Platform for installing wind power concrete tower drum
By designing an adjustable skeleton and table structure and combining with the hanging structure, the problem that the existing platform cannot adapt to the changes in the inner diameter of the large-diameter wind power tower is solved, and the platform is flexible to adjust and the inner wall connection of the tower is achieved, satisfying the large-diameter wind power tower continuous installation requirements of cylinders.
Patent Information
- Application Number
- CN202420362077.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-02-27
AI Technical Summary
The existing construction platform cannot be adjusted appropriately according to the specific inner diameter of the tower, and cannot meet the continuous installation operation requirements of large-diameter wind power towers. When the tower height is low, the platform cannot reach the inner wall of the tower, or on the upper part of the tower. The position is stuck.
A platform for installation of wind power concrete towers is designed, including an adjustable skeleton assembly, platform assembly, fence assembly and lifting installation assembly. Through an intermediate skeleton device, multiple sets of extending arm devices and a detachable table structure. Achieve flexible adjustment of the platform size and shape to ensure that the platform can adapt to changes in the inner diameter of the tower and be connected to the inner wall of the tower through a hanging structure.
The platform is variable in size, adapts to changes in the inner diameter of the tower, meets the continuous installation operation requirements of large-diameter wind power tower, and ensures the smooth progress of the construction process and the flexibility of operation.
Smart Images

Figure CN222066107U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of wind power generation facilities, and in particular relates to a platform for installing a wind power concrete tower. Background Art
[0002] As a clean and sustainable form of energy, wind power generation has been strongly supported by the country in recent years, which has also promoted the rapid development of domestic wind power.
[0003] The wind turbine is mainly composed of foundation, tower, main cabin, hub and blades, of which the tower accounts for more than 15% of the total cost of the wind turbine, and the tower is also the most basic guarantee for the safety of the whole machine. With the increase of the power of a single wind turbine, the height of the tower increases accordingly, usually tens of meters or even hundreds of meters. Traditional wind power flexible all-steel tower technology has been difficult to meet the needs of high-rigidity and large-diameter wind turbine towers. In recent years, with the promotion of prefabricated concrete technology in my country, the application of segmented prefabricated concrete towers in the field of wind power generation has become increasingly common, effectively making up for the low rigidity and small diameter shortcomings of flexible steel towers. Generally speaking, the concrete tower is divided into multiple sections in the height direction of the tower, and each section is basically composed of 4 or 8 prefabricated concrete segments spliced on site. In the actual work process, after the concrete cylinder segments are transported to the site, they are assembled on a special assembly platform to form concrete cylinder sections. After the concrete cylinder sections are assembled, the entire section is hoisted; after hoisting to the preset position, the construction personnel need to perform construction operations on the connecting surfaces of the two concrete cylinder sections to achieve the connection between the two, and then repeatedly hoist the concrete cylinder sections until the installation of the entire concrete tower is completed. Because the tower has a large diameter, a processing construction platform needs to be built inside the tower during the assembly of the wind turbine tower to facilitate the workers to walk and move on it.
[0004] The tower is a conical columnar structure, and its inner diameter gradually decreases with the height. The existing construction platform structure is relatively simple and cannot be appropriately adjusted according to the specific inner diameter of the tower, which limits the use of the construction platform, especially the continuous installation requirements of large-diameter wind turbine towers. When the height is low, the platform cannot reach the inner wall of the tower, and if the diameter of the platform is increased, the platform will get stuck in the upper part of the tower. Therefore, it is necessary to optimize the structure of the construction platform to solve the above problems. Utility Model Content
[0005] The utility model provides a wind power concrete tower installation platform with a reasonable structural design to solve the technical problems existing in the known technology. The utility model can meet the continuous installation operation requirements of large-diameter wind power concrete towers and has strong applicability.
[0006] The utility model adopts a technical solution to solve the technical problems existing in the known technology: a wind power concrete tower installation platform includes a skeleton assembly, on which a platform assembly, a fence assembly and a lifting installation assembly are installed; the skeleton assembly includes an intermediate skeleton device with an avoidance gap arranged at the edge, and a plurality of first arm devices and two second arm devices are slidably inserted on the intermediate skeleton device, the plurality of first arm devices are radially distributed about the center of the intermediate skeleton device, and the two second arm devices are arranged in parallel and distributed on both sides of the avoidance gap; the lengths of the plurality of first arm devices and the two second arm devices are adjustable; the platform assembly includes a fixed platform fixedly connected to the intermediate skeleton device The structure also includes a detachable platform structure located on the periphery of the fixed platform structure, and the detachable platform structure is detachably connected to multiple groups of first arm devices and two groups of second arm devices; the fence assembly includes a fixed guardrail installed on the intermediate frame device, and also includes multiple groups of movable guardrail devices respectively installed on the outer end of each first arm device and the outer end of each second arm device; it also includes guardrail chains installed between the fixed guardrail and the movable guardrail device adjacent to it, and between two adjacent movable guardrail devices; the lifting and installation assembly includes multiple groups of platform lifting rings installed on the intermediate frame device, and also includes multiple groups of hanging structures installed on the outer end of each first arm device and the outer end of each second arm device.
