Water purifier
By setting two EDI filter elements and water circuit boards in parallel in the water purifier and adjusting the water flow using the control valve, the problem of small water production of existing EDI technology water purifiers is solved, and an efficient water purifier design is achieved, and the water production is doubled. And reduces noise and water loss.
Patent Information
- Application Number
- CN202323621752.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing water purifiers using EDI technology have small water production and cannot meet the needs of users.
Design a water purifier including two EDI filter elements and water circuit board. By setting up a water purifier and a pure water circuit channel, the water flow rate is adjusted by using a control valve to realize parallel setting of the EDI filter element, increase water production, and pass power The pump provides low noise and low water loss filtration.
Compared with a single EDI filter filter, the water production is doubled, greatly increasing the water production of the water purifier and achieving a filtration effect of low noise and low water loss.
Smart Images

Figure CN222082524U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water treatment, in particular to a water purifier. Background Art
[0002] Continuous electrodeionization (EDI) is a new membrane separation technology formed by the organic combination of EDI and ion exchange. It uses high voltage at both ends of the electrodes to move charged ions in the water, and cooperates with ion exchange resins and selective resin membranes to accelerate the movement and removal of ions, which is used to produce ultrapure water. In related technologies, water purifiers using EDI technology have a small water output and cannot meet some user needs. Utility Model Content
[0003] The first purpose of the utility model is to provide a water purifier, which aims to solve the technical problem of small water output of the existing water purifier using EDI technology.
[0004] To achieve the above object, the utility model provides a solution: a water purifier, including a first EDI filter element, a second EDI filter element, and a waterway plate;
[0005] The first EDI filter element is provided with a first EDI water inlet and a first EDI water outlet, and the second EDI filter element is provided with a second EDI water inlet and a second EDI water outlet;
[0006] A clean water channel and a pure water channel are formed inside the water channel plate, wherein the clean water channel includes a clean water main channel, a first clean water branch channel and a second clean water branch channel, and the pure water channel includes a pure water main channel, a first pure water branch channel and a second pure water branch channel;
[0007] The first clean water branch channel is used to connect the clean water main channel and the first EDI water inlet, the first pure water branch channel is used to connect the first EDI water outlet and the pure water main channel, the second clean water branch channel is used to connect the clean water main channel and the second EDI water inlet, and the second pure water branch channel is used to connect the second EDI water outlet and the pure water main channel; the clean water main channel is used to connect a water source, and the pure water main channel is used to output pure water.
[0008] As an implementation mode, the water purifier further includes a first control valve and a second control valve, wherein the first control valve and the second control valve are both arranged on the waterway plate;
[0009] The first control valve is used to control the connection or disconnection between the first purified water branch channel and the purified water main channel, and to control the flow rate of water in the first purified water branch channel;
[0010] The second control valve is used to control whether the second purified water branch channel is connected or disconnected with the purified water main channel, and to control the flow rate of water in the second purified water branch channel.
[0011] As an implementation mode, a wastewater waterway channel is also formed inside the waterway plate;
[0012] The water purifier further comprises a third control valve and a fourth control valve, wherein the third control valve and the fourth control valve are both arranged on the waterway plate;
[0013] The third control valve is used to control whether the first clean water branch channel is connected or disconnected with the waste water channel, and the fourth control valve is used to control whether the second clean water branch channel is connected or disconnected with the waste water channel.
[0014] As an embodiment, the water purifier further comprises a post-filter element, wherein the post-filter element is provided with a post-water inlet and a post-water outlet;
[0015] A water outlet waterway channel is also formed inside the waterway plate, the pure water main channel is connected to the rear water inlet, and the water outlet waterway channel is connected to the rear water outlet.
[0016] As an embodiment, the water outlet waterway channel includes a first water outlet branch channel and a second water outlet branch channel, and the first water outlet branch channel is used to connect the rear water outlet and the second water outlet branch channel;
[0017] The water purifier further includes a fifth control valve, which is disposed on the waterway plate and is used to control the connection or disconnection between the first water outlet branch channel and the second water outlet branch channel.
[0018] As an implementation mode, the water purifier further includes a sixth control valve;
[0019] The sixth control valve is disposed on the waterway plate, and is used to selectively control the second pure water branch channel to be connected to the pure water main channel or to be connected to the first water outlet branch channel.
[0020] As an embodiment, the water purifier further comprises a pre-filter element, wherein the pre-filter element is provided with a pre-water inlet and a pre-water outlet;
[0021] A water inlet channel is also formed inside the waterway plate, the water inlet channel is connected to the front water inlet, and the main water purification channel is connected to the front water outlet.
[0022] As an embodiment, at least one of the first EDI water inlets is provided, and at least one of the first EDI water inlets is provided at an upper end of the first EDI filter element.
[0023] As an embodiment, the water purifier further includes a first power supply and a second power supply, wherein the first power supply is electrically connected to the first EDI filter element, and the second power supply is electrically connected to the second EDI filter element.
