Gantry rock drilling vehicle

Through the gantry structure of the cube frame and rectangular sliding frame, the complex structure and multi-point drilling problems of rock drilling trucks in large tunnel construction are solved, the equipment is compact and reused, the construction efficiency and safety are improved, and the construction is reduced. cost.

CN107701196BActive Publication Date: 2024-11-15刘国勇
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201711169329.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-11-16
Publication Date
2024-11-15
Estimated Expiration
2037-11-16

AI Technical Summary

Technical Problem

The existing rock drilling and boring vehicles are complex in the construction of large tunnels and cannot achieve multiple points of drilling, resulting in low construction efficiency, high cost, and difficult to reuse the operating room and hydraulic workstation.

Method used

The gantry structure adopts a cube frame and a rectangular sliding frame. The position of the rock-chising splitting device is adjusted through arc-shaped slide rails and sliders, simplifies the equipment structure, and sets the operating room and hydraulic workstation above the slag output interval to achieve compactness and repetition of the equipment. use.

Benefits of technology

It improves work efficiency, reduces construction costs, simplifies equipment structure, ensures construction safety and equipment stability, and realizes the reuse of multi-point co-drilling and equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107701196B_ABST
    Figure CN107701196B_ABST
Patent Text Reader

Abstract

The present invention discloses a gantry rock drilling vehicle that can simplify equipment and has a control room, a hydraulic workstation, and a rock drilling and splitting device that can be reused. The gantry rock drilling vehicle comprises a cubic frame, a rectangular sliding frame, an operating room, and a hydraulic workstation; an arc-shaped slide rail is arranged on the outer side of the cubic frame; the sliding frame is mounted on the cubic frame; a lifting device for driving the sliding frame to slide is arranged on the cubic frame; a slag discharge section is provided at the lower part of the cubic frame; a mounting plate that can slide up and down is arranged inside the cubic frame; the operating room and the hydraulic workstation are fixedly mounted on the mounting plate, a rock drilling and splitting device is arranged on the sliding frame; a position-adjustable rock drilling and splitting device is arranged on the arc track; and rollers are arranged at the bottom of the cubic frame. The gantry rock drilling vehicle has a simple structure, good structural stability, and low construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel rock drilling, in particular to a gantry rock drilling vehicle. Background Art

[0002] It is well known that the drilling and blasting method is mostly used in the process of tunnel construction. The use of a drilling rig to drill holes is already common in tunnel construction. Its main purpose is to increase the excavation speed, improve the working environment of the construction workers, and liberate the construction workers from the harsh conditions and heavy labor of rock drilling.

[0003] The existing rock drilling trolley rock drill is basically connected to the trolley through a support arm, such as: Japan's nine-arm trolley and China's patent application "A Thousand-Hand Rock Drill"; "A Thousand-Hand Rock Drill" discloses a thousand-hand rock drill, including a frame, a workbench, a bracket, and a walking mechanism supporting the frame on the frame. A power device and a hydraulic power device are installed on the frame. A group of hydraulic support devices are provided on the frame, and the devices respectively support the body of the rock drill. The utility model uses a multi-stage movable arm and a hydraulic cylinder and a piston rod connected between each arm to adjust the height of the rock drill connected to the end, adjust the state of the rock drill, such as the horizontal position or angle drilling, which greatly reduces the labor intensity of the workers and improves the work efficiency. The rock drill is installed on the support arm, so one rock drill needs a support arm. Since the rock drill is subjected to a large force during the working process, the material requirements of the support arm are high. At the same time, a rock drill is supported by a support arm and occupies a large space. Mutual interference is easy to occur during the operation, and it is not easy to achieve multi-point simultaneous drilling. The construction efficiency is low and the manufacturing cost is high.

[0004] Especially for the rock drilling and excavation of existing larger tunnels, such as tunnels with a cross-sectional equivalent diameter of 7 to 10 meters, the existing rock drilling and excavation vehicles have complex structures and cannot achieve multi-point simultaneous drilling, resulting in low rock drilling efficiency, high manufacturing costs, low construction efficiency, and high construction costs. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a gantry rock drilling vehicle with a simple structure, good structural stability, simplified equipment, and a reusable operating room, hydraulic workstation and rock drilling and splitting device.