[0007] The advantages and positive effects of the utility model are as follows: the utility model provides a platform for installing a wind power concrete tower, which forms a skeleton assembly by arranging an intermediate skeleton device, and a plurality of first arm devices and two second arm devices that are slidably connected to the intermediate skeleton device, thereby ensuring that the size of the skeleton assembly can be changed, thereby making the size of the platform of the utility model changeable, so as to adapt to the gradually decreasing inner diameter of the tower section during the tower construction process; by arranging a fixed platform structure fixedly connected to the intermediate skeleton device, and a detachable platform structure that is detachably connected to each arm device and is located on the periphery of the fixed platform structure , which can ensure that the platform assembly can change with the size of the skeleton assembly; by setting up multiple sets of hanging structures, the connection between the platform and the inner wall of the tower can be realized, and by setting up platform lifting rings, the connection between the platform and the crane can be realized, thereby facilitating the conversion of the platform between the two states of connection with the crane and connection with the tower section during the construction of the tower, thereby enabling the construction of the tower to proceed smoothly; during the construction of the tower, the size of the platform of the utility model can be changed during the lifting and moving process, thereby adapting to the change of the inner diameter of the tower, thereby meeting the continuous installation operation requirements of large-diameter wind power towers, and has strong applicability.
[0008] Preferably: the first arm extension device includes a first arm extension, in which a second arm extension is slidably inserted, and guide mounting seats are fixedly connected to the inner ends of the first arm extension and the second arm extension, and two groups of inner guide wheels distributed in an up-and-down manner are rotatably connected to each guide mounting seat, and also include two groups of inner sliding blocks distributed in a left-and-right manner installed on the guide mounting seat; an outer guide wheel is installed at the outer end of the first arm extension, and a connecting plate mounting seat with a through hole is installed on the top surface of the outer end of the second arm extension, and the connecting plate mounting seat is connected to the detachable platform structure by a screw and a locking nut inserted in the through hole; a lifting roller is installed on the bottom surface of the outer end of the second arm extension, and when working, the lifting roller is in rolling contact with the inner wall of the tower; the structure of the second arm extension device is consistent with that of the first arm extension device.
[0009] Preferably, the intermediate skeleton device comprises a first docking assembly and a second docking assembly which are detachably connected.
[0010] Preferably: the first docking assembly includes a first polygonal square tube, and mounting plates with a plurality of mounting holes are fixedly connected to both ends of the first polygonal square tube; a plurality of groups of radial guide tubes radially distributed about the center are fixedly connected to the first polygonal square tube, a plurality of groups of duct connecting tubes are fixedly connected between two adjacent groups of radial guide tubes, and also includes a group of notch guide tubes fixedly connected to the bottom of the radial guide tubes, positioning through holes are provided on the notch guide tubes and each radial guide tube, and skeleton guide wheels are installed on the outer ends; a plurality of groups of first front docking tubes and a plurality of groups of first rear docking tubes are respectively fixedly connected to the outer side walls of the two groups of radial guide tubes located at the edge, and a mounting plate with a plurality of mounting holes is fixedly connected to the end of each first front docking tube and each first rear docking tube.
[0011] Preferably: the second docking assembly includes a second polygonal square tube, and a mounting plate with a plurality of mounting holes is fixedly connected at both ends of the second polygonal square tube, and the first polygonal square tube and the second polygonal square tube are docked and connected by screws and locking nuts penetrated on the mounting plate; a plurality of groups of radial guide tubes radially distributed about the center are fixedly connected to the second polygonal square tube, and a plurality of groups of conduit connecting tubes are fixedly connected between two adjacent groups of radial guide tubes, and also includes a group of notched guide tubes fixedly connected to the bottom of the radial guide tubes, and positioning through holes are provided on the notched guide tubes and each radial guide tube, and skeleton guide wheels are installed on the outer ends; a plurality of groups of second rear docking tubes and a plurality of groups of second front docking tubes are respectively fixedly connected to the outer side walls of the two groups of radial guide tubes located at the edge, and a mounting plate with a plurality of mounting holes is fixedly connected to the ends of each second rear docking tube and each second front docking tube; the corresponding first rear docking tube and the second rear docking tube are docked and connected by screws and locking nuts penetrated on the mounting plate, and the corresponding first front docking tube and the second front docking tube are docked and connected by screws and locking nuts penetrated on the mounting plate.
[0012] Preferably, the detachable platform structure comprises a plurality of groups of first square tube arrays and a plurality of groups of second square tube arrays connected by screws and locking nuts, and each of the first square tube arrays and each of the second square tube arrays are trapezoidal structures.
