Transportation, in-place and disassembly method for offshore large facility
By forming a floating box array in front of the dock and adjusting buoyancy, a heavy object bearing platform is built, which solves the problem of high transportation and installation difficulties in traditional methods, and realizes the simple and economical transportation, positioning and dismantling of large-scale offshore facilities.
Patent Information
- Application Number
- PCT/CN2024/095476
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-29
- Filing Date
- 2024-05-27
- Publication Date
- 2024-12-05
AI Technical Summary
The traditional floating-tool method requires additional lifting mechanisms and load adjustment devices during the transportation, positioning and disassembly of large offshore facilities, which leads to high cost, high operational difficulty, and is limited by natural marine conditions.
By forming a floating box array in front of the dock, a heavy object bearing platform is built, and the air in the floating box is used to regulate the buoyancy, so that the heavy object bearing platform remains horizontal, and large facilities are directly assembled and transported on the platform, and placed at the target location and Disassemble.
The transportation and installation process is simplified, the cost and operation difficulty is reduced, and the huge load and high cost operation in traditional methods are avoided, and the tide level changes are adapted to changes in the swaying sea waves are not affected.
Smart Images

Figure CN2024095476_05122024_PF_FP_ABST
Abstract
Description
A method for transporting, positioning and dismantling large offshore facilities
[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on May 29, 2023, with application number 2023106172693, and invention name “A method for transporting, positioning and dismantling large offshore facilities”, the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present invention relates to the field of marine engineering, and in particular to a method for transporting, positioning and dismantling large-scale offshore facilities. Background Art
[0003] With the rapid development of offshore resource exploration and development, industries such as offshore oil and wind power are experiencing rapid growth. Large-scale offshore facilities, jackets, modules, and equipment (collectively referred to as facilities) are becoming larger and more intensive, and the overall weight of these facilities is increasing. This rapid pace of offshore resource development is placing higher demands on the transportation, installation, and disassembly technologies and operational capabilities of these ultra-large offshore facilities. Traditional offshore operational solutions are facing unprecedented challenges, hindering the rapid development of China's marine resource development.
[0004] Currently, the transportation, installation, and disassembly of ultra-large facilities generally utilize floating cranes or float-out methods (float-out installation). The float-out method utilizes barges to transport offshore facilities. During installation, the upper structure is raised and lowered based on tide levels, barge load adjustments, and lifting mechanisms. Specialized connecting components are used to connect the upper structure to the underlying guide and support structure.
[0005] In the process of realizing the present invention, the applicant found that there are at least the following problems in the prior art: the traditional floating method requires additional lifting mechanisms and load adjustment devices during transportation, as well as during positioning and disassembly, which are expensive and difficult to operate.
[0006] Summary of the Invention
[0007] The present invention provides a method for transporting, installing, and dismantling large offshore facilities. This method addresses the existing technical issues of conventional floatation methods, which rely on tidal fluctuations and are subject to natural ocean conditions during transportation, installation, and dismantling. These methods require additional lifting and loading mechanisms, resulting in high costs and operational difficulties.
[0008] To achieve the above-mentioned objectives, an embodiment of the present invention provides a method for transporting, positioning, and dismantling a large offshore facility, comprising:
[0009] Injecting air into a plurality of main pontoons and placing the plurality of main pontoons in a predetermined arrangement order on the sea surface in front of the dock to form a pontoon array; constructing a heavy-load carrying platform through the pontoon array, and adjusting the amount of air in the main pontoons so that the upper surface of the heavy-load carrying platform is always kept horizontal;
[0010] A large-scale facility is fixed on the heavy-load bearing platform in a fully assembled form or in the form of its various components; wherein the type of the large-scale facility includes at least one of the following: a large building, an upper assembly, or a supporting jacket; the upper assembly refers to a facility that appears above the sea surface, and the upper assembly includes at least one of the following: an oil and gas processing facility, a booster station, a converter station, or a large wind turbine, wherein the large wind turbine is a large-scale facility with a high center of gravity; the supporting jacket is used to support the large building or the upper assembly;
[0011] transporting the large-scale facility and the heavy-load carrying platform at sea, and transporting the large-scale facility and the heavy-load carrying platform to a target location at sea;
[0012] Placing the large-scale facility at a preset location of the target location; placing the large-scale facility at the preset location of the target location specifically includes:
[0013] For the upper assembly, the upper assembly is positioned on the load-bearing member at the preset position in a completely assembled manner, or the components of the upper assembly are positioned in sequence according to the assembly order according to the structural characteristics of the upper assembly; after positioning, the heavy object bearing platform is dragged away;
[0014] For the large building or the supporting jacket, the load-bearing members at the preset positions are positioned in a manner such that they are fixed on the heavy object bearing platform; after positioning, the heavy object bearing platform is dragged away;
[0015] When dismantling the large facility, the large facility is fixed on the heavy object carrying platform, and the large facility and the heavy object carrying platform are dragged away from the load-bearing member at the preset position; when dismantling the large facility, the large facility is fixed on the heavy object carrying platform, and the large facility and the heavy object carrying platform are dragged away from the load-bearing member at the preset position, specifically including:
[0016] For the upper assembly, the upper assembly is directly fixed on the heavy object bearing platform in an assembled form; or, according to the structural characteristics of the upper assembly, the components of the upper assembly are separated in the reverse order of their placement, and fixed on the heavy object bearing platform in the form of components or in an assembled form; the upper assembly and the heavy object bearing platform are dragged away from the load-bearing member;
[0017] For the large building or the supporting jacket, the large building or the supporting jacket is fixed to the large facility in the form of their respective positions; the large building and the heavy object carrying platform are dragged away from the load-bearing member, or the supporting jacket and the heavy object carrying platform are dragged away from the load-bearing member.
[0018] Preferably, placing the large-scale facility at a preset location at the target location specifically includes:
[0019] When the large facility is the large building or the upper assembly, the support member is a double-row jacket with a spacing, and the large building or the upper assembly is finally installed on the double-row jacket with a spacing, after the large building or the upper assembly and the heavy-load carrying platform are transported to the target location at sea, the buoyancy of each of the main pontoons is increased to raise the heavy-load carrying platform so that each supported point at the bottom of the large building or the upper assembly is higher than the top of the double-row jacket; while raising the heavy-load carrying platform, the buoyancy of the main pontoons is adjusted to keep the heavy-load carrying platform and the large building in a horizontal state, or keep the heavy-load carrying platform and the upper assembly in a horizontal state;
[0020] Using a tugboat and a positioning vessel to tow the heavy-load carrying platform between the double-row jackets;
[0021] After aligning the supported points at the bottom of the large building or the upper block with the corresponding supporting points at the top of the double-row jacket, gradually reducing the buoyancy of the main pontoon so that the supported points at the bottom of the large building or the upper block are respectively supported on the corresponding supporting points at the top of the double-row jacket;
[0022] After the weight of the large building or the upper assembly is completely transferred to the corresponding support points on the top of the double-row jacket, the buoyancy of the main pontoon is further reduced so that the heavy object carrying platform is completely separated from the bottom of the large building or the upper assembly;
[0023] Using a tugboat to tow the heavy-load carrying platform out from between the double-row jackets, thereby completing the placement of the large building or the upper assembly;
[0024] When dismantling the large facility, fixing the large facility on the heavy object carrying platform and dragging the large facility and the heavy object carrying platform away from the load-bearing member at a preset position specifically includes:
[0025] For the large-scale building or the upper assembly, when dismantling the large-scale building or the upper assembly from the double-row jackets with a spacing therebetween, a tugboat and a positioning ship are used to tow the heavy-load carrying platform between the double-row jackets;
[0026] After the heavy object carrying platform is in a fixed position at the bottom of the large building or the upper block, gradually increasing the buoyancy of the main pontoon so that the heavy object carrying platform gradually rises to the bottom of the large building or the upper block and contacts the bottom of the large building or the upper block;
[0027] Continue to increase the buoyancy of the main buoyancy box until each supported point at the bottom of the large building or the upper module is separated from the corresponding supporting point at the top of the double-row jacket;
[0028] After the weight of the large building or the upper assembly is completely transferred to the heavy-load bearing platform, a tugboat is used to tow the heavy-load bearing platform and the large building out from between the double-row jackets, or a tugboat is used to tow the heavy-load bearing platform and the upper assembly out from between the double-row jackets; thus, the demolition of the large building or the upper assembly is completed.
[0029] Preferably, placing the large-scale facility at a preset location at the target location specifically includes:
[0030] When the support member is a centralized jacket, and the large-scale facility is finally installed on the centralized jacket arranged in a centralized manner, after the large-scale facility and the heavy-load carrying platform are transported to the target location at sea, the buoyancy of each of the main pontoons is increased to raise the heavy-load carrying platform so that each supported point at the bottom of the large-scale facility is higher than the top of the centralized jacket; while raising the heavy-load carrying platform, the buoyancy of the main pontoons is adjusted to keep the heavy-load carrying platform in a horizontal state; wherein, for the centralized jacket, the main pontoons are arranged in double rows, and the double-row main pontoons are connected by multiple groups of transverse fixed structures; or the main pontoons are arranged in a U-shape.
[0031] Using a tugboat and a positioning vessel to tow the heavy-load carrying platform to the outside of the centralized jacket;
[0032] After aligning the supported points at the bottom of the large-scale facility with the corresponding supporting points at the top of the centralized jacket, gradually reducing the buoyancy of the main pontoon so that the supported points of the large-scale facility are respectively supported on the corresponding supporting points at the top of the centralized jacket;
[0033] After the weight of the large facility is completely transferred to the corresponding support point on the top of the centralized jacket, the buoyancy of the main pontoon is further reduced so that the heavy object carrying platform is completely separated from the bottom of the large facility;
[0034] Using a tugboat to tow out the heavy-load carrying platform, thus completing the placement of the large-scale facility;
[0035] When dismantling the large facility, fixing the large facility on the heavy object carrying platform and dragging the large facility and the heavy object carrying platform away from the load-bearing member at a preset position specifically includes:
[0036] When removing the large facilities from the centralized jacket, a tugboat and a positioning ship are used to tow the heavy-load carrying platform to the outside of the centralized jacket;
[0037] After the heavy object carrying platform is in a fixed position at the bottom of the large facility, gradually increasing the buoyancy of the main pontoon so that the heavy object carrying platform gradually rises to the bottom of the large facility and contacts the bottom of the large facility;
[0038] Continue to increase the buoyancy of the main buoyancy tank until each supported point at the bottom of the large facility is separated from the corresponding supporting point at the top of the centralized jacket;
[0039] After the weight of the large-scale facility is completely transferred to the heavy-object carrying platform, a tugboat is used to tow the heavy-object carrying platform and the large-scale facility away from the centralized jacket, thereby completing the dismantling of the large-scale facility.
