Fabricated roof-out air shaft structure
Through the assembled roof ventilation shaft structure, the coordination of positioning shaft and prefabricated hoop beams is used to solve the problems of long construction period and poor installation accuracy in the existing technology, and efficient and stable ventilation shaft installation and good waterproofing effect are achieved.
Patent Information
- Application Number
- CN202422839092.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-21
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2034-11-21
AI Technical Summary
The existing construction method of roof ventilation shaft has problems such as long construction period, poor installation accuracy and poor stability. In particular, the formwork of cast-in-place reinforced concrete structure is difficult, and the installation of prefabricated assembled structure is complicated and the positioning accuracy is not high.
An assembled roof air shaft structure is adopted, including a positioning shaft integrally formed with the roof panel, a prefabricated shaft and prefabricated hoop beams mounted on the outside of the positioning shaft. Accurate positioning is achieved through the joint action of the positioning shaft and the prefabricated hoop beams, and annular grooves are provided on the shaft cover and the top of the prefabricated shaft to facilitate installation. The roof waterproof layer extends to the outer side of the prefabricated shaft to improve the waterproof effect.
The reliability and stability of the prefabricated well are achieved, the construction efficiency is improved, the construction process is simplified, the labor intensity is reduced, and a good waterproof effect is ensured.