Indoor simulation experimental device and method for temporary plugging of near-wellbore zone

By designing a near-wellbore temporary plugging indoor simulation experimental device, the plugging process of the temporary plugging agent under fracture conditions was realistically simulated, which solved the problem that the construction parameters in the existing technology depend on field experience, and achieved a more efficient plugging effect and construction guidance.

CN107976520BActive Publication Date: 2024-11-01CHINA NAT PETROLEUM CORP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN201711294750.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-12-08
Publication Date
2024-11-01
Estimated Expiration
2037-12-08

AI Technical Summary

Technical Problem

Existing technologies cannot effectively simulate the sealing capacity of temporary plugging agents under crack conditions, especially granular and fibrous diverting agents, and the determination of construction parameters depends on field experience, lacking scientific evaluation methods.

Method used

An indoor simulation experimental device for near-wellbore temporary plugging was designed, including a vertical wellbore, branches, simulated blast holes, and simulated fractures. Combined with sensors at the information acquisition end, it can realistically simulate the dynamic temporary plugging process near the wellbore and optimize the construction process by adjusting parameters.

Benefits of technology

It improved the sealing effect and quality, reduced reliance on on-site experience, provided scientific construction guidance, optimized construction parameters, and improved the reliability of experimental results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107976520B_ABST
    Figure CN107976520B_ABST
Patent Text Reader

Abstract

The present invention relates to an indoor simulation experimental device for temporary plugging of a near-wellbore zone, comprising an experimental end and an information collection end, wherein the experimental end comprises an injection body and an experimental body, the experimental body comprises a vertical wellbore and at least one branch, at least one branch interface is provided on the lower side wall of the vertical wellbore, and a simulated blasthole and a simulated crack are provided on the side wall of the branch, and the information collection end is connected to a sensor arranged in the experimental body. An indoor simulation experimental method for temporary plugging of a near-wellbore zone is applied to an indoor simulation experimental device for temporary plugging of a near-wellbore zone. The indoor simulation experimental device and method for temporary plugging of a near-wellbore zone can realistically simulate different blastholes and corresponding crack conditions, thereby simulating a near-wellbore temporary plugging process, effectively guiding on-site construction design, and improving construction effects. The information collection end is used to collect data, and the results are highly credible, and there is no need to rely on on-site experience, thereby improving the actual plugging effect and plugging quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of petroleum fracturing, and in particular to an indoor simulation experimental device and method for temporary plugging of a near-wellbore zone. Background Art

[0002] At present, Schlumberger broadband fracturing, Sichuan diversion temporary plugging fracturing, and Changqing Oilfield dynamic multi-stage temporary plugging fracturing are novel technologies. Their principles are similar to those of flow-limiting fracturing and blasthole plugging technologies. They are large-scale pre-perforation, and adopt a general combined pressure. During the transformation process, temporary plugging materials are used to achieve natural selective plugging of the near-well zone, thereby improving the effectiveness of vertical reservoir interlayer transformation. This technology can not only try to solve the problem of dense thin interlayer fracturing, but also has reference significance for vertical well repeated fracturing, horizontal well repeated fracturing, and horizontal well segmented multi-cluster perforation fracturing.

[0003] At present, there is no relevant means to determine the process parameters of this technology, and it mainly relies on field experience. The evaluation technology of the plugging ability of fracture diverters is relatively backward. Single-tube or parallel double-tube core or sand filling model flow simulation experimental devices are mostly used to qualitatively evaluate the plugging ability of diverters. However, there are problems such as the inability to simulate fracture conditions and the inability to simulate the plugging of granular and fiber diverters due to injection problems. Summary of the invention

[0004] In order to solve the above problems, the present invention provides an indoor simulation experimental device and method for temporary plugging in the near-wellbore zone, which can truly simulate the dynamic temporary plugging process in the near-wellbore zone and evaluate the plugging performance of different temporary plugging agents under formation conditions, without relying on field experience, thereby improving the actual plugging effect and plugging quality.

