Elevated steel-concrete composite beam
Through the elevated steel-concrete composite beam structure, the use of separate steel boxes and cross-link mechanism splicing and concrete layers to reduce noise has solved the problems of construction difficulty and noise impact in the elevated section of rail transit, and achieved standardized design and improvement of construction efficiency.
Patent Information
- Application Number
- CN201810763285.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing rail transit elevated section structure has problems such as long construction period, heavy structure, many construction measures, large interference to urban traffic, and non-environmental protection. In addition, the steel bridge structure has a great impact on noise, and the welding quality is difficult to control during welding construction. .
It adopts an elevated steel-concrete composite beam structure, splicing separate steel boxes and cross-link mechanisms to form an integral beam. The concrete layer is used to reduce noise, and high-strength bolt connections are used to reduce welding residual stress, achieving standardized design, factory-based production and assembly construction. .
It achieves standardized design of bridge span structures with different bridge widths, reduces dead weight, reduces noise impact, shortens the construction period, improves structural stability and construction efficiency, avoids welding quality problems, and solves the construction difficulty and environmental protection problems of elevated sections in the existing technology. .
Smart Images

Figure CN108677679B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of rail transportation, and in particular relates to an elevated steel-concrete composite beam. Background Art
[0002] Modern trams are a type of low-capacity urban rail transit, between light rail and public buses, with the characteristics of low noise, low vibration, energy saving, comfort, convenience, environmental protection and beauty. There are many cities that have built or are building modern trams, and there is a trend of accelerated development. Tram tracks are mainly laid on urban road surfaces and run mixed with other ground transportation. A few trams have elevated sections. Elevated sections should give priority to simple, short construction period, small interference with urban traffic, low life cycle cost, and green and environmentally friendly structures. However, at present, most of the elevated sections of trams refer to the design of elevated sections of urban rail transit and adopt simply supported cast-in-place concrete box girders. The long construction period, heavy structure, many construction measures, large interference with existing traffic, and environmental protection of cast-in-place box girders are factors that plague the selection of elevated structures for rail transit. It is an urgent task to propose a rail transit beam type with simple structure and strong adaptability.
[0003] The field of engineering technology should implement the development concept of innovation, coordination, greenness, openness and sharing. Although the domestic rail transit superstructure construction methods have also been innovated and optimized, adopting whole-hole prefabrication, prefabricated segment assembly, mobile formwork and other construction methods, such construction methods have not yet achieved green, circular and low-carbon development. The above-mentioned construction methods still have the disadvantages of large initial investment, high requirements for construction technology, and greater difficulty in the overall organization and coordination of construction.
[0004] Urban rail transit elevated bridge structures do not use steel structures on a large scale, not only because the elevated line sound source is high, the noise has a large impact range, a long propagation distance, and strong penetration, which brings great harm to people's physical and mental health, but also compared with other rail transit structures, the steel bridges on rail transit lines generate more noise when the vehicles are running, because the steel bridge structure will vibrate and cause noise. Using a structure that has both the advantages of steel structure bridges and can reduce the noise of steel bridges has always been a research direction for rail transit bridge structures.
[0005] Sometimes elevated sections need to be set up in the turnout area of rail transit. The width of the bridge in the turnout area varies greatly. When engineers encounter the above situation, they can only choose to use integral support cast-in-place box girders. Often, the above will become the node project that controls the elevated project. The construction speed of the project is relatively slow, the quality is not as easy to control as steel beams, the measures cost is high, the construction site occupies a large area, and the time is long, which has a greater impact on the urban environment and transportation.
[0006] Steel box girders are usually manufactured in the factory, transported, hoisted, assembled and welded on site. Among them, reducing the residual stress of steel structure welding is related to the safety performance of the structure and the quality of the project, which is a key issue. In addition, the welding construction of steel box girders is usually affected by various factors. Porosity, weld nodules and other unqualified welds in the welds of steel box girders. Solving the weld quality problem in on-site construction has become the primary issue for steel box girders. Summary of the invention
[0007] An embodiment of the present invention relates to an elevated steel-concrete composite beam, which can at least solve some of the defects of the prior art.
