Air conditioning system and cooling tower

By setting up coolant supply equipment in the cooling tower, clean coolant is input into the hydraulic fan and returned to the heat exchanger, which solves the problem of spray water pollution, improves the cooling efficiency of the cooling tower and the working efficiency of the fan, and extends the service life , and realize the recycling of coolant.

WO2024207815A1PCT designated stage expired Publication Date: 2024-10-10GREE ELECTRIC APPLIANCE INC OF ZHUHAI +2

Patent Information

Application Number
PCT/CN2023/141347
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-06
Filing Date
2023-12-25
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

When existing cooling towers are used in dust and gas environments such as coal mines, the spray water is contaminated, which reduces the working efficiency of the hydraulic fan and the cooling efficiency of the cooling tower, affecting the service life.

Method used

An air conditioning system is designed, which inputs clean coolant to the hydraulic fan through the first coolant supply device, drives the fan to rotate, and returns the coolant from the liquid outlet to the heat exchanger to avoid impurities from entering and realize the circulation of the coolant. use.

Benefits of technology

The working efficiency of the hydraulic fan and the cooling efficiency of the cooling tower are improved, the service life is extended, the clean state of the coolant is maintained, and the efficient use of the coolant is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023141347_10102024_PF_FP_ABST
    Figure CN2023141347_10102024_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure relates to an air conditioning system and a cooling tower. The air conditioning system comprises: a heat exchanger for circulating a first coolant; a hydraulic fan for introducing air into the heat exchanger, so as to cause the air to exchange heat with the first coolant in the heat exchanger and to discharge the air having exchanged the heat; and a first coolant supply apparatus configured to input the first coolant to an inlet of the hydraulic fan, so as to drive the rotation of the hydraulic fan, wherein the first coolant flowing out of an outlet of the hydraulic fan is introduced into the heat exchanger. When the cooling tower having the air conditioning system cools a mine environment, the first coolant supply apparatus can continuously input the clean first coolant to the hydraulic fan directly, such that the clean first coolant drives the hydraulic fan to continuously rotate, dust and other impurities in a mine are prevented from entering the hydraulic fan and influencing the operating efficiency of the hydraulic fan, and the cooling efficiency of the entire cooling tower for the mine is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Air conditioning systems and cooling towers

[0001] Cross-references to related applications

[0002] This disclosure is based on and claims priority to a Chinese application with application number 202310361460.6 and filing date April 6, 2023. The disclosure content of the Chinese application is hereby introduced into this disclosure as a whole. Technical Field

[0003] The present disclosure relates to an air conditioning system and a cooling tower. Background Art

[0004] In some places where there is a lot of dust and gas and electricity is not allowed, such as the return air tunnel of a coal mine, the cooling tower needs to use spray water to drive the hydraulic fan for cooling.

[0005] During the cooling process of the existing cooling tower, the spray water is in contact with the outside air. The spray water tends to absorb and dissolve a large amount of dust, impurities, etc., and the spray water is seriously polluted, resulting in excessive impurities in the spray water, which reduces the working efficiency of the hydraulic fan and thus reduces the overall cooling efficiency of the cooling tower. At the same time, it also affects the service life of the hydraulic fan.

[0006] Summary of the Invention

[0007] The present disclosure aims to solve at least one of the technical problems existing in the prior art. To this end, the present disclosure provides an air conditioning system and a cooling tower that can prevent impurities from entering the hydraulic fan, thereby improving the operating efficiency and service life of the hydraulic fan and ensuring the overall cooling efficiency of the cooling tower.

[0008] In a first aspect, the present disclosure provides an air conditioning system, comprising:

[0009] a heat exchanger for circulating a first coolant;

[0010] a hydraulic fan for introducing air into the heat exchanger so as to exchange heat between the air and the first coolant in the heat exchanger, and exhausting the heat-exchanged air; and

[0011] a first coolant supply device configured to input the first coolant into the liquid inlet of the hydraulic fan to drive the hydraulic fan to rotate;

[0012] The first coolant flowing out of the liquid outlet of the hydraulic fan is introduced into the heat exchanger.