[0005] The technical solution of the present invention is: an indoor simulation experimental device for temporary plugging of the near-wellbore zone, including an experimental end and an information collection end, the experimental end includes an injection body and the experimental body, the injection body is connected to the experimental body through a pipeline, the experimental body includes a vertical wellbore and at least one branch, at least one branch interface is provided on the lower side wall of the vertical wellbore, one end of the branch is detachably connected to the vertical wellbore through the branch interface, a simulated blasthole and a simulated crack are provided on the side wall of the branch, and the information collection end is connected to a sensor arranged in the experimental body.

[0006] The experimental body also includes at least one dead plug, which is detachably connected to the vertical wellbore through a branch interface, and the sum of the number of dead plugs and branches is equal to the number of branch interfaces.

[0007] The simulated blastholes are evenly distributed along the extension of the other end of the branch and are cylindrical holes with a diameter of 1-2 cm and a length of 5-10 cm. The simulated cracks are distributed along the side walls of the branches and are parallel to the axis of the branches. The cracks are wedge-shaped structures with a width of 0.2-2 cm and a length of 20-50 cm.

[0008] The axial direction of the branch is perpendicular to the axial direction of the vertical wellbore, the angle between adjacent branches is 0°-360°, and the diameter of the vertical wellbore is 38.1 mm.

[0009] There are multiple sensors, which are respectively located at the upper inner side of the vertical wellbore, at the connection between the branch and the vertical wellbore, at the simulated blasthole and at the simulated crack.

[0010] The injection body includes a piston container, a displacement pump and a safety valve. One end of the piston container is connected to the displacement pump, the other end of the piston container is connected to the safety valve, and the other end of the safety valve is connected to the temporary plugging agent inlet of the vertical wellbore.

[0011] A stirring device is arranged in the piston container.

[0012] A pressure display device is provided on the vertical wellbore.

[0013] An indoor simulation experimental method for temporary plugging of a near-well zone, the method being applied to a device according to any one of claims 1 to 8, comprising the following steps:

[0014] Step 1: Put the pre-prepared temporary plugging agent into the piston container and turn on the stirring device;

[0015] Step 2: According to the parameters of the blastholes and fractures to be simulated, determine the branches and the number of branches corresponding to the parameters of the blastholes and fractures to be simulated, remove the unnecessary branches on the vertical wellbore and replace them with dead plugs;

[0016] Step 3: Turn on the displacement pump to deliver the temporary plugging agent in the piston container into the vertical wellbore;

[0017] Step 4: Observe the flow and plugging of the temporary plugging agent through the simulated cracks on each branch, read the pressure values ​​at various locations of the experimental body through the pressure display device, and collect experimental data at the information collection end.

[0018] The experimental body includes the upper part of the vertical wellbore, the connection between the branch and the vertical wellbore, the simulated blasthole and the simulated crack. The information collection end collects the relationship between the temperature and the time and the relationship between the pressure and the time at each part of the experimental body.

[0019] The beneficial effects of the present invention are:

[0020] 1. The indoor simulation experiment device and method for temporary plugging near the well can realistically simulate different blastholes and corresponding crack conditions, thereby simulating the temporary plugging process near the well. It can not only accurately record the temporary plugging pressure increase of each branch, but also record the branch pressure increase sequence, effectively guide the on-site construction design, and improve the construction effect. The indoor simulation experiment device for temporary plugging near the well has a novel structure, safe and simple operation, a high degree of automation, and uses an information acquisition terminal to collect data. The results are highly credible and no longer rely on on-site experience, which improves the actual plugging effect and plugging quality.

[0021] 2. During the experiment, multiple parameters such as different crack openings, crack lengths, blasthole diameters, and blasthole lengths can be adjusted to optimize the construction process parameters of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing), thereby guiding on-site construction and ensuring the fracturing effect. The branches are arranged at various phase angles of 0°-360°. According to the purpose of the experiment, the number of branches (1-5 branches) is determined, and the unsuitable branches are removed and replaced with dead plugs to simulate the real vertical wellbore perforation blastholes and cracks in proportion, which improves the credibility of the experimental results.