[0008] The embodiment of the present invention relates to an elevated steel-concrete composite beam, comprising at least two separated steel boxes, each of which comprises a box top plate, a box bottom plate and two web plates, the box top plate, the box bottom plate and the two web plates are connected to form a box structure, and a concrete layer is poured on each of the box top plates;
[0009] The separate steel boxes are arranged in sequence along the transverse direction of the beam, and each adjacent two separate steel boxes are spliced by a transverse connection mechanism. The transverse connection mechanism includes a plurality of transverse connection groups arranged in sequence along the longitudinal direction of the beam, and each transverse connection group includes a plurality of transverse connection plates spliced in sequence along the transverse direction of the beam by splicing plates and bolts, and each of the transverse connection plates is respectively connected to the box top plate of the corresponding separate steel box.
[0010] As one of the embodiments, the first and last two cross-connecting plates of each cross-connecting group are also respectively connected to the webs of the corresponding separate steel boxes.
[0011] As one of the embodiments, each of the cross-connection groups of the cross-connection mechanism includes two groups of beam end cross-connection groups respectively located at both ends of the beam, and the height of each cross-connection plate of the beam end cross-connection group is the same as the height of the web plate.
[0012] As one of the embodiments, each of the cross-connection groups of the cross-connection mechanism includes a plurality of middle cross-connection groups located between the two ends of the beam, and the height of each of the cross-connection plates of each of the middle cross-connection groups is smaller than the height of the web plate.
[0013] As one of the embodiments, each of the cross-connection groups of the cross-connection mechanism further includes a plurality of reinforcing cross-connection groups located between the two ends of the beam, and the height of each of the cross-connection plates of each of the reinforcing cross-connection groups is the same as the height of the web plate.
[0014] As one of the embodiments, along the longitudinal direction of the beam, there is at least one group of the middle cross-connection groups between every two adjacent reinforcing cross-connection groups.
[0015] As one of the embodiments, both lateral sides of the beam are provided with cantilever beams and cantilevers, wherein the cantilever beam is connected to the web and top plate of the adjacent separate steel box, the cantilever is fixedly connected to the bottom of the top plate of the adjacent separate steel box, and the cantilever is located on the outside of the cantilever beam along the transverse direction of the beam and the two are spliced by splicing plates and bolts.
[0016] As one of the embodiments, each of the cross-connection groups includes three cross-connection plates and two joints are respectively close to the corresponding two separate steel boxes.
[0017] As one of the embodiments, the concrete layer includes a cast-in-place steel fiber concrete layer, and a shear key connected to the steel fiber concrete is provided on the box top plate.
[0018] As one of the embodiments, the concrete layer further includes a self-compacting concrete layer cast on top of the cast-in-place steel fiber concrete layer, and a prefabricated track slab is laid on the self-compacting concrete layer.
[0019] The embodiments of the present invention have at least the following beneficial effects:
[0020] The elevated steel-concrete composite beam provided by the present invention adopts a separate steel box and assembles each separate steel box into an integral beam through a cross-connection mechanism. The required bridge width can be freely combined by adjusting the length of each cross-connection plate (i.e., the length of the beam in the transverse direction), so that the main box structure of the bridge span structure with different bridge widths can be completely consistent, thereby realizing standardized design, factory production, and assembly construction. The box top plate can be used as a template for concrete pouring, which is convenient for on-site construction. The concrete box top plate used can play a role in reducing the noise of the steel bridge structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 A schematic diagram of the planar structure of a steel-concrete composite beam provided in an embodiment of the present invention;
[0023] Figure 2 A schematic diagram of a standard cross-sectional structure of a standard beam segment provided by an embodiment of the present invention;
[0024] Figure 3 A schematic diagram of the cross-sectional structure of the middle cross-connection group of the standard beam section provided in an embodiment of the present invention;
[0025] Figure 4A schematic diagram of the cross-sectional structure of the connection of the beam end cross-connection group / reinforced cross-connection group of the standard beam section provided in an embodiment of the present invention;
[0026] Figure 5 A schematic diagram of the cross-sectional structure of the middle cross-connection group of the turnout section provided by an embodiment of the present invention;