[0040] Preferably, placing the large-scale facility at a preset location at the target location specifically includes:
[0041] When the large-scale facility is the supporting jacket, the supporting member is a pile foundation at a specific position on the seabed or arranged centrally, and the supporting jacket is finally installed on the pile foundation at a specific position on the seabed or arranged centrally, after transporting the supporting jacket and the weight-bearing platform to the target location at sea, the buoyancy of each of the main pontoons is reduced, the weight-bearing platform and the supporting jacket are lowered, and the weight-bearing platform is switched to a diving working mode; while lowering the weight-bearing platform and the supporting jacket, the buoyancy of the main pontoons is adjusted to keep the weight-bearing platform and the supporting jacket in a horizontal state;
[0042] When the distance between the supported point at the bottom of the supporting jacket and a specific position on the seabed or the top of the pile foundation is within a preset distance range, the buoyancy of the main pontoon is increased to place the weight-bearing platform and the supporting jacket in a zero-gravity state, and to maintain the heights of the weight-bearing platform and the supporting jacket unchanged;
[0043] Using a tugboat and a positioning vessel to horizontally move the heavy-load carrying platform, when the supported point at the bottom of the supporting jacket is aligned with a specific position on the seabed or the supporting point of the pile foundation, the buoyancy of the main pontoon is gradually reduced;
[0044] After the weight of the supporting jacket is completely transferred to a specific position on the seabed or the supporting point of the pile foundation, the buoyancy of the main pontoon is further reduced so that the weight-bearing platform is completely separated from the supporting jacket; the weight-bearing platform is towed out by a tugboat to complete the positioning of the supporting jacket;
[0045] When dismantling the large facility, fixing the large facility on the heavy object carrying platform and dragging the large facility and the heavy object carrying platform away from the load-bearing member at a preset position specifically includes:
[0046] When removing the supporting jacket from a specific location on the seabed or the pile foundation, a tugboat and a positioning vessel are used to tow the heavy-load carrying platform to the specific location on the seabed or outside the pile foundation;
[0047] After the weight-bearing platform is in the fixed position supporting the jacket, gradually increasing the buoyancy of the main buoyancy tank so that the weight-bearing platform gradually rises to the fixed position supporting the jacket and contacts the fixed position supporting the jacket;
[0048] Continue to increase the buoyancy of the main buoyancy tank until each supported point at the bottom of the supporting jacket is separated from a specific position on the seabed or a supporting point of the pile foundation;
[0049] After the weight of the supporting jacket is completely transferred to the weight bearing platform, a tugboat is used to tow the weight bearing platform and the supporting jacket away from a specific location on the seabed or the pile foundation, thereby completing the removal of the supporting jacket.
[0050] Preferably, placing the plurality of main pontoons on the sea surface in front of the wharf in a preset arrangement order to form a pontoon array specifically includes:
[0051] When the large facility is a large wind turbine, the heavy object carrying platform is divided into two groups, the two groups of heavy object transfer platforms are symmetrically arranged, and there is a distance between the two groups of heavy object transfer platforms;
[0052] Along the ends of the length direction of the heavy object transfer platforms, transverse fixing structures connecting two groups of the heavy object transfer platforms are provided between the heavy object transfer platforms, and the transverse fixing structures are provided in multiple groups;
[0053] The step of fixing the large-scale facility on the heavy-object bearing platform in a fully assembled form or in the form of its components specifically includes:
[0054] When the large facility is a large wind turbine, the large wind turbine is suspended in the gap formed by the distance between the two sets of heavy object bearing platforms;
[0055] The first end of each diagonal brace is connected to the weight-bearing platform, and the second end of each diagonal brace is connected to the large-scale wind turbine; wherein a preset number of the second ends of the diagonal brace are connected to a position above the center of gravity of the large-scale wind turbine;
[0056] Two adjacent diagonal braces are connected by a horizontal supporting structure. After the large-scale wind turbine is in place, the horizontal supporting structure is removed, and the connecting parts between the diagonal braces and the large-scale wind turbine are removed.
[0057] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0058] During use of the main pontoon, when the sea waves reach a specified level, the inlet and outlet valves provided on the main pontoon are closed, so that the main pontoon with the inlet and outlet valves closed works as a watertight compartment, and the water in the main pontoon with the inlet and outlet valves closed becomes ballast water; or
[0059] For the main pontoon, by controlling the opening size of the water inlet and outlet valves, the speed of seawater entering and leaving the main pontoon during the swaying of the main pontoon is controlled, so as to suppress the swaying of the heavy object carrying platform according to the natural period of the waves; or
[0060] For the main pontoon, the lower bottom cover of the main pontoon is removed to allow seawater to freely flow in and out of the main pontoon, thereby suppressing the swaying of the heavy object carrying platform caused by waves; or
[0061] With respect to the main pontoon, by increasing or decreasing the air pressure in the main pontoon, the stability of the pontoon array is maintained within a preset level, thereby suppressing the swaying of the heavy object carrying platform caused by waves.
[0062] Preferably, the heavy object carrying platform further comprises a transfer structure; the transfer structure is uniformly filled with inflatable capsules or a closed body composed of a lightweight material, the density of the lightweight material being less than the density of seawater; or the components of the transfer structure are sealed hollow structural members;
[0063] The method for transporting, positioning and dismantling large offshore facilities further includes:
[0064] The transfer structure is arranged on the upper surface of the main pontoon of the pontoon array, and a heavy object carrying platform is formed by the transfer structure and the pontoon array;
[0065] If the main buoyancy box fails and cannot provide support, the inflatable capsule in the transfer structure or the closed body or sealed hollow structure composed of the lightweight material will provide buoyancy to prevent the heavy load-bearing platform and the large facility from sinking.
[0066] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0067] During use of the main pontoons, the height of the weight-bearing platform is adjusted by controlling the buoyancy of each main pontoon to raise or lower the weight-bearing platform as needed; and the upper surface of the weight-bearing platform is kept horizontal at all times by controlling the buoyancy of each main pontoon as needed;
[0068] During the entire process of dismantling the large facility, the height of the heavy object carrying platform is adjusted by controlling the buoyancy of each of the main pontoons to raise and lower the heavy object carrying platform as needed; and, as needed, the upper surface of the heavy object carrying platform is kept in a horizontal state at all times by controlling the buoyancy of each of the main pontoons.
[0069] Preferably, fixing the large-scale facility on the heavy-object carrying platform in a fully assembled form or in the form of its components specifically includes:
[0070] For the large-scale facilities that need to be constructed on the heavy-load carrying platform, the large-scale facilities are first constructed on the upper surface of the heavy-load carrying platform, and then the large-scale facilities are fixedly connected to the heavy-load carrying platform; during the construction of the large-scale facilities, the amount of air in the main pontoon is adjusted so that the height difference between the upper surface of the heavy-load carrying platform and the pier is within a preset range, and the heavy-load carrying platform is always kept in a horizontal state;
[0071] For the large facilities that do not need to be built on the heavy-load carrying platform, the large facilities are directly fixed to the heavy-load carrying platform through the connecting structure; in the process of transferring the large facilities to the heavy-load carrying platform, the amount of air in the main pontoon is adjusted so that the height difference between the upper surface of the heavy-load carrying platform and the dock is within a preset range, and the heavy-load carrying platform is always kept in a horizontal state.
[0072] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0073] When the large-scale facility is finally installed on the double-row jacket, the arrangement of the load-bearing platform includes a centralized array arrangement, a T-shaped arrangement, or a cross-shaped arrangement; the T-shaped arrangement or the cross-shaped arrangement means that: the pontoon array includes at least one row of the main pontoons; additional balancing pontoons are connected to both sides of the ends of the main pontoon row in the longitudinal direction; the horizontal projection of the main pontoon is an arbitrary shape;
[0074] When the large-scale facility is finally installed on a centralized jacket, the heavy-load bearing platform is arranged in a double row or a U-shaped arrangement. When the main pontoons are arranged in double rows, the two rows are connected to each other by a transverse fixed structure. The horizontal projection of the main pontoons can be any shape.
[0075] When the large-scale facility is finally installed at a specific location on the seabed or on pile foundations centrally arranged on the seabed, the arrangement of the load-bearing platform includes a double-row arrangement or a U-shaped arrangement; the horizontal projection of the main pontoon can be any shape.