[0022] 3. According to the actual well conditions, if multiple branches are selected, the temporary plugging agent starts to work under the action of the displacement pump. Through the simulated cracks on each branch, the flow and plugging of the temporary plugging agent can be observed visually, which is more intuitive. At the same time, combined with the information collection end, the plugging process of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing) in the actual construction process can be intuitively displayed. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0024] Figure 1 It is a schematic diagram of the structure of the present invention.

[0025] In the figure, 1. information collection end, 2. vertical wellbore, 3. branch, 4. branch interface, 5. simulated blasthole, 6. simulated fracture, 7. dead blockage, 8. piston container, 9. displacement pump, 10. safety valve, 11. pressure display device. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Embodiment 1:

[0028] like Figure 1 As shown, an indoor simulation experiment device for temporary plugging of the near-wellbore zone includes an experiment end and an information collection end 1. The experiment end includes an injection body and an experiment body. The injection body is connected to the experiment body through a pipeline. The experiment body includes a vertical wellbore 2 and at least one branch 3. At least one branch interface 4 is provided on the lower side wall of the vertical wellbore 2. One end of the branch 3 is detachably connected to the vertical wellbore 2 through the branch interface 4. A simulated blasthole 5 and a simulated crack 6 are provided on the side wall of the branch 3. The information collection end 1 is connected to a sensor arranged in the experiment body.

[0029] When a simulation experiment is required, the pre-prepared temporary plugging agent is placed in the injection body. The temporary plugging agent enters the vertical wellbore 2 through the injection body, enters the branch 3 through the vertical wellbore 2, and finally enters the simulated blasthole 5 and the simulated fracture 6. During this process, the information collection end 1 will collect experimental data through sensors.

[0030] During the experiment, different temporary plugging agent formulas, particle size distribution, ratio, dosage, segment plug design, injection speed and other parameters can be adjusted. The experimental data after temporary plugging are used as the standard, such as the pressure increase amplitude and the pressure increase sequence of each branch 3, etc., to optimize the construction process parameters of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing), so as to guide on-site construction and ensure the fracturing effect.

[0031] The indoor simulation experimental device for temporary plugging near the wellbore is provided with multiple branches 3, which can realistically simulate the conditions of different blastholes and cracks, thereby simulating the temporary plugging process near the wellbore, accurately recording various data during the experiment, effectively guiding the on-site construction design, and improving the construction effect. In particular, it provides a solution to the problem of difficult indoor flow simulation injection of granular and fiber-type diverting agents, and can also be used to optimize dynamic multi-stage temporary plugging fracturing process parameters, determine the particle size distribution, particle size combination concentration, dosage and segment plug design of the temporary plugging agent, etc. The indoor simulation experimental device for temporary plugging near the wellbore is novel in structure, safe and simple to operate, and has a high degree of automation. It uses the information collection terminal 1 to collect data, and the results are highly credible, and there is no need to rely on on-site experience, thereby improving the actual plugging effect and plugging quality.

[0032] Embodiment 2:

[0033] like Figure 1 As shown, the experimental body also includes at least one dead plug 7, which is detachably connected to the vertical wellbore 2 through a branch interface 4, and the sum of the number of dead plugs 7 and branches 3 is equal to the number of branch interfaces 4.

[0034] The simulated blastholes 5 are evenly distributed along the extension of the other end of the branch 3 and are cylindrical holes with a diameter of 1-2 cm and a length of 5-10 cm. The simulated cracks 6 are distributed along the side wall of the branch 3 and are parallel to the axis of the branch 3. The cracks are wedge-shaped structures with a width of 0.2-2 cm and a length of 20-50 cm.

[0035] The axial direction of the branch 3 is perpendicular to the axial direction of the vertical shaft 2, the angle between adjacent branches 3 is 0°-360°, and the diameter of the vertical shaft 2 is 38.1 mm.

[0036] There are multiple sensors, which are respectively located at the upper inner side of the vertical wellbore 2, the connection between the branch 3 and the vertical wellbore 2, the simulated blasthole 5 and the simulated crack 6.