[0027] Figure 6 A schematic diagram of the cross-sectional structure of the beam end cross-connection group / reinforced cross-connection group connection of the turnout section provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] like Figure 1-Figure 6The embodiment of the present invention provides an elevated steel-concrete composite beam, comprising at least two separated steel boxes 1, each of which comprises a box top plate 101, a box bottom plate 102 and two webs 103, wherein the box top plate 101, the box bottom plate 102 and the two webs 103 are connected to form a box structure, and a concrete layer is poured on each of the box top plates 101; each of the separated steel boxes 1 is arranged in sequence along the transverse direction of the beam, and each adjacent two separated steel boxes 1 are spliced by a cross-connection mechanism, and the cross-connection mechanism comprises a plurality of cross-connection groups arranged in sequence along the longitudinal direction of the beam, and each of the cross-connection groups comprises a plurality of cross-connection plates spliced in sequence along the transverse direction of the beam by splicing plates 6 and bolts 7, and each of the cross-connection plates is respectively connected to the box top plate 101 of the corresponding separated steel box 1. It is easy to understand that the box top plate 101, the box bottom plate 102 and the two webs 103 are all steel plates, and the four are connected as a whole by welding, and the box structure is also a steel box beam structure. Two adjacent cross-connecting plates are connected by a group of splicing plates 6 and bolts 7. Generally, the two cross-connecting plates are butt-jointed, that is, the adjacent ends of the two cross-connecting plates are directly in contact and spliced together. The plate surface of the splicing plate 6 is parallel to the plate surface of the two cross-connecting plates, and the plate surface of a part of the splicing plate 6 is in contact with the plate surface of one of the cross-connecting plates, and the plate surface of a part of the splicing plate 6 is in contact with the plate surface of the other cross-connecting plate. The splicing plate 6 and the two cross-connecting plates are provided with bolt 7 assembly holes, so that they are assembled together by multiple bolts 7. The first and last cross-connecting plates are the two cross-connecting plates in each cross-connecting group that are close to the corresponding two separate steel boxes 1. The first and last cross-connecting plates are preferably welded to the separate steel boxes 1 on the corresponding sides. It is easy to know that the plate surface of the above-mentioned cross-connecting plate is perpendicular to the plate surface of the web 103 and the box top plate 101. Preferably, the bolts 7 are all high-strength bolts 7. The high-strength bolts 7 avoid on-site welding, reduce residual stress in steel structure welding, avoid weld quality problems during on-site construction, ensure the strength and stability of the connection structure, and improve the efficiency of assembly construction.
[0030] More preferably, if Figure 2-Figure 6 The first and last two cross-connecting plates of each cross-connecting group are also respectively connected to the web 103 of the corresponding separate steel box 1 to ensure the strength and stability of the connection structure.
[0031] More preferably, if Figure 2-Figure 6 In each separated steel box 1, longitudinal stiffening ribs 105 can be arranged on the box bottom plate 102 and the two webs 103 to improve the structural strength; end transverse partitions and middle transverse partitions can be arranged at the ends and the middle of the beam, and vertical stiffening ribs 104 can be arranged on each transverse partition to improve the structural strength.
[0032] like Figure 1-Figure 6In this embodiment, preferably, the number of the above-mentioned separated steel boxes 1 is two, and the structural stability after splicing is high. Each separated steel box 1 can be produced and installed as a whole, or it can be produced and assembled in sections. The production and assembly in sections is convenient for construction and can be assembled into elevated section steel-concrete composite beams of different lengths.
[0033] The elevated steel-concrete composite beam provided in this embodiment adopts a separate steel box 1 and assembles each separate steel box 1 into an integral beam through a cross-connection mechanism. The required bridge width can be freely combined by adjusting the length of each cross-connection plate (i.e., the length of the beam in the transverse direction), so that the main box structure of the bridge span structure with different bridge widths can be completely consistent, thereby realizing standardized design, factory production, and assembly construction. The box top plate 101 can be used as a template for concrete pouring, which is convenient for on-site construction. The concrete box top plate 101 used can play a role in reducing the noise of the steel bridge structure.
[0034] Compared with conventional cast-in-place concrete box girders: the elevated steel-concrete composite beam can reduce its own weight, reduce the impact of earthquakes, reduce the cross-sectional size of components, increase the effective use space, reduce the foundation cost, save high-altitude formwork processes and templates, shorten the construction period, and increase the ductility of components and structures. The elevated steel-concrete composite beam realizes the standardized design, factory production, and assembly construction of the upper structure of the elevated section, solving the problems of the conventional elevated cast-in-place box girders, such as long construction period, heavy structure, multiple construction measures, large interference with existing traffic, and environmental pollution.