[0076] The above technical solution has the following beneficial effects: a pontoon array is constructed using a main pontoon at sea in front of the dock, a heavy-duty load-bearing platform 1 is constructed by the pontoon array, large facilities are assembled and fixed on the heavy-duty load-bearing platform, and can be directly transported after installation. The method is simple and convenient to operate, with low difficulty and low cost. It avoids the difficult and expensive operation of the huge and overweight load required for the traditional method of transferring from shore to ship. It solves the technical problem in the prior art that "additional configuration of lifting mechanisms and load adjustment devices is required, which is expensive and difficult to operate." In addition, when dismantling large facilities, it avoids the need to dismantle and transport large facilities piecemeal. The method is simple and convenient to operate, with low difficulty and low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0077] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0078] FIG1 is a flow chart of a method for transporting, positioning, and dismantling a large offshore facility according to an embodiment of the present invention;
[0079] FIG2 is a schematic diagram of the installation or disassembly of a single component in a large building or an upper block according to an embodiment of the present invention;
[0080] 3 is a front view of a large facility according to an embodiment of the present invention before being installed on a centralized pipe rack;
[0081] FIG4 is a top view of a large facility according to an embodiment of the present invention before being installed on a centralized pipe rack;
[0082] 5 is a left side view of a large facility installed on a centralized pipe rack according to an embodiment of the present invention;
[0083] 6 is a front view of a large fan according to an embodiment of the present invention before being installed on a load-bearing member;
[0084] 7 is a top view of a large facility according to an embodiment of the present invention before being installed on a load-bearing member;
[0085] 8 is a left side view of a large facility installed on a load-bearing member according to an embodiment of the present invention;
[0086] FIG9 is a front view of a supporting jacket according to an embodiment of the present invention before being installed at a specific location on the seabed or at a centrally arranged pile foundation 33;
[0087] FIG10 is a top view of a supporting jacket according to an embodiment of the present invention before being installed at a specific location on the seabed or at a centrally arranged pile foundation 33;
[0088] FIG11 is a left side view of a supporting jacket according to an embodiment of the present invention installed on pile foundations 33 at specific locations on the seabed or arranged centrally.
[0089] The reference numerals indicate:
[0090] 1. Heavy-load carrying platform; 2. Large facilities; 10. Pontoon array; 20. Transfer structure; 21. Support jacket; 22. Large wind turbine; 31. Double-row jacket; 32. Centralized jacket; 33. Pile foundation; 101. Main pontoon; 102. Horizontal fixed structure; 103. Diagonal brace; 104. Horizontal support structure. DETAILED DESCRIPTION
[0091] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0092] As shown in FIG1 , in conjunction with an embodiment of the present invention, a method for transporting, positioning, and dismantling a large offshore facility is provided, comprising:
[0093] S101: Inject air into a plurality of main pontoons 101, and place the plurality of main pontoons 101 on the sea surface in front of the dock in a predetermined arrangement order to form a pontoon array 10; construct a heavy object carrying platform 1 by means of the pontoon array 10, and adjust the amount of air in the main pontoons 101 so that the upper surface of the heavy object carrying platform 1 is always kept in a horizontal state;
[0094] S102: Fix the large-scale facility 2 on the heavy-load bearing platform 1 in an assembled form or in the form of its various components; wherein the type of the large-scale facility 2 includes at least one of the following: a large building, an upper assembly or a supporting jacket 21; the upper assembly refers to a facility that appears above the sea surface, and the upper assembly includes at least one of the following: an oil and gas processing facility, a booster station, a converter station or a large wind turbine 22, and the large wind turbine 22 is a large-scale facility with a high center of gravity; the supporting jacket 21 is used to support the large building or the upper assembly; the height error of different points on the upper surface of the heavy-load bearing platform 1 is within a preset error range to avoid causing the large-scale facility 2 to overturn; under normal circumstances, the center of gravity of the large-scale facility 2 is eccentric, such as lateral drift, which causes the large-scale facility 2 to tilt and deviate from the vertical state. The center of gravity offset can be overcome by adjusting the buoyancy of the relevant main pontoon 101 to keep the building in a vertical state or the large-scale facility 2 in a horizontal state. Therefore, by individually controlling the buoyancy of each main pontoon 101, the overall attitude (height) of the pontoon array 10 can be controlled. This can overcome the eccentricity of the large-scale facility 2, ensuring that the heavy-load-bearing platform 1 remains horizontal, and guaranteeing the safe and high-quality construction of the large-scale facility 2. During the construction, installation, and securing of the large-scale facility 2 (including the equipment located therein), the center of gravity of the large-scale facility 2 may shift horizontally, causing it to tilt and deviate from its vertical position. By adjusting the buoyancy of each main pontoon 101, this problem caused by the center of gravity shift can be offset, maintaining the large-scale facility 2 in a vertical or horizontal position.
[0095] S103: transporting the large-scale facility 2 and the heavy-load carrying platform 1 at sea to a target location at sea;
[0096] S104: placing the large-scale facility 2 at a preset location of the target location; placing the large-scale facility 2 at the preset location of the target location specifically includes:
[0097] For the upper block, the upper block is put into place in the assembled form on the load-bearing part at the preset position, or according to the structural characteristics of the upper block, the various components of the upper block are put into place in sequence according to the assembly order; after the upper block is put into place, the heavy object bearing platform 1 is dragged away.
[0098] For the large building or the supporting jacket 21, the load-bearing parts at the preset positions are fixed on the heavy object carrying platform 1 to be positioned; after positioning, the heavy object carrying platform 1 is dragged away;
[0099] S105: When dismantling the large-scale facility 2, the large-scale facility 2 is fixed on the heavy-load carrying platform 1, and the large-scale facility 2 and the heavy-load carrying platform 1 are dragged away from the load-bearing parts at the preset positions; when dismantling the large-scale facility 2, the large-scale facility 2 is fixed on the heavy-load carrying platform 1, and the large-scale facility 2 and the heavy-load carrying platform 1 are dragged away from the load-bearing parts at the preset positions, specifically including:
[0100] For the upper assembly, the upper assembly is directly fixed on the heavy object bearing platform 1 in a fully assembled form; or, according to the structural characteristics of the upper assembly, the components of the upper assembly are separated in the reverse order of their placement, and fixed on the heavy object bearing platform 1 in the form of components or in a fully assembled form; the upper assembly and the heavy object bearing platform 1 are dragged away from the load-bearing member;
[0101] For the large building or the supporting jacket 21, the large building or the supporting jacket 21 is fixed on the large facility 2 in the form in which they are respectively in place; the large building and the heavy object carrying platform 1 are dragged away from the load-bearing part, or the supporting jacket 21 and the heavy object carrying platform 1 are dragged away from the load-bearing part.
[0102] The method uses a main pontoon 101 to construct a pontoon array 10 at sea in front of the dock, and then uses the pontoon array 10 to construct a heavy-duty carrying platform 1. Large-scale facilities 2 are assembled, fixed, and equipment is installed on the heavy-duty carrying platform 1. After installation, they can be directly transported. After arriving at the target location, the height of the large-scale facilities 2 is changed by adjusting the buoyancy. The method is simple and convenient to operate, with low difficulty and low cost. It avoids the difficult and expensive operation of the huge and overweight loads required for the traditional method of transferring from shore to ship. It solves the technical problem in the prior art that "additional configuration of lifting mechanisms and load adjustment devices is required, which is expensive and difficult to operate." It realizes the assembly, loading, transportation, lifting and installation of large-scale offshore facilities, especially in booster stations and converter stations for offshore wind power generation, which has broad application prospects and economic value.
[0103] During disassembly, the use of floating cranes and disassembly for transportation are avoided.
[0104] During the operation of the main pontoon 101 , the buoyancy of the main pontoon 101 can be adjusted as needed, thereby adjusting the height of the heavy object carrying platform 1 to adapt to changes in tide level and no longer being restricted by natural ocean conditions.
[0105] The schematic diagram of the installation or disassembly of a single component in a large building or upper block is shown in FIG2 .
[0106] Preferably, S104: placing the large-scale facility 2 at a preset location at the target location specifically includes:
[0107] When the large facility 2 is the large building or the upper assembly, the support member is a double-row jacket 31 with a spacing, and the large building or the upper assembly is finally installed on the double-row jacket 31 with a spacing, after the large building or the upper assembly and the heavy-load carrying platform 1 are transported to the target location at sea, the buoyancy of each of the main pontoons 101 is increased to raise the heavy-load carrying platform 1 so that each supported point at the bottom of the large building or the upper assembly is higher than the top of the double-row jacket 31; while raising the heavy-load carrying platform 1, the buoyancy of the main pontoons 101 is adjusted to keep the heavy-load carrying platform 1 and the large building in a horizontal state, or keep the heavy-load carrying platform 1 and the upper assembly in a horizontal state;
[0108] The heavy-load carrying platform 1 is towed between the double-row jackets 31 by using a tugboat and a positioning ship; therefore, the width of the heavy-load carrying platform 1 and the large facility 2 is smaller than the spacing between the double-row jackets 31 .
[0109] After aligning the supported points at the bottom of the large building or the upper module with the corresponding supporting points at the top of the double-row jacket rack 31, the buoyancy of the main pontoon 101 is gradually reduced so that the supported points at the bottom of the large building or the upper module are respectively supported on the corresponding supporting points at the top of the double-row jacket rack 31. Only then can the large facility 2 be placed on the double-row jacket rack 31, and the large facility 2 can be finally installed on the double-row jacket rack 31, thereby achieving the installation of the large facility 2 at sea. FIG2 can also be a schematic diagram of the arrangement of the large facility 2 and the heavy object carrying platform 1 installed on the double-row jacket rack 31 with a spacing therebetween.
[0110] After the weight of the large building or the upper assembly is completely transferred to the corresponding support point on the top of the double-row jacket 31, the buoyancy of the main pontoon 101 is further reduced so that the heavy object carrying platform 1 is completely separated from the bottom of the large building or the upper assembly;
[0111] The heavy-load carrying platform 1 is towed out from between the double-row jackets 31 by a tugboat, thereby completing the placement of the large building or the upper assembly.
[0112] In summary, during the above positioning process, the upper block is positioned on the load-bearing member (double-row jacket 31) at the preset position in a fully assembled manner, or the components of the upper block are positioned in sequence according to the assembly order based on the structural characteristics of the upper block; after positioning, the heavy object bearing platform 1 is towed away. For the large building, the upper block is positioned on the load-bearing member (double-row jacket 31) at the preset position in a manner that it is fixed to the heavy object bearing platform 1; after positioning, the heavy object bearing platform 1 is towed away.