[0013] Preferably: the first square tube array includes first erected square tubes which are horizontally arranged in parallel from the inside to the outside and whose lengths gradually decrease, and the two ends of the first erected square tubes are respectively erected on two adjacent groups of first arm devices, and also includes a plurality of groups of square tube connecting plates for connecting the two adjacent groups of first erected square tubes; through holes and strip holes are respectively opened at the two ends of each square tube connecting plate, and the two adjacent groups of first erected square tubes are connected by screws and locking screws penetrated through the through holes and the strip holes; the square tube connecting plate located at the outermost side is connected to the outer end of the corresponding first arm device by screws and locking nuts penetrated through the strip holes; and also includes a first slope plate installed on the first erected square tube located at the innermost side, and a plurality of anti-slip protrusions are arranged on the first slope plate.
[0014] Preferably: the second square tube array includes second erected square tubes which are distributed in parallel from the inside to the outside and whose lengths gradually decrease, and the two ends of the second erected square tubes are respectively erected on adjacent first arm devices and second arm devices, and the two adjacent groups of second erected square tubes are connected by a square tube connecting plate; it also includes multiple groups of edge hooks hooked on the second arm devices and connected one-to-one with the multiple groups of second erected square tubes, and the two adjacent groups of edge hooks are connected by a square tube connecting plate; it also includes a second slope plate installed on the second erected square tube located at the innermost side, and a number of anti-slip protrusions are arranged on the second slope plate.
[0015] Preferably: the movable guardrail device includes a gate-type guardrail fixed to the outer end of the extension arm device, and latch seats are fixed to the top and middle of the gate-type guardrail. A through hole is opened on each latch seat and a limit latch is passed through the through hole for installing a guardrail chain.
[0016] Preferably, the hanging structure comprises a bow shackle installed at the outer end of the boom device, a steel wire rope is installed on the bow shackle, and also comprises a tower lifting ring installed on the inner wall of the tower, and the bow shackle is connected to the tower lifting ring through the steel wire rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0018] Figure 2 It is a schematic diagram of the explosion structure of the utility model;
[0019] Figure 3 It is a three-dimensional structural schematic diagram of the first extension arm device, the movable guardrail device and the hanging structure in the utility model;
[0020] Figure 4It is a three-dimensional structural schematic diagram of the intermediate skeleton device in the utility model;
[0021] Figure 5 yes Figure 2 A schematic diagram of the enlarged area in FIG.
[0022] Figure 6 yes Figure 2 A magnified schematic diagram of area B in FIG.
[0023] Figure 7 yes Figure 2 A magnified schematic diagram of the C region in FIG.
[0024] Figure 8 It is a three-dimensional structural schematic diagram of the fixed platform structure in the utility model;
[0025] Fig. 9 It is a three-dimensional structural schematic diagram of the utility model when it is in the smallest state.
[0026] In the figure: 1, first arm device; 1-1, guide mounting seat; 1-2, inner slider; 1-3, inner guide wheel; 1-4, first arm; 1-5, second arm; 1-6, lifting roller; 1-7, connecting plate mounting seat; 1-8, outer guide wheel; 2, intermediate skeleton device; 2-1, first polygonal square tube; 2-2, first front butt joint tube; 2-3, radial guide tube; 2-4, skeleton guide wheel; 2-5, catheter connecting tube; 2-6, first rear butt joint tube; 2-7, second rear butt joint tube; 2-8, second polygonal square tube; 2-9, support foot; 2-10, notch guide tube; 2-11, second front butt joint tube ; 3. Fixed platform structure; 3-1. Notched pedal; 3-2. Center pedal; 3-3. Fan-shaped pedal; 4. Fixed guardrail; 5. Second extension arm device; 6. Movable guardrail device; 6-1. Gate-type guardrail; 6-2. Limit latch; 6-3. Latch seat; 7. Hanging structure; 7-1. Tower lifting ring; 7-2. Wire rope; 7-3. Bow-shaped shackle; 8. Removable platform structure; 8-1. First erection square tube; 8-2. Square tube connecting plate; 8-3. First slope plate; 8-4. Second erection square tube; 8-5. Second slope plate; 8-6. Edge hook; 9. Guardrail chain; 10. Platform lifting ring; 11. Avoid gap. DETAILED DESCRIPTION
[0027] In order to further understand the content, features and effects of the present invention, the following embodiments are described in detail as follows:
[0028] See also Figure 1 The utility model of the wind power concrete tower installation platform includes a frame assembly, a platform assembly is installed on the frame assembly, a fence assembly is arranged at the edge of the frame assembly, and also includes a lifting and installation assembly installed on the frame assembly.
[0029] like Figure 1 and Figure 2 As shown, in the present embodiment, the above-mentioned skeleton assembly includes an intermediate skeleton device 2 having an avoidance gap 11 at the edge, and a plurality of groups of first arm devices 1 and two groups of second arm devices 5 are slidably inserted on the intermediate skeleton device 2, the plurality of groups of first arm devices 1 are radially distributed about the center of the intermediate skeleton device 2, and the two groups of second arm devices 5 are arranged in parallel and distributed on both sides of the avoidance gap 11; wherein, the lengths of the plurality of groups of first arm devices 1 and the two groups of second arm devices 5 are adjustable.