[0037] According to the purpose of the experiment, the number of branches 3 is determined. Generally, the number of branches 3 is 1-5. Unsuitable branches 3 are removed and replaced with dead plugs 7. The parameters of the simulated blastholes 5 and simulated cracks 6 on one branch 3 are different from those on another branch 3. The parameters of the simulated blastholes 5 are the diameter and length of the simulated blastholes 5, which are 1-2 cm in diameter and 5-10 cm in length. The parameters of the simulated cracks 6 are the width and length of the simulated cracks 6, which are 2.0 cm, 1.5 cm, 1.0 cm, 0.6 cm, 0.4 cm or 0.2 cm in width and 20-50 cm in length. During the experiment, only branches 3 with the same size of simulated blastholes 5 and simulated cracks 6 as the experimental requirements need to be selected and connected to the branch interfaces 4, and the remaining unused branch interfaces 4 are connected to the dead plugs 7. The angle between adjacent branches 3 is 0°-360°, which can simulate the plugging experiment at any angle. The diameter of the vertical wellbore 2 is 38.1 mm, and the cracks have a wedge-shaped scale. The temporary plugging agent will gradually accumulate until a plugging effect is produced. The real vertical wellbore 2 perforation holes and cracks can be simulated in proportion, which improves the credibility of the experimental results and expands the scope of the simulation experiment as much as possible.

[0038] The information collection terminal 1 collects experimental data at the upper part of the vertical wellbore 2, the connection between the branch 3 and the vertical wellbore 2, the simulated blasthole 5 and the simulated fracture 6 through sensors.

[0039] And by simulating the crack 6, the flow and plugging of the temporary plugging agent can be observed intuitively, mainly including the temporary plugging agent accumulation process, accumulation form, the order of accumulation in different branches 3, etc., which is more intuitive. Based on this, the plugging process of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing) in the actual construction process can be intuitively demonstrated.

[0040] Embodiment three:

[0041] like Figure 1 As shown, the injection body includes a piston container 8, a displacement pump 9 and a safety valve 10, one end of the piston container 8 is connected to the displacement pump 9, the other end of the piston container 8 is connected to the safety valve 10, and the other end of the safety valve 10 is connected to the temporary plugging agent inlet of the vertical wellbore 2.

[0042] The piston container 8 is provided with a stirring device.

[0043] The vertical shaft 2 is provided with a pressure display device 11 .

[0044] After the temporary plugging agent is placed in the piston container 8, when the experiment is needed, the displacement pump 9 is turned on, and the displacement pump 9 can send the temporary plugging agent into the vertical wellbore 2. The safety valve 10 can be used to control the flow of the temporary plugging agent. The system working pressure is 0-50MPa, the displacement range of the displacement pump 9 is 0.01-1000ml / min, and the injection pressure of the displacement pump 9 is 0.1-50MPa. In order to prevent the temporary plugging agent from sinking to the bottom, a stirring device is provided in the piston container 8. The pressure display device 11 can read the pressure of the temporary plugging agent flowing into the vertical wellbore 2 in real time.

[0045] Embodiment 4:

[0046] A near-wellbore temporary plugging indoor simulation experiment method, the method is applied to a near-wellbore temporary plugging indoor simulation experiment device, comprising the following steps:

[0047] Step 1: Place the pre-prepared temporary plugging agent into the piston container 8 and start the stirring device;

[0048] Step 2: According to the parameters of the blasthole and the crack to be simulated, determine the branches 3 and the number of branches 3 corresponding to the parameters of the blasthole and the crack to be simulated, remove the unnecessary branches 3 on the vertical wellbore 2 and replace them with dead plugs 7;

[0049] Step 3: Turn on the displacement pump 9 to deliver the temporary plugging agent in the piston container 8 into the vertical wellbore 2;

[0050] Step 4: Observe the flow and plugging of the temporary plugging agent through the simulated cracks 6 on each branch 3, read the pressure values ​​at various locations of the experimental body through the pressure display device 11, and collect experimental data at the information collection terminal 1 at the same time.

