encircling rope 6 and the supporting column 90 is formed by the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9. The connection with the encircling rope 6 and the supporting column 90 is realized by the lower clamping nut 7, the adjusting nut 8 and the upper clamping nut 9. The technical purpose is to serve as the fourth component for connecting the pier column reinforcement cage.
[0064] In this embodiment, the warning light 91 is configured as a single-body warning light with a self-contained rechargeable power supply and the warning light 91 is configured to be sunk in connection with the bar beam 1 , and the housing of the warning light 91 is configured to be connected to the bar beam 1 .
[0065] A supporting connection point for the beam 1 is formed by the warning light 91, and the connection with the beam 1 is realized by the warning light 91. Its technical purpose is to be used as a component for emitting warning light during the lifting process of the pier column steel cage.
[0066] In this embodiment, the bar beam 1 and the hanging ear 2 are arranged to be distributed in a manner of supporting the whole frame with the positioning seat 5, the surrounding rope 6, the lower clamping nut 7, the adjusting nut 8, the upper clamping nut 9 and the supporting vertical column 90, and the bar beam 1, the hanging ear 2, the positioning seat 5, the surrounding rope 6, the lower clamping nut 7, the adjusting nut 8, the upper clamping nut 9 and the supporting vertical column 90 and the supporting horizontal column 3 and the clamping nut 4 are arranged to be distributed in a manner of longitudinal position adjustment, the bar beam 1, the hanging ear 2, the positioning seat 5, the surrounding rope 6, the lower clamping nut 7, the adjusting nut 8, the upper clamping nut 9 and the supporting vertical column 90 and the warning light 91 are arranged to be distributed in a manner of releasing the lifting position signal, and the center line of the bar beam 1, the center line of the hanging ear 2, the center line of the supporting horizontal column 3, the center line of the positioning seat 5 and the center line of the warning light 91 are arranged The two hooks 2 and the two warning lights 91 are arranged on the beam 1 respectively, a supporting cross column 3, a clamping nut 4 and a positioning seat 5 are arranged to form a group of pressure plate components, and multiple groups of pressure plate components are arranged to be arranged and distributed along the transverse center line of the beam portion 11, a surrounding rope 6, a lower clamping nut 7, an adjusting nut 8, an upper clamping nut 9 and a supporting vertical column 90 are arranged to form a group of surrounding components, and multiple groups of surrounding components are arranged to be arranged and distributed along the longitudinal center line of the seat portion Ⅱ53, the rope portion 61 is arranged to be distributed corresponding to the accommodating groove body Ⅱ54, the ring portion Ⅰ62 is arranged to be connected to the seat portion Ⅱ53, the nut portion Ⅰ41 and the nut portion Ⅱ42 are respectively arranged to be connected to the cylinder portion 51, and the seat portion Ⅰ21 is arranged to be connected to the beam portion 11.
[0067] The method of using this embodiment is as follows: when the pier column reinforcement cage is transported between process positions, the hanging hole body 23 is connected to the hook of the gantry crane, and the positioning seat 5 is placed on the pier column reinforcement cage through the gantry crane, so that the accommodating tank body II54 is placed on the vertical reinforcement on the pier column reinforcement cage, and the collar part I62 is put on the supporting vertical column 90, so that one of the end surfaces of the collar part I62 is put on the upper end surface edge of the seat part II53, and the lower clamping nut 7 is rotated on the supporting vertical column 90, so that the lower end surface of the lower clamping nut 7 acts on another end surface of the collar part I62, so that the adjusting nut 8 is rotated on the supporting vertical column 90, and the rope part 61 is wrapped around the vertical reinforcement on the pier column reinforcement cage, and the collar part II63 is put on the supporting vertical column 90, so that the upper clamping nut 9 is rotated on the supporting vertical column 90, and the upper clamping nut 9 moves downward on the supporting vertical column 90, so that the upper clamping nut The lower end surface of 9 acts on the other end surface of the collar part II 63. After the rope part 61 has tied the vertical steel bars on the pier column steel bar cage, the adjusting nut 8 is rotated in the opposite direction on the supporting column 90 to make the adjusting nut 8 move upward on the supporting column 90, so that the upper end surface of the adjusting nut 8 acts on one of the end surfaces of the collar part II 63, thereby connecting the positioning seat 5 with the pier column steel bar cage 2, and the beam part 11 is hoisted by the gantry crane, and the pier column steel bar cage is placed in the next process position, and the upper clamping nut 9 is rotated in the opposite direction on the supporting column 90 to make the upper clamping nut 9 move upward on the supporting column 90, separate the upper clamping nut 9 from the supporting column 90, separate the collar part II 63 from the supporting column 90, and separate the rope part 61 from the vertical steel bars on the pier column steel bar cage, thereby realizing the transportation of the pier column steel bar cage between process positions.