[0113] S105: When dismantling the large facility 2, the large facility 2 is fixed on the heavy object carrying platform 1, and the large facility 2 and the heavy object carrying platform 1 are dragged away from the load-bearing parts at the preset position, specifically including:
[0114] For the large-scale building or the upper assembly, when dismantling the large-scale building or the upper assembly from the double-row jackets 31 with spacing, a tugboat and a positioning ship are used to tow the heavy-object carrying platform 1 between the double-row jackets 31;
[0115] After the heavy object carrying platform 1 is in a fixed position at the bottom of the large building or the upper assembly, the buoyancy of the main pontoon 101 is gradually increased so that the heavy object carrying platform 1 is gradually raised to the bottom of the large building or the upper assembly and contacts the bottom of the large building or the upper assembly;
[0116] Continue to increase the buoyancy of the main buoyancy tank 101 until each supported point at the bottom of the large building or the upper module is separated from the corresponding supporting point at the top of the double-row jacket 31;
[0117] After the weight of the large building or the upper assembly is completely transferred to the heavy-load carrying platform 1, a tugboat is used to tow the heavy-load carrying platform 1 out from between the double-row jackets, or a tugboat is used to tow the heavy-load carrying platform 1 and the large building or the upper assembly out from between the double-row jackets; thus, the demolition of the large building or the upper assembly is completed.
[0118] For the upper assembly, the upper assembly is directly fixed on the heavy-load bearing platform 1 in an assembled form; or according to the structural characteristics of the upper assembly, the components of the upper assembly are separated in sequence in the reverse order of their placement, and fixed on the heavy-load bearing platform 1 in the form of their respective components or in an assembled form; the upper assembly and the heavy-load bearing platform 1 are dragged away from the load-bearing member; for the large building, the large building is fixed on the large facility 2 in the form when it is in place; the large building and the heavy-load bearing platform 1 are dragged away from the load-bearing member.
[0119] Preferably, S104: placing the large-scale facility 2 at a preset location at the target location specifically includes:
[0120] 3, 4 and 5. When the supporting member is a centralized jacket 32 and the large-scale facility 2 is finally installed on the centralized jacket 32, after the large-scale facility 2 and the heavy-load carrying platform 1 are transported to the target location at sea, the buoyancy of each of the main pontoons 101 is increased to raise the heavy-load carrying platform 1, so that each supported point at the bottom of the large-scale facility 2 is higher than the top of the centralized jacket 32, so that the large-scale facility 2 is conveniently located on the centralized jacket 32; while raising the heavy-load carrying platform 1, the buoyancy of the main pontoons 101 is adjusted to keep the heavy-load carrying platform 1 in a horizontal state; wherein, for the centralized jacket 32, the heavy-load transfer platform 1 is arranged in double rows, and the double rows of the heavy-load transfer platforms 1 are connected by a transverse fixed structure 102; or, the heavy-load transfer platform 1 is arranged in a U shape;
[0121] The double rows of heavy-load carrying platforms 1 are towed to the outside of the centralized jacket 32 by using a tugboat and a positioning ship.
[0122] After aligning the supported points at the bottom of the large-scale facility 2 with the corresponding supporting points at the top of the centralized jacket 32, the buoyancy of the main pontoon 101 is gradually reduced so that the supported points of the large-scale facility 2 are respectively supported on the corresponding supporting points at the top of the centralized jacket 32; only then can the large-scale facility 2 be placed on the centralized jacket 32, and finally the large-scale facility 2 is installed on the centralized jacket 32, thus achieving the installation of the large-scale facility 2 at sea.
[0123] After the weight of the large facility 2 is completely transferred to the corresponding support point on the top of the centralized jacket 32, the buoyancy of the main pontoon 101 is further reduced so that the heavy object carrying platform 1 is completely separated from the bottom of the large facility 2;
[0124] The heavy-load carrying platform 1 is towed out by a tugboat, thereby completing the placement of the large-scale facility 2 .
[0125] During the above positioning process, the upper block is positioned on the pre-positioned load-bearing member (centralized jacket 32) in a pre-assembled manner, or the components of the upper block are positioned sequentially in the assembly order according to the structural characteristics of the upper block; after positioning, the heavy object bearing platform 1 is towed away. For large buildings, the upper block is positioned on the pre-positioned load-bearing member (centralized jacket 32) by being fixed to the heavy object bearing platform 1; after positioning, the heavy object bearing platform 1 is towed away.
[0126] S105: When disassembling the large facility 2 (including the upper assembly or the supporting jacket 21), the large facility 2 is fixed on the heavy object carrying platform 1, and the large facility 2 and the heavy object carrying platform 1 are dragged away from the load-bearing parts at the preset position, specifically including:
[0127] When the large facility 2 is removed from the centralized jacket 32 , a tugboat and a positioning ship are used to tow the heavy-load carrying platform 1 to the outside of the centralized jacket 32 ;
[0128] After the heavy object carrying platform 1 is in a fixed position at the bottom of the large facility 2, the buoyancy of the main pontoon 101 is gradually increased, so that the heavy object carrying platform 1 is gradually raised to the bottom of the large facility 2 and contacts the bottom of the large facility 2;
[0129] Continue to increase the buoyancy of the main pontoon 101 until each supported point at the bottom of the large facility 2 is separated from the corresponding supporting point at the top of the centralized jacket 32;
[0130] After the weight of the large facility 2 is completely transferred to the heavy object carrying platform 1 , a tugboat is used to tow the heavy object carrying platform 1 and the large facility 2 away from the centralized jacket 32 , thereby completing the dismantling of the large facility 2 .
[0131] In summary, for the upper assembly, the upper assembly is directly fixed to the heavy-load carrying platform 1 in a fully assembled form; or, based on the structural characteristics of the upper assembly, the components of the upper assembly are separated in the reverse order of their placement, and fixed to the heavy-load carrying platform 1 in the form of individual components or in a fully assembled form; the upper assembly and the heavy-load carrying platform 1 are then dragged away from the load-bearing member. For the large building, the large building is fixed to the large facility 2 in the form in which it was placed; the large building and the heavy-load carrying platform 1 are then dragged away from the load-bearing member.
[0132] Preferably, S104: placing the large-scale facility 2 at a preset location at the target location specifically includes:
[0133] 9 , 10 and 11 , when the large-scale facility 2 and the heavy-load carrying platform 1 installed on a specific position on the seabed or on a centrally arranged pile foundation 33 are shown. When the large-scale facility 2 is the supporting jacket 21, the supporting member is the pile foundation 33 at a specific position on the seabed or on a centrally arranged pile foundation 33, and the supporting jacket 21 is finally installed on a specific position on the seabed or on a centrally arranged pile foundation 33, after the supporting jacket 21 and the heavy-load carrying platform 1 are transported to the target location at sea, the buoyancy of each of the main pontoons 101 is reduced, the heavy-load carrying platform 1 and the supporting jacket 21 are reduced, and the heavy-load carrying platform 1 is switched to a diving working mode; while lowering the heavy-load carrying platform 1 and the supporting jacket 21, the buoyancy of the main pontoon 101 is adjusted to keep the heavy-load carrying platform 1 and the supporting jacket 21 in a horizontal state;
[0134] When the distance between the supported point at the bottom of the supporting jacket 21 and the specific position of the seabed or the top of the pile foundation 33 is within a preset distance range, the buoyancy of the main pontoon 101 is increased to place the weight-bearing platform 1 and the supporting jacket 21 in a zero-gravity state, and to keep the heights of the weight-bearing platform 1 and the supporting jacket 21 unchanged; only then can the supporting jacket 21 be seated at the specific position of the seabed or on the pile foundation 33, and the supporting jacket 21 can be finally installed at the specific position of the seabed or on the pile foundation 33, thereby realizing the installation of the supporting jacket 21 at sea.
[0135] The heavy-load carrying platform 1 is moved horizontally by a tugboat and a positioning vessel. When the supported point at the bottom of the supporting jacket 21 is aligned with a specific position on the seabed or the supporting point of the pile foundation 33, the buoyancy of the main pontoon 101 is gradually reduced.
[0136] After the weight of the supporting jacket 21 is completely transferred to a specific position on the seabed or the supporting point of the pile foundation 33, the buoyancy of the main pontoon 101 is further reduced so that the heavy-load carrying platform 1 is completely separated from the supporting jacket 21; the heavy-load carrying platform 1 is towed out by a tugboat to complete the positioning of the supporting jacket 21; the installed supporting jacket 21 is used to support upper modules or large buildings.
[0137] In the above positioning process, the load-bearing member at the preset position (a specific position on the seabed or the pile foundation 33) is positioned in the form of being fixed on the heavy object carrying platform 1; after positioning is completed, the heavy object carrying platform 1 is dragged away.
[0138] S105: When dismantling the large facility 2, the large facility 2 is fixed on the heavy object carrying platform 1, and the large facility 2 and the heavy object carrying platform 1 are dragged away from the load-bearing parts at the preset position, specifically including:
[0139] When removing the supporting jacket 21 from a specific location on the seabed or the pile foundation 33, a tugboat and a positioning vessel are used to tow the heavy-load carrying platform 1 to a specific location on the seabed or outside the pile foundation 33;
[0140] After the heavy object carrying platform 1 is in the fixed position of the supporting jacket 21, the buoyancy of the main buoyancy tank 101 is gradually increased, so that the heavy object carrying platform 1 is gradually raised to the fixed position of the supporting jacket 21 and contacts the fixed position of the supporting jacket 21;
[0141] Continue to increase the buoyancy of the main buoyancy tank 101 until each supported point at the bottom of the supporting jacket 21 is separated from a specific position on the seabed or a supporting point of the pile foundation 33;
[0142] After the weight of the supporting jacket 21 is completely transferred to the heavy-load platform 1 , a tugboat is used to tow the heavy-load platform 1 and the supporting jacket 21 away from a specific location on the seabed or the pile foundation 33 , thereby completing the removal of the supporting jacket 21 .
[0143] During the process of dismantling the supporting jacket 21 , the supporting jacket 21 is fixed to the large facility 2 in the same manner as when it was in place; and the supporting jacket 21 and the heavy object bearing platform 1 are dragged away from the load-bearing member.