[0030] See also Figure 4 In this embodiment, the intermediate skeleton device 2 includes a first docking assembly and a second docking assembly that are detachably connected, and a plurality of groups of legs 2-9 are fixedly connected to the bottom of the first docking assembly and the second docking assembly.
[0031] The first docking assembly includes a first polygonal square tube 2-1, and a mounting plate with a plurality of mounting holes is fixedly connected to both ends of the first polygonal square tube 2-1; multiple groups of radial guide tubes 2-3 are fixedly connected to the first polygonal square tube 2-1 and are radially distributed about the center thereof; multiple groups of duct connection tubes 2-5 are fixedly connected between two adjacent groups of radial guide tubes 2-3; and a group of notched guide tubes 2-10 are fixedly connected to the bottom of the radial guide tubes 2-3; positioning holes are opened on the notched guide tubes 2-10 and each radial guide tube 2-3, and skeleton guide wheels 2-4 are installed at the outer ends. In addition, positioning pins are inserted into the above-mentioned positioning holes. Multiple groups of first front butt joint tubes 2-2 and multiple groups of first rear butt joint tubes 2-6 are fixedly connected to the outer side walls of the two groups of radial guide tubes 2-3 located at the edge, and a mounting plate with a plurality of mounting holes is fixedly connected to the ends of each first front butt joint tube 2-2 and each first rear butt joint tube 2-6.
[0032] In addition, the second docking assembly includes a second polygonal square tube 2-8, and a mounting plate with a plurality of mounting holes is fixedly connected to both ends of the second polygonal square tube 2-8, and the first polygonal square tube 2-1 and the second polygonal square tube 2-8 are connected by screws and locking nuts that penetrate the mounting plate. In this embodiment, the first polygonal square tube 2-1 and the second polygonal square tube 2-8 are both formed by bending square tubes, and further, the first polygonal square tube 2-1 and the second polygonal square tube 2-8 are half regular octagonal structures, so that the first polygonal square tube 2-1 and the second polygonal square tube 2-8 form a regular octagonal structure after docking. A plurality of radial guide tubes 2-3 are fixedly connected to the second polygonal square tube 2-8 and are radially distributed about the center thereof. A plurality of duct connection tubes 2-5 are fixedly connected between two adjacent radial guide tubes 2-3. A group of notched guide tubes 2-10 are fixedly connected to the bottom of the radial guide tubes 2-3. Positioning holes are provided on the notched guide tubes 2-10 and each radial guide tube 2-3, and skeleton guide wheels 2-4 are installed at the outer ends. In addition, positioning pins are inserted into the above-mentioned positioning holes. A plurality of second rear butt joint tubes 2-7 and a plurality of second front butt joint tubes 2-11 are fixedly connected to the outer side walls of the two radial guide tubes 2-3 located at the edge, respectively. A mounting plate with a plurality of mounting holes is fixedly connected to the ends of each second rear butt joint tube 2-7 and each second front butt joint tube 2-11. The corresponding first rear butt joint tube 2-6 and the second rear butt joint tube 2-7 are butt-connected by means of screws and locking nuts passing through the mounting plate, and the corresponding first front butt joint tube 2-2 and the second front butt joint tube 2-11 are butt-connected by means of screws and locking nuts passing through the mounting plate.
[0033] In addition, if Figure 4 As shown, in this embodiment, three groups of radial guide tubes 2-3 are fixedly connected to the first polygonal square tube 2-1, and four groups of radial guide tubes 2-3 are fixedly connected to the second polygonal square tube 2-8. Among them, the first front butt-jointed tube 2-2 and the second front butt-jointed tube 2-11 and the two groups of notch guide tubes 2-10 jointly constitute the avoidance notch 11 mentioned above. The fixed guardrail 4 mentioned above is installed on the first front butt-jointed tube 2-2, the first polygonal square tube 2-1 and the two groups of radial guide tubes 2-3 respectively connected to the two.
[0034] Through the above arrangement, the first docking assembly and the second docking assembly are connected by screws and locking nuts to form the intermediate skeleton device 2, which is convenient for disassembly, installation, transportation and transfer of the intermediate skeleton device 2.
