Three-dimensional simulation method for building engineering construction

Through the three-dimensional simulation method of construction engineering construction, a three-dimensional model is constructed and combined with geological and natural disaster data is solved, the problem of inaccurate construction risk assessment in traditional methods is improved, construction safety and efficiency are improved, and building design is optimized to enhance risk resistance.

CN119047829AInactive Publication Date: 2024-11-29朱文青

Patent Information

Application Number
CN202411131186.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-17
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional construction methods rely on two-dimensional floor plans, making it difficult to fully consider geological conditions, structural strength and external environmental factors, resulting in inaccurate construction risk assessment and inaccurate external factors assessment, affecting construction quality and safety.

Method used

The three-dimensional simulation method of construction engineering construction is adopted to construct a three-dimensional model by obtaining construction design data, extract geological status data, calculate foundation stability and building strength, combine historical natural disaster data for risk assessment, and optimize building structure design strategies.

Benefits of technology

It improves the effectiveness of the construction preparation stage, identifies the risk of uneven settlement of the foundation, ensures construction safety and the safety of the building in extreme environments, simplifies construction steps, reduces costs, and enhances the risk resistance of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047829A_ABST
    Figure CN119047829A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building engineering construction, in particular to a building engineering construction three-dimensional simulation method. The method comprises the following steps of obtaining building engineering construction design data, constructing a building engineering construction three-dimensional model, extracting construction geological condition data, calculating building foundation level differentiation and foundation stability, and calculating building body strength according to the foundation stability data. Furthermore, historical natural disaster data around the building are acquired, building risk assessment is performed in combination with the building strength data, risk assessment data are generated, and a building structure design optimization strategy is analyzed according to the risk assessment data. According to the method, through three-dimensional model construction and multi-level data analysis, the precision and safety prediction of construction simulation are effectively improved, and data support is provided for design optimization of constructional engineering. Through building construction risk assessment optimization, a building engineering construction three-dimensional simulation technology is safer and more efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering construction, and in particular to a three-dimensional simulation method for building engineering construction. Background Art

[0002] In modern construction projects, the complexity and diversity of the construction process require efficient management and monitoring to ensure construction quality and safety. Traditional construction methods often rely on two-dimensional plan drawings, which make it difficult to fully consider the geological conditions, structural strength, and external environmental factors of the construction site. This method not only limits the construction workers' intuitive understanding of the site situation, but also makes risk assessment and the formulation of countermeasures during the construction process more difficult. With the rapid development of computer technology, three-dimensional modeling and simulation technology has gradually become an important tool for construction engineering. By performing three-dimensional simulations of construction projects, this technology can intuitively display the building structure and its relationship with the surrounding environment, helping engineers and designers better understand and analyze the spatial characteristics of the building, foundation conditions, and potential risks during construction. 3D simulations can also integrate a variety of information such as construction design data, geological conditions, historical natural disaster information, and building material properties, thereby improving the scientificity and accuracy of building design and construction. However, traditional construction methods have problems with inaccurate assessment of building risks and external factors. Summary of the Invention

[0003] Based on this, it is necessary to provide a three-dimensional simulation method for construction engineering to solve at least one of the above technical problems.

[0004] To achieve the above object, a three-dimensional simulation method for construction engineering is provided, the method comprising the following steps:

[0005] Step S1: Acquire construction design data of a building project; construct a three-dimensional construction model of the building project according to the construction design data to obtain a three-dimensional construction model of the building project;

[0006] Step S2: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data; performing building foundation level differentiation calculation based on the construction design data of the building project and the three-dimensional model of the building project to obtain building foundation level differentiation data; performing foundation stability calculation based on the building foundation level differentiation data and the construction geological condition data to obtain building foundation stability data;

[0007] Step S3: Calculating the building strength of the three-dimensional building construction model based on the building foundation stability data and the building construction design data to obtain building strength data;

[0008] Step S4: Obtain historical natural disaster data around the building; perform building risk assessment based on the historical natural disaster data around the building and the building strength data to obtain building risk assessment data;

[0009] Step S5: performing a building structure design optimization strategy analysis on the building structure design data according to the building risk estimation data to obtain building structure design optimization strategy data.

[0010] The beneficial effects of the present invention are as follows: by acquiring construction design data of a building project, the present invention can integrate various types of design information (such as plan drawings, elevation drawings, structural drawings, etc.) into a unified platform, ensuring a unified understanding of the design intent by all parties; the three-dimensional model constructed based on the design data can intuitively display the spatial characteristics of the building, help designers and construction personnel better understand the building structure, improve the effectiveness of the construction preparation stage, extract construction geological condition data, and provide an important basis for subsequent foundation design and construction. It can identify the potential risks of uneven foundation settlement, discover problems in advance, reduce safety hazards during the construction process, and perform foundation stability calculations to ensure the safety of the building during construction and subsequent use, reducing risks such as collapse; it can evaluate the performance of the building structure under different loads, thereby ensuring the safety and reliability of the building; through the strength calculation results, it can promptly discover deficiencies in the design, make necessary adjustments and optimizations, and improve the overall performance of the building. It can obtain historical natural disaster data around the building and provide a strong reference for risk assessment by analyzing the impact of past natural disasters on the building. Combining building strength data with natural disaster data to conduct building risk assessment can comprehensively evaluate the safety of buildings in extreme environments and ensure the reliability of building design. According to the building risk estimation data, the optimized design scheme can simplify the construction steps, reduce the construction difficulty, improve construction efficiency, shorten the construction period, and reduce costs. By optimizing the design strategy, the risk resistance of the building can be further enhanced, and the safety of the building in natural disasters or other extreme conditions can be improved. Therefore, the present invention is an optimization treatment of the traditional three-dimensional simulation method for construction engineering, which solves the problems of inaccurate building risk assessment and inaccurate external factor assessment in the traditional three-dimensional simulation method for construction engineering, and reduces the problems of inaccurate building risk assessment and inaccurate external factor assessment.

[0011] Preferably, step S1 includes the following steps:

[0012] Step S11: Acquire construction design data of a building project;

[0013] Step S12: extracting the construction area and the construction building height according to the construction design data of the building project to obtain the construction area data and the construction building height data of the building project;

[0014] Step S13: performing building space feature analysis based on the construction area data and the building height data of the construction project to obtain building space feature data;

[0015] Step S14: constructing a construction space coordinate system according to the building space characteristic data to obtain a building space coordinate system;

[0016] Step S15: constructing a three-dimensional model of the construction project according to the building space coordinate system and the building space characteristic data to obtain the three-dimensional model data of the construction project.

[0017] By acquiring construction design data for a building project, the present invention ensures the integrity and consistency of all relevant information during the construction process. This process lays the foundation for subsequent three-dimensional modeling, enabling the accurate communication of design intent and engineering requirements, reducing errors and omissions in information transmission. Extracting construction area and building height data based on the construction design data not only provides the building's basic physical parameters but also helps clarify the scope and height restrictions of the construction site, providing the necessary basic data for subsequent spatial analysis. Building spatial feature analysis based on construction area and building height data provides a deep understanding of the building's spatial layout and structural relationships. This analysis helps identify the building's functional areas, access design, and space utilization efficiency, providing data support for the rationality of the building design. Constructing a construction space coordinate system based on the building space feature data ensures accurate positioning and description of the building in three-dimensional space. This process provides the necessary spatial framework and reference benchmark for subsequent three-dimensional model construction. Combining the building space coordinate system and spatial feature data to construct a three-dimensional model of the building project not only intuitively displays the building's appearance and structure, but also enables virtual simulation and performance analysis during the design phase.