[0024] As an embodiment, the water purifier further includes a power pump, and the power pump is arranged on the main water purification channel.
[0025] The water purifier provided by the utility model filters the water flow by setting an EDI filter element. Compared with the water purifier using a reverse osmosis filter element, there is no need to set a booster pump for boosting the pressure. The filtration can be achieved by the water pressure of tap water, thereby achieving low water loss and low noise. By setting a first clean water branch channel to connect the clean water main channel and the first EDI water inlet, a first pure water branch channel to connect the first EDI water outlet and the pure water main channel, a second clean water branch channel to connect the clean water main channel and the second EDI water inlet, and a second pure water branch channel to connect the second EDI water outlet and the pure water main channel, after the first EDI filter element and the second EDI filter element are connected with the clean water waterway channel and the pure water waterway channel, a waterway in which the first EDI filter element and the second EDI filter element are set in parallel is formed. Compared with the water purifier using a single EDI filter element for filtration, the water output is doubled, thereby greatly increasing the water output of the water purifier. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0027] Figure 1 It is a structural schematic diagram of a water purifier provided by an embodiment of the utility model;
[0028] Figure 2 This is a structural schematic diagram of a water purifier provided by an embodiment of the utility model after removing the outer shell from a viewing angle;
[0029] Figure 3 This is a schematic structural diagram of the water purifier provided by the embodiment of the utility model from another perspective after the outer shell is removed;
[0030] Figure 4 It is a structural schematic diagram of a first EDI filter element provided by an embodiment of the utility model;
[0031] Figure 5 It is a structural schematic diagram of a second EDI filter element provided by an embodiment of the utility model;
[0032] Figure 6 is a cross-sectional view of a waterway plate provided in an embodiment of the utility model;
[0033] Figure 7 It is a flow diagram of water in the waterway plate when the water purifier provided by the embodiment of the utility model is in the water making mode;
[0034] Figure 8 It is a schematic diagram of the assembly structure of the waterway plate and each control valve provided in the embodiment of the utility model;
[0035] Fig. 9 It is a flow diagram of water in the waterway plate when the water purifier provided by the embodiment of the utility model is in the first EDI filter element regeneration mode;
[0036] Fig.10 It is a flow diagram of water in the waterway plate when the water purifier provided by the embodiment of the utility model is in the second EDI filter element regeneration mode;
[0037] Fig.11 It is a structural schematic diagram of a composite filter element provided in an embodiment of the utility model.
[0038] Description of Figure Numbers:
[0039] 100, water purifier; 10, first EDI filter element; 11, first EDI water inlet; 12, first EDI water outlet; 20, second EDI filter element; 21, second EDI water inlet; 22, second EDI water outlet; 30, waterway plate; 31, purified water channel; 311, purified water main channel; 312, first purified water branch channel; 313, second purified water branch channel; 32, pure water channel ; 321, pure water main channel; 322, first pure water branch channel; 3221, first pure water channel section; 3222, second pure water channel section; 323, second pure water branch channel; 3231, third pure water channel section; 3232, fourth pure water channel section; 33, waste water channel; 34, outlet water channel; 341, first outlet branch channel; 342, second outlet branch channel; 35, inlet water Road channel; 361, first EDI water inlet interface; 362, first EDI water outlet interface; 363, second EDI water inlet interface; 364, second EDI water outlet interface; 365, rear water inlet interface; 366, rear water outlet interface; 367, front water inlet interface; 368, front water outlet interface; 369, total water inlet interface; 370, total water outlet interface; 371, wastewater interface; 41, first flow meter; 42, second flow meter; 51, first control valve; 52, second control valve; 53, third control valve; 54, fourth control valve; 55, fifth control valve; 56, sixth control valve; 60, composite filter element; 61, rear water inlet; 62, rear water outlet; 63, front water inlet; 64, front water outlet; 71, first power supply; 72, second power supply; 80, power pump; 91, housing; 92, middle frame.
[0040] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0042] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0043] It should also be noted that when an element is referred to as being "fixed on" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element at the same time. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.
[0044] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.
[0045] like Figures 1 to 6 As shown, the embodiment of the utility model provides a water purifier 100, including a first EDI (Electrodeionization, continuous electro deionization) filter element 10, a second EDI filter element 20, and a waterway plate 30; the first EDI filter element 10 is provided with a first EDI water inlet 11 and a first EDI water outlet 12, and the second EDI filter element 20 is provided with a second EDI water inlet 21 and a second EDI water outlet 22; the interior of the waterway plate 30 is formed with a clean water waterway channel 31 and a pure water waterway channel 32, the clean water waterway channel 31 includes a clean water main channel 311, a first clean water branch channel 312 and a second clean water branch channel 313, and the pure water The water channel 32 includes a pure water main channel 321, a first pure water branch channel 322 and a second pure water branch channel 323; the first pure water branch channel 312 is used to connect the pure water main channel 311 and the first EDI water inlet 11, the first pure water branch channel 322 is used to connect the first EDI water outlet 12 and the pure water main channel 321, the second pure water branch channel 313 is used to connect the pure water main channel 311 and the second EDI water inlet 21, the second pure water branch channel 323 is used to connect the second EDI water outlet 22 and the pure water main channel 321; the pure water main channel 311 is used to connect the water source, and the pure water main channel 321 is used to output pure water.