[0035] Compared with the steel box girder bridge structure: the elevated steel-concrete composite beam can reduce the amount of steel used, increase rigidity, increase stability and integrity, reduce steel structure noise, and enhance the fire resistance and durability of the structure. Compared with the traditional on-site welded steel box beam, the steel-concrete composite beam is connected by high-strength bolts 7 to the maximum extent on the construction site, thereby avoiding on-site welding, reducing the residual stress of steel structure welding and avoiding the situation where the quality of the on-site welds is difficult to meet the qualified requirements.
[0036] It can be seen that the elevated steel-concrete composite beam provided in this embodiment can effectively solve the disadvantages of the elevated bridge using cast-in-place concrete box beams or steel box beams in the prior art.
[0037] The structure of the above-mentioned elevated steel-concrete composite beam is as follows: Figure 1 , Figure 4 and Figure 6, each of the cross-connection groups of the cross-connection mechanism includes two groups of beam end cross-connection groups 202 respectively located at the two ends of the beam, and the height of each cross-connection plate of the beam end cross-connection group 202 is the same as the height of the web 103. It is easy to know that the above-mentioned beam ends are the two ends of the steel-concrete composite beam along the longitudinal direction of the beam; the height of the cross-connection plate and the height of the web 103 are both the length of the plate body along the vertical direction. By setting the beam end cross-connection group 202, on the one hand, the torque of the bridge can be resisted, and the torque and horizontal force can be transmitted to the support of the steel-concrete composite beam; on the other hand, it plays a role of lateral support at the end of the bridge deck.
[0038] The structure of the above-mentioned elevated steel-concrete composite beam is as follows: Figure 1 , Figure 3 and Figure 5 Each of the cross-linking groups of the cross-linking mechanism includes a plurality of middle cross-linking groups 201 located between the two ends of the beam, and the height of each cross-linking plate of each middle cross-linking group 201 is less than the height of the web 103. The middle cross-linking group 201 can play the following roles: (1) prevent each separated steel box 1 from tilting and losing stability; (2) play the role of load distribution, so that each separated steel box 1 is subjected to a more uniform force; (3) form a space truss with each separated steel box 1 and the longitudinal connection system to resist horizontal load; (4) can position the separated steel box 1 when the bridge is installed.
[0039] The structure of the above-mentioned elevated steel-concrete composite beam is as follows: Figure 1 , Figure 4 and Figure 6 Each of the cross-linking groups of the cross-linking mechanism further includes a plurality of reinforcing cross-linking groups 203 located between the two ends of the beam, and the height of each cross-linking plate of each reinforcing cross-linking group 203 is the same as the height of the web plate 103. The reinforcing cross-linking group 203 can play the following roles: (1) resisting the torque of the bridge and enhancing the ability to resist torque in the mid-span; (2) enhancing the anti-rolling ability of the separated steel box 1; (3) not only playing the role of load distribution, so that each separated steel box 1 is subjected to uniform force, but also preventing the separated steel boxes 1 from being too deformed relative to each other, which may cause the bridge deck to be subjected to unfavorable force. Generally, under the connecting action of the above-mentioned middle cross-connection group 201, the structural strength and stability of the steel-concrete composite beam can be guaranteed. However, the elevated steel-concrete composite beam provided in this embodiment can be used not only for elevated roads for automobiles, elevated roads for BRT, etc., but is also mainly used for rail transit such as trams. Since the load of rail transit is larger than that of automobiles, by providing the above-mentioned reinforced cross-connection group 203, the torsional resistance and other properties of the steel-concrete composite beam structure can be effectively enhanced.
[0040] Each middle cross-connection group 201 between two adjacent separated steel boxes 1 is preferably arranged at intervals, and each reinforced cross-connection group 203 is also preferably arranged at intervals, so as to reduce the steel consumption and reduce the self-weight of the beam while ensuring the structural performance of the steel-concrete composite beam. Figure 1 , along the longitudinal direction of the beam, there is at least one group of the middle cross-link groups 201 between each two adjacent reinforcing cross-link groups 203; wherein, a more preferred solution is that the number of the middle cross-link groups 201 between each two adjacent reinforcing cross-link groups 203 is the same, Figure 1 In the embodiment shown in FIG. 1 , there are two middle cross-joint groups 201 between each two adjacent reinforcing cross-joint groups 203. The structure of cross-arrangement of the middle cross-joint groups 201 and the reinforcing cross-joint groups 203 can further improve the anti-rolling ability, anti-torque ability, and anti-load ability of each separated steel box 1 of the steel-concrete composite beam, and make the force of each separated steel box 1 more uniform.
