Pushing system of connection channel heading machine

By designing upper, lower, and middle propulsion components in the jacking system of the connecting tunnel tunneling machine, combined with a passage platform and avoidance groove, the problem of large space occupation of the jacking system in small-diameter main tunnels was solved, enabling the synchronous construction of the connecting tunnel and the main tunnel, and improving construction efficiency and safety.

CN222045768UActive Publication Date: 2024-11-22CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420024498.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-22
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

The existing jacking system occupies a large amount of passage space and jacking drive unit activity space in small-diameter main tunnels, which makes it impossible to construct the main tunnel and connecting passage at the same time, thus affecting the construction progress.

Method used

Design a tunnel boring machine jacking system, including an upper propulsion component, a lower propulsion component and a middle propulsion component. By setting up a passage space in the same space, the system ensures the passage space while construction is carried out using a passage platform and a clearance groove, and achieves synchronous construction through the combined action of the rear support block and the hydraulic cylinder.

Benefits of technology

This enabled the simultaneous construction of connecting passages and the main tunnel within a small-diameter main tunnel, reducing space occupation, improving construction efficiency, and ensuring the smooth progress and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045768U_ABST
    Figure CN222045768U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of connection channel construction, in particular to a pushing system of a connection channel heading machine, which solves the problem that the passage space and the moving space of a pushing driving unit occupy large space in the prior art. The pushing system comprises an upper pushing assembly and a lower pushing assembly, and a passing space arranged in the extending direction of the main tunnel is formed between the upper pushing assembly and the lower pushing assembly. The device has the advantages that the passage space and the propelling assembly are arranged in the same space, the occupied space is small, smooth passage of the main tunnel is guaranteed, smooth proceeding of tunneling construction of the connecting channel is guaranteed, the problem that the connecting channel in the small-diameter main tunnel is difficult to construct is solved, and the construction efficiency is improved. Synchronous construction of the connection channel and the main tunnel can be achieved without mutual interference, the overall construction efficiency is improved, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of communication channel construction, in particular to a communication channel boring machine jacking system. Background Art

[0002] As a part of the subway tunnel, the connecting channel is generally set between two section tunnels to play the role of connection, drainage and fire prevention. At present, the construction methods of the connecting channel include open-cut method, mining method, frozen dark excavation method, shield method and pipe jacking method. Compared with the non-mechanized construction methods of the connecting channel such as open-cut method, mining method, frozen dark excavation method, shield method or pipe jacking method and other fully mechanical construction methods have the advantages of fast construction, low cost, high safety and small environmental impact, which is an inevitable trend in the development of the connecting channel construction technology field. As a mechanical connecting channel construction method, the pipe jacking method has been widely used in the construction of connecting channels in urban subway tunnels in recent years. However, the pipe jacking machine propulsion system will occupy more space in the main tunnel, resulting in inconvenience for personnel to pass through, and the train formation in the main tunnel cannot pass through the pipe jacking machine. The main tunnel and the connecting channel cannot be operated at the same time, affecting the construction progress.

[0003] The patent with publication number CN219197335U discloses a jacking system for excavation construction of a T-shaped connecting channel of a tunnel group, and the jacking system includes a reaction frame and a first force transmission member. The reaction frame is used to provide support for the excavation equipment in the excavation direction. The first force transmission member connects the reaction frame to the main tunnel segment located on the side of the reaction frame away from the connecting channel, and the supporting force acting on the reaction frame is transmitted to the main tunnel segment via the first force transmission member. A passage space along the extension direction of the main tunnel is provided on the side of the reaction frame away from the connecting channel. The jacking drive unit is arranged on the reaction frame, and the rear side of the reaction frame is supported by the force transmission member. The passage space and the activity space of the jacking drive unit are arranged side by side. The passage space and the activity space of the jacking drive unit occupy a large space, and the jacking system cannot be applied to the construction of the connecting channel of the small diameter main tunnel. Utility Model Content

[0004] The utility model provides a jacking system for a communication channel boring machine, which solves the problem in the prior art that the passage space and the activity space of the jacking drive unit occupy a large space.

[0005] The technical solution of the utility model is achieved in this way:

[0006] A jacking system for a tunnel boring machine for a connecting channel includes an upper pushing assembly and a lower pushing assembly, wherein a passage space arranged along the extension direction of a main tunnel is provided between the upper pushing assembly and the lower pushing assembly. The passage space and the pushing assembly are arranged in the same space, occupying a small space, and the pushing assembly will not affect the passage of the passage space, so that the connecting channel and the main tunnel can be constructed synchronously without interfering with each other, thereby making the jacking system suitable for the connecting channel of a main tunnel with a small diameter.