[0018] Preferably, step S2 includes the following steps:

[0019] Step S21: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data;

[0020] Step S22: performing building foundation level differentiation calculation based on the building project construction design data and the building project three-dimensional model to obtain building foundation level differentiation data;

[0021] Step S23: Calculating foundation settlement based on the building foundation level difference data and the construction geological condition data to obtain building foundation settlement data;

[0022] Step S24: performing foundation stability analysis based on the building foundation level difference data and the building foundation settlement data to obtain building foundation stability data.

[0023] By extracting construction geological data, the present invention provides a comprehensive understanding of the geological characteristics of the construction site, including key information such as soil type, soil layer distribution, and groundwater level. This process provides a solid foundation for subsequent foundation design, helping construction teams make scientific decisions in actual operations and ensuring the safety and effectiveness of construction. Secondly, using construction engineering design data and three-dimensional models to perform building foundation level differentiation calculations can identify and quantify differences in foundation levels at different locations. This data not only reveals potential uneven foundation settlement issues, but also promptly identifies risks that may arise during construction, providing a basis for subsequent design adjustments and construction strategies. Calculating foundation settlement based on foundation level differentiation data and construction geological data can predict future settlement during the building's operation. This calculation can help designers and construction personnel assess the foundation's performance under long-term loads, ensuring the building's stability during construction and operation, and avoiding structural damage caused by settlement. Finally, performing foundation stability analysis based on foundation level differentiation data and settlement data can comprehensively assess the foundation's performance under various loads and environmental conditions, ensuring the building's safety and reliability under different circumstances.

[0024] Preferably, step S22 includes the following steps:

[0025] Step S221: Taking building foundation points from the three-dimensional model of the construction project to obtain a building foundation point dataset;

[0026] Step S222: measuring the elevation of the building foundation points according to the building foundation point data to obtain a building foundation point elevation dataset;

[0027] Step S223: Calculating the average elevation benchmark point based on the building foundation point elevation dataset to obtain the building foundation elevation benchmark point;

[0028] Step S224: performing elevation difference calculation on the building foundation point elevation dataset according to the building foundation elevation reference point to obtain building foundation elevation difference data;

[0029] Step S225: performing foundation point horizontal distance calculation based on the building foundation point elevation data set to obtain building foundation point horizontal distance data; performing inclination differentiation calculation based on the building foundation point horizontal distance data and the building foundation elevation differentiation data to obtain building foundation inclination differentiation data;

[0030] Step S226: performing building foundation level difference calculation based on the building foundation elevation difference data and the building foundation inclination difference data to obtain building foundation level difference data.

[0031] The present invention generates a building foundation point data set by taking building foundation points from a three-dimensional model of a construction project, thereby providing accurate spatial location data for subsequent foundation analysis. This process ensures the reliability and accuracy of the foundation point data, so that subsequent elevation measurements and calculations can be carried out on a scientific basis. Elevation measurements are performed based on the building foundation point data to obtain a building foundation point elevation data set. This data set provides an important basis for the vertical positioning and settlement analysis of the foundation, helping the construction team to accurately assess the actual situation of the foundation. By performing an elevation average benchmark calculation on the building foundation point elevation data set, a unified benchmark point can be determined, which provides a reference basis for subsequent elevation difference calculations. Performing elevation difference calculations based on this benchmark point can reveal the elevation difference data between the various points on the foundation. This information is crucial for identifying potential settlement risks and unevenness of the foundation. The next step involves calculating the horizontal distance of the foundation points. Through this calculation, the horizontal distance data between the foundation points can be obtained, laying the foundation for subsequent tilt difference calculations. Combining the horizontal distance data of building foundation points with the elevation difference data to perform tilt difference calculations can quantify the degree of foundation tilt and assess the stability of the building during use. Performing horizontal difference calculations of building foundations based on the elevation difference data and tilt difference data can comprehensively assess the horizontal stability of the foundation.

[0032] Preferably, step S23 includes the following steps:

[0033] Step S231: performing building stratum analysis based on construction geological condition data to obtain building foundation stratum distribution data;

[0034] Step S232: performing stratum soil strength heterogeneity analysis based on the building foundation stratum distribution data to obtain stratum soil strength heterogeneity data;

[0035] Step S233: performing defect overlap structure analysis based on the heterogeneous data of building stratum soil strength and the differential data of building foundation levels to obtain foundation defect overlap data;

[0036] Step S234: performing load calculation based on the foundation defect overlapping data to obtain building foundation load data;

[0037] Step S235: performing foundation settlement calculation based on the building foundation load data and the foundation defect overlapping data to obtain building foundation settlement data.

[0038] The present invention performs building stratum analysis based on construction geological condition data, which can provide an in-depth understanding of the distribution of the foundation strata. This process provides the necessary geological background for subsequent foundation design, helps the design team identify the characteristics of different soil layers and their impact on the bearing capacity of the foundation, thereby providing a scientific basis for subsequent foundation design. The heterogeneous analysis of stratum soil strength based on the building foundation stratum distribution data helps to reveal the changes in soil strength in different strata. This analysis can effectively evaluate the bearing capacity and stability of the foundation, thereby reducing the structural safety hazards caused by insufficient soil strength. The defect overlap structure analysis based on the soil strength heterogeneous data and the building foundation level differentiation data can identify potential defect areas in the foundation. This analysis process helps the construction team understand which areas have insufficient soil strength or other geological problems, so as to formulate targeted reinforcement measures to ensure the safety and stability of the building. Subsequently, load calculation is performed based on the foundation defect overlap data, which can accurately evaluate the load impact of the building on the foundation under different working conditions. This load data provides the basis for subsequent settlement calculations, allowing designers to optimize foundation design while fully considering the impact of loads, thereby improving the safety of the overall structure. Foundation settlement calculations based on building foundation load data and foundation defect overlapping data can predict the settlement behavior of the building during use.

[0039] Preferably, step S3 includes the following steps:

[0040] Step S31: extracting building design structure and building materials based on the building construction design data to obtain building design structure data and building material data;

[0041] Step S32: Calculating the bearing capacity of the building's load-bearing walls on the three-dimensional model of the building project based on the building structure data and the building material data to obtain the bearing capacity data of the building's load-bearing walls;

[0042] Step S33: performing a connection point stability assessment based on the building load-bearing wall bearing capacity data, building structure data, and building material data to obtain building connection point stability data;

[0043] Step S34: Calculate the building strength based on the bearing capacity data of the building's load-bearing walls, the building's foundation stability data, and the building's connection point stability data to obtain the building's strength data.

[0044] The present invention first extracts the building design structure and building materials based on the construction design data of the building project. This process can accurately obtain the structural composition of the building and the material information used, providing basic data for subsequent design and analysis. The integrity and accuracy of this data are crucial to ensuring the safety and reliability of the building, and provide designers with a basis for a comprehensive understanding of the building's characteristics. The load-bearing wall bearing capacity calculation is performed on the three-dimensional model of the building construction project. This calculation can evaluate the performance of the load-bearing wall under different load conditions. Based on the load-bearing wall bearing capacity data, the connection point stability assessment is performed. This assessment can analyze the stability of the building connection points under different load and environmental conditions. This analysis is crucial to ensuring the overall structural integrity and safety of the building, especially when facing external loads or natural disasters. The stability of the connection points directly affects the anti-collapse ability and durability of the entire structure. The building strength calculation is performed based on the data of the load-bearing wall bearing capacity, the stability of the building foundation and the stability of the connection points. The comprehensive assessment can comprehensively analyze the overall strength performance of the building.