[0144] Preferably, the plurality of main pontoons 101 are placed on the sea surface in front of the dock in a preset arrangement order to form a pontoon array 10. After adding the transfer structure 20, a heavy object carrying platform 1 is formed, which specifically includes:
[0145] When the large facility 2 is a large wind turbine 22, two groups of the heavy object carrying platforms 1 are used. The two groups of the heavy object carrying platforms 1 are symmetrically arranged, and there is a distance between the two groups of the heavy object carrying platforms 1.
[0146] Along the end of the length direction of the heavy object transfer platform 1, a transverse fixing structure 102 connecting the two groups of the heavy object transfer platforms 1 is provided between two adjacent rows of the heavy object transfer platforms 1. The transverse fixing structure 102 is provided in multiple groups.
[0147] The step of fixing the large-scale facility 2 on the heavy-object carrying platform 1 in an assembled form or in the form of its components specifically includes:
[0148] When the large facility 2 is a large fan 22, the large fan 22 is suspended in the gap formed by the distance between the two sets of heavy object bearing platforms; the layout diagrams of the large facility 2 and the large fan 22 installed on the load-bearing parts are shown in Figures 6, 7 and 8.
[0149] Because the large fan 22 is a high-center-of-gravity device, it is necessary to connect the first end of each diagonal support rod 103 to the heavy-object carrying platform 1, and connect the second end of each diagonal support rod 103 to the large fan 22 to ensure the stability of the large fan 22; wherein, the second ends of a preset number of the diagonal support rods 103 are connected to a position above the center of gravity of the large fan 22 to ensure that the large fan 22 will not tilt.
[0150] Two adjacent diagonal braces 103 are connected by a horizontal support structure 104. The horizontal support structure 104 and the diagonal braces 103 jointly secure the large wind turbine 22, ensuring its stability. This solves the problem of "conventional floating methods, which pose a significant stability issue for facilities with a high center of gravity, such as large wind turbines, during transportation."
[0151] After the large wind turbines 22 are in place, the horizontal support structure 104 is removed, as are the connectors between the diagonal braces 103 and the large wind turbines 22. Specifically, after the large wind turbines 22 are in place, the horizontal support structure 104 is removed to facilitate the exit of the entire pontoon array 10 (i.e., the load-bearing platform 1). Simultaneously, the connectors between the diagonal braces 103 and the large wind turbines 22 are removed, allowing the diagonal braces 103 and the pontoon array 10 (i.e., the load-bearing platform 1) to exit together.
[0152] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0153] During the use of the main buoyancy tank 101, when the waves reach a specified level, the inlet and outlet valves provided on the main buoyancy tank 101 are closed, so that the main buoyancy tank 101 with the inlet and outlet valves closed works as a watertight compartment, and the water in the main buoyancy tank 101 with the inlet and outlet valves closed becomes ballast water; or
[0154] For the main pontoon 101, by controlling the opening size of the water inlet and outlet valves, the speed of seawater entering and leaving the main pontoon 101 during the swinging process of the main pontoon 101 is controlled to suppress the swaying of the heavy object carrying platform 1 according to the natural period of the waves; or
[0155] For the main pontoon 101, remove the lower bottom cover of the main pontoon 101 to allow seawater to freely flow in and out of the main pontoon 101, thereby suppressing the swaying of the heavy object carrying platform 1 caused by waves; or
[0156] With respect to the main pontoon 101 , by increasing or decreasing the air pressure in the main pontoon 101 , the stability of the pontoon array 10 is maintained within a preset range, thereby suppressing the swaying of the heavy object carrying platform 1 caused by waves.
[0157] The large-scale facility 2 is fixed on the heavy-load carrying platform 1, and the transportation, installation, or removal of the large-scale facility 2 can adapt to the changes in the tide level and is not restricted by the tide level or the swaying of the waves, so there will be no delay. No additional lifting mechanism or load adjustment device is required, the cost is low, and the operation difficulty is greatly reduced.
[0158] If an additional balancing buoyancy tank is used, the buoyancy of the additional balancing buoyancy tank can be adjusted when necessary while adjusting the buoyancy of the main buoyancy tank 101 .
[0159] Preferably, the heavy-load carrying platform 1 further includes a transfer structure 20; the transfer structure 20 is uniformly filled with inflatable capsules or a closed body composed of a lightweight material having a density less than that of seawater. Alternatively, the transfer structure 20 may be formed of sealed hollow structural members, such as steel pipes, with sealed ends.
[0160] The method for transporting, positioning and dismantling large offshore facilities further includes:
[0161] The transfer structure 20 is arranged on the upper surface of the main pontoon 101 of the pontoon array 10, and a heavy object carrying platform 1 is formed by the transfer structure 20 and the pontoon array 10; the transfer structure 20 is arranged under the large facility 2, so that the power of the large facility 2 can be evenly transferred to the pontoon array 10 located at the lower layer of the transfer structure 20, and the buoyancy force of the pontoon array 10 is fully utilized to lift the large facility 2.
[0162] If the main pontoon 101 fails and cannot provide support, the inflatable capsules or the enclosed body or sealed hollow structure composed of the lightweight material within the transfer structure 20 will provide buoyancy, keeping the upper surface of the heavy-load carrying platform 1 level and providing corresponding support for the large-scale facility 2, thereby preventing the heavy-load carrying platform 1 and the large-scale facility 2 from sinking. In other words, by providing additional buoyancy to the inflatable capsules or the enclosed body composed of the lightweight material within the transfer structure 20, a new buoyancy balance is established with the intact main pontoon 101, and the platform and the intact main pontoon 101 jointly support the large-scale facility 2. This maintains the upper surface of the heavy-load carrying platform 1 level and provides corresponding support for the large-scale facility 2.
[0163] During the construction and installation of a large-scale facility 2 (including the equipment located therein) on the load-carrying platform 1, the center of gravity of the large-scale facility 2 may shift horizontally, causing the transfer structure 20 to lose its horizontal position, leading to quality and safety issues during the construction process. By adjusting the buoyancy of each main pontoon 101, the problem caused by the center of gravity shift can be offset, and the load-carrying structure 20 can be kept horizontal.
[0164] The heavy-load carrying platform 1, constructed using a pontoon array 10, can be raised or lowered by controlling the air pressure by injecting or releasing air from the main pontoon 101. The pontoon array 10 can work in conjunction with the transfer structure 20, or it can directly and evenly contact the bottom of the large facility 2.
[0165] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0166] During the use of the main pontoon 101, the height of the heavy object carrying platform 1 is adjusted by controlling the buoyancy of each main pontoon 101 to raise and lower the heavy object carrying platform 1 as needed. For example, when the waves reach a specified level, they have the same swing period as the waves. If an additional balancing pontoon is used, while controlling the buoyancy of the main pontoon 101, the buoyancy of the additional balancing pontoon can be controlled synchronously when necessary.
[0167] Furthermore, as needed, the upper surface of the heavy-load carrying platform 1 is maintained horizontally by controlling the buoyancy of each of the main pontoons 101 (if additional balancing pontoons are used, the buoyancy of the main pontoons 101 is controlled while, if necessary, the buoyancy of the additional balancing pontoons is controlled simultaneously with the buoyancy of the main pontoons 101), i.e., the height error at different points on the upper surface is within a preset error range, thereby preventing the large-scale facility 2 from tipping over. Typically, the center of gravity of the large-scale facility 2 is eccentric, such as when it drifts laterally, causing the large-scale facility 2 to tilt and deviate from a vertical state. This center of gravity offset can be overcome by adjusting the buoyancy of the relevant main pontoons 101, thereby maintaining the building in a vertical state or the large-scale facility 2 in a horizontal state. Therefore, by individually controlling the buoyancy of each main pontoon 101, the overall attitude (height) of the pontoon array 10 is controlled, overcoming the eccentricity of the large-scale facility 2, ensuring that the heavy-load carrying platform 1 is horizontal, and guaranteeing the safety and quality of the construction of the large-scale facility 2 thereon. During the construction and installation of the large-scale facility 2 (including the equipment located therein), the center of gravity of the large-scale facility 2 may shift horizontally, causing the large-scale facility 2 to tilt and deviate from its vertical position. By adjusting the buoyancy of each main pontoon 101, the problem caused by the center of gravity shift can be offset, and the building can be kept in a vertical or horizontal position.
[0168] During the entire process of dismantling the large-scale facility 2, the height of the heavy-load carrying platform 1 is adjusted by controlling the buoyancy of each of the main pontoons 101 to raise or lower the heavy-load carrying platform 1 as needed. If additional balancing pontoons are used, the buoyancy of the main pontoons 101 is controlled simultaneously with the buoyancy of the additional balancing pontoons, if necessary. Furthermore, the buoyancy of each of the main pontoons 101 is controlled simultaneously with the buoyancy of the additional balancing pontoons, if necessary, to maintain the upper surface of the heavy-load carrying platform 1 in a horizontal state. That is, the height error at different points on the upper surface is within a preset error range, preventing the large-scale facility 2 from tipping over. Typically, the center of gravity of the large-scale facility 2 is eccentric, such as lateral drift, causing the large-scale facility 2 to tilt and deviate from a vertical position. By adjusting the buoyancy of the relevant main pontoons 101, the center of gravity offset can be overcome, maintaining the building in a vertical position or the large-scale facility 2 in a horizontal position. Therefore, by individually controlling the buoyancy of each main pontoon 101, the overall attitude (height) of the pontoon array 10 can be controlled, which can overcome the eccentricity of the large-scale facility 2, ensure that the heavy-load bearing platform 1 is in a horizontal state, and ensure the safety and quality of the construction of the large-scale facility 2 thereon.
[0169] Preferably, the fixing of the large-scale facility 2 on the heavy-object carrying platform 1 in a fully assembled form or in the form of its components specifically includes:
[0170] For the large-scale facility 2 that needs to be constructed on the heavy-load carrying platform 1, the large-scale facility 2 is first constructed on the upper surface of the heavy-load carrying platform 1, and then the large-scale facility 2 is fixedly connected to the heavy-load carrying platform 1. During the construction of the large-scale facility 2, the amount of air in the main pontoon 101 is adjusted so that the height difference between the upper surface of the heavy-load carrying platform 1 and the dock is within a preset range, and the heavy-load carrying platform 1 is always kept in a horizontal state. This facilitates the installation of building materials for the large-scale facility 2, and also facilitates the transportation and installation of equipment. If an additional balancing pontoon is used, the buoyancy of the additional balancing pontoon is adjusted when necessary while adjusting the buoyancy of the main pontoon 101.