[0013] The air conditioning system according to the first aspect of the present disclosure has at least the following beneficial effects:

[0014] The air-conditioning system disclosed herein provides a first coolant supply device to input the first coolant into the liquid inlet of the hydraulic fan, and uses the kinetic energy of the first coolant to drive the hydraulic fan to rotate, so as to introduce air with a higher temperature in the environment into the heat exchanger, so that the air exchanges heat with the first coolant circulating in the heat exchanger pipe, and the first coolant in the heat exchanger absorbs heat from the air, thereby cooling the air; at the same time, by introducing the first coolant flowing out of the liquid outlet of the hydraulic fan into the heat exchanger, the first coolant that completes the driving of the hydraulic fan can flow from the liquid outlet of the hydraulic fan into the heat exchanger, continuously providing the heat exchanger with the first coolant for heat exchange with the air. In this way, the first coolant supply device, the hydraulic fan and the heat exchanger form an air-conditioning system that can cool the environment.

[0015] When a cooling tower equipped with this air conditioning system cools the mine environment, the first coolant supply device can directly and continuously input clean first coolant into the hydraulic fan, allowing the clean first coolant to drive the hydraulic fan continuously. This replaces the traditional method of driving the hydraulic fan with cooling water contaminated by the mine environment, preventing dust and other impurities in the mine from entering the hydraulic fan and affecting its operating efficiency, thereby ensuring the cooling tower's overall efficiency in cooling the mine. At the same time, the first coolant output by the first coolant supply device can be recycled into the heat exchanger, thereby continuously providing the heat exchanger with the first coolant for heat exchange with the air in the mine. This process also prevents the first coolant from being contaminated by direct contact with the air in the mine. This not only ensures the quality of the first coolant, but also enables the recycling of the first coolant, improving its utilization efficiency.

[0016] In some embodiments, the first coolant supply device is connected to the liquid inlet of the hydraulic blower through a first pipeline, and a first flow regulating valve is provided on the first pipeline.

[0017] In some embodiments, the first coolant supply device is further connected to the liquid inlet of the heat exchanger through a second pipeline to input the first coolant into the heat exchanger.

[0018] In some embodiments, a second flow regulating valve is provided on the second pipeline.

[0019] In some embodiments, the liquid outlet of the hydraulic fan is connected to the second pipeline through a third pipeline, so that the first coolant flowing out of the liquid outlet of the hydraulic fan merges with the first coolant of the second pipeline and is then introduced into the heat exchanger.

[0020] In some embodiments, the liquid outlet of the heat exchanger is connected to the first coolant supply device.

[0021] In a second aspect, the present disclosure provides a cooling tower, comprising:

[0022] tower body; and

[0023] The air conditioning system of the above embodiment;

[0024] The heat exchanger and the hydraulic fan are arranged in the tower body, and the heat exchanger is located below the hydraulic fan in the height direction.

[0025] The cooling tower according to the second aspect of the present disclosure has at least the following beneficial effects:

[0026] Because the cooling tower disclosed herein is equipped with the aforementioned air conditioning system, it also achieves the same technical benefits as the aforementioned air conditioning system. Specifically, when cooling the mine environment, the cooling tower prevents dust and other impurities within the mine from entering the hydraulic blower and affecting its operating efficiency, thereby ensuring the cooling efficiency of the cooling tower as a whole. Furthermore, the cooling tower prevents the first coolant from being contaminated by direct contact with the air within the mine, thereby ensuring its quality and enabling the recycling of the first coolant, thereby improving its utilization efficiency.

[0027] In some embodiments, the cooling tower further comprises:

[0028] The sprayer is arranged in the tower body and is located between the heat exchanger and the hydraulic fan in the height direction. The sprayer is configured to spray the second coolant toward the heat exchanger.

[0029] In some embodiments, the cooling tower further comprises:

[0030] The second coolant supply device is arranged at the bottom of the tower body and is configured to recover the second coolant that slides down from the heat exchanger and input the second coolant into the sprayer.

[0031] In some embodiments, the second coolant supply device is connected to the sprayer through a third pipeline, and a third flow regulating valve is provided on the third pipeline.

[0032] In some embodiments, a water pump is provided on the third pipeline.

[0033] In some embodiments, the cooling tower further comprises:

[0034] The ventilation filler structure is arranged in the tower body and is located between the heat exchanger and the second coolant supply device in the height direction.

[0035] In some embodiments, the vent fill structure is a fin structure.