[0045] Preferably, step S32 includes the following steps:

[0046] Step S321: extracting the height and thickness of the load-bearing walls of the building according to the building structure data to obtain the height data and thickness data of the load-bearing walls of the building;

[0047] Step S322: Calculating the rigidity of the load-bearing wall based on the building material data, the height data of the building load-bearing wall, and the thickness data of the building load-bearing wall to obtain the rigidity data of the building load-bearing wall;

[0048] Step S323: performing elastic limit load weight simulation on the three-dimensional construction model of the building project according to the rigidity data of the load-bearing wall to obtain the limit load weight data of the load-bearing wall;

[0049] Step S324: Calculate the bearing capacity of the building's load-bearing walls based on the rigidity data and the ultimate load weight data of the load-bearing walls to obtain the bearing capacity data of the building's load-bearing walls.

[0050] First, the present invention can accurately obtain the geometric characteristic data of the load-bearing wall by extracting the height and thickness of the load-bearing wall according to the building structure data. It provides basic information for subsequent analysis, so that designers can fully understand the design parameters of the wall and ensure that it complies with the building design specifications and safety standards. The rigidity of the load-bearing wall is calculated based on the building material data and the extracted height and thickness data of the load-bearing wall, and the rigidity performance of the load-bearing wall under different loads can be evaluated. The rigidity of the load-bearing wall directly affects its bearing capacity. The elastic limit load weight simulation is performed on the three-dimensional construction model of the building project based on the rigidity data of the load-bearing wall. This simulation can predict the bearing capacity of the load-bearing wall under the limit state. Ensure that the building can withstand the expected load during use and avoid structural damage caused by overload. The bearing capacity is calculated based on the rigidity data and the limit load weight data of the building's load-bearing wall, and a comprehensive evaluation can obtain the final bearing capacity data of the load-bearing wall.

[0051] Preferably, step S33 includes the following steps:

[0052] Step S331: extracting the building connection point structure according to the building structure data to obtain the building connection point structure data;

[0053] Step S332: performing a connection point axial force distribution simulation on the building connection point structure data based on the building load-bearing wall bearing capacity data to obtain the building connection point axial force distribution data;

[0054] Step S333: performing fatigue limit value testing based on the axial force distribution data of the building connection points and the building material data to obtain fatigue limit data of the building connection points;

[0055] Step S334: performing connection point life prediction based on the building connection point fatigue limit data and building material data to obtain building connection point life prediction data;

[0056] Step S335: performing connection point stability assessment based on the building connection point life prediction data and the building connection point fatigue limit data to obtain building connection point stability data.

[0057] The present invention first extracts the structure of building connection points based on building structural data, obtaining the specific geometric and structural characteristics of the connection points. This process provides foundational information for subsequent analysis. Simulating the axial force distribution of the connection points based on the bearing capacity data of the building's load-bearing walls effectively identifies the distribution of forces acting on the connection points under different load conditions. This provides the actual stress state of the connection points, thereby identifying potential safety hazards and design flaws. Fatigue limit value testing, based on the axial force distribution data and building material data, assesses the fatigue performance of the connection points under long-term and repeated loads. This testing provides the design team with information on the fatigue resistance of the connection points under various operating conditions. Predicting the life of the connection points based on the fatigue limit data and building material data estimates the expected service life of the connection points under actual operating conditions. This prediction provides important maintenance and inspection information for construction teams, helping to identify critical areas requiring regular maintenance. Predicting the stability of the connection points based on the predicted life and fatigue limit data provides a comprehensive analysis of the stability of the connection points under different operating conditions.

[0058] Preferably, step S4 includes the following steps:

[0059] Step S41: Obtain historical natural disaster data around the building;

[0060] Step S42: performing a building degradation trend analysis based on the building strength data and the historical natural disaster data around the building to obtain building degradation trend data;

[0061] Step S43: Performing a building risk assessment based on the building degradation trend data and the building strength data to obtain building risk assessment data.

[0062] By acquiring historical natural disaster data around the building, the present invention can fully understand the types, frequencies and impacts of natural disasters that have occurred in the area in the past. This process provides the necessary background information for subsequent degradation trend analysis and risk assessment, and provides higher safety guarantees for the design and construction of buildings. By conducting a building degradation trend analysis based on the building strength data and the historical natural disaster data around the building, it is possible to identify the degradation pattern of the building under the influence of different natural disasters. This analysis helps to evaluate the structural performance and safety of the building after various natural disasters. Through the analysis of the degradation trend, the design team can understand the weaknesses of the building under specific environmental conditions, and thus formulate corresponding repair and reinforcement measures to ensure that the building can maintain good safety performance in future natural disasters. By conducting a building risk assessment based on the building degradation trend data and the building strength data, it is possible to comprehensively analyze the risk level of the building under various natural disasters that may be encountered in the future.

[0063] Preferably, step S42 includes the following steps:

[0064] Step S421: Analyze historical typhoon directions and historical typhoon wind speeds based on historical natural disaster data around the building to obtain historical typhoon direction data and historical typhoon wind speed data;

[0065] Step S422: extracting typhoon high-frequency directions based on historical typhoon direction data to obtain historical typhoon high-frequency direction data, and performing typhoon strong wind force analysis based on historical typhoon wind force data to obtain historical typhoon strong wind force data;

[0066] Step S423: Utilizing historical typhoon strong wind force data and historical typhoon high frequency direction data, a typhoon load simulation is performed on the three-dimensional model of the building project to obtain building typhoon load data;

[0067] Step S424: performing a self-weight load analysis based on the building strength data to obtain building self-weight load data; performing load aggregation based on the building typhoon load data and the building self-weight load data to obtain building load data;

[0068] Step S425: using the three-dimensional model of the building project to perform building deformation curvature analysis on the building load data to obtain building deformation curvature data;

[0069] Step S426: performing degradation trend analysis based on the building deformation curvature data and the building strength data to obtain building degradation trend data.

[0070] By analyzing historical typhoon direction and wind force based on historical natural disaster data surrounding a building, this method provides a comprehensive understanding of the direction and intensity of past typhoons in the area. This process provides essential historical background information for subsequent load simulations, enabling design teams to make informed decisions based on an understanding of environmental risks. Extracting high-frequency typhoon directions based on historical typhoon direction data identifies the most common typhoon attack directions, helping to consider the impact of wind direction on structures during building design. Typhoon high-force analysis based on historical typhoon wind force data assesses a building's performance under high-intensity winds. Typhoon load simulation using historical typhoon high-force and high-frequency direction data on a three-dimensional building model calculates the wind loads borne by the building under specific typhoon conditions. Self-weight load analysis based on building strength data assesses the impact of the building's deadweight on the structure and provides basic data for load aggregation. Combining building typhoon load data with self-weight load data for load aggregation yields the total load on the building under different operating conditions. Deformation curvature analysis of building load data using a three-dimensional building model assesses the building's deformation under different load conditions. By analyzing the deterioration trend based on the building deformation curvature data and building strength data, it is possible to predict the deterioration of the building under long-term use and the impact of natural disasters.