[0006] The technical solution adopted by the present invention to solve the technical problem is as follows: the gantry rock drilling vehicle provided by the present invention comprises a cubic frame, a rectangular sliding frame, an operating room and a hydraulic workstation;

[0007] The outer side of the cubic frame is provided with an arc-shaped slide rail; the sliding frame is sleeved on the outer side of the cubic frame and slides with the cubic frame; the two opposite sides of the cubic frame are provided with a lifting device for driving the sliding frame to slide in the vertical direction; the lower part of the cubic frame has a slag discharge area;

[0008] A mounting plate that can slide up and down is arranged in the cubic frame; the operating room and the hydraulic workstation are fixedly mounted on the mounting plate, and a lifting device is arranged between the middle position of the mounting plate and the top of the cubic frame; a positioning pin for fixing the mounting plate is arranged on the inner side of the column of the cubic frame; the positioning pin is located above the slag discharge interval;

[0009] A mounting bracket is provided at one end of the sliding frame, and a rock drilling and splitting device is provided on the mounting bracket; a slider sliding along the arcuate slide rail is provided on the arcuate slide rail, and a driving device driving the slider to slide along the arcuate slide rail is provided on the slider; the rock drilling and splitting device is provided on the slider;

[0010] The rock drilling and splitting device on the sliding block and the rock drilling and splitting device on the mounting bracket both point to one end of the slag discharge interval; and a roller is arranged at the bottom of the cubic frame.

[0011] Preferably, the lifting device comprises a first pulley arranged on the mounting plate, and a second pulley arranged on the top of the cubic frame, and a pull rope is arranged between the first pulley and the second pulley.

[0012] Furthermore, vertical guide rails are provided on two opposite sides of the cubic frame; the sliding frame is guided in the vertical direction by the guide rails.

[0013] Furthermore, the columns on both the front and rear end surfaces of the cubic frame are provided with second vertical guide rails; the inner rings on the front and rear ends of the sliding frame are provided with clamping grooves matching the second vertical guide rails, and slidingly cooperate with the second vertical guide rails.

[0014] Preferably, the cubic frame is a steel structure frame.

[0015] Preferably, the lifting device adopts a hydraulic cylinder, one end of which is fixed to the upper end of the cubic frame, and the other end is fixedly connected to the sliding frame.

[0016] Furthermore, the roller is provided with a hydraulic drive device for driving the roller to roll.

[0017] Optionally, the hydraulic drive device adopts a hydraulic pump.

[0018] The beneficial effects of the present invention are as follows: the gantry rock drilling and tunneling vehicle of the present invention adopts a sliding frame which is mounted on a cubic frame and can slide in a vertical direction, and a mounting bracket is arranged on one end of the sliding frame, a rock drilling and splitting device is arranged on the mounting bracket, and an arc-shaped slide rail is arranged on the outer side of the cubic frame, a slider is arranged on the arc-shaped slide rail, and the rock drilling and splitting device is installed on the slider; thereby, the upper and lower position adjustment of the rock drilling and splitting device on the mounting bracket and the position adjustment of the rock drilling and splitting device on the arc-shaped slide rail can be realized, thereby realizing rock drilling at various positions of the tunnel end face and improving work efficiency.

[0019] At the same time, since the operating room and the hydraulic workstation are arranged above the slag discharge section 14 on the gantry rock drilling vehicle, space can be saved to make the entire device compact, and the subsequent slag discharge will not be affected, the trolley for carrying the operating room and the hydraulic workstation in the prior art is simplified, and the slag discharge section is reserved, which is convenient for the arrangement of the slag discharge equipment and the arrangement of the construction process;

[0020] Secondly, a sliding frame that can slide in the vertical direction is installed on the cubic frame, which simplifies the structure, saves space, optimizes the force to ensure the stability of the structure; it can improve the safety of construction and ensure the stability of the equipment during work;