[0068] The nut part I 41 and the nut part II 42 are rotated on the supporting cross column 3, and the inner end face parts of the nut part I 41 and the inner end face parts of the nut part II 42 are separated from the end part of the cylinder 51, so that the cylinder 51 is moved on the supporting cross column 3 to realize the longitudinal position adjustment of the positioning seat 5 on the beam 11. When the longitudinal position adjustment of the positioning seat 5 is completed, the nut part I 41 and the nut part II 42 are rotated in the opposite direction on the supporting cross column 3, and the inner end face parts of the nut part I 41 and the inner end face parts of the nut part II 42 act on the end part of the cylinder 51.
[0069] When verifying the utility model, the inventor abandoned the existing technical feature of using two gantry cranes and connecting the hook of one of the gantry cranes to one end of the pier column steel bar cage and the hook of the other gantry crane to the other end of the pier column steel bar cage to cause the pier column steel bar cage to deform. Firstly, a technical feature of making the pier column steel bar cage be in a state of having the same lifting force at multiple points was proposed, and the first unexpected technical effect was obtained: the installation of lifting points with the same lifting force on the pier column steel bar cage was realized, the second unexpected technical effect was obtained: the local setting of lifting points for the pier column steel bar cage was realized, the third unexpected technical effect was obtained: the lifting point of the pier column steel bar cage was realized to be supported by the trough body to prevent the pier column steel bar cage from shaking, and the fourth unexpected technical effect was obtained: the pier column steel bar cage was quickly tied and fixed.
[0070] In the second embodiment of the utility model, the bar beam 1, the hanging ear 2 and the connecting and binding seat device are connected to each other in such a way that the pier column reinforcement cage is in a state of having the same lifting force at multiple points.
[0071] In this embodiment, the bar beam 1 is connected with the hanging ear 2 and the connecting and binding seat device in a manner of supporting the extended line body.
[0072] In this embodiment, the connection and binding seat device is configured to include a positioning seat 5, a surrounding rope 6, a lower clamping nut 7, an upper clamping nut 9 and a supporting vertical column 90.
[0073] In this embodiment, a first accessory device is also included and is arranged between the connecting seat binding device and the beam 1 . The first accessory device is arranged to include a supporting cross column 3 and a clamping nut 4 .
[0074] In this embodiment, a second accessory device is further included and is arranged on the connecting and binding seat device. The second accessory device is arranged as an adjusting nut 8 .
[0075] In this embodiment, a third accessory device is further included and is arranged on the bar 1 , and the third accessory device is arranged as a warning light 91 .
[0076] The second embodiment of the present utility model is based on the first embodiment.
[0077] The utility model has the following characteristics:
[0078] 1. Due to the design of the bar beam 1, the hanging ear 2 and the connecting and binding device, the hook connection with the gantry crane is realized through the hanging ear 2, and the connection with the pier column steel cage is realized through the connecting and binding device. Through the bar beam 1, the connecting and binding device is supported as an extended line body, and the pier column steel cage is placed in a state of having the same lifting force at multiple points. The technical problem of deformation of the pier column steel cage caused by using two gantries and connecting the hook of one of the gantry cranes to one end of the pier column steel cage and the hook of the other gantry crane to the other end of the pier column steel cage is solved, thereby improving the forming effect of the prefabricated pier.