[0046] Reference Figure 2 , Figure 4 , Figure 5 and Figure 7As shown, when pure water is produced (i.e., pure water is discharged to the water use terminal), water flows from the pure water main channel 311 into the first pure water branch channel 312 and the second pure water branch channel 313 respectively; the water flowing into the first pure water branch channel 312 enters the first EDI filter element 10 from the first EDI water inlet 11, and the pure water formed after being filtered by the first EDI filter element 10 flows into the first pure water branch channel 322 from the first EDI water outlet 12, and then is output through the pure water main channel 321; the water flowing into the second pure water branch channel 313 enters the second EDI filter element 20 from the second EDI water inlet 21, and the pure water formed after being filtered by the second EDI filter element 20 flows into the second pure water branch channel 323 from the second EDI water outlet 22, and then is output through the pure water main channel 321.
[0047] By adopting the above technical solution, the water flow is filtered by setting an EDI filter element. Compared with the water purifier using a reverse osmosis filter element, there is no need to set a booster pump for pressurization. The filtration can be achieved by the water pressure of tap water, achieving low water loss and low noise; by setting a first clean water branch channel 312 to connect the clean water main channel 311 and the first EDI water inlet 11, the first pure water branch channel 322 to connect the first EDI water outlet 12 and the pure water main channel 321, and the second clean water branch channel 313 to connect the first EDI water outlet 12 and the pure water main channel 321. The clean water main channel 311 and the second EDI water inlet 21 are connected, the second pure water branch channel 323 is connected to the second EDI water outlet 22 and the pure water main channel 321, and after the first EDI filter element 10 and the second EDI filter element 20 are connected with the clean water waterway channel 31 and the pure water waterway channel 32, a waterway in which the first EDI filter element 10 and the second EDI filter element 20 are arranged in parallel is formed. Compared with the water purifier using a single EDI filter element for filtration, the water output is doubled, which greatly increases the water output of the water purifier.
[0048] As an implementation method, refer to Figure 2 , Figures 4 to 6 As shown, the water circuit plate 30 is provided with a first EDI water inlet interface 361 for connecting to the first EDI water inlet 11, a first EDI water outlet interface 362 for connecting to the first EDI water outlet 12, a second EDI water inlet interface 363 for connecting to the second EDI water inlet 21, and a second EDI water outlet interface 364 for connecting to the second EDI water outlet 22.
[0049] The first clean water branch channel 312 is connected to the first EDI water inlet 11 through the first EDI water inlet interface 361, the first pure water branch channel 322 is connected to the first EDI water outlet 12 through the first EDI water outlet interface 362, the second clean water branch channel 313 is connected to the second EDI water inlet 21 through the second EDI water inlet interface 363, and the second pure water branch channel 323 is connected to the second EDI water outlet 22 through the second EDI water outlet interface 364. In this embodiment, the first EDI water inlet interface 361 and the first EDI water inlet 11, the first EDI water outlet interface 362 and the first EDI water outlet 12, the second EDI water inlet interface 363 and the second EDI water inlet 21, and the second EDI water outlet interface 364 and the second EDI water outlet 22 are all connected by connecting pipes.
[0050] As an implementation method, refer to Figure 1 , Figure 6 and Figure 8 As shown, the water purifier 100 also includes a first flow meter 41 and a second flow meter 42, and the first flow meter 41 and the second flow meter 42 are both arranged on the waterway plate 30; the first pure water branch channel 322 includes a first pure water channel section 3221 and a second pure water channel section 3222, and the second pure water branch channel 323 includes a third pure water channel section 3231 and a fourth pure water channel section 3232; the first pure water channel section 3221 is connected to the first EDI water outlet interface 362, the second pure water channel section 3222 is connected to the pure water main channel 321, and the first pure water channel section 3221 and the second pure water channel section 3222 are connected through the first flow meter 41; the third pure water channel section 3231 is connected to the second EDI water outlet interface 364, the fourth pure water channel section 3232 is connected to the pure water main channel 321, and the third pure water channel section 3231 and the fourth pure water channel section 3232 are connected through the second flow meter 42.
[0051] As an implementation method, refer to Figure 1 , Figure 6 and Figure 8 As shown, the water purifier 100 also includes a first control valve 51 and a second control valve 52, and the first control valve 51 and the second control valve 52 are both arranged on the waterway plate 30; the first control valve 51 is used to control the connection or disconnection of the first clean water branch channel 312 with the clean water main channel 311, and control the size of the water flow rate in the first clean water branch channel 312; the second control valve 52 is used to control the connection or disconnection of the second clean water branch channel 313 with the clean water main channel 311, and control the size of the water flow rate in the second clean water branch channel 313.