[0035] See also Figure 3In this embodiment, the first arm extension device 1 includes a first arm extension 1-4. During the assembly process, the first arm extension 1-4 is slidably inserted into the corresponding radial guide tube 2-3. A second arm extension 1-5 is slidably inserted into the first arm extension 1-4. In addition, a guide mounting seat 1-1 is fixedly connected to the inner end of the first arm extension 1-4 and the second arm extension 1-5. Two groups of inner guide wheels 1-3 distributed in an upper and lower manner are rotatably connected to each guide mounting seat 1-1, and two groups of inner sliders 1-2 distributed in a left and right manner are installed on the guide mounting seat 1-1. In the actual working process, the two groups of inner guide wheels 1-3 installed at the inner end of the first extending arm 1-4 are in rolling contact with the upper and lower inner walls of the radial guide tube 2-3 respectively, and the two groups of inner sliders 1-2 installed at the inner end of the first extending arm 1-4 are in sliding contact with the left and right inner walls of the radial guide tube 2-3 respectively; the two groups of inner guide wheels 1-3 installed at the inner end of the second extending arm 1-5 are in rolling contact with the upper and lower inner walls of the first extending arm 1-4 respectively, and the two groups of inner sliders 1-2 installed at the inner end of the second extending arm 1-5 are in sliding contact with the left and right inner walls of the second extending arm 1-5 respectively; the outer guide wheel 1-8 is in rolling contact with the bottom surface of the second extending arm 1-5.
[0036] An outer guide wheel 1-8 is installed at the outer end of the first extension arm 1-4, and a connecting plate mounting seat 1-7 with a through hole is installed on the top surface of the outer end of the second extension arm 1-5. The connecting plate mounting seat 1-7 is connected to the detachable platform structure 8 through a screw and a locking nut inserted in the through hole. A lifting roller 1-6 is installed on the bottom surface of the outer end of the second extension arm 1-5. When working, the lifting roller 1-6 rolls in contact with the inner wall of the tower;
[0037] In this embodiment, the structure of the second arm extension device 5 is consistent with that of the first arm extension device 1, and the first arm extension device 5 is slidably inserted into the notch guide tube 2-10.
[0038] In the actual working process, the position of the outer end of the skeleton assembly can be adjusted by adjusting the length of the first extension arm device 1 and the second extension arm device 5 inserted in the middle skeleton device 2 and the extension between the first extension arm and the second extension arm, so that the size of the skeleton assembly is adapted to the inner diameter of the wind turbine tower, thereby facilitating the flexible movement of the operating personnel on the platform and performing installation operations on the two butt-connected sections during the tower construction process.
[0039] like Figure 1 and Figure 2 As shown, in this embodiment, the above-mentioned platform assembly includes a fixed platform structure 3 fixedly connected to the intermediate frame device 2, and also includes a detachable platform structure 8 located on the periphery of the fixed platform structure 3; wherein the detachable platform structure 8 is detachably connected to multiple groups of first arm devices 1 and two groups of second arm devices 5.
[0040] In this embodiment, the above-mentioned detachable platform structure 8 includes multiple groups of first square tube arrays and multiple groups of second square tube arrays connected by screws and locking nuts, and each first square tube array and each second square tube array are trapezoidal structures.
[0041] See also Figure 5 and Figure 6 The above-mentioned first square tube array includes first erected square tubes 8-1 which are horizontally arranged and gradually reduced in length from the inside to the outside. The two ends of the first erected square tubes 8-1 are respectively erected on two adjacent groups of first arm devices 1, and also include multiple groups of square tube connecting plates 8-2 for connecting the two adjacent groups of first erected square tubes 8-1. Through holes and strip holes are respectively opened at the two ends of each square tube connecting plate 8-2, and the two adjacent groups of first erected square tubes 8-1 are connected by screws and locking screws penetrated in the through holes and strip holes. Notches are opened at both ends of each first erected square tube 8-1 for convenient erection on the first arm device 1, and plates with through holes are welded and fixed at both ends of each first erected square tube 8-1 for penetrating screws to install square tube connecting plates 8-2 and two groups of first erected square tubes 8-1 that are butt-jointed. Through the above-mentioned arrangement, the spacing between the two adjacent groups of first erected square tubes 8-1 can be adjusted.
[0042] In addition, the outermost square tube connecting plate 8-2 is connected to the corresponding connecting plate mounting seat 1-7 in the first arm extension device 1 through screws and locking nuts inserted in the strip holes. Through the above arrangement, it can be ensured that the first arm extension device 1 can drive the first square tube array to extend and retract when it is extended and retracted.
[0043] like Figure 6 As shown, the first square tube array also includes a first ramp 8-3 installed on the first erected square tube 8-1 located at the innermost side. The first ramp 8-3 is bent to compensate for the height difference between the fixed platform structure 3 and the detachable platform structure 8 to prevent workers from tripping due to the height difference. In addition, a number of anti-slip protrusions are provided on the first ramp 8-3 to prevent workers from slipping.
[0044] like Figure 7As shown, in this embodiment, the second square tube array includes second erected square tubes 8-4 that are horizontally arranged and gradually reduced in length from the inside to the outside, and the two ends of the second erected square tubes 8-4 are respectively erected on the adjacent first arm device 1 and the second arm device 5, and a notch is provided in a section of each second erected square tube 8-4 for convenient erection on the first arm device 1, and the other end is erected on the second arm device 5 located below the first arm device 1. The two adjacent groups of second erected square tubes 8-4 are connected by a square tube connecting plate 8-2; similarly, the outermost square tube connecting plate 8-2 in the second square tube array is connected to the corresponding connecting plate mounting seat in the second arm device 5 by screws and locking nuts inserted in the strip holes. Through the above arrangement, the spacing between the two adjacent groups of second erected square tubes 8-4 can be adjusted. And it can be ensured that the first arm device 1 and the second arm device 5 can drive the second square tube array to extend and retract when they are extended and retracted.