[0079] 2. Due to the design of the positioning seat 5, the surrounding rope 6, the lower clamping nut 7, the upper clamping nut 9 and the supporting vertical column 90, the connection setting with the pier column steel bar cage is realized.
[0080] 3. Due to the design of the supporting cross column 3 and the clamping nut 4, the position of the positioning seat 5 can be adjusted.
[0081] 4. Due to the design of the adjusting nut 8, the end of the surrounding rope 6 can be clamped and fixed.
[0082] 5. Due to the design of the warning light 91, the lifting status of the pier column reinforcement cage can be marked.
[0083] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the utility model, and is not a technical feature calculated by formula or obtained through a limited number of tests. Tests have shown that the technical features of this numerical range have achieved good technical effects.
[0084] 7. Due to the design of the technical features of the utility model and the effects of the individual and combined technical features, experiments have shown that the performance indicators of the utility model are at least 1.7 times the existing performance indicators, and the evaluation shows that the utility model has a good market value.
[0085] There are other technical features that connect the beam 1, the hanging ear 2 and the connecting binding seat device so that the pier column reinforcement cage is in a state of having the same lifting force at multiple points, which are all embodiments of the present utility model, and the various technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, the Patent Implementing Rules and the Examination Guidelines, all possible combinations of the various technical features in the above-mentioned embodiments will no longer be described.
[0086] Therefore, in the technical field of lifting devices for pier column steel cages, all technical contents including the bar beam 1 used as an intermediate support body, the hanging ears 2 arranged on the bar beam 1, and the connecting and binding seat devices arranged on the bar beam 1 are within the protection scope of the present utility model.
Claims
1. A hoisting device for a pier column steel bar cage, characterized by: The invention comprises a bar beam (1) used as an intermediate support body, a hanging ear (2) arranged on the bar beam (1), and a connecting and binding seat device arranged on the bar beam (1). The connection and binding seat device is configured to include a positioning seat (5), a surrounding rope (6), a lower clamping nut (7), an upper clamping nut (9) and a supporting vertical column (90). It also includes a first accessory device and the first accessory device is arranged between the connecting seat binding device and the beam (1), and the first accessory device is arranged to include a supporting cross column (3) and a clamping nut (4). It also includes a second accessory device and the second accessory device is arranged on the connecting and binding seat device, and the second accessory device is arranged as an adjusting nut (8). A third accessory device is also included and is arranged on the bar (1), and the third accessory device is arranged as a warning light (91).
2. The hoisting device for pier column reinforcement cage according to claim 1 is characterized in that: The strip beam (1), the hanging lug (2) and the connecting and binding seat device are connected to each other in a manner that the pier column reinforcement cage is in a state of having the same lifting force at multiple points.
3. The hoisting device for pier column reinforcement cage according to claim 2 is characterized in that: The bar beam (1) is connected with the hanging ear (2) and the connecting and binding seat device in a manner of supporting the extended line body.
4. The hoisting device for pier column reinforcement cage according to claim 1 is characterized in that: The bar beam (1) is respectively provided with a hanging ear (2), a supporting cross column (3) and a warning light (91); a positioning seat (5) is provided on the supporting cross column (3), and a clamping nut (4) is provided between the positioning seat (5) and the supporting cross column (3); a supporting vertical column (90) is provided on the positioning seat (5), and a surrounding rope (6) is provided between the supporting vertical column (90) and the positioning seat (5); and a lower clamping nut (7), an adjusting nut (8) and an upper clamping nut (9) are respectively provided between the surrounding rope (6) and the supporting vertical column (90).