[0007] A passage platform is provided in the passage space, and a passage track is laid on the passage platform along the extension direction of the main tunnel. The passage platform provides support for the passage track to prevent the passage track from being suspended in the air, and ensures that the passage track provides good support for the marshaling train; the passage platform is convenient for the passage of workers, and the passage track is convenient for the passage of the marshaling train, ensuring the normal progress of the main tunnel construction.

[0008] The passage platform is provided with an avoidance groove, in which the lower propulsion assembly is arranged. The avoidance groove facilitates the smooth telescopic action of the lower propulsion assembly and avoids interference between the lower propulsion assembly and the passage track.

[0009] A rear support block is provided on the main tunnel segment on the opposite side of the communication channel, and the tails of the upper propulsion assembly and the lower propulsion assembly are connected to the rear support block. The rear side of the rear support block is in contact with the pipe wall of the main tunnel, and the rear support block can provide a supporting reaction force for the jacking assembly.

[0010] The lower propulsion assembly includes a lower oil cylinder, the tail of the lower oil cylinder is connected to the rear support block, and the lower oil cylinder is located in the avoidance groove. The rear support block is arranged at the tail of the avoidance groove, and the lower oil cylinder is extended and retracted in the avoidance groove to realize the top pushing construction.

[0011] The upper propulsion assembly includes an upper oil cylinder, the tail of which is connected to the rear support block; an upper sleeve is sleeved on the upper oil cylinder, and the head of the upper oil cylinder is connected to the upper sleeve through a steel ring. The upper oil cylinder uses the rear support block as a fulcrum, and the telescopic movement of the upper oil cylinder realizes the top-pushing construction. At the same time, the upper sleeve can enhance the structural strength of the upper oil cylinder and ensure the safety of the upper propulsion assembly.

[0012] A middle propulsion assembly is movably arranged between the upper propulsion assembly and the lower propulsion assembly. The middle propulsion assembly includes a middle oil cylinder, the tail of which is hinged to the rear support block; a middle sleeve is sleeved on the middle oil cylinder, and the head of the middle oil cylinder is connected to the middle sleeve through a steel ring. When the middle oil cylinder is arranged parallel to the axis of the communication channel, the middle oil cylinder is telescopic to realize the top-pushing construction; when the middle oil cylinder swings open, the middle oil cylinder avoids, and at this time, the passage space can be used for marshaling outflow.

[0013] The main tunnel is provided with a support platform, the passage platform is located on the support platform, and a top iron is slidably connected to the support platform; the side of the top iron away from the communication channel cooperates with the head of the upper propulsion assembly, the middle propulsion assembly and the lower propulsion assembly. The upper propulsion assembly, the middle propulsion assembly and the lower propulsion assembly work together to push the top iron, so that the top pushing construction can proceed smoothly, and at the same time, it can ensure that the pipe joints are evenly stressed.

[0014] The head of the lower oil cylinder is provided with a conversion block, which is slidably matched with the avoidance groove; the lower part of the top iron is provided with a sliding seat, which is slidably connected with the support platform, and the conversion block is matched with the sliding seat. It ensures that the contact between the conversion block and the sliding seat is stable, thereby ensuring that the thrust of the lower oil cylinder on the top iron is stable.

[0015] The beneficial effects of the utility model are as follows: the passage space and the propulsion assembly are arranged in the same space, occupying a small space, ensuring the smooth passage of the main tunnel while ensuring the smooth progress of the excavation construction of the connecting channel, solving the problem of the difficulty in constructing the connecting channel in the main tunnel with a small diameter, and realizing the synchronous construction of the connecting channel and the main tunnel without interfering with each other, thereby improving the overall construction efficiency and shortening the construction period.

[0016] The upper propulsion assembly, the middle propulsion assembly and the lower propulsion assembly jointly provide thrust for the pipe segments, so that the pipe sections are evenly stressed during the construction of the connecting channel. At the same time, the middle propulsion assembly is connected to the rear support block in a hinged manner. When the middle propulsion assembly is opened, the marshaled train in the main tunnel passes in the passage space. When the middle propulsion assembly is facing the connecting channel, the connecting channel is subjected to pipe jacking construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the jacking state of the jacking system of a communication channel tunnel boring machine.

[0019] Figure 2 This is a schematic diagram of the traffic status of a top-pushing system of a connecting channel tunnel boring machine.

[0020] Figure 3 This is a schematic diagram of the cylinder when the jacking system is in the pass state.

[0021] Figure 4 This is an overhead view of the access platform.

[0022] Figure 5 This is a schematic diagram of Example 1.