[0051] The experimental body includes the upper part of the vertical wellbore 2, the connection between the branch 3 and the vertical wellbore 2, the simulated blasthole 5 and the simulated crack 6. The information collection terminal 1 collects the temperature change relationship and pressure change relationship of each part of the experimental body over time.

[0052] There is no order between step 1 and step 2 during execution, or if step 1 meets the experimental requirements, step 2 can be omitted.

[0053] The pre-prepared temporary plugging agent is placed into the injection body, and the stirring device in the piston container 8 is turned on to prevent the temporary plugging agent from sinking to the bottom.

[0054] According to the purpose of the experiment, the number of branches 3 is determined. Generally, the number of branches 3 is 1-5. Unsuitable branches 3 are removed and replaced with dead plugs 7. The parameters of the simulated blastholes 5 and simulated cracks 6 on one branch 3 are different from those on another branch 3. The parameters of the simulated blastholes 5 are the diameter and length of the simulated blastholes 5, which are 1-2 cm in diameter and 5-10 cm in length. The parameters of the simulated cracks 6 are the width and length of the simulated cracks 6, which are 2.0 cm, 1.5 cm, 1.0 cm, 0.6 cm, 0.4 cm or 0.2 cm in width and 20-50 cm in length. During the experiment, only branches 3 with the same size of simulated blastholes 5 and simulated cracks 6 as the experimental requirements need to be selected and connected to the branch interfaces 4, and the remaining unused branch interfaces 4 are connected to the dead plugs 7.

[0055] When the experiment is needed, turn on the displacement pump 9, which can deliver the temporary plugging agent into the vertical wellbore 2. The temporary plugging agent enters the vertical wellbore 2 through the injection body, enters the branch 3 through the vertical wellbore 2, and finally enters the simulated blasthole 5 and the simulated fracture 6. The system working pressure is 0-50MPa, the displacement range of the displacement pump 9 is 0.01-1000ml / min, and the injection pressure of the displacement pump 9 is 0.1-50MPa.

[0056] By simulating the crack 6, the flow and plugging of the temporary plugging agent can be observed intuitively, mainly including the temporary plugging agent accumulation process, accumulation form, the order of accumulation in different branches 3, etc., which is more intuitive. Based on this, the plugging process of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing) in the actual construction process can be intuitively demonstrated.

[0057] The pressure display device 11 can read the pressure of the temporary plugging agent flowing into the vertical wellbore 2 in real time.

[0058] The information collection terminal 1 collects the temperature variation relationship and the pressure variation relationship over time at the upper part of the vertical wellbore 2, the connection between the branch 3 and the vertical wellbore 2, the simulated blasthole 5 and the simulated fracture 6 through sensors.

[0059] During the experiment, different temporary plugging agent formulas, particle size distribution, ratio, dosage, segment plug design, injection speed and other parameters can be adjusted. The experimental data after temporary plugging are used as the standard, such as the pressure increase amplitude and the pressure increase sequence of each branch 3, etc., to optimize the construction process parameters of broadband fracturing (diversion temporary plugging fracturing, dynamic multi-stage temporary plugging fracturing), so as to guide on-site construction and ensure the fracturing effect.

[0060] The indoor simulation experiment method for temporary plugging near the well can truly simulate the temporary plugging process near the well, accurately record the relationship between the temperature and pressure of each branch 3 over time, effectively guide the on-site construction design, and improve the construction effect. In particular, it provides a solution to the problem of difficult indoor flow simulation injection of granular and fiber-type diverting agents, and can also be used to optimize dynamic multi-stage temporary plugging fracturing process parameters, determine the particle size distribution, particle size combination concentration, dosage and segment plug design of temporary plugging agents, etc. The indoor simulation experiment method for temporary plugging near the well is safe and simple to operate, has a high degree of automation, and has high credibility of results. It no longer needs to rely on on-site experience, and improves the actual plugging effect and plugging quality.

[0061] It should be noted that the technical solutions of various embodiments can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention. Devices not described in detail are all prior art.