[0052] By setting the first control valve 51 and the second control valve 52, the water flow rate in the first water purification branch channel 312 or the second water purification branch channel 313 can be controlled according to different needs, and even the water flow in the first water purification branch channel 312 or the second water purification branch channel 313 can be disconnected. For example, when a smaller water flow rate is required, it can be achieved by closing the first control valve 51 or the second control valve 52, and it can also be achieved by controlling the first control valve 51 and the second control valve 52 at the same time, and reducing the water flow rate in the first water purification branch channel 312 and the second water purification branch channel 313. Preferably, the first control valve 51 and the second control valve 52 are multi-speed regulating valves to control the water flow rate flowing in the water channel and to disconnect the water flow in the water channel.
[0053] As an implementation method, refer to Figure 1 , Figure 2 , Figure 6 and Figure 8 As shown, a wastewater waterway channel 33 is also formed inside the waterway plate 30, and the water purifier 100 also includes a third control valve 53 and a fourth control valve 54, both of which are arranged on the waterway plate 30; the third control valve 53 is used to control the connection or disconnection between the first clean water branch channel 312 and the wastewater waterway channel 33, and the fourth control valve 54 is used to control the connection or disconnection between the second clean water branch channel 313 and the wastewater waterway channel 33. In this way, by controlling different control valves to open or close, the waterway in which the first EDI filter element 10 and the second EDI filter element 20 are arranged in series can be realized. When the first EDI filter element 10 and the second EDI filter element 20 are arranged in series, they can be flushed with each other to avoid scaling, and the regeneration treatment of the first EDI filter element 10 and the second EDI filter element 20 can be realized. Preferably, the third control valve 53 and the fourth control valve 54 are direct-acting solenoid valves, which have larger holes, facilitating the passage of wastewater (containing impurities such as scale) and preventing impurities in the wastewater from clogging the holes of the control valves.
[0054] In specific applications, when the regeneration mode of the first EDI filter element 10 is executed, the first control valve 51 and the fourth control valve 54 are closed, and the second control valve 52 and the third control valve 53 are opened, so that the clean water main channel 311 is disconnected from the first clean water branch channel 312 and connected to the second clean water branch channel 313, and the waste water channel 33 is connected to the first clean water branch channel 312 and disconnected from the second clean water branch channel 313.
[0055] In this mode, water flows from the main clean water channel 311 into the second clean water branch channel 313, flows to the second EDI water inlet 21 through the second EDI water inlet interface 363, and forms pure water after being filtered by the second EDI filter element 20. The filtered pure water flows from the second EDI water outlet 22 to the second EDI water outlet interface 364, flows to the first pure water branch channel 322 through the second pure water branch channel 323, and then flows to the first EDI water outlet 12 through the first EDI water outlet interface 362. After the pure water passes through the first EDI filter element 10, waste water is formed. The waste water flows from the first EDI water inlet 11 to the first EDI water inlet interface 361, and then flows into the waste water channel 33 through the first clean water branch channel 312, and finally is discharged through the waste water channel 33. In this way, the regeneration process of the first EDI filter element 10 is realized.
[0056] When the regeneration mode of the second EDI filter element 20 is executed, the second control valve 52 and the third control valve 53 are closed, and the first control valve 51 and the fourth control valve 54 are opened, so that the clean water main channel 311 is disconnected from the second clean water branch channel 313 and connected to the first clean water branch channel 312, and the waste water channel 33 is connected to the second clean water branch channel 313 and disconnected from the first clean water branch channel 312.
[0057] In this mode, water flows from the main clean water channel 311 into the first clean water branch channel 312, flows through the first EDI water inlet interface 361 to the first EDI water inlet 11, and forms pure water after being filtered by the first EDI filter element 10. The filtered pure water flows from the first EDI water outlet 12 to the first EDI water outlet interface 362, flows through the first pure water branch channel 322 to the second pure water branch channel 323, and then flows through the second EDI water outlet interface 364 to the second EDI water outlet 22. After the pure water passes through the second EDI filter element 20, it forms waste water, and the waste water flows from the second EDI water inlet 21 to the second EDI water inlet interface 363, and then flows through the second clean water branch channel 313 into the waste water channel 33, and finally is discharged through the waste water channel 33. In this way, the regeneration process of the second EDI filter element 20 is realized.
[0058] When the water purifier 100 executes the water production mode and the regeneration mode of the EDI filter element, the water flow rate requirements in the waterway are different. By setting the first control valve 51 and the second control valve 52 as multi-speed regulating valves, the water flow rate in the waterway channel can be effectively adjusted to meet the different mode requirements. In addition, when executing the mineral adjustable mode (adjusting the electric field strength to achieve different degrees of ion adsorption), the retention rate of minerals is different for different water flow rates. By setting the first control valve 51 and the second control valve 52 as multi-speed regulating valves, the water flow rate in the waterway is adjusted, and the water flow rate is changed, which can meet the needs of different minerals in the mineral adjustable mode.