[0071] The beneficial effects of the present invention are as follows: by acquiring construction design data of a building project, the present invention can integrate various types of design information (such as plan drawings, elevation drawings, structural drawings, etc.) into a unified platform, ensuring a unified understanding of the design intent by all parties; the three-dimensional model constructed based on the design data can intuitively display the spatial characteristics of the building, help designers and construction personnel better understand the building structure, improve the effectiveness of the construction preparation stage, extract construction geological condition data, and provide an important basis for subsequent foundation design and construction. It can identify the potential risks of uneven foundation settlement, discover problems in advance, reduce safety hazards during the construction process, and perform foundation stability calculations to ensure the safety of the building during construction and subsequent use, reducing risks such as collapse; it can evaluate the performance of the building structure under different loads, thereby ensuring the safety and reliability of the building; through the strength calculation results, it can promptly discover deficiencies in the design, make necessary adjustments and optimizations, and improve the overall performance of the building. It can obtain historical natural disaster data around the building and provide a strong reference for risk assessment by analyzing the impact of past natural disasters on the building. Combining building strength data with natural disaster data to conduct building risk assessment can comprehensively evaluate the safety of buildings in extreme environments and ensure the reliability of building design. According to the building risk estimation data, the optimized design scheme can simplify the construction steps, reduce the construction difficulty, improve construction efficiency, shorten the construction period, and reduce costs. By optimizing the design strategy, the risk resistance of the building can be further enhanced, and the safety of the building in natural disasters or other extreme conditions can be improved. Therefore, the present invention is an optimization treatment of the traditional three-dimensional simulation method for construction engineering, which solves the problems of inaccurate building risk assessment and inaccurate external factor assessment in the traditional three-dimensional simulation method for construction engineering, and reduces the problems of inaccurate building risk assessment and inaccurate external factor assessment. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] Figure 1 A schematic diagram of the steps of a three-dimensional simulation method for construction engineering;

[0073] Figure 2 for Figure 1 Detailed implementation steps of step S2 in FIG.

[0074] Figure 3 for Figure 1 Detailed implementation steps of step S3 in FIG.

[0075] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings and in conjunction with the embodiments. DETAILED DESCRIPTION

[0076] The following is a clear and complete description of the technical method of the present invention in conjunction with the accompanying drawings. It is obvious that the embodiments described are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making any creative efforts are within the scope of protection of the present invention.

[0077] In addition, the accompanying drawings are merely schematic illustrations of the present invention and are not necessarily drawn to scale. Identical reference numerals in the figures denote identical or similar parts, and thus repetitive descriptions thereof will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities that do not necessarily correspond to physically or logically separate entities. These functional entities may be implemented in software, in one or more hardware modules or integrated circuits, or in different network and / or processor and / or microcontroller approaches.

[0078] It should be understood that although the terms "first," "second," and the like may be used herein to describe various elements, these elements should not be limited by these terms. These terms are used solely to distinguish one element from another. For example, a first element may be referred to as a second element, and similarly, a second element may be referred to as a first element, without departing from the scope of the exemplary embodiments. The term "and / or" as used herein includes any and all combinations of one or more of the listed associated items.

[0079] To achieve this, please refer to Figures 1 to 3 A three-dimensional simulation method for construction engineering, comprising the following steps:

[0080] Step S1: Acquire construction design data of a building project; construct a three-dimensional construction model of the building project according to the construction design data to obtain a three-dimensional construction model of the building project;

[0081] Step S2: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data; performing building foundation level differentiation calculation based on the construction design data of the building project and the three-dimensional model of the building project to obtain building foundation level differentiation data; performing foundation stability calculation based on the building foundation level differentiation data and the construction geological condition data to obtain building foundation stability data;

[0082] Step S3: Calculating the building strength of the three-dimensional building construction model based on the building foundation stability data and the building construction design data to obtain building strength data;

[0083] Step S4: Obtain historical natural disaster data around the building; perform building risk assessment based on the historical natural disaster data around the building and the building strength data to obtain building risk assessment data;

[0084] Step S5: performing a building structure design optimization strategy analysis on the building structure design data according to the building risk estimation data to obtain building structure design optimization strategy data.

[0085] In the embodiment of the present invention, reference Figure 1 The above is a schematic flow chart of the steps of a three-dimensional construction simulation method of the present invention. In this example, the three-dimensional construction simulation method of the present invention includes the following steps:

[0086] Step S1: Acquire construction design data of a building project; construct a three-dimensional construction model of the building project according to the construction design data to obtain a three-dimensional construction model of the building project;

[0087] In an embodiment of the present invention, architectural design software (such as AutoCAD or Revit) is used to obtain construction design data for a building project, including floor plans, elevations, and structural drawings. Subsequently, using BIM (Building Information Modeling) technology, this data is input into specific 3D modeling software (such as Navisworks or Tekla Structures) to construct a 3D model of the building project. This model must include the specific dimensions and materials of all structural elements, such as load-bearing walls, floor slabs, windows, and doors, to ensure that the model accurately reflects the architectural design intent.

[0088] Step S2: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data; performing building foundation level differentiation calculation based on the construction design data of the building project and the three-dimensional model of the building project to obtain building foundation level differentiation data; performing foundation stability calculation based on the building foundation level differentiation data and the construction geological condition data to obtain building foundation stability data;

[0089] In this embodiment of the present invention, based on the obtained design data, geological survey software (such as GeoStudio) is used to extract construction geological condition data, including soil type, groundwater level, and bearing capacity. Subsequently, combined with the three-dimensional model, foundation level differentiation calculations are performed. Finite element analysis (FEA) tools (such as ANSYS or Plaxis) are used to calculate the horizontal differentiation data of each foundation point to ensure that the bearing capacity of each foundation point meets the design requirements. Finally, this data is used to perform foundation stability calculations, analyzing the foundation's performance under different loads to ensure its stability and prevent settlement or other risks.

[0090] Step S3: Calculating the building strength of the three-dimensional building construction model based on the building foundation stability data and the building construction design data to obtain building strength data;

[0091] In this embodiment of the present invention, the building foundation stability data and construction design data obtained in the previous step are used to calculate the strength of the building using structural analysis software. The calculation process takes into account all load factors, including deadweight, live load, wind load, and seismic load.

[0092] Step S4: Obtain historical natural disaster data around the building; perform building risk assessment based on the historical natural disaster data around the building and the building strength data to obtain building risk assessment data;

[0093] In this embodiment of the present invention, historical natural disaster data surrounding a building is collected, specifically typhoon and earthquake records from the past decade. Geographic Information System (GIS) software (such as ArcGIS) is used to analyze the frequency and intensity of these natural disasters. This data is combined with building strength data to conduct a risk assessment. Wind load calculation models and seismic response analysis models are used to assess the building's risk level under potential natural disasters.

[0094] Step S5: performing a building structure design optimization strategy analysis on the building structure design data according to the building risk estimation data to obtain building structure design optimization strategy data.

[0095] In this embodiment of the present invention, an optimization algorithm (such as a genetic algorithm or particle swarm optimization) is used to analyze building structural design strategies based on building risk assessment data and building structural design data. Design optimization is performed by taking into account factors such as strength, material usage, and cost, adjusting wall dimensions, material selection, or structural form to improve the building's disaster resistance and affordability. Furthermore, the optimized design should be verified in a three-dimensional model to ensure its feasibility and effectiveness.

[0096] Preferably, step S1 includes the following steps:

[0097] Step S11: Acquire construction design data of a building project;

[0098] Step S12: extracting the construction area and the construction building height according to the construction design data of the building project to obtain the construction area data and the construction building height data of the building project;

[0099] Step S13: performing building space feature analysis based on the construction area data and the building height data of the construction project to obtain building space feature data;

[0100] Step S14: constructing a construction space coordinate system according to the building space characteristic data to obtain a building space coordinate system;

[0101] Step S15: constructing a three-dimensional model of the construction project according to the building space coordinate system and the building space characteristic data to obtain the three-dimensional model data of the construction project.