[0045] The second square tube array also includes multiple sets of edge hooks 8-6 hooked on the second arm device 5 and connected to multiple sets of second erection square tubes 8-4 in a one-to-one correspondence, and two adjacent sets of edge hooks 8-6 are connected through a square tube connecting plate 8-2; each edge hook 8-6 is composed of a Z-shaped plate and a reinforcing rib installed on the plate. Similarly, the second square tube array also includes a second ramp plate 8-5 installed on the innermost second erection square tube 8-4, and a plurality of anti-slip protrusions are arranged on the second ramp plate 8-5.
[0046] like Figure 8 As shown, in this embodiment, the above-mentioned fixed platform structure 3 includes a central pedal 3-2 installed on a regular octagonal structure formed by docking a first polygonal square tube 2-1 and a second polygonal square tube 2-8, and also includes a plurality of groups of fan-shaped pedals 3-3 distributed in a circumferential direction arranged on the periphery of the central pedal 3-2, each fan-shaped pedal 3-3 is in a fan-shaped structure and is installed on two adjacent groups of radial guide tubes 2-3; and also includes a notched pedal 3-1 installed on the first front docking tube 2-2 and the second front docking tube 2-11 that are docked.
[0047] like Figure 1 and Figure 2 As shown, in this embodiment, the fence assembly includes a fixed guardrail 4 installed on the middle frame device 2, and also includes a plurality of movable guardrail devices 6 respectively installed on the outer ends of each first extension arm device 1 and the outer ends of each second extension arm device 5. The fence assembly also includes a guardrail iron chain 9 installed between the fixed guardrail 4 and the adjacent movable guardrail device 6, and between two adjacent movable guardrail devices 6.
[0048] like Figure 3As shown, in this embodiment, the movable guardrail device 6 includes a gate-type guardrail 6-1 fixed to the outer end of the extension arm device, and a latch seat 6-3 is fixed to the top and middle of the gate-type guardrail 6-1. A through hole is opened on each latch seat 6-3 and a limit latch 6-2 is inserted in the through hole for installing the guardrail chain 9. Further, two groups of latch seats 6-3 are fixed to the top of the gate-type guardrail 6-1, respectively located at both ends, and two groups of latch seats 6-3 are fixed to the middle of the gate-type structure gate-type guardrail 6-1, and the two groups of latch seats 6-3 are respectively located on the two sides of the gate-type guardrail 6-1.
[0049] like Figure 1 As shown, in this embodiment, the lifting and installation assembly includes multiple sets of platform lifting rings 10 installed on the intermediate skeleton device 2, and also includes multiple sets of hanging structures 7 installed on the outer ends of each first arm device 1 and the outer ends of each second arm device 5.
[0050] See also Figure 3 The hanging structure 7 includes a bow shackle 7-3 installed at the outer end of the boom device, a steel wire rope 7-2 is installed on the bow shackle 7-3, and a tower ring 7-1 installed on the inner wall of the tower, and the bow shackle 7-3 is connected to the tower ring 7-1 through the steel wire rope 7-2. In the actual working process, multiple groups of tower rings 7-1 are pre-installed on the inner circumferential wall of each tower section, and a steel wire rope 7-2 is installed on each of the tower rings 7-1, and the bow shackle 7-3 is installed on the corresponding boom device.
[0051] Working process:
[0052] During the assembly process of the wind power tower, the platform of the utility model is hoisted by a crane, and the platform and the workers on the platform are transferred to the tower section located at the bottom. Before the transfer, the platform is in the maximum state adapted to the upper part of the inner cavity of the tower section. When the crane transfers the platform to the construction position in the tower section, the steel wire rope 7-2 installed on the tower lifting ring 7-1 is installed on the corresponding bow-shaped shackle 7-3 to realize the installation of the tower section and the platform. At this time, the lifting rollers installed on each first arm device 1 and each second arm device 5 are in rolling contact with the inner wall of the tower section;
[0053] After the installation of the tower section and the platform is completed, the hoisting of the crane and the platform is released, so that the next tower barrel section can be hoisted to the top of the bottom tower barrel section for docking operation. At this time, the operators on the platform can dock and fix the two docked barrel sections; after the docking and installation operation of the two barrel sections is completed, the crane re-lifts the platform of the utility model, and then releases the connection between the bow-shaped shackle 7-3 and the wire rope 7-2, and then the crane hoists and drives the platform of the utility model to move upward. Since the lifting rollers installed on each first boom device 1 and each second boom device 5 are in rolling contact with the inner wall of the tower barrel section, The cylinder segment is a tapered columnar structure with a small top and a large bottom. In the process of the platform moving upward, each first boom device 1 and each second boom device 5 will shrink inward under the action of the inner wall of the tower, and at the same time drive each first square tube array and each second square tube array in the detachable platform structure 8 to shrink synchronously to adapt to the change in the size of the platform. After the platform moves to a position suitable for operation on the upper part of the upper tower, repeat the above-mentioned operations of installing the wire rope 7-2 and the upper bow-shaped shackle 7-3, releasing the installation of the platform and the crane, lifting the next cylinder segment and docking and fixing the two cylinder segments, until the installation of the used cylinder segments is completed;
[0054] In the process of the platform gradually rising, each first arm device 1 and each second arm device 5 are gradually retracted, and if necessary, the first erection square tube 8-1 and the second erection square tube 8-4 can be removed one by one to adapt to the change of the size of the platform of the utility model; Fig. 9 As shown, when the platform is in the smallest state, the first erection square tube 8-1 and the second erection square tube 8-4 are completely removed.