[0021] Finally, since a plurality of rock drilling and splitting devices can be arranged on the mounting bracket, a plurality of rock drills can be installed in a limited space to achieve multi-point simultaneous drilling, thereby improving work efficiency and reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a three-dimensional diagram of a gantry rock drilling vehicle according to an embodiment of the present invention;

[0023] Figure 2 1 is a front view of a gantry rock drilling vehicle according to an embodiment of the present invention;

[0024] Figure 3 is a top view of a gantry rock drilling vehicle according to an embodiment of the present invention;

[0025] Figure 4 is a side view of a gantry rock drilling vehicle according to an embodiment of the present invention;

[0026] Figure 5 yes Figure 4 AA section view in;

[0027] Markings in the figure: 1-cube frame, 2-sliding frame, 3-mounting bracket, 4-arc slide rail, 5-rock drilling and splitting device, 6-sliding block, 61-driving device, 7-operating room, 8-guide rail, 9-hydraulic workstation, 10-lifting device, 11-roller, 12-hydraulic driving device, 13-positioning pin, 14-slag discharge interval, 15-second vertical guide rail, 16-mounting plate, 17-lifting device. DETAILED DESCRIPTION

[0028] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0029] like Figures 1 to 4 As shown, the gantry rock drilling vehicle of the present invention comprises a cubic frame 1, a rectangular sliding frame 2, an operating room 7 and a hydraulic workstation 9;

[0030] The outer side of the cubic frame 1 is provided with an arc-shaped slide rail 4; the sliding frame 2 is sleeved on the outer side of the cubic frame 1 and slides with the cubic frame 1; the two opposite sides of the cubic frame 1 are provided with a lifting device 10 for driving the sliding frame 2 to slide in the vertical direction; the lower part of the cubic frame 1 has a slag discharge area 14;

[0031] The cubic frame 1 is provided with a mounting plate 16 that can slide up and down; the operating room 7 and the hydraulic workstation 9 are fixedly mounted on the mounting plate 16, and a lifting device 17 is provided between the middle position of the mounting plate 16 and the top of the cubic frame 1; the inner side of the column of the cubic frame 1 is provided with a positioning pin 13 for fixing the mounting plate 16; the positioning pin 13 is located above the slag discharge interval 14;

[0032] A mounting bracket 3 is provided at one end of the sliding frame 2, and a rock drilling and splitting device 5 is provided on the mounting bracket; a slider 6 sliding along the arcuate slide rail 4 is provided on the arcuate slide rail 4, and a driving device 61 driving the slider 6 to slide along the arcuate slide rail 4 is provided on the slider 6; the rock drilling and splitting device 5 is provided on the slider 6;

[0033] The rock drilling and splitting device 5 on the slide block 6 and the rock drilling and splitting device 5 on the mounting bracket 3 both point to one end of the slag discharge interval 14 ; a roller 11 is provided at the bottom of the cubic frame 1 .

[0034] Specifically, the driving device 61 for driving the sliding block 6 to slide on the arc-shaped slide rail may be a driving device for driving a roller coaster on a slide rail in the prior art.

[0035] During the assembly of the gantry rock drilling vehicle:

[0036] First, assemble the cubic frame 1, then install the sliding frame, the mounting bracket 3, the rock drilling and splitting device 5 and the mounting plate 16 on the cubic frame 1; finally, install the operating room 7 and the hydraulic workstation 9. In the process of installing the operating room 7 and the hydraulic workstation 9, first slide the mounting plate 16 to the lowest end, and then fix the operating room 7 and the hydraulic workstation 9 on the mounting plate 16; then slowly raise the mounting plate 16 through the lifting device 17 until the mounting plate 16 is located above the slag discharge interval 14, and then insert the positioning pin 13 to achieve the positioning of the mounting plate 16; finally, install the pipes and lines between the operating room 7, the hydraulic workstation 9, the rock drilling and splitting device 5 and other devices on the equipment; thus completing the assembly of the whole machine.