[0102] In an embodiment of the present invention, during the project preparation phase, building information modeling (BIM) software is used to extract construction design data from architectural design documents. This includes floor plans, elevations, sections, and bills of materials. All data should include the building's functional requirements, dimensions, material properties, and construction details. Ensure that the extracted data complies with local building regulations and standards to provide an accurate basis for subsequent spatial analysis and modeling. An algorithm is used to calculate the building's total construction area, taking into account the areas of all floors and ancillary structures. The building's maximum height is then measured to determine the building's vertical constraints. Finally, the resulting construction area and building height data are presented in a visual chart format, and 3D modeling software is used to analyze the building's spatial characteristics. This analysis includes calculating the building's volume, surface area, and space utilization, and assessing the building's functional layout and pedestrian flow. By recording this spatial characteristic data in a database, a construction space coordinate system is constructed based on the building's spatial characteristic data. Using 3D modeling software (such as CAD or Revit), the coordinate origin, X, Y, and Z axes are set to ensure they align with the geometric center of the building design. The coordinate system should be able to cover the entire construction area and indicate the main reference points (such as the location of wall corners, columns, and doors). Use 3D modeling software (such as BIM 360 or Navisworks) to construct a 3D model of the construction project. Based on the building space characteristic data, accurately draw the structure and appearance of the building, including elements such as walls, roofs, windows, and doors. During the model construction process, ensure that the connection and relative position between each part meet the design requirements, and perform real-time collision detection to identify design problems or conflicts. Ultimately, the generated 3D model data of the construction project should include all relevant component information.

[0103] Preferably, step S2 includes the following steps:

[0104] Step S21: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data;

[0105] Step S22: performing building foundation level differentiation calculation based on the building project construction design data and the building project three-dimensional model to obtain building foundation level differentiation data;

[0106] Step S23: Calculating foundation settlement based on the building foundation level difference data and the construction geological condition data to obtain building foundation settlement data;

[0107] Step S24: performing foundation stability analysis based on the building foundation level difference data and the building foundation settlement data to obtain building foundation stability data.

[0108] As an example of the present invention, refer to Figure 2 As shown, in this example, step S2 includes:

[0109] Step S21: extracting construction geological conditions based on the construction design data of the building project to obtain construction geological condition data;

[0110] In this embodiment of the present invention, geological survey reports and soil test data are used to extract construction geological conditions based on construction project design data. Geological survey software (such as GeoStudio or PLAXIS) is then used to analyze the on-site soil type, groundwater level, bearing capacity, and foundation depth. Based on the on-site survey results, a detailed construction geological conditions data report is generated.

[0111] Step S22: performing building foundation level differentiation calculation based on the building project construction design data and the building project three-dimensional model to obtain building foundation level differentiation data;

[0112] In this embodiment of the present invention, finite element analysis software (such as ANSYS or SAP2000) is used to perform differential calculations of building foundation levels. Specifically, building design parameters and geological data are input to simulate the load distribution at different foundation points. The calculation process considers various building loads (such as deadweight, live loads, and wind loads) and their impact on the foundation.

[0113] Step S23: Calculating foundation settlement based on the building foundation level difference data and the construction geological condition data to obtain building foundation settlement data;

[0114] In this embodiment of the present invention, soil mechanics analysis software (such as Settle3D) is used to calculate foundation settlement. During the calculation process, the load conditions and soil properties at each base point are input, and settlement trends over different time periods are analyzed. By considering factors such as soil compressibility and groundwater level fluctuations, building foundation settlement data is obtained.

[0115] Step S24: performing foundation stability analysis based on the building foundation level difference data and the building foundation settlement data to obtain building foundation stability data.

[0116] In an embodiment of the present invention, a foundation stability analysis is performed, and a comprehensive assessment is performed using structural analysis software (such as GeoSlope). All relevant data, including soil strength, settlement, and foundation load, are input to analyze the stability of the foundation under different working conditions. The analysis results not only provide the safety factor of the foundation, but also identify potential instability risk areas.

[0117] Preferably, step S22 includes the following steps:

[0118] Step S221: Taking building foundation points from the three-dimensional model of the construction project to obtain a building foundation point dataset;

[0119] Step S222: measuring the elevation of the building foundation points according to the building foundation point data to obtain a building foundation point elevation dataset;

[0120] Step S223: Calculating the average elevation benchmark point based on the building foundation point elevation dataset to obtain the building foundation elevation benchmark point;

[0121] Step S224: performing elevation difference calculation on the building foundation point elevation dataset according to the building foundation elevation reference point to obtain building foundation elevation difference data;

[0122] Step S225: performing foundation point horizontal distance calculation based on the building foundation point elevation data set to obtain building foundation point horizontal distance data; performing inclination differentiation calculation based on the building foundation point horizontal distance data and the building foundation elevation differentiation data to obtain building foundation inclination differentiation data;

[0123] Step S226: performing building foundation level difference calculation based on the building foundation elevation difference data and the building foundation inclination difference data to obtain building foundation level difference data.

[0124] In an embodiment of the present invention, in a three-dimensional model of a construction project, points are taken from the building foundation, and foundation point information is extracted from the model using BIM software (such as Revit or Navisworks). The key load-bearing positions and support points of the building are selected to ensure that the points are evenly distributed and cover the entire foundation area. Each foundation point needs to record its three-dimensional coordinates (X, Y, Z), and these data are integrated into a database. A laser rangefinder or digital level is used to measure the elevation of each foundation point, ensuring that the measuring equipment is calibrated to improve measurement accuracy. The elevation measurement results of each foundation point should be recorded in an elevation dataset, and the data includes the elevation value relative to the benchmark point. After the measurement is completed, the generated building foundation point elevation dataset should contain the elevation values ​​of all measured points, and the elevation average benchmark point is calculated. The building foundation point elevation data is analyzed using statistical software (such as MATLAB or Excel), and the average of all elevation data is calculated to determine an elevation benchmark point. This benchmark point will serve as a reference point for subsequent elevation difference calculations. Finally, the generated building foundation elevation benchmark points should be clearly identified, and data processing software (such as ArcGIS or AutoCAD) should be used to compare the elevation value of each foundation point with the benchmark point to calculate the elevation difference of each foundation point. Use CAD software to measure the horizontal distance between each base point to ensure that the measurement conforms to the actual building layout. During the calculation process, the Euclidean distance formula is used to obtain the horizontal distance between each pair of foundation points and record it in the data set. At the same time, combined with the elevation difference data, tilt differentiation calculation is performed to quantify the relative tilt of the foundation points. Finally, the generated building foundation tilt differentiation data should include the tilt values ​​of all foundation points to ensure the accuracy and completeness of the data. To perform the building foundation horizontal differentiation calculation, use specialized civil engineering software (such as PLAXIS or GeoStudio) for comprehensive analysis, and calculate the horizontal differentiation value of each foundation point by inputting the elevation difference and tilt difference data.

[0125] Preferably, step S23 includes the following steps:

[0126] Step S231: performing building stratum analysis based on construction geological condition data to obtain building foundation stratum distribution data;

[0127] Step S232: performing stratum soil strength heterogeneity analysis based on the building foundation stratum distribution data to obtain stratum soil strength heterogeneity data;

[0128] Step S233: performing defect overlap structure analysis based on the heterogeneous data of building stratum soil strength and the differential data of building foundation levels to obtain foundation defect overlap data;

[0129] Step S234: performing load calculation based on the foundation defect overlapping data to obtain building foundation load data;

[0130] Step S235: performing foundation settlement calculation based on the building foundation load data and the foundation defect overlapping data to obtain building foundation settlement data.