[0023] In the figure: 1. upper propulsion assembly, 11. upper cylinder, 12. upper sleeve, 2. middle propulsion assembly, 21. middle cylinder, 22. middle sleeve, 3. lower propulsion assembly, 31. lower cylinder, 4. conversion block, 5. rear support block, 6. steel ring, 7. top iron, 71. slide seat, 8. support platform, 9. passage platform, 901. passage track, 902. avoidance groove, 10. passage space. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Embodiment 1, as Figure 5 As shown, a jacking system of a tunnel boring machine for a connecting channel includes an upper jacking assembly 1 and a lower jacking assembly 3, and a passage space 10 arranged along the extension direction of the main tunnel is provided between the upper jacking assembly 1 and the lower jacking assembly 3. The upper jacking assembly 1 and the lower jacking assembly 3 work together to push the pipe segment forward; the upper jacking assembly 1 corresponds to the upper setting of the pipe segment, and the lower jacking assembly 3 corresponds to the lower setting of the pipe segment. In this embodiment, the number of the upper jacking assembly 1 and the lower jacking assembly 3 is three, which ensures that the upper jacking assembly 1 and the lower jacking assembly 3 can provide sufficient thrust for the pipe segment, ensure the smooth progress of the jacking construction, and the upper jacking assembly 1 and the lower jacking assembly 3 will not interfere with the passage space 10, and ensure the smooth passage of the marshaling train and personnel in the main tunnel; the upper jacking assembly 1, the lower jacking assembly 3 and the passage space 10 are in the same space, occupying a small space, suitable for the construction of the connecting channel of the main tunnel with a small diameter, and can realize the synchronous construction of the connecting channel and the main tunnel without interfering with each other, improve the overall construction efficiency, and shorten the construction period.

[0026] Further, if Figure 4As shown, a passage platform 9 is provided in the passage space 10, and a passage track 901 arranged along the extension direction of the main tunnel is laid on the passage platform 9. The passage platform 9 provides stable support for the passage track 901, so that the passage track 901 provides stable support for the marshaling train used for construction in the main tunnel, and ensures the smooth passage of the marshaling train while the connection channel is being constructed. The passage platform 9 is provided with an avoidance groove 902, and the lower propulsion assembly 3 is arranged in the avoidance groove 902. The avoidance groove 902 is used for the lower propulsion assembly 3 to avoid interference between the lower propulsion assembly 3 and the passage track 901, and the lower propulsion assembly 3 corresponds to the lower part of the pipe section. Specifically, the avoidance groove 902 is arranged on the lower side of the passage platform 9, and will not affect the support stability of the passage platform 9 during the use of the lower propulsion assembly 3.

[0027] Furthermore, a rear support block 5 is provided on the main tunnel segment on the opposite side of the connecting channel, and the tails of the upper propulsion assembly 1 and the lower propulsion assembly 3 are connected to the rear support block 5. The rear side of the rear support block 5 is connected to the pipe wall of the main tunnel, and the rear support block 5 can provide a supporting reaction force for the upper propulsion assembly 1 and the lower propulsion assembly 3, so that the upper propulsion assembly 1 and the lower propulsion assembly 3 provide a positive thrust to the end face of the pipe segment. In this embodiment, the rear support block 5 is a concrete block, and the concrete block and the segment are made by integral casting to ensure the stability of the connection between the concrete block and the segment. At the same time, a connector is pre-embedded in the head of the concrete block, and the tails of the upper propulsion assembly 1 and the lower propulsion assembly 3 are connected to the connector by welding to ensure the installation stability of the upper propulsion assembly 1 and the lower propulsion assembly 3.

[0028] Further, if Figure 1 , Figure 2 As shown, the lower propulsion assembly 3 includes a lower oil cylinder 31, the tail of the lower oil cylinder 31 is connected to the rear support block 5, and the lower oil cylinder 31 is located in the avoidance groove 902. The rear support block 5 is arranged at the tail of the avoidance groove 902, and the tail of the lower oil cylinder 31 is connected to the rear support block 5 by welding. The lower oil cylinder 31 is telescoped in the avoidance groove 902 to realize the jacking construction of the pipe section. At the same time, the avoidance groove 902 can limit the lower oil cylinder 31 to avoid the deflection of the lower oil cylinder 31 during the jacking process, and ensure the stability of the lower oil cylinder 31 in jacking the pipe section.