[0171] For large facilities 2 that do not need to be built on the heavy-load platform 1, they are directly fixed to the heavy-load platform 1 via a connecting structure. During the transfer of the large facilities 2 to the heavy-load platform 1, the air volume within the main pontoon 101 is adjusted to ensure that the height difference between the upper surface of the heavy-load platform 1 and the dock is within a preset range, and the heavy-load platform 1 is always kept horizontal. If additional balancing pontoons are used, the buoyancy of the main pontoon 101 is adjusted, and if necessary, the buoyancy of the additional balancing pontoons is also adjusted when necessary.
[0172] Preferably, the method for transporting, positioning and dismantling large offshore facilities further comprises:
[0173] When the large-scale facility 2 is finally installed on the double-row jacket 31, the layout of the load-bearing platform 1 includes a centralized array layout, a T-shaped layout, or a cross-shaped layout. The T-shaped layout or cross-shaped layout means that the pontoon array 10 includes at least one row of main pontoons 101; additional balancing pontoons are connected to both sides of the ends of the main pontoon 101 row in the longitudinal direction; and the transfer structure 20 is extended above the additional balancing pontoons so that the transfer structure 20 and the pontoon array 10 work together. This can prevent the overall center of gravity from being too high and causing overturning. The lower bottom surface of the additional balancing pontoon includes a lower bottom cover with an inlet and outlet, or the lower bottom surface does not include a lower bottom cover. Seawater can enter the additional balancing pontoon, facilitating rapid adjustment of the buoyancy of the additional balancing pontoon. The horizontal projections of the main pontoons 101 and the additional balancing pontoons can be any shape, set according to the material and process, for easy production.
[0174] When the large-scale facility 2 is finally installed on the centralized jacket 32, the heavy-load carrying platform 1 can be arranged in two rows or in a U-shape. When the main pontoons 101 are arranged in two rows, the two rows are connected by a transverse fixing structure 102. When the double-row arrangement is used, the heavy-load carrying platform 1 is towed to the outside of the centralized jacket 32 during installation or removal. When the U-shape arrangement is used, the centralized jacket 32 is inserted into the U-shaped interior through the U-shaped opening during installation or removal.
[0175] When the large-scale facility 2 is finally installed on a specific location on the seabed or on a pile foundation 33 arranged centrally on the seabed, the arrangement of the heavy-load bearing platform 1 includes a double-row arrangement or a U-shaped arrangement, both of which can be used to transport and put the supporting jacket 21 and the heavy-load bearing platform 1 into position. After being transported to the target location at sea, the buoyancy of each of the main pontoons 101 is reduced to lower the heavy-load bearing platform 1 and the supporting jacket 21, and the heavy-load bearing platform 1 is switched to a diving working mode; while lowering the heavy-load bearing platform 1 and the supporting jacket 21, the buoyancy of the main pontoon 101 is adjusted to keep the heavy-load bearing platform 1 and the supporting jacket 21 in a horizontal state; when the distance between the supported point at the bottom of the supporting jacket 21 and the specific location on the seabed or the top of the pile foundation 33 is within a preset distance range, the buoyancy of the main pontoon 101 is increased to make the heavy-load bearing platform 1 and the supporting jacket 21 in zero gravity. state, keeping the heights of the heavy-load bearing platform 1 and the supporting jacket 21 unchanged; using a tugboat and a positioning ship to horizontally move the heavy-load bearing platform 1, and when the supported point at the bottom of the supporting jacket 21 is aligned with the specific position of the seabed or the supporting point of the pile foundation 33, gradually reducing the buoyancy of the main pontoon 101; after the weight of the supporting jacket 21 is completely transferred to the specific position of the seabed or the supporting point of the pile foundation 33, continuing to reduce the buoyancy of the main pontoon 101, so that the heavy-load bearing platform 1 is completely separated from the supporting jacket 21; using a tugboat to tow out the heavy-load bearing platform 1, completing the positioning of the supporting jacket 21.
[0176] Preferably, before transporting the large facility 2 and the heavy-load carrying platform 1, the buoyancy of each main pontoon 101 is reduced by adjusting the amount of air in each main pontoon 101, thereby lowering the center of gravity of the large facility 2. Since the buoyancy of the main pontoon 101 is easy to adjust, the center of gravity of the large facility 2 can be lowered by appropriately reducing the buoyancy of the main pontoon 101 during the transfer of the large facility 2 from the dock to the target location, ensuring a more stable transportation process. If additional balancing pontoons are used, the buoyancy of each main pontoon 101 can be adjusted as necessary. At the same time, the upper surface of the heavy-load carrying platform 1 is always kept horizontal to prevent the heavy-load carrying platform 1 from tipping over and causing the large facility 2 to tip over.
[0177] In summary, the embodiment of the present invention is a method for transporting, positioning, and dismantling large offshore facilities by adjusting buoyancy for self-elevation. This method can solve the high difficulty and high cost of constructing, transporting, positioning, and dismantling large offshore facilities in the prior art. The type of the large facility 2 includes at least one of the following: a large building, an upper assembly, or a supporting jacket 21; the upper assembly refers to a facility that appears above the sea surface, and the upper assembly includes at least one of the following: an oil and gas processing facility, a booster station, a converter station, or a large wind turbine 22. The large wind turbine 22 is a large facility with a high center of gravity; the supporting jacket 21 is used to support the large building or the upper assembly;
[0178] The heavy-load carrying platform 1 in this method includes a pontoon array 10 and a transfer structure 20 arranged on the pontoon array 10. By adjusting the buoyancy of each pontoon (including the main pontoon 101 and the additional balancing pontoon) or part of the pontoons (including the main pontoon 101 and the additional balancing pontoon), the height of the heavy-load carrying platform 1 can be raised or lowered as a whole, which can ensure that the center of gravity of the large-scale facility 2 is low during transportation, and it is easy to realize lifting and lowering operations during installation and disassembly. The pontoon array 10 can also be used as a construction platform for the large-scale facility 2, saving the cost of transferring from the shore to the ship. The pontoon array 10 can also realize submersible operations, which will also bring major changes to the installation of underwater equipment, such as the support conductor frame 21. The equipment is simple and easy to operate. The technical and economic value of this method and equipment is extremely high.
[0179] A method for constructing, transporting, positioning, and dismantling a large offshore facility according to an embodiment of the present invention includes the following steps:
[0180] 1. Assembly platform
[0181] Air is injected into a plurality of main pontoons 101, and the plurality of main pontoons 101 are placed on the sea surface in front of the dock in a preset arrangement order to form a pontoon array 10; a heavy-load carrying platform 1 is constructed by the pontoon array 10, and the amount of air in the main pontoons 101 is adjusted so that the upper surface of the heavy-load carrying platform 1 is always kept horizontal; and in each process of construction, transportation, placement and dismantling, the entire array of pontoons can be raised and lowered by buoyancy control to adjust the attitude (height) and maintain a horizontal state.
[0182] 2. Fixed large facilities
[0183] For a large-scale facility 2 constructed or directly supported on the upper surface of the heavy-load carrying platform 1, the large-scale facility 2 is constructed or directly supported on the upper surface of the heavy-load carrying platform 1 and connected to the heavy-load carrying platform 1. During the construction or direct support of the large-scale facility 2, the air volume within the main pontoon 101 is adjusted to ensure that the height difference between the upper surface of the heavy-load carrying platform 1 and the dock is within a preset range, and the heavy-load carrying platform 1 is always kept horizontal. A single or multiple sets of heavy-load carrying platforms 1 can be used. A single set of heavy-load carrying platforms 1 can be arranged in a centralized, T-shaped, or cross-shaped arrangement; multiple sets of heavy-load carrying platforms 1 can be arranged in a double row, U-shaped, or other arrangement, with the large-scale facility 2 secured to each heavy-load carrying platform 1 via a connecting structure. During the transfer of the large-scale facility 2 to the heavy-load carrying platform 1, the air volume within the main pontoon 101 is adjusted to ensure that the height difference between the upper surface of the heavy-load carrying platform 1 and the dock is within a preset range, and the heavy-load carrying platform 1 is always kept horizontal.
[0184] 3. Transportation
[0185] The large-scale facility 2 connected to the heavy-load carrying platform 1 is transported as a whole at sea together with the heavy-load carrying platform 1; and the large-scale facility 2 is transported to a target location at sea (ocean, including the seabed).
[0186] 4. Positioning and disassembly
[0187] The large-scale facility 2 is positioned at a preset location at the target location; wherein:
[0188] For the upper assembly, the upper assembly is placed in place on the load-bearing member at the preset position in a completely assembled form, or the components of the upper assembly are placed in place in sequence according to the assembly order according to the structural characteristics of the upper assembly; after the upper assembly is placed in place, the heavy object bearing platform 1 is dragged away;
[0189] For the large building or the supporting jacket 21, the load-bearing parts at the preset positions are fixed on the heavy object carrying platform 1 to be positioned; after positioning, the heavy object carrying platform 1 is dragged away;
[0190] When dismantling the large facility 2, the large facility 2 is fixed on the heavy object carrying platform 1, and the large facility 2 and the heavy object carrying platform 1 are dragged away from the load-bearing parts in the preset position; wherein:
[0191] For the upper assembly, the upper assembly is directly fixed on the heavy object bearing platform 1 in a fully assembled form; or, according to the structural characteristics of the upper assembly, the components of the upper assembly are separated in the reverse order of their placement, and fixed on the heavy object bearing platform 1 in the form of components or in a fully assembled form; the upper assembly and the heavy object bearing platform 1 are dragged away from the load-bearing member;
[0192] For the large building or the supporting jacket 21, the large building or the supporting jacket 21 is fixed on the large facility 2 in the form in which they are respectively in place; the large building and the heavy object carrying platform 1 are dragged away from the load-bearing part, or the supporting jacket 21 and the heavy object carrying platform 1 are dragged away from the load-bearing part.