[0131] In this embodiment of the present invention, geological modeling software (such as GEO5) is used to conduct a detailed analysis of the on-site soil layers. Construction geological data, including the depth, type, and physical properties of different soil layers, is imported. A stratigraphic distribution map is then generated, indicating the thickness and distribution of each soil layer. Ultimately, the resulting building foundation stratigraphic distribution data should detail the properties of each soil layer. Physical parameters for each soil layer, including friction angle, cohesion, and elastic modulus, are input. Advanced computational methods (such as the finite element method) are used to analyze strength differences between different strata, generating stratigraphic soil strength heterogeneity data. The results should be presented in graphical and tabular form, clearly indicating the strength characteristics and trends of each soil layer. Soil strength heterogeneity data and horizontal differentiation data are input to identify potential defective areas. A model is then constructed to analyze the overlap of soil layers and the impact of defects on the foundation. Ultimately, the generated foundation defect overlap data should detail the characteristics and potential risks of each defective area. The building's design loads, including deadweight, live load, and wind load, are input. Then, based on the defect overlap data, analyze the impact of each defect area on the building load distribution and calculate the load data for the building foundation. The results should be presented in a table, clearly listing the load value and location at each point. Based on the load data and incorporating the foundation soil strength and settlement characteristics, an appropriate calculation model (such as the step-by-step loading method) should be used to simulate settlement. Ultimately, the generated building foundation settlement data should detail the settlement amount and settlement trend at each location.

[0132] Preferably, step S3 includes the following steps:

[0133] Step S31: extracting building design structure and building materials based on the building construction design data to obtain building design structure data and building material data;

[0134] Step S32: Calculating the bearing capacity of the building's load-bearing walls on the three-dimensional model of the building project based on the building structure data and the building material data to obtain the bearing capacity data of the building's load-bearing walls;

[0135] Step S33: performing a connection point stability assessment based on the building load-bearing wall bearing capacity data, building structure data, and building material data to obtain building connection point stability data;

[0136] Step S34: Calculate the building strength based on the bearing capacity data of the building's load-bearing walls, the building's foundation stability data, and the building's connection point stability data to obtain the building's strength data.

[0137] As an example of the present invention, refer to Figure 3As shown, in this example, step S3 includes:

[0138] Step S31: extracting building design structure and building materials based on the building construction design data to obtain building design structure data and building material data;

[0139] In this embodiment of the present invention, building information modeling (BIM) software is used to extract building design structure and building material information based on construction design data. Specifically, all load-bearing structures (such as walls, columns, and floor slabs) and non-load-bearing structures must be identified from the design blueprints, and their corresponding geometric parameters (such as size and shape) as well as the building materials used (such as concrete grade and steel type) must be extracted.

[0140] Step S32: Calculating the bearing capacity of the building's load-bearing walls on the three-dimensional model of the building project based on the building structure data and the building material data to obtain the bearing capacity data of the building's load-bearing walls;

[0141] In this embodiment of the present invention, structural analysis software (such as SAP2000 or ETABS) is used to calculate the bearing capacity of a building's load-bearing walls based on extracted building structure and material data. Input data includes the wall's geometric characteristics (height, thickness, width) and material properties (compressive strength, elastic modulus, etc.). By applying different load conditions (such as deadweight, live load, and wind load), the bearing capacity of each wall is calculated and a bearing capacity analysis report is generated.

[0142] Step S33: performing a connection point stability assessment based on the building load-bearing wall bearing capacity data, building structure data, and building material data to obtain building connection point stability data;

[0143] In an embodiment of the present invention, after obtaining the bearing capacity data of the load-bearing wall, the connection point stability assessment is performed in combination with the building structure data and the building material data. Using connection point analysis software (such as RISA or Tekla Structures), the geometric information of each connection point (such as the connection point type, location, etc.) and its stress conditions are input. During the assessment process, the axial force distribution, shear force and bending moment of the connection point under different loads are analyzed, and the stability index of the connection point (such as the safety factor) is calculated. The assessment results should list the stability status of each connection point in detail and indicate which connection points need to be reinforced or optimized.

[0144] Step S34: Calculate the building strength based on the bearing capacity data of the building's load-bearing walls, the building's foundation stability data, and the building's connection point stability data to obtain the building's strength data.

[0145] In this embodiment of the present invention, building strength calculations are performed using comprehensive structural analysis software (such as ANSYS or MIDAS) based on data on the bearing capacity of load-bearing walls, the stability of the building foundation, and the stability of connection points. All relevant data, including the bearing capacity of the load-bearing walls, the bearing condition of the foundation, and the stability assessment results of the connection points, are input. By simulating the stresses on the building under different operating conditions, the strength and deformation of the entire building are calculated.

[0146] Preferably, step S32 includes the following steps:

[0147] Step S321: extracting the height and thickness of the load-bearing walls of the building according to the building structure data to obtain the height data and thickness data of the load-bearing walls of the building;

[0148] Step S322: Calculating the rigidity of the load-bearing wall based on the building material data, the height data of the building load-bearing wall, and the thickness data of the building load-bearing wall to obtain the rigidity data of the building load-bearing wall;

[0149] Step S323: performing elastic limit load weight simulation on the three-dimensional construction model of the building project according to the rigidity data of the load-bearing wall to obtain the limit load weight data of the load-bearing wall;

[0150] Step S324: Calculate the bearing capacity of the building's load-bearing walls based on the rigidity data and the ultimate load weight data of the load-bearing walls to obtain the bearing capacity data of the building's load-bearing walls.

[0151] In an embodiment of the present invention, the position and size of the load-bearing wall are identified by parsing the structural data in the building information model (BIM). During the extraction process, the software automatically identifies the boundaries of the load-bearing wall and calibrates the extracted data according to the building design standards and actual engineering experience to ensure the accuracy of the height and thickness data. For example, for a certain high-rise building, the height extraction range of its load-bearing wall is between 3 and 4 meters, and the thickness extraction range is 20 to 30 centimeters, which is refined according to the specific building materials and design requirements. Based on the load-bearing wall height data and thickness data extracted in Example 1, combined with the physical and mechanical performance parameters of the building materials (such as the compressive strength of concrete, the yield strength of steel bars, etc.), the load-bearing wall rigidity calculation is performed using finite element analysis software. The rigidity calculation includes stress and strain analysis of the wall under different load conditions, taking into account the material heterogeneity and geometric nonlinear effects of the wall. Through calculation, the rigidity matrix of the wall in different directions is obtained, and a rigidity distribution diagram is visually output. For example, for a certain concrete load-bearing wall, the rigidity data under load shows that its rigidity in the vertical direction is large, while its rigidity in the horizontal shear direction is small, thereby providing a basis for subsequent bearing capacity calculations. Using load-bearing wall rigidity data, a 3D construction model of a building project is simulated for elastic limit loads. During the simulation, the wall load is gradually increased until the wall material reaches its elastic limit state. The recorded load value represents the load-bearing wall's ultimate load. The simulation considers the combined effects of various factors, including floor deadweight, live loads, wind loads, and seismic effects. For example, on the tenth floor of a building, simulation results show that the ultimate load of the load-bearing wall under vertical load is 500 tons, while the ultimate load under horizontal seismic action is 300 tons. The load-bearing capacity of the building's load-bearing walls is calculated using structural mechanics analysis methods. The calculation takes into account the actual operating conditions and safety margins of the wall, using appropriate reduction factors and safety factors to ensure the rationality and safety of the results. For example, the vertical load-bearing capacity of a particular load-bearing wall is calculated to be 600 tons, and the horizontal load-bearing capacity is 350 tons.

[0152] Preferably, step S33 includes the following steps:

[0153] Step S331: extracting the building connection point structure according to the building structure data to obtain the building connection point structure data;

[0154] Step S332: performing a connection point axial force distribution simulation on the building connection point structure data based on the building load-bearing wall bearing capacity data to obtain the building connection point axial force distribution data;

[0155] Step S333: performing fatigue limit value testing based on the axial force distribution data of the building connection points and the building material data to obtain fatigue limit data of the building connection points;

[0156] Step S334: performing connection point life prediction based on the building connection point fatigue limit data and building material data to obtain building connection point life prediction data;

[0157] Step S335: performing connection point stability assessment based on the building connection point life prediction data and the building connection point fatigue limit data to obtain building connection point stability data.