[0029] Furthermore, the upper propulsion assembly 1 includes an upper cylinder 11, the tail of which is connected to the rear support block 5; an upper sleeve 12 is sleeved on the upper cylinder 11, and the head of the upper cylinder 11 is connected to the upper sleeve 12 through a steel ring 6. The upper cylinder 11 is connected to the rear support block 5 by welding, and the extension and retraction of the upper cylinder 11 realizes the jacking construction of the pipe section; at the same time, during the extension and retraction of the upper cylinder 11, the upper sleeve 12 moves synchronously to improve the support strength of the upper cylinder 11 and ensure the safety of the upper cylinder. The upper sleeve 12 can improve the structural strength of the upper cylinder 11. Specifically, the upper sleeve 12 is a telescopic sleeve. When the upper cylinder 11 is extended and retracted, the upper sleeve 12 is extended and retracted synchronously. The upper sleeve 12 plays a protective and guiding role for the upper cylinder 11 to avoid the bending of the upper cylinder 11.

[0030] Embodiment 2, on the basis of embodiment 1, a top-pushing system for a connecting channel boring machine, a middle propulsion assembly 2 is movably provided between the upper propulsion assembly 1 and the lower propulsion assembly 3. The middle propulsion assembly 2 is arranged corresponding to the middle part of the pipe segment, the upper propulsion assembly 1 is arranged corresponding to the upper part of the pipe segment, and the lower propulsion assembly 3 is arranged corresponding to the lower part of the pipe segment. In this embodiment, the number of upper propulsion assemblies 1 is three, the number of middle propulsion assemblies 2 is two, and the number of lower propulsion assemblies 3 is three. The upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 jointly apply thrust to the pipe segment, and the upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 provide sufficient thrust for the pipe segment to ensure that the force on the pipe segment is balanced and the construction safety is ensured.

[0031] Further, the middle propulsion assembly 2 includes a middle oil cylinder 21, the tail of which is hinged to the rear support block 5; a middle sleeve 22 is sleeved on the middle oil cylinder 21, and the head of the middle oil cylinder 21 is connected to the middle sleeve 22 through a steel ring 6. The middle oil cylinder 21 can swing on the rear support block 5. In this embodiment, the middle oil cylinder 21 swings in the horizontal direction, and the two middle oil cylinders 21 can be opened to both sides. The middle sleeve 22 can improve the structural strength of the middle oil cylinder 21. Specifically, the middle sleeve 22 is a telescopic sleeve. When the middle oil cylinder 21 is extended and retracted, the telescopic sleeve is synchronously extended and retracted. The middle sleeve 22 plays a protective and guiding role for the middle oil cylinder 21 to avoid the middle oil cylinder 21 from bending.

[0032] In addition, in this embodiment, the rear support block 5 is a steel structure support, which is fixedly connected to the pipe segment of the main tunnel by bolts, and a hinge shaft is rotatably provided on the steel structure support, and the tail of the middle oil cylinder 21 is connected to the hinge shaft. In addition, the hinge shaft is arranged vertically, and the two middle oil cylinders 21 can be swung open to both sides to facilitate the passage of the marshaled train in the passage space 10.

[0033] Specifically, the pipe segment jacking process is as follows: Figure 1As shown, the rear support block 5 is supported on the pipe wall on the side away from the connecting channel in the main tunnel, and the upper cylinder 11, the middle cylinder 21 and the lower cylinder 31 extend in the excavation direction of the connecting channel, so that the heads of the upper cylinder 11, the middle cylinder 21 and the lower cylinder 31 push the pipe section forward; after the pipe section moves into place, the upper cylinder 11, the middle cylinder 21 and the lower cylinder 31 shrink and retreat, and then continue to push the next pipe section, and so on and so forth to realize the jacking construction of the connecting channel; the passage process of the passage space 10 is as follows: Figure 2 , Figure 3 As shown, when the marshaling train in the main tunnel needs to pass through the excavation construction position of the connecting channel, the two middle cylinders 21 are swung to both sides and opened, so that the middle cylinders 21 contact the pipe wall of the main tunnel, and then the middle cylinders 21 leave the passage space 10. At this time, the marshaling train can smoothly pass through the excavation position of the connecting channel. After the marshaling train passes, the middle cylinders 21 return to their original positions and continue to push the connecting channel pipe sections.

[0034] Embodiment 3, on the basis of embodiment 2, a top-pushing system for a connecting channel boring machine, a supporting platform 8 is provided in the main tunnel, a traffic platform 9 is located on the supporting platform 8, and a top iron 7 is slidably connected to the supporting platform 8; the side of the top iron 7 away from the connecting channel cooperates with the head of the upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3. The top iron 7 can increase the contact area between the upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 and the pipe joint, avoiding the situation that the upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 directly contact the pipe joint and cause a small force area, which is easy to cause damage to the pipe joint; the supporting platform 8 provides support for the traffic platform 9 and the top iron 7, and the supporting platform 8 can be used as a construction platform, which is convenient for the staff to stand and place the pipe joint materials; the upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 apply thrust to the top iron, and the top iron 7 evenly disperses the thrust to the end surface of the pipe joint to ensure that the pipe joint is evenly stressed.