[0193] It should be understood that the specific order or hierarchy of steps in the disclosed processes is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of the present disclosure. The accompanying method claims present elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.
[0194] In the foregoing detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that embodiments of the claimed subject matter require more features than are expressly recited in each claim. On the contrary, as reflected in the appended claims, the invention comprises less than all the features of any individual disclosed embodiment. The appended claims are hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.
[0195] The above description of the disclosed embodiments is intended to enable any person skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other embodiments without departing from the spirit and scope of the present disclosure. Therefore, the present disclosure is not limited to the embodiments presented herein but is intended to be accorded the widest scope consistent with the principles and novel features disclosed herein.
[0196] The foregoing description includes examples of one or more embodiments. Of course, it is not possible to describe all possible combinations of components or methods for the purposes of describing the above embodiments, but one of ordinary skill in the art will recognize that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to encompass all such changes, modifications and variations that fall within the scope of the appended claims. Furthermore, to the extent the term "comprising" is used in the specification or claims, the term is intended to be encompassed in a manner similar to the term "including," as explained in terms of "including," used as a transitional word in the claims. Furthermore, any use of the term "or" in the specification of the claims is intended to mean a "non-exclusive or."
[0197] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for transporting, positioning and dismantling large offshore facilities, characterized in that: include: Air is injected into a plurality of main pontoons (101), and the plurality of main pontoons (101) are placed on the sea surface in front of the dock in a preset arrangement order to form a pontoon array (10); a heavy object bearing platform (1) is constructed by the pontoon array (10), and the amount of air in the main pontoons (101) is adjusted so that the upper surface of the heavy object bearing platform (1) is always kept in a horizontal state; The large-scale facility (2) is fixed on the heavy-object bearing platform (1) in an assembled form or in the form of its various components; wherein the type of the large-scale facility (2) includes at least one of the following: a large-scale building, an upper block or a supporting jacket (21); the upper block refers to a facility that appears above the sea surface, and the upper block includes at least one of the following: an oil and gas processing facility, a booster station, a converter station or a large-scale wind turbine (22), and the large-scale wind turbine (22) is a large-scale facility with a high center of gravity; the supporting jacket (21) is used to support the large-scale building or the upper block; Transporting the large-scale facility (2) and the heavy-load carrying platform (1) at sea, and transporting the large-scale facility (2) and the heavy-load carrying platform (1) to a target location at sea; Placing the large-scale facility (2) at a preset position of the target location; Placing the large-scale facility (2) at a preset position of the target location specifically comprises: For the upper assembly block, the upper assembly block is put in place on the load-bearing member at the preset position in a fully assembled form, or the components of the upper assembly block are put in place in sequence according to the assembly sequence according to the structural characteristics of the upper assembly block; after the upper assembly block is put in place, the heavy object bearing platform (1) is dragged away; For the large building or the supporting pipe frame (21), the load-bearing parts at the preset positions are positioned in the form of being fixed to the heavy object bearing platform (1); after positioning, the heavy object bearing platform (1) is towed away; When dismantling the large-scale facility (2), the large-scale facility (2) is fixed on the heavy-object bearing platform (1), and the large-scale facility (2) and the heavy-object bearing platform (1) are dragged away from the load-bearing parts at the preset position; when dismantling the large-scale facility (2), the large-scale facility (2) is fixed on the heavy-object bearing platform (1), and the large-scale facility (2) and the heavy-object bearing platform (1) are dragged away from the load-bearing parts at the preset position, specifically comprising: For the upper block, the upper block is directly fixed on the heavy object bearing platform (1) in a fully assembled form; or, according to the structural characteristics of the upper block, the components of the upper block are separated in sequence in the reverse order of their being in place, and fixed on the heavy object bearing platform (1) in the form of components or in a fully assembled form; the upper block and the heavy object bearing platform (1) are dragged away from the load-bearing member; With respect to the large-scale building or the supporting conduit frame (21), the large-scale building or the supporting conduit frame (21) is fixed on the large-scale facility (2) in the form in which each is in place; the large-scale building and the heavy-object bearing platform (1) are dragged away from the load-bearing member, or the supporting conduit frame (21) and the heavy-object bearing platform (1) are dragged away from the load-bearing member.
2. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: The placing of the large-scale facility (2) at a preset position of the target location specifically comprises: When the large facility (2) is the large building or the upper assembly, the support is a double-row duct frame (31) with a spacing, and the large building or the upper assembly is finally installed on the double-row duct frame (31) with a spacing, after the large building or the upper assembly and the heavy object bearing platform (1) are transported to the target location at sea, the buoyancy of each of the main pontoons (101) is increased to raise the heavy object bearing platform (1), so that each supported point at the bottom of the large building or the upper assembly is higher than the top of the double-row duct frame (31); while raising the heavy object bearing platform (1), the buoyancy of the main pontoons (101) is adjusted to keep the heavy object bearing platform (1) and the large building in a horizontal state, or keep the heavy object bearing platform (1) and the upper assembly in a horizontal state; Using a tugboat and a positioning ship to tow the heavy object bearing platform (1) between the double-row conductor racks (31); After aligning the supported points at the bottom of the large building or the upper block with the corresponding supporting points at the top of the double-row duct rack (31), gradually reducing the buoyancy of the main buoyancy tank (101), so that the supported points at the bottom of the large building or the upper block are respectively supported on the corresponding supporting points at the top of the double-row duct rack (31); After the weight of the large building or the upper assembly is completely transferred to the corresponding supporting point on the top of the double-row conductor pipe rack (31), the buoyancy of the main pontoon (101) is further reduced, so that the heavy object bearing platform (1) is completely separated from the bottom of the large building or the upper assembly; Using a tugboat to tow the heavy object bearing platform (1) out from between the double-row conductor pipe racks (31), thereby completing the placement of the large-scale building or the upper assembly; When disassembling the large-scale facility (2), the large-scale facility (2) is fixed on the heavy-object bearing platform (1), and the large-scale facility (2) and the heavy-object bearing platform (1) are dragged away from the load-bearing parts at a preset position, specifically comprising: For the large-scale building or the upper assembly, when the large-scale building or the upper assembly is removed from the double-row jackets (31) with a spacing, a tugboat and a positioning ship are used to tow the heavy-object carrying platform (1) between the double-row jackets (31); When the heavy object bearing platform (1) is in a fixed position at the bottom of the large building or the upper block Then, gradually increase the buoyancy of the main buoyancy box (101), so that the heavy object bearing platform (1) gradually rises to the bottom of the large building or the upper block and contacts the bottom of the large building or the upper block; Continue to increase the buoyancy of the main buoyancy box (101) until each supported point at the bottom of the large building or the upper assembly is separated from the corresponding supporting point at the top of the double-row conductor pipe rack (31); After the weight of the large building or the upper assembly is completely transferred to the heavy object bearing platform (1), a tugboat is used to tow the heavy object bearing platform (1) and the large building out from between the double-row conductor racks, or a tugboat is used to tow the heavy object bearing platform (1) and the upper assembly out from between the double-row conductor racks; thus, the demolition of the large building or the upper assembly is completed.
3. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: The placing of the large-scale facility (2) at a preset position of the target location specifically comprises: When the support member is a centralized conductor frame (32), and the large-scale facility (2) is finally installed on the centralized conductor frame (32) arranged in a centralized manner, after the large-scale facility (2) and the heavy-load bearing platform (1) are transported to a target location at sea, the buoyancy of each of the main pontoons (101) is increased to raise the heavy-load bearing platform (1), so that each supported point at the bottom of the large-scale facility (2) is higher than the top of the centralized conductor frame (32); while raising the heavy-load bearing platform (1), the buoyancy of the main pontoons (101) is adjusted to keep the heavy-load bearing platform (1) in a horizontal state; Using a tugboat and a positioning ship to tow the heavy-object carrying platform (1) to the outside of the centralized conductor frame (32); After aligning the supported points at the bottom of the large-scale facility (2) with the corresponding supporting points at the top of the centralized pipe rack (32), the buoyancy of the main buoyancy tank (101) is gradually reduced, so that the supported points of the large-scale facility (2) are respectively supported on the corresponding supporting points at the top of the centralized pipe rack (32); After the weight of the large facility (2) is completely transferred to the supporting point corresponding to the top of the centralized jacket (32), the buoyancy of the main pontoon (101) is further reduced, so that the heavy object bearing platform (1) is completely separated from the bottom of the large facility (2); Using a tugboat to tow out the heavy-object carrying platform (1) to complete the placement of the large-scale facility (2); When disassembling the large-scale facility (2), the large-scale facility (2) is fixed on the heavy-object bearing platform (1), and the large-scale facility (2) and the heavy-object bearing platform (1) are dragged away from the load-bearing parts at a preset position, specifically comprising: When the large facility (2) is removed from the centralized conductor frame (32), a tugboat and a positioning ship are used to tow the heavy-object carrying platform (1) to the outside of the centralized conductor frame (32); After the heavy object carrying platform (1) is in a fixed position at the bottom of the large facility (2), gradually increase The buoyancy of the main buoyancy box (101) causes the heavy object carrying platform (1) to gradually rise to the bottom of the large facility (2) and to contact the bottom of the large facility (2); Continue to increase the buoyancy of the main buoyancy tank (101) until each supported point at the bottom of the large-scale facility (2) is separated from the corresponding supporting point at the top of the centralized conductor frame (32); After the weight of the large facility (2) is completely transferred to the heavy object bearing platform (1), a tugboat is used to tow the heavy object bearing platform (1) and the large facility (2) away from the centralized conductor frame (32), thereby completing the dismantling of the large facility (2).
4. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: The placing of the large-scale facility (2) at a preset position of the target location specifically comprises: When the large-scale facility (2) is the supporting jacket (21), the supporting member is a pile foundation (33) at a specific position on the seabed or arranged in a centralized manner, and the supporting jacket (21) is finally installed at a specific position on the seabed or on the pile foundation (33) arranged in a centralized manner, after the supporting jacket (21) and the heavy-duty carrying platform (1) are transported to a target location at sea, the buoyancy of each of the main pontoons (101) is reduced, the heavy-duty carrying platform (1) and the supporting jacket (21) are reduced, and the heavy-duty carrying platform (1) and the supporting jacket (21) are switched to a diving working mode; while the heavy-duty carrying platform (1) and the supporting jacket (21) are reduced, the buoyancy of the main pontoon (101) is adjusted to keep the heavy-duty carrying platform (1) and the supporting jacket (21) in a horizontal state; When the distance between the supported point at the bottom of the supporting jacket (21) and a specific position on the seabed or the top of the pile foundation (33) is within a preset distance range, the buoyancy of the main buoy (101) is increased, so that the heavy object bearing platform (1) and the supporting jacket (21) are in a zero gravity state, and the heights of the heavy object bearing platform (1) and the supporting jacket (21) are kept unchanged; The heavy-object bearing platform (1) is horizontally moved using a tugboat and a positioning ship, and when the supported point at the bottom of the supporting jacket (21) is aligned with a specific position of the seabed or a supporting point of the pile foundation (33), the buoyancy of the main buoyancy box (101) is gradually reduced; After the weight of the supporting jacket (21) is completely transferred to a specific position on the seabed or to the supporting point of the pile foundation (33), the buoyancy of the main pontoon (101) is further reduced so that the heavy object bearing platform (1) is completely separated from the supporting jacket (21); the heavy object bearing platform (1) is towed out by a tugboat to complete the positioning of the supporting jacket (21); When disassembling the large-scale facility (2), the large-scale facility (2) is fixed on the heavy-object bearing platform (1), and the large-scale facility (2) and the heavy-object bearing platform (1) are dragged away from the load-bearing parts at a preset position, specifically comprising: When the supporting jacket (21) is removed from a specific position on the seabed or the pile foundation (33), a tugboat and a positioning ship are used to tow the heavy object bearing platform (1) to a specific position on the seabed or outside the pile foundation (33); After the heavy object bearing platform (1) is in the fixed position of the supporting pipe frame (21), the buoyancy of the main buoyancy box (101) is gradually increased, so that the heavy object bearing platform (1) is gradually raised to the fixed position of the supporting pipe frame (21) and contacts the fixed position of the supporting pipe frame (21); Continue to increase the buoyancy of the main buoyancy box (101) until each supported point at the bottom of the supporting jacket (21) is separated from a specific position on the seabed or a supporting point of the pile foundation (33); After the weight of the supporting jacket (21) is completely transferred to the heavy-load bearing platform (1), a tugboat is used to tow the heavy-load bearing platform (1) and the supporting jacket (21) away from a specific location on the seabed or the pile foundation (33), thereby completing the removal of the supporting jacket (21).
5. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: Placing the plurality of main pontoons (101) on the sea surface in front of the wharf in a preset arrangement order to form a pontoon array (10) specifically comprises: When the large facility (2) is a large wind turbine (22), the heavy object carrying platform (1) is divided into two groups, the two groups of heavy object transfer platforms (1) are symmetrically arranged, and there is a distance between the two groups of heavy object transfer platforms (1); Along the ends of the length direction of the heavy object transfer platforms (1), a transverse fixing structure (102) connecting two groups of the heavy object transfer platforms (1) is provided between the heavy object transfer platforms (1), and the transverse fixing structure (102) is provided in multiple groups; The method of fixing the large-scale facility (2) on the heavy-object bearing platform (1) in a fully assembled form or in the form of its components specifically comprises: When the large facility (2) is a large fan (22), the large fan (22) is suspended in the gap formed by the distance between the two sets of heavy object transfer platforms (1); The first end of each diagonal support rod (103) is connected to the heavy object bearing platform (1), and the second end of each diagonal support rod (103) is connected to the large-scale wind turbine (22); wherein a preset number of second ends of the diagonal support rods (103) are connected to a position above the center of gravity of the large-scale wind turbine (22); Two adjacent diagonal braces (103) are connected via a horizontal support structure (104), wherein after the large fan (22) is in place, the horizontal support structure (104) is removed, and the connecting piece between the diagonal brace (103) and the large fan (22) is removed.
6. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: Also includes: During the use of the main buoyancy tank (101), when the sea waves reach a specified level, the water inlet and outlet valves provided on the main buoyancy tank (101) are closed, so that the main buoyancy tank (101) with the water inlet and outlet valves closed works in a watertight compartment mode, and the water in the main buoyancy tank (101) with the water inlet and outlet valves closed becomes ballast water; or For the main buoyancy tank (101), by controlling the opening of the water inlet and outlet valves, the speed of seawater entering and exiting the main buoyancy tank (101) during the swaying of the main buoyancy tank (101) is controlled, so as to suppress the swaying of the heavy object bearing platform (1) according to the natural period of the waves; or With respect to the main pontoon (101), the lower bottom cover of the main pontoon (101) is removed to allow seawater to freely enter and exit the main pontoon (101), thereby suppressing the swaying of the heavy object bearing platform (1) caused by waves; or With respect to the main pontoon (101), by increasing or decreasing the air pressure in the main pontoon (101), the stability of the pontoon array (10) is maintained within a preset level, thereby suppressing the swaying of the heavy object carrying platform (1) caused by sea waves.
7. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: The heavy object bearing platform (1) further comprises a transfer structure (20); the transfer structure (20) is uniformly filled with air-filled capsules or a closed body composed of a light material, the density of the light material being less than the density of seawater; or the components of the transfer structure (20) are sealed hollow structural members; The method for transporting, positioning and dismantling large offshore facilities also includes: The transfer structure (20) is arranged on the upper surface of the main pontoon (101) of the pontoon array (10), and a heavy object bearing platform (1) is formed by the transfer structure (20) and the pontoon array (10); If the main buoy (101) fails and cannot provide support, the inflatable capsule or the closed body or sealed hollow structure composed of the lightweight material in the transfer structure (20) will provide buoyancy, so that the heavy object bearing platform (1) and the large facility (2) will not sink.
8. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: Also includes: During use of the main buoyancy tank (101), the height of the heavy object carrying platform (1) is adjusted by controlling the buoyancy of each main buoyancy tank (101) to raise or lower the heavy object carrying platform (1) as required; And, as required, the upper surface of the heavy object carrying platform (1) is kept in a horizontal state at all times by controlling the buoyancy of each of the main buoyancy boxes (101); During the whole process of dismantling the large facility (2), the main buoys are controlled as required. The buoyancy of (101) raises and lowers the heavy object carrying platform (1) to adjust the height of the heavy object carrying platform (1); And, as required, the upper surface of the heavy object carrying platform (1) is kept in a horizontal state at all times by controlling the buoyancy of each of the main buoyancy boxes (101).
9. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: The method of fixing the large-scale facility (2) on the heavy-object bearing platform (1) in a fully assembled form or in the form of its components specifically comprises: For the large-scale facility (2) that needs to be constructed on the heavy-object carrying platform (1), the large-scale facility (2) is first constructed on the upper surface of the heavy-object carrying platform (1), and then the large-scale facility (2) is fixedly connected to the heavy-object carrying platform (1); in the process of constructing the large-scale facility (2), the amount of air in the main pontoon (101) is adjusted so that the height difference between the upper surface of the heavy-object carrying platform (1) and the dock is within a preset range, and the heavy-object carrying platform (1) is always kept in a horizontal state; For the large-scale facilities (2) that do not need to be constructed on the heavy-load-bearing platform (1), the large-scale facilities (2) are directly fixed to the heavy-load-bearing platform (1) through a connecting structure; in the process of transferring the large-scale facilities (2) to the heavy-load-bearing platform (1), the amount of air in the main pontoon (101) is adjusted so that the height difference between the upper surface of the heavy-load-bearing platform (1) and the dock is within a preset range, and the heavy-load-bearing platform (1) is always kept in a horizontal state.
10. The method for transporting, positioning and dismantling large offshore facilities according to claim 1, characterized in that: Also includes: When the large-scale facility (2) is finally installed on the double-row conductor rack (31), the arrangement of the heavy-object bearing platform (1) includes a concentrated array arrangement, a T-shaped arrangement or a cross-shaped arrangement; the T-shaped arrangement or the cross-shaped arrangement means that: the pontoon array (10) includes at least one row of the main pontoons (101); additional balancing pontoons are connected to both sides of the ends of the length direction of the main pontoons (101); the horizontal projection of the main pontoons (101) is an arbitrary shape; When the large-scale facility (2) is finally installed on a centralized conductor frame (32) arranged in a centralized manner, the heavy object bearing platform (1) is arranged in a double row or in a U-shaped arrangement; when the main pontoons (101) are arranged in a double row, the two rows are connected to each other via a transverse fixed structure (102); the horizontal projection of the main pontoons (101) is in any shape; When the large-scale facility (2) is finally installed at a specific location on the seabed or on pile foundations (33) centrally arranged on the seabed, the arrangement of the heavy object bearing platform (1) includes a double-row arrangement or a U-shaped arrangement; the horizontal projection of the main buoy (101) is an arbitrary shape.
Citation Information
Patent Citations
Floating type installation structure and method for offshore converter station
CN113353202A
Construction, transportation and in-place method of offshore large-scale real object
CN116395093A
Transportation, in-place and dismantling method for large offshore facilities
CN116605366A
A float and hold in palm demolition structure that is used for fan in reservoir or lake
CN207791078U
C-shaped assembly type floating transportation structure for split floating transportation of offshore transformer substation
CN218506092U
Cited By
Double-ship floating scheme design method based on multi-module transportation
CN119962940A
Buoyancy tank lifting floating type jacket mounting method
CN121158154A
Semi-submerged ship and use method of semi-submerged ship
CN121180389A
Offshore wind power jacket construction device and construction method
CN121519541A
Load transfer stress unit simulation device for multi-ship collaborative buoyancy operation
CN121977876A