[0158] In an embodiment of the present invention, a plan view, elevation view, cross-section view and structural model of a building are included. Building information modeling (BIM) technology is used to extract the structural data of the connection points in the building through software (such as Revit or Tekla Structures). These connection points generally include the connection between beams and columns, the connection between floor slabs and beams, etc. By analyzing these data, information such as the geometric shape, material properties, load conditions and support conditions of the connection points can be obtained to form a detailed building connection point structural data report, which contains the coordinates, stress distribution and material properties of each connection point. The finite element analysis (FEA) software is used to simulate the axial force distribution of the extracted connection point structural data. By setting load conditions (such as vertical load, wind load and seismic load, etc.), the axial force distribution of each connection point under different load conditions is analyzed. The corresponding load is applied, and the simulation calculation is run to obtain the axial force data of each connection point. Fatigue tests are carried out to obtain the fatigue limit value of the material under specific conditions. Based on the axial force distribution of the connection points, the fatigue limit values ​​of the connection points under different operating conditions are analyzed. A comprehensive report on the fatigue limit data of the connection points is generated. Based on the fatigue limit data and material properties of the building connection points, the connection life is predicted. A fatigue analysis model is used to calculate fatigue damage incurred during actual use. The stress amplitude of the connection points under actual loading conditions is compared with the fatigue limit of the material to calculate the equivalent number of fatigue cycles, and the remaining life of the connection points is estimated using relevant formulas. Finally, connection life prediction data is generated. Based on the fatigue limit data and life prediction data, the stability of the connection points is assessed. Stability theories (such as limit state design and durability analysis) are used to evaluate the stability of the connection points under long-term loads and environmental factors. Based on the actual use of the connection points, the safety factors under different conditions are analyzed to determine whether the connection meets the design requirements. Through calculations and simulations, a connection stability data report is generated, identifying potential risks and providing improvement suggestions to ensure the overall safety of the building structure.

[0159] Preferably, step S4 includes the following steps:

[0160] Step S41: Obtain historical natural disaster data around the building;

[0161] Step S42: performing a building degradation trend analysis based on the building strength data and the historical natural disaster data around the building to obtain building degradation trend data;

[0162] Step S43: Performing a building risk assessment based on the building degradation trend data and the building strength data to obtain building risk assessment data.

[0163] In an embodiment of the present invention, it is necessary to collect historical natural disaster data from the area surrounding the building. The implementation process includes accessing the database of a national or local natural disaster management agency to obtain records of disasters such as earthquakes, floods, and typhoons in the past few decades. The specific operation can use geographic information system (GIS) software (such as ArcGIS) to spatially associate disaster data with the location of the building, analyze the frequency of natural disasters and their potential impact on specific buildings. Combining the strength data of the building with historical natural disaster data, the deterioration trend of the building is analyzed, a physical model of the building is established, and information such as its material strength, structural design parameters, and usage is collected. Then, statistical analysis methods (such as regression analysis or time series analysis) are used in combination with historical disaster data to evaluate the impact of natural disasters on the strength of the building. For example, the strength changes of a building after experiencing multiple earthquakes can be analyzed, its deterioration rate can be calculated, and a degradation trend data graph can be generated to show the strength changes of the building within a specific time period to predict future deterioration. Based on building degradation trend and strength data, a comprehensive building risk assessment is conducted. Using risk assessment models (such as the Analytic Hierarchy Process or Fuzzy Comprehensive Evaluation Method), a comprehensive assessment is conducted combining the building's degradation trend with the natural disaster risk it faces. By analyzing the degradation trend data, critical structural components with high levels of degradation are identified. Then, combined with the probability of natural disasters, the risk of damage under specific circumstances is assessed. For example, if a building has demonstrated a high degradation trend in past earthquakes, combined with the probability of future earthquakes, an assessment of the building's risk of severe damage within the next five years can be derived.

[0164] Preferably, step S42 includes the following steps:

[0165] Step S421: Analyze historical typhoon directions and historical typhoon wind speeds based on historical natural disaster data around the building to obtain historical typhoon direction data and historical typhoon wind speed data;

[0166] Step S422: extracting typhoon high-frequency directions based on historical typhoon direction data to obtain historical typhoon high-frequency direction data, and performing typhoon strong wind force analysis based on historical typhoon wind force data to obtain historical typhoon strong wind force data;

[0167] Step S423: Utilizing historical typhoon strong wind force data and historical typhoon high frequency direction data, a typhoon load simulation is performed on the three-dimensional model of the building project to obtain building typhoon load data;

[0168] Step S424: performing a self-weight load analysis based on the building strength data to obtain building self-weight load data; performing load aggregation based on the building typhoon load data and the building self-weight load data to obtain building load data;

[0169] Step S425: using the three-dimensional model of the building project to perform building deformation curvature analysis on the building load data to obtain building deformation curvature data;

[0170] Step S426: performing degradation trend analysis based on the building deformation curvature data and the building strength data to obtain building degradation trend data.

[0171] In an embodiment of the present invention, historical typhoon data for the area surrounding a building is collected, including information such as each typhoon's path, wind speed, and wind direction. During implementation, a database provided by the meteorological department can be used to extract typhoon records from the past 30 years and establish a typhoon database. Data analysis software is used to statistically analyze the wind direction and force of historical typhoons, calculate the maximum wind speed and direction of each typhoon, and determine the distribution characteristics of wind force and direction. Based on historical typhoon strong wind force data and high-frequency directional data, a 3D model of the building project is used to simulate and analyze typhoon loads. Typhoon wind speed and direction are input into the 3D model, and typhoon load calculation standards are used to determine the wind load acting on the building. A deadweight load analysis is performed based on the building's strength data. The building's deadweight load data is determined by calculating the density and volume of the building materials. For example, for concrete structures, the deadweight of each floor is calculated using the standard density of concrete. The building's typhoon load data and deadweight load data are combined to calculate the total load of the building, including deadweight and typhoon loads. Using a 3D model of the building project, deformation curvature analysis can be performed on the building load data. Finite element analysis software can be used to input the building load data and perform structural analysis to calculate the building's deformation under various loads. Based on the building deformation curvature data and building strength data obtained in the previous steps, a degradation trend analysis can be performed. Statistical analysis methods (such as linear regression analysis) can be used to assess the building's degradation trends under different loads.

[0172] The present invention is therefore intended to be illustrative and non-restrictive in all respects, with the scope of the invention being defined by the appended claims rather than the foregoing description, and all changes that come within the meaning and range of equivalents of the application documents are intended to be embraced therein.

[0173] The foregoing description is intended only to provide specific embodiments of the present invention, which will enable those skilled in the art to understand and implement the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not intended to be limited to the embodiments shown herein, but is to be construed in the widest possible manner consistent with the principles and novel features disclosed herein.

Claims

1. A three-dimensional simulation method for construction engineering, characterized in that: The following steps are involved: Step S1: Acquire construction design data of a building project; construct a three-dimensional model of the building project construction according to the construction design data of the building project to obtain a three-dimensional model of the building project construction; Step S2: extracting construction geological conditions according to the construction design data of the building project to obtain construction geological condition data; performing building foundation level differentiation calculation according to the construction design data of the building project and the three-dimensional model of the building project to obtain building foundation level differentiation data; The foundation stability is calculated based on the building foundation level difference data and the construction geological condition data to obtain the building foundation stability data; Step S3: Calculate the building strength of the three-dimensional model of the building construction project according to the building foundation stability data and the building construction design data to obtain the building strength data; Step S4: Obtain historical natural disaster data around the building; Conduct building risk assessment based on historical natural disaster data around the building and building strength data to obtain building risk assessment data; Step S5: Performing building structure design optimization strategy analysis on the building structure design data according to the building risk estimation data to obtain building structure design optimization strategy data.