[0037] In the course of work:

[0038] First, the gantry rock drilling vehicle is installed at the entrance of the tunnel to be excavated, and then the operator enters the operation room 7 to start the hydraulic workstation 9 to debug the equipment. After the debugging is completed, excavation is carried out. During the excavation process, the operator first controls the sliding frame 2 to slide to the highest point, so that the rock drilling and splitting device 5 is located at the uppermost end, to achieve rock drilling and excavation on the upper part of the tunnel end face, and to move the rock drilling and splitting device 5 on the arc slide rail 4 to a corresponding position, to implement rock drilling and excavation on the edge of the tunnel section.

[0039] Then, the lifting device 10 is used to slide the sliding frame 2 downwards, and after sliding a certain distance, rock drilling and excavation are performed in the horizontal direction, and at the same time, the rock drilling and splitting device 5 on the arc-shaped slide rail 4 is moved to a corresponding position to perform rock drilling and excavation at the edge of the tunnel section. This process is repeated until the sliding frame 2 slides to the lowest position to perform rock drilling and excavation at the bottom of the tunnel, and the rock drilling and splitting device 5 on the arc-shaped slide rail 4 performs rock drilling and excavation at the edge of the tunnel section.

[0040] The power source of the rock drilling and splitting device 5 is provided by a hydraulic workstation 9, and the main function of the hydraulic workstation 9 is to provide power for the entire equipment.

[0041] In the prior art, the operating room and hydraulic workstation of the rock drilling vehicle are both arranged on a trolley, and each type of tunnel corresponds to a corresponding trolley model, so the general model changes, and it is not easy to reuse the equipment. The gantry rock drilling vehicle described in the present invention adopts a gantry structure of a cubic frame, so the cubic frame on which the splitting device is installed is integrated with the transport vehicle carrying the operating room 7 and the hydraulic workstation 9, and the operating room 7 and the hydraulic workstation 9 can also be disassembled and used separately, so that the equipment can be reused. Secondly, the operating room and the hydraulic workstation are arranged above the slag discharge section 14 on the gantry rock drilling vehicle, so that space can be saved and the entire equipment is compact, and the subsequent slag discharge will not be affected.

[0042] In summary, the gantry rock drilling vehicle of the present invention adopts a sliding frame 2 that can slide in the vertical direction mounted on the cubic frame 1, and a mounting bracket 3 is arranged on one end of the sliding frame 2, a rock drilling and splitting device 5 is arranged on the mounting bracket 3, and an arc-shaped slide rail 4 is arranged on the outer side of the cubic frame 1, a slider 6 is arranged on the arc-shaped slide rail 4, and the rock drilling and splitting device 5 is mounted on the slider 6; thereby, the up and down position adjustment of the rock drilling and splitting device 5 on the mounting bracket 1 and the position adjustment of the rock drilling and splitting device 5 on the arc-shaped slide rail 4 can be realized, thereby realizing rock drilling at various positions of the tunnel end face, and improving work efficiency. At the same time, since the sliding frame 2 that can slide in the vertical direction is mounted on the cubic frame 1, the structure is simplified, space is saved, and the force can be optimized to ensure the stability of the structure; the safety of construction can be improved, and the stability of the equipment during work can be ensured; finally, since multiple rock drilling and splitting devices can be arranged on the mounting bracket, multiple rock drills can be installed in a limited space, and multi-point simultaneous drilling can be realized, which improves work efficiency and reduces construction costs.

[0043] The lifting of the mounting plate 16 can be achieved in a variety of ways, and the lifting device 17 can adopt a variety of devices, such as a hydraulic cylinder, a winch, etc. In order to simplify the structure and reduce the cost, a preferred way is that the lifting device 17 includes a first pulley arranged on the mounting plate 16, and a second pulley arranged on the top of the cubic frame 1, and a pull rope is arranged between the first pulley and the second pulley; during the installation process, the lifting of the mounting plate 16 can be achieved by simply pulling the pull rope.

[0044] In order to make the structure more stable and prevent the sliding frame 2 from getting stuck during the sliding process, vertical guide rails 8 are further provided on two opposite sides of the cubic frame 1; the sliding frame 2 is guided in the vertical direction by the guide rails 8.