[0036] In some embodiments, the heat exchanger and the second coolant supply are both spaced apart from the vent fill structure.

[0037] The above description is only an overview of the technical solution of the present disclosure. In order to more clearly understand the technical means of the present disclosure, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present disclosure more obvious and easy to understand, the specific implementation methods of the present disclosure are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Various other advantages and benefits will become apparent to those skilled in the art upon reading the detailed description of the preferred embodiments below. The accompanying drawings are for illustration purposes only and are not to be considered as limiting the present disclosure. The same reference numerals are used throughout the drawings to denote the same components. In the drawings:

[0039] FIG1 is a schematic structural diagram of some embodiments of the air-conditioning system disclosed herein.

[0040] FIG2 is a schematic structural diagram of some other embodiments of the air-conditioning system disclosed herein.

[0041] FIG3 is a schematic structural diagram of some embodiments of the cooling tower disclosed herein.

[0042] Explanation of the accompanying drawings: 10, cooling tower; 11, ventilation filler structure; 100, heat exchanger; 200, hydraulic fan; 300, first coolant supply equipment; 400, first pipeline; 410, first flow regulating valve; 500, second pipeline; 510, second flow regulating valve; 600, third pipeline; 700, sprinkler; 800, second coolant supply equipment; 900, third pipeline; 910, third flow regulating valve; 920, water pump. DETAILED DESCRIPTION

[0043] The following embodiments of the technical solution of the present disclosure are described in detail with reference to the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present disclosure and are therefore only examples and are not intended to limit the scope of protection of the present disclosure.

[0044] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which the present disclosure belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present disclosure; the terms "including" and "having" and any variations thereof in the specification and claims of the present disclosure and the above-mentioned drawings are intended to cover non-exclusive inclusions.

[0045] In the description of the embodiments of the present disclosure, technical terms such as "first" and "second" are used solely to distinguish between different objects and should not be understood to indicate or imply relative importance or to implicitly specify the quantity, specific order, or primary and secondary relationship of the technical features indicated. In the description of the embodiments of the present disclosure, "plurality" means more than two, unless otherwise specifically defined.

[0046] References herein to "embodiments" mean that a particular feature, structure, or characteristic described in connection with the embodiments may be included in at least one embodiment of the present disclosure. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor does it constitute an independent or alternative embodiment that is mutually exclusive of other embodiments. It is understood, both explicitly and implicitly, by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0047] In the description of the embodiments of the present disclosure, the term "and / or" is simply a description of the association relationship between associated objects, indicating that three relationships can exist. For example, A and / or B can represent three situations: A exists alone, A and B exist simultaneously, and B exists alone. In addition, the character " / " in this document generally indicates that the associated objects are in an "or" relationship.

[0048] In the description of the embodiments of the present disclosure, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).

[0049] In the description of the embodiments of the present disclosure, the technical terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be understood as limiting the embodiments of the present disclosure.

[0050] In the description of the embodiments of the present disclosure, unless otherwise expressly specified or limited, technical terms such as "installed," "connected," "connected," and "fixed" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integration; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; and they can refer to internal connectivity between two components or interaction between two components. Those skilled in the art can understand the specific meanings of the above terms in the embodiments of the present disclosure based on specific circumstances.

[0051] In some places where there is a lot of dust and gas and electricity is not allowed, such as the return air tunnel of a coal mine, electrical equipment cannot be used in the place because the environment contains flammable and explosive gases or substances.

[0052] The cooling towers used in such places are equipped with hydraulic fans, which use spray water to drive the hydraulic fans to rotate in order to cool the environment.

[0053] In the process of cooling the environment, the existing cooling tower sprays water in contact with the outside air. The spray water tends to absorb and dissolve a large amount of dust, impurities, etc. The spray water is seriously polluted, resulting in excessive impurities in the spray water. When the spray water drives the hydraulic fan to rotate, the impurities in the spray water will contact and adhere to the functional components of the hydraulic fan, causing the hydraulic fan to slow down or even get stuck, affecting the rotation of the hydraulic fan, reducing the working efficiency of the hydraulic fan, and thus reducing the overall cooling efficiency of the cooling tower. At the same time, it also affects the service life of the hydraulic fan.