5. The hoisting device for pier column reinforcement cage according to claim 4 is characterized in that: A leakage window body (12) is provided at the middle contraction portion of the beam portion (11) of the strip beam (1), and a receiving groove body I (13) is provided at the lower end face of the lower extension portion of the beam portion (11); the upper end face end of the upper extension portion of the beam portion (11) is arranged to be connected to the hanging ear (2), and the leakage window body (12) is arranged to be connected to the warning light (91) in an accommodating manner; the inner wall of the leakage window body (12) is arranged to be connected to the warning light (91), and the receiving groove body I (13) is arranged to be connected to the supporting horizontal column (3); the front and rear inner walls of the receiving groove body I (13) are arranged to be connected to the supporting horizontal column (3), and the beam portion (11) is arranged to be an I-shaped beam; the leakage window body (12) is arranged to be a rectangular hole-shaped body, and the receiving groove body I (13) is arranged to be a long strip hole-shaped body with a ︹-shaped cross section; the leakage window body (12) and the receiving groove body I (13) are arranged to be spaced and distributed along the transverse center line of the beam portion (11).
6. The hoisting device for pier column reinforcement cage according to claim 4 is characterized in that: The hanging ear (2) is configured to include a seat portion I (21) and a plate portion (22), and a hanging hole body (23) is provided in the plate portion (22); the outer end surface portion of the seat portion I (21) is configured to be connected to the inner end surface portion of the plate portion (22), and the inner end surface portion of the seat portion I (21) is configured to be connected to the beam (1); the seat portion I (21) is configured to be a conical table-shaped body and the plate portion (22) is configured to be a rectangular sheet-shaped body; the plate portion (22) is configured to be arranged and distributed at intervals along the transverse center line of the seat portion I (21), and the hanging hole body (23) is configured to be a hole-shaped body.
7. The hoisting device for pier column reinforcement cage according to claim 4 is characterized in that: The positioning seat (5) is configured to include a barrel (51), a rod (52) and a seat II (53), and a receiving groove body II (54) is provided on the lower end surface of the seat II (53), one end of the rod (52) is configured to be connected to the middle part of the barrel (51) and the other end of the rod (52) is configured to be connected to the middle part of the upper end surface of the seat II (53), the edge of the upper end surface of the seat II (53) is configured to be connected to the supporting vertical column (90) and the upper end surface of the seat II (53) is configured to be connected to the supporting vertical column (90). The edge portion is configured to be in contact connection with the surrounding rope (6), the barrel portion (51) is configured to be sleeve-connected with the supporting cross column (3) and the end portion of the barrel portion (51) is configured to be in contact connection with the clamping nut (4), the barrel portion (51) is configured to be a tubular body and the rod portion (52) is configured to be a rod-shaped body, the seat portion II (53) is configured to be a rectangular block body and the receiving groove body II (54) is configured to be a slotted body with a C-shaped cross section, and the receiving groove body II (54) is configured to be arranged and distributed at intervals along the longitudinal center line of the seat portion II (53), Alternatively, the support column (90) is configured as a bare column bolt and the lower end surface of the support column (90) is configured to be connected to the positioning seat (5), the support column (90) is configured to be connected to the surrounding rope (6) in a through-type manner, and the support column (90) is configured to be connected to the lower clamping nut (7), the adjustment nut (8) and the upper clamping nut (9) in a threaded manner, respectively. Alternatively, the encircling rope (6) is configured to include a rope portion (61), a collar portion I (62) and a collar portion II (63), and one end of the rope portion (61) is configured to be connected to the collar portion I (62), the other end of the rope portion (61) is configured to be connected to the collar portion II (63), and the collar portion I (62) and the collar portion II (63) are respectively configured to be sleeve-connected to the support vertical column (90), one end surface portion of the collar portion I (62) is configured to be contact-connected to the positioning seat (5), and the collar portion Another end surface portion of Ⅰ (62) is configured to be in contact with the lower clamping nut (7), one end surface portion of the collar portion Ⅱ (63) is configured to be in contact with the adjusting nut (8) and another end surface portion of the collar portion Ⅱ (63) is configured to be in contact with the upper clamping nut (9), the rope portion (61) is configured to be connected to the vertical steel bars on the pier column steel bar cage in a surrounding manner and the rope portion (61) is configured to be a textile rope body, the collar portion Ⅰ (62) and the collar portion Ⅱ (63) are respectively configured to be annular gaskets, Alternatively, the lower clamping nut (7), the adjusting nut (8) and the upper clamping nut (9) are respectively configured as hexagonal nuts and the lower clamping nut (7), the adjusting nut (8) and the upper clamping nut (9) are respectively configured to be threadedly connected to the supporting vertical column (90), and the lower end surface portion of the lower clamping nut (7), the upper end surface portion of the adjusting nut (8) and the lower end surface portion of the upper clamping nut (9) are respectively configured to be contact-connected to the surrounding rope (6).