2. The three-dimensional simulation method for construction engineering according to claim 1, characterized in that: Step S1 includes the following steps: Step S11: Acquire construction design data of building engineering; Step S12: extracting the construction area and the construction building height according to the construction design data of the building project, and obtaining the construction area data and the construction building height data of the building project; Step S13: Performing building space feature analysis based on the construction area data and the building height data of the construction project to obtain building space feature data; Step S14: constructing a construction space coordinate system according to the building space characteristic data to obtain a building space coordinate system; Step S15: constructing a three-dimensional model of the construction project according to the construction space coordinate system and the construction space characteristic data to obtain the three-dimensional model data of the construction project.

3. The three-dimensional simulation method for construction engineering according to claim 1, characterized in that: Step S2 includes the following steps: Step S21: extracting construction geological conditions according to the construction design data of the building project to obtain construction geological conditions data; Step S22: performing building foundation level differentiation calculation according to the building engineering construction design data and the building engineering three-dimensional model to obtain building foundation level differentiation data; Step S23: Calculate the foundation settlement according to the building foundation level difference data and the construction geological condition data to obtain the building foundation settlement data; Step S24: Perform foundation stability analysis based on the building foundation horizontal differentiation data and the building foundation settlement data to obtain building foundation stability data.

4. The three-dimensional simulation method for construction engineering according to claim 3, characterized in that: Step S22 includes the following steps: Step S221: taking building foundation points from the three-dimensional model of the construction project to obtain a building foundation point data set; Step S222: measuring the elevation of the building foundation points according to the building foundation point data to obtain a building foundation point elevation data set; Step S223: Calculate the average elevation reference point according to the building foundation point elevation data set to obtain the building foundation elevation reference point; Step S224: performing elevation difference calculation on the building foundation point elevation data set according to the building foundation elevation reference point to obtain building foundation elevation difference data; Step S225: Calculate the horizontal distance of the foundation points according to the building foundation point elevation data set to obtain the horizontal distance data of the building foundation points; perform inclination differentiation calculation according to the horizontal distance data of the building foundation points and the building foundation elevation differentiation data to obtain the building foundation inclination differentiation data; Step S226: Perform building foundation level differentiation calculation according to the building foundation elevation differentiation data and the building foundation inclination differentiation data to obtain building foundation level differentiation data.

5. The three-dimensional simulation method for construction engineering according to claim 3, characterized in that: Step S23 includes the following steps: Step S231: Perform building stratum analysis based on construction geological condition data to obtain building foundation stratum distribution data; Step S232: performing a stratum soil strength heterogeneity analysis according to the building foundation stratum distribution data to obtain stratum soil strength heterogeneity data; Step S233: performing defect overlap structure analysis based on the building stratum soil strength heterogeneous data and the building foundation level differential data to obtain foundation defect overlap data; Step S234: performing load calculation according to the foundation defect overlapping data to obtain building foundation load data; Step S235: Calculate the foundation settlement based on the building foundation load data and the foundation defect overlapping data to obtain the building foundation settlement data.

6. The three-dimensional simulation method for construction engineering according to claim 1, characterized in that: Step S4 includes the following steps: Step S31: extracting the building design structure and the building materials according to the building engineering construction design data to obtain the building design structure data and the building material data; Step S32: Calculate the bearing capacity of the building load-bearing walls of the three-dimensional model of the construction project according to the building structure data and the building material data to obtain the bearing capacity data of the building load-bearing walls; Step S33: evaluating the stability of the connection points according to the bearing capacity data of the building load-bearing walls, the building structure data and the building material data, and obtaining the stability data of the building connection points; Step S34: Calculate the building strength according to the bearing capacity data of the building's load-bearing walls, the stability data of the building's foundations, and the stability data of the building's connection points to obtain the building strength data.

7. The three-dimensional simulation method for construction engineering according to claim 6, characterized in that: Step S32 includes the following steps: Step S321: extracting the height of the load-bearing wall of the building and the thickness of the load-bearing wall of the building according to the building structure data, and obtaining the height data of the load-bearing wall of the building and the thickness data of the load-bearing wall of the building; Step S322: Calculate the rigidity of the load-bearing wall based on the building material data, the height data of the building load-bearing wall, and the thickness data of the building load-bearing wall to obtain the rigidity data of the building load-bearing wall; Step S323: performing elastic limit load weight simulation on the three-dimensional model of the construction project according to the rigidity data of the load-bearing wall to obtain the limit load weight data of the load-bearing wall; Step S324: Calculate the bearing capacity of the building's load-bearing walls based on the rigidity data of the building's load-bearing walls and the ultimate load weight data of the load-bearing walls to obtain the bearing capacity data of the building's load-bearing walls.

8. The three-dimensional simulation method for construction engineering according to claim 6, characterized in that: Step S33 includes the following steps: Step S331: extracting the structure of building connection points according to the building structure data to obtain the building connection point structure data; Step S332: simulating the axial force distribution of the connection points of the building based on the bearing capacity data of the building's load-bearing walls to obtain the axial force distribution data of the building's connection points; Step S333: performing fatigue limit value test according to the axial force distribution data of the building connection point and the building material data to obtain fatigue limit data of the building connection point; Step S334: predicting the life of the connection point according to the fatigue limit data of the building connection point and the building material data to obtain the predicted life of the building connection point; Step S335: Perform connection point stability assessment based on the building connection point life prediction data and the building connection point fatigue limit data to obtain the building connection point stability data.

9. The three-dimensional simulation method for construction engineering according to claim 1, characterized in that: Step S4 includes the following steps: Step S41: Acquire historical natural disaster data around the building; Step S42: performing a building degradation trend analysis based on the building strength data and the historical natural disaster data around the building to obtain building degradation trend data; Step S43: Perform building risk assessment based on the building degradation trend data and the building strength data to obtain building risk assessment data.

10. The three-dimensional simulation method for construction engineering according to claim 9, characterized in that: Step S42 includes the following steps: Step S421: Perform historical typhoon direction analysis and historical typhoon wind force analysis based on historical natural disaster data around the building to obtain historical typhoon direction data and historical typhoon wind force data; Step S422: extracting the typhoon high-frequency direction according to the historical typhoon direction data to obtain the historical typhoon high-frequency direction data, and performing typhoon strong wind force analysis according to the historical typhoon wind force data to obtain the historical typhoon strong wind force data; Step S423: using historical typhoon strong wind force data and historical typhoon high frequency direction data to simulate the typhoon load on the three-dimensional model of the building project, and obtaining the building typhoon load data; Step S424: Perform self-weight load analysis based on the building strength data to obtain building self-weight load data; perform load aggregation based on the building typhoon load data and the building self-weight load data to obtain building load data; Step S425: using the three-dimensional model of the building project to perform building deformation curvature analysis on the building load data to obtain building deformation curvature data; Step S426: Perform a degradation trend analysis based on the building deformation curvature data and the building body strength data to obtain building degradation trend data.

Citation Information

Patent Citations

  • Construction quality and safety online risk detection system and method for building

    CN110411820A

  • BIM-based building construction management system and method

    CN117151652A

  • Digital twin processing method and system

    CN117669305A

  • Stratum model construction method coupling voxel segmentation algorithm and Markov random field

    CN118504075A

Cited By

  • Building three-dimensional simulation design method and system based on BIM

    CN121145319A