[0054] Based on the above background, referring to FIG. 1 to FIG. 3 , the present disclosure provides an air conditioning system, which includes a heat exchanger 100 , a hydraulic fan 200 , and a first coolant supply device 300 .

[0055] The heat exchanger 100 is used to circulate a first coolant. The hydraulic fan 200 is used to draw air into the heat exchanger 100 to exchange heat with the first coolant in the heat exchanger 100 and to exhaust the heated air. The first coolant supply device 300 is configured to input the first coolant into the liquid inlet of the hydraulic fan 200 to drive the hydraulic fan 200. Furthermore, the first coolant flowing out of the liquid outlet of the hydraulic fan 200 is directed into the heat exchanger 100.

[0056] It should be noted that, in FIG1 , the dotted arrow indicates the flow direction of the first coolant.

[0057] The heat exchanger 100 is preferably a coil heat exchanger, so as to increase the heat exchange area between the air and the first coolant circulating in the heat exchanger 100 and accelerate the cooling rate of the ambient air.

[0058] The hydraulic fan 200 is a hydraulic fan structure in the prior art, that is, the hydraulic fan 200 includes a coaxially arranged turbine and fan blades, and the turbine is respectively provided with a liquid inlet and a liquid outlet, which are the liquid inlet and liquid outlet of the hydraulic fan 200.

[0059] It should be noted that when the first coolant supply device 300 feeds the first coolant into the liquid inlet of the hydraulic fan 200 to drive the hydraulic fan 200, the first coolant has a high kinetic energy. The first coolant performs work on the turbine of the hydraulic fan 200, thereby driving the turbine and, in turn, the fan blades. This draws the warmer air within the mine environment to the heat exchanger 100. The air then contacts the pipes of the heat exchanger 100 and exchanges heat with the first coolant within the pipes. The first coolant within the heat exchanger 100 absorbs heat from the air, thereby cooling the air. After performing work on the hydraulic fan 200, the first coolant flows from the liquid outlet of the hydraulic fan 200 into the pipes of the heat exchanger 100, providing a fluid medium for heat exchange with the air.

[0060] In addition, it should be noted that the first coolant supply device 300 is connected to the liquid inlet of the hydraulic fan 200, and the liquid outlet of the hydraulic fan 200 is connected to the heat exchanger 100 through pipes. The first coolant can be pre-prepared clean cooling water to ensure the cleanliness of the first coolant.

[0061] Furthermore, the first coolant supply device 300 can be connected to an external refrigeration device or air conditioning device, allowing the external refrigeration device or air conditioning device to continuously provide the first coolant supply device 300 with a lower temperature first coolant, thereby ensuring that the hydraulic fan 200 can be continuously driven to rotate. Furthermore, to increase the kinetic energy of the first coolant input to the hydraulic fan 200, the first coolant supply device 300 can be equipped with a corresponding power water pump to increase the kinetic energy of the first coolant input to the hydraulic fan 200, thereby increasing the rotation rate of the hydraulic fan 200.

[0062] In addition, in other embodiments, the head and tail ends of the heat exchanger 100 are respectively the liquid inlet and the liquid outlet of the heat exchanger 100. The liquid outlet of the heat exchanger 100 can be connected to an external first coolant recovery device to complete the recovery of the first coolant that has undergone heat exchange in the heat exchanger 100. Since the first coolant in the heat exchanger 100 absorbs the heat of the air, the temperature of the first coolant flowing out of the liquid outlet of the heat exchanger 100 increases. After the first coolant recovery device recovers the corresponding first coolant, the first coolant can also be passed into the corresponding refrigeration equipment or air-conditioning equipment to cool the recovered first coolant, and then the first coolant with a lower temperature is passed into the first coolant supply device 300, thereby realizing the recycling of the first coolant.

[0063] Of course, in other embodiments, the liquid outlet of the heat exchanger 100 can be directly connected to the first coolant supply device 300 through a pipeline, and the first coolant that has undergone heat exchange can be directly recovered to the first coolant supply device 300. The recovered first coolant is directly mixed with the original first coolant in the first coolant supply device 300, which can also achieve the cooling effect of the recovered first coolant and realize the recycling of the first coolant.