8. The hoisting device for pier column reinforcement cage according to claim 4 is characterized in that: The support cross column (3) is configured as a plain column bolt and the end surface of the support cross column (3) is configured to be connected to the bar beam (1), the support cross column (3) is configured to be connected to the positioning seat (5) in a through-type manner and the support cross column (3) is configured to be connected to the clamping nut (4) in a threaded manner, Alternatively, the clamping nut (4) is configured to include a nut portion I (41) and a nut portion II (42), and the nut portion I (41) and the nut portion II (42) are respectively configured to be threadedly connected to the supporting cross column (3), the inner end surface portion of the nut portion I (41) and the inner end surface portion of the nut portion II (42) are respectively configured to be contact-connected to the positioning seat (5), and the nut portion I (41) and the nut portion II (42) are respectively configured to be hexagonal nuts, Alternatively, the warning light (91) is configured as a single-body warning light having a self-contained rechargeable power source, and the warning light (91) is configured to be sunk-connected to the bar beam (1), and the housing of the warning light (91) is configured to be connected to the bar beam (1).
9. The hoisting device for pier column reinforcement cage according to any one of claims 1 to 8, characterized in that: The bar beam (1) and the hanging ear (2) are arranged to be distributed in a manner of supporting the whole frame with the positioning seat (5), the surrounding rope (6), the lower clamping nut (7), the adjusting nut (8), the upper clamping nut (9) and the supporting vertical column (90); and the bar beam (1), the hanging ear (2), the positioning seat (5), the surrounding rope (6), the lower clamping nut (7), the adjusting nut (8), the upper clamping nut (9) and the supporting vertical column (90) are arranged to be distributed in a manner of longitudinal position adjustment with the supporting horizontal column (3) and the clamping nut (4); and the bar beam (1), the hanging ear (2), the positioning seat (5), the surrounding rope (6), the lower clamping nut (7), the adjusting nut (8), the upper clamping nut (9) and the supporting vertical column (90) and the warning light (91) are arranged to be distributed in a manner of releasing a hoisting position signal. Alternatively, the center line of the beam (1), the center line of the lug (2), the center line of the support cross column (3), the center line of the positioning seat (5) and the center line of the warning light (91) are arranged on the same straight line, two lugs (2) and two warning lights (91) are respectively arranged on the beam (1), a support cross column (3), a clamping nut (4) and a positioning seat (5) are arranged to form a set of pressure plate components, and multiple sets of pressure plate components are arranged to be arranged and distributed along the transverse center line of the beam portion (11), a surrounding rope (6), a lower pressing rope (6) and a lower pressing rope (6) are arranged to form a set of pressure plate components. The nut (7), an adjusting nut (8), an upper clamping nut (9) and a supporting vertical column (90) are arranged to form a group of surrounding components, and the multiple groups of surrounding components are arranged to be arranged and distributed along the longitudinal center line of the seat part II (53). The rope part (61) is arranged to be distributed corresponding to the accommodating groove body II (54), the ring part I (62) is arranged to be connected to the seat part II (53), the nut part I (41) and the nut part II (42) are respectively arranged to be connected to the barrel part (51), and the seat part I (21) is arranged to be connected to the beam part (11).
Citation Information
Cited By
Prefabricated pier column reinforcement cage hoisting device
CN120756979A
A prefabricated pier column reinforcement cage hoisting device
CN120756979B