[0059] In another embodiment, the first EDI filter element 10 or the second EDI filter element 20 may be replaced with a water storage container such as a water storage tank or a pressure tank to achieve regeneration of the EDI filter element. When this embodiment is adopted, the water storage tank or the pressure tank needs to store pure water generated by filtration of the EDI filter element in advance, and the pure water is used to backwash the first EDI filter element 10 or the second EDI filter element 20.
[0060] As an implementation method, refer to Figure 1 , Figure 2 , Figure 6 and Fig.11 As shown, the water purifier 100 further includes a post-filter element, which is provided with a post-water inlet 61 and a post-water outlet 62; a water outlet channel 34 is also formed inside the waterway plate 30, the pure water main channel 321 is connected to the post-water inlet 61, and the water outlet channel 34 is connected to the post-water outlet 62. By providing a post-filter element, the water flow can be filtered again by the post-filter element after being filtered by the EDI filter element.
[0061] The type of the post filter element can be activated carbon in different forms. The pure water main channel 321 is connected to the post water inlet 61, and the water outlet channel 34 is connected to the post water outlet 62. When the water production mode is executed, the pure water in the pure water main channel 321 enters the post filter element from the post water inlet 61, and after being filtered again by the post filter element, enters the water outlet channel 34 from the post water outlet 62, and finally outputs the pure water for drinking.
[0062] Reference Figure 1 , Figure 2 , Figure 6 and Fig.11 As shown, the waterway plate 30 is also provided with a rear water inlet interface 365 for connecting to the rear water inlet 61, and a rear water outlet interface 366 for connecting to the rear water outlet 62; the pure water main channel 321 is connected to the rear water inlet 61 through the rear water inlet interface 365, and the water outlet channel 34 is connected to the rear water outlet 62 through the rear water outlet interface 366. The rear filter element is connected to the pure water channel 32 and the water outlet channel 34 of the waterway plate 30 through the rear water inlet interface 365 and the rear water outlet interface 366 of the waterway plate 30, without the need for additional connecting pipelines, thereby simplifying the pipeline connection between the internal components of the water purifier 100.
[0063] Reference Figure 6 and Fig.11 As shown, the outlet waterway channel 34 includes a first outlet branch channel 341 and a second outlet branch channel 342. The first outlet branch channel 341 is used to connect the rear outlet 62 and the second outlet branch channel 342. Specifically, the first outlet branch channel 341 connects the rear outlet 62 through the rear outlet interface 366.
[0064] Reference Figure 7 and Fig.11 As shown, when the water production mode is executed, the pure water in the pure water main channel 321 enters the rear filter element through the rear water inlet interface 365 and the rear water inlet 61, is filtered again by the rear filter element, flows into the first water outlet branch channel 341 through the rear water outlet 62 and the rear water outlet interface 366, and is then transported out through the second water outlet branch channel 342.
[0065] Reference Figure 1 , Figure 2 , Figure 6 and Figure 8 As shown, the water purifier 100 further includes a fifth control valve 55, which is disposed on the waterway plate 30 and is used to control the connection or disconnection of the first water outlet branch channel 341 and the second water outlet branch channel 342. When the regeneration mode of the EDI filter element is executed, pure water needs to be used to flush the EDI filter element. By setting the fifth control valve 55, the water outlet waterway channel 34 is disconnected to prevent pure water from being output, which is conducive to executing the regeneration mode of the EDI filter element.
[0066] Reference Figure 1 , Figure 6 and Figure 8 As shown, the water purifier 100 also includes a sixth control valve 56, which is arranged on the waterway plate 30, and is used to selectively control the second pure water branch channel 323 to be connected to the pure water main channel 321 or to be connected to the first water outlet branch channel 341. Preferably, the sixth control valve 56 is a three-way switching valve. In a specific application, when the water production mode is executed, the sixth control valve 56 is controlled to connect the second pure water branch channel 323 to the pure water main channel 321, and when the regeneration mode of the first EDI filter element 10 or the second EDI filter element 20 is executed, the sixth control valve 56 is controlled to connect the second pure water branch channel 323 to the first water outlet branch channel 341. With such arrangement, when the regeneration mode of the first EDI filter cartridge 10 is executed, the pure water filtered by the second EDI filter cartridge 20 can be filtered again by the post-filter cartridge and then enter the first EDI filter cartridge 10; and when the regeneration mode of the second EDI filter cartridge 20 is executed, the pure water filtered by the first EDI filter cartridge 10 can be filtered again by the post-filter cartridge and then enter the first EDI filter cartridge 10.