[0064] It is not difficult to understand that the air-conditioning system of the present invention provides a first coolant supply device 300 to input the first coolant into the liquid inlet of the hydraulic fan 200, and uses the kinetic energy of the first coolant to drive the hydraulic fan 200 to rotate, so as to introduce the air with a higher temperature in the environment into the heat exchanger 100, so that the air exchanges heat with the first coolant circulating in the pipe of the heat exchanger 100, and the first coolant in the heat exchanger 100 absorbs heat in the air, thereby cooling the air.

[0065] At the same time, by introducing the first coolant flowing out of the liquid outlet of the hydraulic fan 200 into the heat exchanger 100, the first coolant that has completed work on the hydraulic fan 200 can flow into the heat exchanger 100 from the liquid outlet of the hydraulic fan 200, continuously providing the heat exchanger 100 with the first coolant for heat exchange with the air. In this way, the first coolant supply device 300, the hydraulic fan 200 and the heat exchanger 100 form an air-conditioning system that can cool the environment.

[0066] When the cooling tower is equipped with this air-conditioning system, the heat exchanger 100 and the hydraulic fan 200 are both arranged in the tower body of the cooling tower, and the hydraulic fan 200 is located above the heat exchanger 100. When the hydraulic fan 200 rotates, the hotter air in the bottom of the tower is drawn from the bottom to the top, so that the air is cooled by the heat exchanger 100 and then discharged into the atmosphere from the outlet of the hydraulic fan 200.

[0067] When the cooling tower with this air-conditioning system cools down the mine environment, the first coolant supply device 300 can directly and continuously input clean first coolant to the hydraulic fan 200, so that the clean first coolant drives the hydraulic fan 200 to rotate continuously, replacing the traditional method of driving the hydraulic fan 200 with cooling water polluted by the mine environment, avoiding dust and other impurities in the mine from entering the hydraulic fan 200 and affecting the working efficiency of the hydraulic fan, ensuring the overall cooling efficiency of the cooling tower for the mine, and making the hydraulic fan 200 easy to maintain.

[0068] At the same time, the first coolant output by the first coolant supply device 300 can be recycled into the heat exchanger 100, thereby continuously providing the heat exchanger 100 with the first coolant for heat exchange with the air in the mine. In this process, the first coolant is also prevented from being contaminated by direct contact with the air in the mine, which not only ensures the quality of the first coolant, but also realizes the recycling of the first coolant, thereby improving the utilization efficiency of the first coolant.

[0069] In some embodiments of the present disclosure, referring to FIG. 1 , the first coolant supply device 300 is connected to the liquid inlet of the hydraulic blower 200 through a first pipeline 400 , and a first flow regulating valve 410 is provided on the first pipeline 400 .

[0070] Specifically, the first flow regulating valve 410 is preferably a manual regulating valve, so as to adapt to the mine environment where electricity cannot be supplied, and also facilitate the operation of the first flow regulating valve 410 by operators in the mine.

[0071] The present disclosure sets a first flow regulating valve 410 in the first pipeline 400, and can adjust the flow and kinetic energy of the first coolant input to the liquid inlet of the hydraulic fan 200 by adjusting the opening of the first flow regulating valve 410, thereby increasing or decreasing the rotation speed of the hydraulic fan 200, meeting the diverse needs of cooling the on-site environment, and also meeting energy-saving needs.

[0072] In some embodiments of the present disclosure, referring to FIG. 1 and FIG. 2 , the first coolant supply device 300 is further connected to the liquid inlet of the heat exchanger 100 through the second pipeline 500 to input the first coolant into the heat exchanger 100 .

[0073] Likewise, in FIG1 and FIG2 , the dashed arrows indicate the flow direction of the first coolant.

[0074] The present disclosure connects the first coolant supply device 300 to the liquid inlet of the heat exchanger 100 through the second pipeline 500, so that the first coolant supply device 300 can input the first coolant into the heat exchanger 100 through the second pipeline 500, increase the flow rate of the first coolant circulating in the pipeline of the heat exchanger 100, improve the heat exchange efficiency between the air in the mine and the first coolant, and thus accelerate the cooling of the mine environment.

[0075] In some embodiments of the present disclosure, referring again to FIG. 1 and FIG. 2 , a second flow regulating valve 510 is provided on the second pipeline 500 .