Claims
1. A wind power concrete tower installation platform, characterized by: The invention comprises a frame assembly, on which a platform assembly, a fence assembly and a lifting installation assembly are installed; the frame assembly comprises an intermediate frame device (2) with an avoidance gap (11) arranged at the edge, a plurality of first arm devices (1) and two second arm devices (5) are slidably inserted on the intermediate frame device (2), the plurality of first arm devices (1) are radially distributed about the center of the intermediate frame device (2), and the two second arm devices (5) are arranged in parallel and distributed on both sides of the avoidance gap (11); the lengths of the plurality of first arm devices (1) and the two second arm devices (5) are adjustable; the platform assembly comprises a fixed platform structure (3) fixedly connected to the intermediate frame device (2), and also comprises a detachable platform structure (8) located on the periphery of the fixed platform structure (3), which can be detached. The dismantling structure (8) is detachably connected to a plurality of first arm extension devices (1) and two second arm extension devices (5); the fence assembly includes a fixed guardrail (4) installed on the intermediate frame device (2), and also includes a plurality of movable guardrail devices (6) respectively installed on the outer ends of each first arm extension device (1) and the outer ends of each second arm extension device (5); and also includes a guardrail chain (9) installed between the fixed guardrail (4) and the adjacent movable guardrail device (6) and between two adjacent movable guardrail devices (6); the lifting and installation assembly includes a plurality of platform lifting rings (10) installed on the intermediate frame device (2), and also includes a plurality of hanging structures (7) installed on the outer ends of each first arm extension device (1) and the outer ends of each second arm extension device (5).
2. The wind power concrete tower installation platform according to claim 1, characterized in that: The first arm extension device (1) comprises a first arm extension (1-4), a second arm extension (1-5) is slidably inserted in the first arm extension (1-4), a guide mounting seat (1-1) is fixedly connected to the inner end of each of the first arm extension (1-4) and the second arm extension (1-5), two groups of inner guide wheels (1-3) distributed vertically are rotatably connected to each guide mounting seat (1-1), and two groups of inner sliding blocks (1-2) distributed horizontally and installed on the guide mounting seat (1-1); An outer guide wheel (1-8) is installed at the outer end of the second extension arm (1-5); a connecting plate mounting seat (1-7) with a through hole is installed on the top surface of the outer end of the second extension arm (1-5); the connecting plate mounting seat (1-7) is connected to the detachable platform structure (8) via a screw and a locking nut inserted in the through hole; a lifting roller (1-6) is installed on the bottom surface of the outer end of the second extension arm (1-5); when working, the lifting roller (1-6) is in rolling contact with the inner wall of the tower; the structure of the second extension arm device (5) is consistent with the structure of the first extension arm device (1).
3. The wind power concrete tower installation platform according to claim 2, characterized in that: The intermediate skeleton device (2) comprises a first docking component and a second docking component which are detachably connected.
4. The wind power concrete tower installation platform as claimed in claim 3 is characterized by: The first docking assembly comprises a first polygonal square tube (2-1), and mounting plates with a plurality of mounting holes are fixedly connected to both ends of the first polygonal square tube (2-1); a plurality of groups of radial guide tubes (2-3) are fixedly connected to the first polygonal square tube (2-1) and are radially distributed about the center thereof; a plurality of groups of duct connection tubes (2-5) are fixedly connected between two adjacent groups of radial guide tubes (2-3); and a group of notched guide tubes (2-10) are fixedly connected to the bottom of the radial guide tubes (2-3); positioning through holes are opened on the notched guide tubes (2-10) and each radial guide tube (2-3), and skeleton guide wheels (2-4) are installed at the outer ends; a plurality of groups of first front butt joint tubes (2-2) and a plurality of groups of first rear butt joint tubes (2-6) are respectively fixedly connected to the outer side walls of the two groups of radial guide tubes (2-3) located at the edge; and a mounting plate with a plurality of mounting holes is fixedly connected to the ends of each first front butt joint tube (2-2) and each first rear butt joint tube (2-6).