[0067] When the regeneration mode of the first EDI filter element 10 is executed, the scale on the first EDI filter element 10 will be discharged through the waste water channel 33. Due to some reasons, the scale may not be completely discharged and some scale will remain. When the regeneration mode of the second EDI filter element 20 is subsequently executed, the residual scale flows with the water flow. When it flows to the post-filter element, the post-filter element can block the residual scale to prevent the residual scale from flowing to the second control valve 52 or the fourth control valve 54 and causing blockage. Similarly, when the regeneration mode of the second EDI filter element 20 is executed, the scale on the second EDI filter element 20 will be discharged through the waste water channel 33. Due to some reasons, the scale may not be completely discharged and some scale will remain. When the regeneration mode of the first EDI filter element 10 is subsequently executed, the residual scale flows with the water flow. When it flows to the post-filter element, the post-filter element can block the residual scale to prevent the residual scale from flowing to the first control valve 51 or the third control valve 53 and causing blockage. Therefore, by providing a post-filter element, when executing the EDI filter element regeneration mode, the blockage of the first control valve 51, the second control valve 52, the third control valve 53 or the fourth control valve 54 can be effectively released.
[0068] In a specific application, when the regeneration mode of the first EDI filter element 10 is turned on, the first control valve 51 and the fourth control valve 54 are closed, and the second control valve 52 and the third control valve 53 are opened to disconnect the clean water main channel 311 from the first clean water branch channel 312 and connect with the second clean water branch channel 313, and connect the waste water channel 33 with the first clean water branch channel 312 and disconnect with the second clean water branch channel 313. At the same time, the sixth control valve 56 is controlled to connect the second pure water branch channel 323 with the first water outlet branch channel 341, and the fifth control valve 55 is controlled to disconnect the first water outlet branch channel 341 and the second water outlet branch channel 342.
[0069] Reference Figure 2 , Figure 4 , Figure 5 and Fig. 9As shown, in this mode, water flows from the main water purification channel 311 into the second water purification branch channel 313, flows to the second EDI water inlet 21 through the second EDI water inlet interface 363, and forms pure water after being filtered by the second EDI filter element 20. The filtered pure water flows from the second EDI water outlet 22 to the second EDI water outlet interface 364, flows to the first water outlet branch channel 341 through the second pure water branch channel 323, and flows into the rear water outlet interface 366. After being filtered again by the post-filter, the filter element flows into the first pure water branch channel 322 through the pure water main channel 321, and then flows to the first EDI water outlet 12 through the first EDI water outlet interface 362. After the pure water passes through the first EDI filter element 10, waste water is formed. The waste water flows from the first EDI water inlet 11 to the first EDI water inlet interface 361, and then flows into the waste water channel 33 through the first clean water branch channel 312, and finally discharged through the waste water channel 33. In this way, the regeneration process of the first EDI filter element 10 is realized.
[0070] When the regeneration mode of the second EDI filter element 20 is turned on, the second control valve 52 and the third control valve 53 are closed, and the first control valve 51 and the fourth control valve 54 are opened to disconnect the clean water main channel 311 from the second clean water branch channel 313 and connect with the first clean water branch channel 312, and to connect the waste water channel 33 with the second clean water branch channel 313 and disconnect from the first clean water branch channel 312. At the same time, the sixth control valve 56 is controlled to connect the second pure water branch channel 323 with the first water outlet branch channel 341, and the fifth control valve 55 is controlled to disconnect the first water outlet branch channel 341 and the second water outlet branch channel 342.
[0071] Reference Figure 2 , Figure 4 , Figure 5 and Fig.10 As shown, in this mode, water flows from the main water purification channel 311 into the first water purification branch channel 312, flows to the first EDI water inlet 11 through the first EDI water inlet interface 361, and forms pure water after being filtered by the first EDI filter element 10. The filtered pure water flows from the first EDI water outlet 12 to the first EDI water outlet interface 362, flows to the main water purification channel 321 through the first pure water branch channel 322, and then enters the rear filter through the rear water inlet interface 365. In the core, after being filtered again by the post-filter, the water flows to the second pure water branch channel 323 through the first water outlet branch channel 341, and then flows to the second EDI water outlet 22 through the second EDI water outlet interface 364. The pure water forms waste water after passing through the second EDI filter element 20. The waste water flows from the second EDI water inlet 21 to the second EDI water inlet interface 363, and then flows into the waste water channel 33 through the second clean water branch channel 313, and finally is discharged through the waste water channel 33. In this way, the regeneration process of the second EDI filter element 20 is realized.
[0072] As an implementation method, the first pure water branch channel 322 is connected to the pure water main channel 321. That is, the first pure water branch channel 322 and the pure water main channel 321 are directly connected, and there is no need to control components such as control valves to connect the two. Of course, in specific applications, as an alternative implementation method, the first pure water branch channel 322 and the pure water main channel 321 can also be connected through a control valve.
[0073] As an implementation method, refer to Figure 1 , Figure 2 , Figure 6 and Fig.11 As shown, the water purifier 100 further includes a pre-filter element, which is provided with a pre-water inlet 63 and a pre-water outlet 64; a water inlet channel 35 is also formed inside the waterway plate 30, the water inlet channel 35 is connected to the pre-water inlet 63, and the purified water main channel 311 is connected to the pre-water outlet 64. By providing the pre-filter element, the water flow can be roughly filtered by the pre-filter element before being filtered by the EDI filter element.