[0076] Specifically, the second flow regulating valve 510 is a manual regulating valve, so as to adapt to the mine environment where electricity cannot be supplied, and also facilitate the operation of the second flow regulating valve 510 by operators in the mine.

[0077] It is not difficult to understand that the present invention sets a second flow regulating valve 510 in the second pipeline 500, and can adjust the flow of the first coolant input into the heat exchanger 100 by adjusting the opening of the second flow regulating valve 510, thereby meeting the diverse needs of cooling the on-site environment and also meeting energy-saving needs.

[0078] In some embodiments of the present disclosure, referring again to FIG. 2 , the liquid outlet of the hydraulic fan 200 is connected to the second pipeline 500 through the third pipeline 600 , so that the first coolant flowing out of the liquid outlet of the hydraulic fan 200 is introduced into the heat exchanger 100 via the second pipeline 500 .

[0079] Specifically, a tee pipe may be provided between the third pipeline 600 and the second pipeline 500 to facilitate communication between the third pipeline 600 , the second pipeline 500 and the liquid inlet of the heat exchanger 100 .

[0080] It can be understood that, through the above-mentioned arrangement, the heat exchanger 100 can have two flow paths for supplying the first coolant thereto, one being the first coolant flowing out of the liquid outlet of the hydraulic fan 200, and the other being the first coolant directly input into the heat exchanger 100 by the first coolant supply device 300, thereby increasing the flow rate of the first coolant circulating in the heat exchanger 100, further improving the heat exchange efficiency between the air in the mine and the first coolant, and thereby accelerating the cooling of the mine environment.

[0081] Moreover, the first coolant in the two flow paths does not come into direct contact with the external environment, which prevents the first coolant from infiltrating into dust and other impurities in the environment and affecting the rotation of the hydraulic fan 200. It can keep the first coolant at its initial cleanliness level, and also ensure the overall cooling efficiency of the cooling tower for the mine, and makes the hydraulic fan 200 easy to maintain.

[0082] In some embodiments of the present disclosure, referring again to FIG. 1 and FIG. 2 , the liquid outlet of the heat exchanger 100 is connected to the first coolant supply device 300 .

[0083] Specifically, the heat exchanger 100 is a coil heat exchanger, and the liquid outlet of the heat exchanger 100 can be directly connected to the first coolant supply device 300 through a pipeline, so that the first coolant that has undergone heat exchange is directly recovered to the first coolant supply device 300, and the recovered first coolant is directly mixed with the original first coolant in the first coolant supply device 300, which can achieve the cooling effect of the recovered first coolant and realize the recycling of the first coolant.

[0084] In some embodiments of the present disclosure, referring to FIG. 3 , the present disclosure further provides a cooling tower 10 , which includes the above-mentioned air-conditioning system.

[0085] It should be noted that, in FIG3 , the dotted arrows indicate the flow direction of the first coolant.

[0086] Because the cooling tower 10 of the present disclosure is equipped with the aforementioned air conditioning system, it also has the same technical effects as the aforementioned air conditioning system. Specifically, when cooling the mine environment, the cooling tower 10 can prevent dust and other impurities within the mine from entering the hydraulic blower 200 and affecting the hydraulic blower's operating efficiency, thereby ensuring the cooling efficiency of the cooling tower as a whole. At the same time, it prevents the first coolant from being contaminated by direct contact with the air within the mine, thereby ensuring the quality of the first coolant and enabling the recycling of the first coolant, thereby improving its utilization efficiency.

[0087] In some embodiments of the present disclosure, referring again to FIG. 3 , the cooling tower 10 further includes a sprayer 700 , which is configured to spray the second coolant toward the heat exchanger 100 .

[0088] Specifically, when the cooling tower 10 of the present disclosure is applied in a mine environment, the heat exchanger 100, the hydraulic fan 200, and the sprayer 700 are all disposed in the cooling tower body, and the heat exchanger 100, the sprayer 700, and the hydraulic fan 200 are sequentially spaced from bottom to top along the cooling tower body, that is, the sprayer 700 is located between the hydraulic fan 200 and the heat exchanger 100. The second coolant sprayed by the sprayer 700 can be cooling water.

