Efficient connecting structure for building assembly construction reinforcing steel bars
By designing a combined structure of threaded connecting pipe and temporary limiting ring, the problems of high difficulty and low efficiency in steel bar connection during prefabricated construction were solved, achieving fast and simplified steel bar connection and improving connection strength and stability.
Patent Information
- Application Number
- CN202520830083.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-28
- Publication Date
- 2026-05-01
- Estimated Expiration
- 2035-04-28
AI Technical Summary
In existing prefabricated construction, the connection of steel bar ends is difficult and inefficient. Welding is slow and complex, and sleeve connection has limited tensile strength.
The system employs a combination structure of two first connecting pipes and one second connecting pipe. It achieves rapid connection through the design of external and internal threads. Combined with axial clearance grooves and temporary limiting rings, it simplifies the process of bending and connecting steel bars. It also utilizes radial through holes filled with concrete to enhance the connection strength.
It significantly improves the speed of rebar connection, reduces connection difficulty, simplifies the process, and has higher axial limiting strength and compressive strength.