Claims

1. The indoor simulation experimental device for temporary plugging near the wellbore is characterized by: The invention comprises an experimental end and an information collection end (1), wherein the experimental end comprises an injection body and an experimental body, the injection body is connected to the experimental body via a pipeline, the experimental body comprises a vertical wellbore (2) and at least one branch (3), at least one branch interface (4) is provided on the lower side wall of the vertical wellbore (2), one end of the branch (3) is detachably connected to the vertical wellbore (2) via the branch interface (4), a simulated blasthole (5) and a simulated crack (6) are provided on the side wall of the branch (3), and the information collection end (1) is connected to a sensor arranged in the experimental body; The experimental body also includes at least one dead plug (7), the dead plug (7) being detachably connected to the vertical wellbore (2) via a branch interface (4), and the sum of the number of the dead plug (7) and the branch (3) being equal to the number of the branch interfaces (4); The simulated blastholes (5) are evenly distributed along the extension of the other end of the branch (3) and are cylindrical holes with a diameter of 1-2 cm and a length of 5-10 cm. The simulated cracks (6) are distributed along the side wall of the branch (3) and are parallel to the axis of the branch (3). The cracks are wedge-shaped structures with a width of 0.2-2 cm and a length of 20-50 cm.

2. The indoor simulation experimental device for temporary plugging of the near-wellbore zone according to claim 1 is characterized by: The axial direction of the branch (3) is perpendicular to the axial direction of the vertical wellbore (2), the angle between adjacent branches (3) is 0°-360°, and the diameter of the vertical wellbore (2) is 38.1 mm.

3. The indoor simulation experimental device for temporary plugging near the wellbore according to claim 1 is characterized by: There are a plurality of sensors, which are respectively located at the upper inner part of the vertical wellbore (2), at the connection between the branch (3) and the vertical wellbore (2), at the simulated blasthole (5) and at the simulated crack (6).

4. The indoor simulation experimental device for temporary plugging near the wellbore according to claim 1 is characterized by: The injection body comprises a piston container (8), a displacement pump (9) and a safety valve (10); one end of the piston container (8) is connected to the displacement pump (9), the other end of the piston container (8) is connected to the safety valve (10), and the other end of the safety valve (10) is connected to the temporary plugging agent inlet of the vertical wellbore (2).

5. The indoor simulation experimental device for temporary plugging of the near-wellbore zone according to claim 4 is characterized by: A stirring device is provided in the piston container (8).

6. The indoor simulation experimental device for temporary plugging near the wellbore according to claim 4 is characterized by: The vertical shaft (2) is provided with a pressure display device (11).

7. The indoor simulation experimental method for temporary plugging of the near-well zone is characterized by: The method is applied to any one of the devices in claims 1-6, comprising the following steps: Step 1: Place the pre-prepared temporary plugging agent into the piston container (8) and start the stirring device; Step 2: According to the parameters of the blasthole and the fracture to be simulated, determine the branches (3) and the number of branches (3) corresponding to the parameters of the blasthole and the fracture to be simulated, remove the unnecessary branches (3) on the vertical wellbore (2) and replace them with dead plugs (7); Step 3: Turn on the displacement pump (9) to deliver the temporary plugging agent in the piston container (8) into the vertical wellbore (2); Step 4: Observe the flow and plugging of the temporary plugging agent through the simulated cracks (6) on each branch (3), read the pressure values ​​at various locations of the experimental body through the pressure display device (11), and collect experimental data at the information collection end (1).

8. The indoor simulation experimental method for temporary plugging of the near-wellbore zone according to claim 7 is characterized by: The experimental body includes the upper part of the vertical wellbore (2), the connection between the branch (3) and the vertical wellbore (2), the simulated blasthole (5) and the simulated fracture (6), and the information collection end (1) collects the relationship between the temperature change over time and the relationship between the pressure change over time at each part of the experimental body.

Citation Information

Cited By

  • An evaluation device and method for temporary plugging materials in open-hole horizontal wells

    CN123109626A