[0045] In order to further optimize the force on the sliding frame 2 and avoid the front and rear ends of the sliding frame 2 from getting stuck, further, second vertical guide rails 15 are provided on the columns on the front and rear end surfaces of the cube frame 1; the inner circles on the front and rear ends of the sliding frame 2 are provided with clamping grooves matching the second vertical guide rails 15, and slidingly cooperate with the second vertical guide rails 15.

[0046] In order to reduce costs and facilitate manufacturing and installation, the cubic frame 1 is optionally a steel structure frame.

[0047] The lifting device 7 can be in various forms, such as a slide. Since it needs to be lifted up and down, it is subjected to greater force. In order to ensure the stability of the equipment and to facilitate control, the lifting device 10 adopts a hydraulic cylinder. One end of the hydraulic cylinder is fixed to the upper end of the cube frame 1, and the other end is fixedly connected to the sliding frame 2.

[0048] In order to realize the automatic movement of the cubic frame 1 and avoid manual pushing, further, a hydraulic driving device 12 for driving the roller 11 to roll is arranged on the roller 11 .

[0049] In order to facilitate control and reduce costs, the hydraulic drive device 12 further adopts a hydraulic pump.

Claims

1. Gantry rock drilling vehicle, characterized by: It comprises a cubic frame (1), a rectangular sliding frame (2), an operating room (7) and a hydraulic workstation (9); The outer side of the cubic frame (1) is provided with an arc-shaped slide rail (4); the sliding frame (2) is sleeved on the outer side of the cubic frame (1) and is slidably matched with the cubic frame (1); two opposite side surfaces of the cubic frame (1) are provided with lifting devices (10) for driving the sliding frame (2) to slide in a vertical direction; the lower part of the cubic frame (1) has a slag discharge area (14); A mounting plate (16) that can slide up and down is arranged inside the cubic frame (1); the operating room (7) and the hydraulic workstation (9) are fixedly mounted on the mounting plate (16); a lifting device (17) is arranged between the middle position of the mounting plate (16) and the top of the cubic frame (1); a positioning pin (13) for fixing the mounting plate (16) is arranged on the inner side of a column of the cubic frame (1); the positioning pin (13) is located above the slag discharge zone (14); A mounting bracket (3) is provided at one end of the sliding frame (2), and a rock drilling and splitting device (5) is provided on the mounting bracket; a sliding block (6) is provided on the arc-shaped sliding rail (4) and slides along the arc-shaped sliding rail (4); a driving device (61) is provided on the sliding block (6) and drives the sliding block (6) to slide along the arc-shaped sliding rail (4); the rock drilling and splitting device (5) is provided on the sliding block (6); The rock drilling and splitting device (5) on the sliding block (6) and the rock drilling and splitting device (5) on the mounting bracket (3) both point to one end of the slag discharge interval (14); a roller (11) is provided at the bottom of the cubic frame (1); The lifting device (17) comprises a first pulley arranged on the mounting plate (16), and a second pulley arranged on the top of the cubic frame (1), wherein a pull rope is arranged between the first pulley and the second pulley; Vertical guide rails (8) are provided on two opposite sides of the cubic frame (1); the sliding frame (2) is guided in the vertical direction by the guide rails (8).

2. The gantry rock drilling vehicle according to claim 1, characterized in that: The columns on the front and rear end surfaces of the cubic frame (1) are both provided with second vertical guide rails (15); the inner rings on the front and rear ends of the sliding frame (2) are provided with clamping grooves matching the second vertical guide rails (15) and slidingly engage with the second vertical guide rails (15).

3. The gantry rock drilling vehicle according to claim 1, characterized in that: The cubic frame (1) is a steel structure frame.

4. The gantry rock drilling vehicle according to claim 1, characterized in that: The lifting device (10) adopts a hydraulic cylinder, one end of which is fixed to the upper end of the cubic frame (1), and the other end of which is fixedly connected to the sliding frame (2).

5. The gantry rock drilling vehicle according to claim 1, characterized in that: The roller (11) is provided with a hydraulic drive device (12) for driving the roller (11) to roll.

6. The gantry rock drilling vehicle according to claim 5, characterized in that: The hydraulic drive device (12) adopts a hydraulic pump.