[0074] The types of pre-filters can be PP in different forms, activated carbon in different forms, ultrafiltration, nanofiltration, and composite filters of the above materials. The water inlet channel 35 is connected to the pre-inlet 63, and the main water purification channel 311 is connected to the pre-outlet 64. When in use, refer to Figure 7 and Fig.11 As shown, raw water enters the pre-filter element from the pre-water inlet 63 through the water inlet waterway channel 35, and after being roughly filtered by the pre-filter element, flows into the clean water waterway channel 31 from the pre-water outlet 64.
[0075] Reference Figure 2 , Figure 6 and Fig.11 As shown, the water circuit board 30 is also provided with a front water inlet interface 367 for connecting to the front water inlet 63, and a front water outlet interface 368 for connecting to the front water outlet 64; the water inlet channel 35 is connected to the front water inlet 63 through the front water inlet interface 367, and the water purification channel 311 is connected to the front water outlet 64 through the front water outlet interface 368. The pre-filter element is connected to the water inlet channel 35 and the water purification channel 311 of the water circuit board 30 through the front water inlet interface 367 and the front water outlet interface 368 of the water circuit board 30, without the need for additional connecting pipelines, thereby simplifying the pipeline connection between the internal components of the water purifier 100.
[0076] The pre-filter and post-filter can be two independent filter elements or a composite filter element. Figure 3As shown, in this embodiment, the pre-filter element and the post-filter element are a composite filter element 60, which has the filtering functions of the pre-filter element and the post-filter element. The composite filter element 60 has two non-interfering flow paths inside. One flow path is used for coarse filtration, which is equivalent to the pre-filter element. The raw water enters the first EDI filter element 10 and the second EDI filter element 20 after coarse filtration in this flow path; the other flow path is used for re-filtration, which is equivalent to the post-filter element. The pure water filtered by the first EDI filter element 10 and the second EDI filter element 20 is filtered again from this flow path, and finally flows out from the water outlet of the composite filter element 60 for user use.
[0077] Reference Figure 3 and Fig.11 As shown, the composite filter element 60 has a front water inlet 63, a front water outlet 64, a rear water inlet 61 and a rear water outlet 62. The front water inlet 63 and the front water outlet 64 are on the same flow path, which are used for coarse filtration of raw water; the rear water inlet 61 and the rear water outlet 62 are on another flow path, which are used for re-filtration of pure water. Raw water enters the composite filter element 60 from the front water inlet 63 and flows out from the front water outlet 64 after coarse filtration. Pure water filtered by the first EDI filter element 10 and the second EDI filter element 20 enters the composite filter element 60 from the rear water inlet 61, and flows out from the rear water outlet 62 after re-filtration.
[0078] As an implementation method, refer to Figure 2 and Figure 6 As shown, the waterway plate 30 is also provided with a total water inlet interface 369 , a total water outlet interface 370 and a wastewater interface 371 . The total water inlet interface 369 is connected to the water inlet waterway channel 35 , the total water outlet interface 370 is connected to the water outlet waterway channel 34 , and the wastewater interface 371 is connected to the wastewater waterway channel 33 .
[0079] As an implementation mode, at least one first EDI water inlet 11 is provided, and at least one first EDI water inlet 11 is provided at the upper end of the first EDI filter element 10. The upper end refers to the upper part of the first EDI filter element 10 when it is in working state. In the water production mode and the EDI filter element regeneration mode, gas is generated inside the EDI filter element, and the gas rises to the top of the EDI filter element and gathers, causing the filtering performance of the area where the gas is gathered to be reduced or even unable to be filtered, thereby reducing the filtering area of the EDI filter element and reducing the filter element flux. By setting the EDI water inlet at the upper end of the EDI filter element, when the EDI filter element regeneration mode is executed, the water flow is discharged from the EDI water inlet, so that the gas at the top can be discharged through the EDI water inlet at the upper end, reducing the accumulation of gas inside the filter element.
[0080] For example, in this embodiment, there are two first EDI water inlets 11, one first EDI water inlet 11 is provided at the upper end of the first EDI filter element 10, and one first EDI water inlet 11 is provided at the lower end of the first EDI filter element 10. The lower end refers to the lower part of the first EDI filter element 10 when it is in working state.
[0081] As an implementation manner, the structure of the second EDI filter element 20 is the same as that of the first EDI filter element 10 .
[0082] As an implementation method, refer to Figure 1 and Figure 3 As shown, the water purifier 100 further includes a first power supply 71 and a second power supply 72 , the first power supply 71 is electrically connected to the first EDI filter element 10 , and the second power supply 72 is electrically connected to the second EDI filter element 20 .