[0089] The sprayer 700 may include multiple nozzles, which spray the second coolant onto the pipe surface of the heat exchanger 100 through the multiple nozzles. The second coolant forms a water film on the pipe surface of the heat exchanger 100, and evaporates to drive the heat in the pipe of the heat exchanger 100 to cool the first coolant in the heat exchanger 100. At the same time, in the process of multiple nozzles spraying the second coolant vertically downward, the air at the bottom of the tower body is drawn out from bottom to top by the hydraulic fan 200. In this way, the second coolant can also directly exchange heat with the air in the environment.

[0090] That is, the second coolant sprayed downward by the sprayer 700 can, on the one hand, exchange heat with the first coolant flowing in the pipe of the heat exchanger 100. Since the first coolant in the pipe of the heat exchanger 100 absorbs part of the heat in the mine environment, the temperature of the first coolant is greater than that of the second coolant. In this way, the second coolant sprayed downward by the sprayer 700 can directly cool the heat exchanger 100, so that the first coolant in the heat exchanger is recovered to the first coolant supply device 300, and its temperature will not increase significantly. In this way, a closed first coolant circulation flow path is formed between the first coolant supply device 300, the hydraulic fan 200 and the heat exchanger 100, and most of the heat in the mine environment is absorbed by the second coolant.

[0091] On the other hand, the second coolant sprayed downward by the sprayer 700 can cool the air in the mine environment together with the first coolant in the heat exchanger 100, thereby accelerating the cooling rate of the mine environment.

[0092] Of course, the operator can also selectively open or close the sprinkler 700 according to the actual temperature requirements of the mine environment to meet usage needs.

[0093] In some embodiments of the present disclosure, referring again to FIG. 3 , the cooling tower 10 further includes a second coolant supply device 800 , which is configured to recover the second coolant that has fallen from the heat exchanger 100 and to input the second coolant into the sprayer 700 .

[0094] Specifically, the second coolant supply device 800 can be a water tank with an opening at the top. It should be noted that when the sprayer 700 sprays the second coolant onto the surface of the heat exchanger 100, the second coolant passes through the surface of the heat exchanger 100 and exchanges heat with the first coolant circulating within the heat exchanger 100. Some unevaporated second coolant droplets will slide off the pipe surface of the heat exchanger 100. The second coolant supply device 800 can receive the second coolant that slides off the heat exchanger 100, thereby recycling the second coolant.

[0095] At the same time, the second coolant is input into the sprayer 700 through the second coolant supply device 800 , and the second coolant supply device 800 also serves to supply the second coolant to the sprayer 700 .

[0096] In some embodiments of the present disclosure, referring again to FIG. 3 , the second coolant supply device 800 is connected to the sprayer 700 via a third pipeline 900 , and a third flow regulating valve 910 is provided on the third pipeline 900 .

[0097] Specifically, the third flow regulating valve 910 is a manual regulating valve, so as to adapt to the mine environment where electricity cannot be supplied, and also facilitate the operation of the third flow regulating valve 910 by operators in the mine.

[0098] It is not difficult to understand that the present invention provides a third flow regulating valve 910 in the third pipeline 900, and can adjust the flow of the second coolant input into the sprayer 700 by adjusting the opening of the third flow regulating valve 910, thereby effectively improving the utilization rate of the second coolant, and can also control the density of the second coolant sprayed into the heat exchanger 100, and can adapt to the second coolant density and flow required under different working conditions, and meet the diverse needs of cooling the on-site environment.

[0099] In some embodiments of the present disclosure, referring to FIG3 , a water pump 920 is further provided on the third pipeline 900. The water pump 920 is a power water pump that can pump the second coolant in the second coolant supply device 800 at the bottom of the tower body to the sprayer 700 , and can increase the kinetic energy of the second coolant as needed, increase the density of the second coolant sprayed from the sprayer 700 , and improve the cooling efficiency of the mine environment.

[0100] In addition, in some embodiments of the present disclosure, referring again to FIG3 , the cooling tower 10 further includes a ventilation filler structure 11, which is specifically a fin structure. The ventilation filler structure 11 is disposed between the heat exchanger 100 and the second coolant supply device 800, and is spaced apart from the heat exchanger 100 and the second coolant supply device 800.