[0035] Furthermore, a conversion block 4 is provided at the head of the lower oil cylinder 31, and the conversion block 4 is slidably matched with the avoidance groove 902; a slide seat 71 is provided at the lower part of the top iron 7, and the slide seat 71 is slidably connected with the support platform 8, and the conversion block 4 is matched with the slide seat 71. The conversion block 4 is an L-shaped structure, and the L-shaped structure fits with the slide seat 71 to ensure the contact stability between the conversion block 4 and the slide seat 71, thereby ensuring the stability of the force on the slide seat 71. The steel ring 6 on the upper propulsion assembly 1 and the middle propulsion assembly 2 cooperates with the top iron 7, and the conversion block 4 can be in stable contact with the slide seat 7. The upper propulsion assembly 1, the middle propulsion assembly 2 and the lower propulsion assembly 3 act synchronously, so that the steel ring 6 and the conversion block 4 push the top iron 7 to slide on the support platform 8, thereby realizing the top push construction of the communication channel. In addition, the end of the avoidance groove 902 is connected to the upper surface of the passing platform 9, and the conversion block 4 can extend upward from the upper surface of the passing platform 9, thereby preventing the passing platform 9 from interfering with the movement of the conversion block 4 during the pushing process. At the same time, the conversion block 4 can be made to face the slide 71, so that the force direction of the slide 71 coincides with the axis of the lower cylinder 31, thereby avoiding the deflection of the lower cylinder 31 due to force, thereby ensuring the safety of the lower cylinder 31 during the pushing process.

[0036] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A top thrust system for a tunnel boring machine, comprising an upper thrust assembly (1) and a lower thrust assembly (3), characterized in that: A passage space (10) is provided between the upper propulsion assembly (1) and the lower propulsion assembly (3) and is arranged along the extension direction of the main tunnel; A rear support block (5) is provided on the main tunnel segment on the opposite side of the connecting channel, and the tails of the upper propulsion assembly (1) and the lower propulsion assembly (3) are connected to the rear support block (5); the lower propulsion assembly (3) comprises a lower oil cylinder (31), and the tail of the lower oil cylinder (31) is connected to the rear support block (5); the upper propulsion assembly (1) comprises an upper oil cylinder (11), and the tail of the upper oil cylinder (11) is connected to the rear support block (5); an upper sleeve (12) is sleeved on the upper oil cylinder (11), and the head of the upper oil cylinder (11) is connected to the upper sleeve (12) via a steel ring (6).

2. The communication channel boring machine jacking system according to claim 1 is characterized in that: A passage platform (9) is provided in the passage space (10), and a passage track (901) arranged along the extension direction of the main tunnel is laid on the passage platform (9).

3. The connecting channel boring machine jacking system according to claim 2 is characterized in that: An avoidance groove (902) is provided on the passage platform (9), and the lower propulsion assembly (3) is arranged in the avoidance groove (902).

4. The communication channel boring machine jacking system according to claim 3 is characterized in that: The lower oil cylinder (31) is located in the avoidance groove (902).

5. The communication channel tunnel boring machine jacking system according to claim 1, characterized in that: A middle propulsion assembly (2) is movably arranged between the upper propulsion assembly (1) and the lower propulsion assembly (3).

6. The communication channel tunnel boring machine jacking system according to claim 5, characterized in that: The middle propulsion assembly (2) comprises a middle oil cylinder (21), the tail of which is hinged to the rear support block (5); a middle sleeve (22) is sleeved on the middle oil cylinder (21), and the head of the middle oil cylinder (21) is connected to the middle sleeve (22) via a steel ring (6).

7. The communication channel boring machine jacking system according to claim 6, characterized in that: A support platform (8) is provided in the main tunnel, a passage platform (9) is located on the support platform (8), and a top iron (7) is slidably connected to the support platform (8); a side of the top iron (7) facing away from the communication channel cooperates with the heads of the upper propulsion assembly (1), the middle propulsion assembly (2), and the lower propulsion assembly (3).

8. The communication channel tunnel boring machine jacking system according to claim 7, characterized in that: The head of the lower oil cylinder (31) is provided with a conversion block (4), and the conversion block (4) is slidably matched with the avoidance groove (902); the lower part of the top iron (7) is provided with a slide seat (71), the slide seat (71) is slidably connected with the support platform (8), and the conversion block (4) is matched with the slide seat (71).