[0083] When the water purifier 100 is executing the water production mode, EDI filter regeneration mode or mineral adjustment mode, the two EDI filter elements are required to operate at different powers. One power supply is used to power the two EDI filter elements, and multiple voltage and current control devices need to be set on the main control board. The control is complex and unreliable. By setting the first power supply 71 and the second power supply 72 to respectively power the first EDI filter element 10 structure and the second EDI filter element 20, the control settings of the main control board are effectively simplified.
[0084] As an implementation method, refer to Figure 1 , Figure 2 and Figure 6 As shown, the water purifier 100 also includes a power pump 80, which is arranged on the main water purification channel 311. By setting the power pump 80, when the pressure of the incoming water is very low, the power pump 80 provides power for the flow of water, so as to achieve stable operation of the whole machine under low inlet water pressure conditions. Of course, in specific applications, it is also possible not to set the power pump 80.
[0085] As an implementation method, refer to Figure 1 and Figure 2 As shown, the water purifier 100 further includes a shell 91 and a middle frame 92 . The middle frame 92 is disposed in the shell 91 , and the first EDI filter element 10 , the second EDI filter element 20 , and the waterway plate 30 are all installed on the middle frame 92 .
[0086] The above description is only a preferred embodiment of the utility model, and does not limit the patent scope of the utility model. All equivalent structural changes made by using the contents of the utility model specification and drawings under the utility model concept, or directly / indirectly used in other related technical fields are included in the patent protection scope of the utility model.
Claims
1. A water purifier, characterized in that: It includes a first EDI filter element, a second EDI filter element, and a waterway plate; The first EDI filter element is provided with a first EDI water inlet and a first EDI water outlet, and the second EDI filter element is provided with a second EDI water inlet and a second EDI water outlet; A clean water channel and a pure water channel are formed inside the water channel plate, wherein the clean water channel includes a clean water main channel, a first clean water branch channel and a second clean water branch channel, and the pure water channel includes a pure water main channel, a first pure water branch channel and a second pure water branch channel; The first clean water branch channel is used to connect the clean water main channel and the first EDI water inlet, the first pure water branch channel is used to connect the first EDI water outlet and the pure water main channel, the second clean water branch channel is used to connect the clean water main channel and the second EDI water inlet, and the second pure water branch channel is used to connect the second EDI water outlet and the pure water main channel; The purified water main channel is used for connecting to a water source, and the pure water main channel is used for outputting pure water.
2. The water purifier according to claim 1, characterized in that The water purifier further comprises a first control valve and a second control valve, wherein the first control valve and the second control valve are both arranged on the waterway plate; The first control valve is used to control the connection or disconnection between the first purified water branch channel and the purified water main channel, and to control the flow rate of water in the first purified water branch channel; The second control valve is used to control whether the second purified water branch channel is connected or disconnected with the purified water main channel, and to control the flow rate of water in the second purified water branch channel.
3. The water purifier according to claim 1, characterized in that A wastewater waterway channel is also formed inside the waterway plate; The water purifier further comprises a third control valve and a fourth control valve, wherein the third control valve and the fourth control valve are both arranged on the waterway plate; The third control valve is used to control whether the first clean water branch channel is connected or disconnected with the waste water channel, and the fourth control valve is used to control whether the second clean water branch channel is connected or disconnected with the waste water channel.
4. The water purifier according to any one of claims 1 to 3, characterized in that: The water purifier further comprises a post-filter element, wherein the post-filter element is provided with a post-water inlet and a post-water outlet; A water outlet waterway channel is also formed inside the waterway plate, the pure water main channel is connected to the rear water inlet, and the water outlet waterway channel is connected to the rear water outlet.
5. The water purifier according to claim 4, characterized in that: The water outlet waterway channel comprises a first water outlet branch channel and a second water outlet branch channel, wherein the first water outlet branch channel is used to connect the rear water outlet and the second water outlet branch channel; The water purifier further includes a fifth control valve, which is disposed on the waterway plate and is used to control the connection or disconnection between the first water outlet branch channel and the second water outlet branch channel.
6. The water purifier according to claim 5, characterized in that The water purifier further comprises a sixth control valve; The sixth control valve is disposed on the waterway plate, and is used to selectively control the second pure water branch channel to be connected to the pure water main channel or to be connected to the first water outlet branch channel.
7. The water purifier according to claim 4, characterized in that: The water purifier also includes a pre-filter element, which is provided with a pre-water inlet and a pre-water outlet; A water inlet channel is also formed inside the waterway plate, the water inlet channel is connected to the front water inlet, and the main water purification channel is connected to the front water outlet.
8. The water purifier according to any one of claims 1 to 3, characterized in that: There is at least one first EDI water inlet, and at least one first EDI water inlet is arranged at the upper end of the first EDI filter element.
9. The water purifier according to any one of claims 1 to 3, characterized in that: The water purifier further includes a first power supply and a second power supply, wherein the first power supply is electrically connected to the first EDI filter element, and the second power supply is electrically connected to the second EDI filter element.
10. The water purifier according to any one of claims 1 to 3, characterized in that: The water purifier also includes a power pump, which is arranged on the main channel of purified water.