5. The wind power concrete tower installation platform as claimed in claim 4 is characterized by: The second docking assembly comprises a second polygonal square tube (2-8), and mounting plates with a plurality of mounting holes are fixedly connected to both ends of the second polygonal square tube (2-8); the first polygonal square tube (2-1) and the second polygonal square tube (2-8) are docked and connected by screws and locking nuts that penetrate the mounting plates; a plurality of groups of radial guide tubes (2-3) that are radially distributed about the center of the second polygonal square tube (2-8) are fixedly connected to the second polygonal square tube (2-8); a plurality of groups of conduit connecting tubes (2-5) are fixedly connected between two adjacent groups of radial guide tubes (2-3); and a group of notched guide tubes (2-10) are fixedly connected to the bottom of the radial guide tubes (2-3); and a plurality of notched guide tubes (2-10) and each radial guide tube (2-3) are fixedly connected to the second polygonal square tube (2-8). Each of the plurality of radial guide tubes (2-3) is provided with a positioning through hole and a skeleton guide wheel (2-4) is installed at the outer end thereof; a plurality of second rear butt joint tubes (2-7) and a plurality of second front butt joint tubes (2-11) are fixedly connected to the outer side walls of the two groups of radial guide tubes (2-3) located at the edge, and a mounting plate with a plurality of mounting holes is fixedly connected to the end of each second rear butt joint tube (2-7) and each second front butt joint tube (2-11); the corresponding first rear butt joint tube (2-6) and the second rear butt joint tube (2-7) are butt-connected by means of screws and locking nuts passing through the mounting plate, and the corresponding first front butt joint tube (2-2) and the second front butt joint tube (2-11) are butt-connected by means of screws and locking nuts passing through the mounting plate.
6. The wind power concrete tower installation platform according to claim 1, characterized in that: The detachable platform structure (8) comprises a plurality of groups of first square tube arrays and a plurality of groups of second square tube arrays connected by screws and locking nuts, and each of the first square tube arrays and each of the second square tube arrays are in a trapezoidal structure.
7. The wind power concrete tower installation platform according to claim 6, characterized in that: The first square tube array comprises first erected square tubes (8-1) which are arranged in parallel from the inside to the outside and whose lengths gradually decrease, the two ends of the first erected square tubes (8-1) being respectively erected on two adjacent groups of first arm extension devices (1), and also comprising a plurality of groups of square tube connecting plates (8-2) for connecting the two adjacent groups of first erected square tubes (8-1); through holes and strip holes are respectively provided at the two ends of each square tube connecting plate (8-2), and the two adjacent groups of first erected square tubes (8-1) are connected by screws and locking screws inserted through the through holes and the strip holes; the square tube connecting plate (8-2) located at the outermost side is connected to the outer end of the corresponding first arm extension device (1) by screws and locking nuts inserted through the strip holes; and also comprises a first ramp plate (8-3) installed on the first erected square tube (8-1) located at the innermost side, and a plurality of anti-slip protrusions are provided on the first ramp plate (8-3).
8. The wind power concrete tower installation platform according to claim 7, characterized in that: The second square tube array comprises second erected square tubes (8-4) which are arranged in parallel from the inside to the outside and whose lengths gradually decrease, the two ends of the second erected square tubes (8-4) being respectively erected on the adjacent first arm extension device (1) and the second arm extension device (5), and the two adjacent groups of second erected square tubes (8-4) being connected via a square tube connecting plate (8-2); it also comprises a plurality of groups of edge hooks (8-6) which are hooked on the second arm extension device (5) and connected to the plurality of groups of second erected square tubes (8-4) in a one-to-one correspondence, and the two adjacent groups of edge hooks (8-6) being connected via a square tube connecting plate (8-2); it also comprises a second ramp plate (8-5) installed on the second erected square tube (8-4) located at the innermost side, and a plurality of anti-slip protrusions are arranged on the second ramp plate (8-5).
9. The wind power concrete tower installation platform according to claim 1, characterized in that: The movable guardrail device (6) comprises a gate-shaped guardrail (6-1) fixedly connected to the outer end of the extension arm device, a latch seat (6-3) fixedly connected to the top and middle of the gate-shaped guardrail (6-1), and each latch seat (6-3) is provided with a through hole and a limit latch (6-2) passing through the through hole for installing a guardrail iron chain (9).
10. The wind power concrete tower installation platform according to claim 1, characterized in that: The hanging structure (7) comprises a bow-shaped shackle (7-3) installed on the outer end of the boom device, a steel wire rope (7-2) is installed on the bow-shaped shackle (7-3), and also comprises a tower hanging ring (7-1) installed on the inner wall of the tower, and the bow-shaped shackle (7-3) is connected to the tower hanging ring (7-1) through the steel wire rope (7-2).
Citation Information
Cited By
Adjustable hoisting construction platform for concrete wind power tower
CN120666900A
An adjustable concrete wind turbine tower hoisting platform
CN120666900B