[0101] When the second coolant sprayed by the sprayer 700 to the heat exchanger 100 slides downward, the second coolant will first fall on the ventilation filler structure 11 and flow in the ventilation filler structure 11, and when the hydraulic fan 200 rotates, the air will flow from bottom to top and will also flow through the ventilation filler structure 11. In this way, the second coolant and the air will flow relative to each other in the ventilation filler structure 11, and the second coolant will also take away the heat in the air due to evaporation. In this way, the cooling efficiency of the cooling tower 10 can be further improved.

[0102] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them. Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some or all of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present disclosure, and they should all be included in the scope of the claims and specification of the present disclosure. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way. The present disclosure is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.

Claims

1. An air conditioning system, comprising: A heat exchanger (100) for circulating a first coolant; a hydraulic fan (200) for introducing air into the heat exchanger (100) so that the air exchanges heat with the first coolant in the heat exchanger (100), and exhausting the heat-exchanged air; and A first coolant supply device (300) is configured to input a first coolant into a liquid inlet of the hydraulic fan (200) to drive the hydraulic fan (200) to rotate; Wherein, the first coolant flowing out of the liquid outlet of the hydraulic fan (200) is introduced into the heat exchanger (100).

2. The air conditioning system according to claim 1, wherein the first coolant supply device (300) is connected to the liquid inlet of the hydraulic fan (200) through a first pipeline (400), and a first flow regulating valve (410) is provided on the first pipeline (400).

3. The air conditioning system according to claim 1 or 2, wherein the first coolant supply device (300) is also connected to the liquid inlet of the heat exchanger (100) through a second pipeline (500) to input the first coolant into the heat exchanger (100).

4. The air conditioning system according to claim 3, wherein a second flow regulating valve (510) is provided on the second pipeline (500).

5. The air conditioning system according to claim 3 or 4, wherein the liquid outlet of the hydraulic fan (200) is connected to the second pipeline (500) through a third pipeline (600), so that the first coolant flowing out of the liquid outlet of the hydraulic fan (200) merges with the first coolant in the second pipeline (500) and is introduced into the heat exchanger (100).

6. The air conditioning system according to any one of claims 1 to 5, wherein a liquid outlet of the heat exchanger (100) is connected to the first coolant supply device (300).

7. A cooling tower (10), comprising: tower body; and The air conditioning system according to any one of claims 1 to 6; The heat exchanger (100) and the hydraulic fan (200) are arranged in the tower body, and the heat exchanger (100) is located below the hydraulic fan (200) in the height direction.

8. The cooling tower (10) according to claim 7, further comprising: A sprayer (700) is disposed in the tower body. The sprayer (700) is located between the heat exchanger (100) and the hydraulic fan (200) in the height direction. The sprayer (700) is configured to spray a second coolant onto the heat exchanger (100).

9. The cooling tower (10) according to claim 8, further comprising: The second coolant supply device (800) is arranged at the bottom of the tower body, and the second coolant supply device (800) is configured to recover the second coolant dropped from the heat exchanger (100) and input the second coolant into the sprayer (700).

10. The cooling tower (10) according to claim 9, wherein the second coolant supply device (800) is connected to the sprayer (700) through a third pipeline (900), and a third flow regulating valve (910) is provided on the third pipeline (900).

11. The cooling tower (10) according to claim 10, wherein a water pump (920) is provided on the third pipeline (900).

12. The cooling tower (10) according to any one of claims 9 to 11, further comprising: A ventilation filler structure (11) is provided in the tower body, and the ventilation filler structure (11) is located between the heat exchanger (100) and the second coolant supply device (800) in the height direction.

13. The cooling tower (10) according to claim 12, wherein the ventilation fill structure (11) is a fin structure.

14. The cooling tower (10) according to claim 12, wherein the heat exchanger (100) and the second coolant supply device (800) are both spaced apart from the ventilation filler structure (11).

Citation Information

Patent Citations

  • Cooling tower circulating water generating system and mounting method thereof

    CN103388992A

  • Air conditioning system and cooling tower

    CN116481097A

  • Cooling towers using water turbines

    CN201600045U

  • Water-film type multi-stage cooling circulating water recycling device

    CN204085235U

  • Water turbine operation condition adjusting device for driving cooling tower fan

    CN211503824U

Cited By

  • Air conditioning system and cooling tower

    CN116481097A

  • Air conditioning system and cooling tower

    CN116481097B

  • Heat pump unit suitable for granary

    CN119268171A