[0041] The elevated steel-concrete composite beam provided in this embodiment is connected as a whole by the combined connection of various cross-connection groups. The separate steel boxes 1 and the cross-connection plates are coordinated and restrained from each other to jointly distribute the load, thereby effectively improving the structural strength, anti-rolling ability, anti-torque ability and anti-load ability of the steel-concrete composite beam, thereby ensuring its application effect and service life.
[0042] As a preferred implementation scheme, the elevated steel-concrete composite beam provided in this embodiment can be used as an elevated beam of the turnout section, so that the elevated section standard beam section and the turnout section adopt a unified assembled structure, realizing the standardized design, factory production and assembled construction of the elevated section superstructure, and the landscape effect is better. Figure 5 and Figure 6 In the turnout section, the assembly structure of each cross-connection group is as follows: each cross-connection group includes three cross-connection plates and the two joints are close to the corresponding two separated steel boxes 1. The three cross-connection plates include two short connection plates and one long connection plate. The two short connection plates are welded to the corresponding two separated steel boxes 1, and the two ends of the long connection plate are spliced to the two short connection plates. The turnout section bridge adopts this structure. On the one hand, the length of the cross-connection group can be flexibly adjusted to adapt to the large width change of the turnout area bridge. On the other hand, the joint is close to the separated steel box 1, which can improve the torque resistance and anti-rolling ability of the separated steel box 1, and ensure the stability and reliability of the turnout area bridge structure.
[0043] Of course, the above-mentioned three-piece cross-connection plate splicing type cross-connection group structure is also applicable to standard beam sections. Figure 3 and Figure 4Preferably, in the standard beam section, each cross-connection group includes two cross-connection plates and the two cross-connection plates have the same transverse length of the beam, that is, the joint of the two cross-connection plates is located in the middle of the two separate steel boxes 1, and is the same as the spacing between the two separate steel boxes 1. The cross-connection structure ensures uniform load distribution between the two separate steel boxes 1, and can prevent the relative deformation between the separate steel boxes 1 from being too large, which may cause unfavorable stress on the bridge deck.
[0044] Further optimize the structure of the above elevated steel-concrete composite beam, such as Figure 5 and Figure 6 In the beam section of the turnout area, both transverse sides of the beam are provided with a cantilever beam 8 and a cantilever arm 9, wherein the cantilever beam 8 is connected to the web plate 103 and the top plate of the adjacent separated steel box 1, and the cantilever arm 9 is fixedly connected to the bottom of the top plate of the adjacent separated steel box 1. The cantilever arm 9 is located outside the cantilever beam 8 along the transverse direction of the beam, and the two are spliced by a splicing plate 6 and a bolt 7. The splicing structure between the cantilever arm 9 and the cantilever beam 8 is the same as the splicing structure between the above-mentioned cross-connecting plates, which will not be described here; the connecting bolt 7 is also preferably a high-strength bolt 7. Different beam widths can be achieved by freely combining and adjusting the lengths of the cantilever arm 9, the cantilever beam 8 and each cross-connecting plate, so that it can easily adapt to the large width variation of the bridge in the turnout area.
[0045] Of course, the above-mentioned structure of providing the cantilever beam 8 and the cantilever 9 is also applicable to the standard beam section. Figure 2 According to the needs, only the cantilever beam 8 may be provided, or the cantilever beam 8 and the cantilever 9 may not be provided.
[0046] As the preferred structure of the elevated steel-concrete composite beam provided in this embodiment, Figure 2-Figure 6 , the concrete layer includes a cast-in-place steel fiber concrete layer 301, and a shear key 1011 connected to the steel fiber concrete is provided on the box top plate 101, and the shear key 1011 is preferably a PBL shear key 1011 (PBL shear key 1011 is a prior art in the art and will not be explained in detail here). By reserving the shear key 1011 on the box top plate 101, the steel fiber concrete layer 301 can be installed on the steel box beam more stably, ensuring the strength of the connection structure with the steel fiber concrete layer 301, and effectively reducing the noise of the steel-concrete composite beam. Further preferably, as Figure 2-Figure 6, the concrete layer also includes a self-compacting concrete layer 302 cast on top of the cast-in-place steel fiber concrete layer 301, and a prefabricated track plate 5 is laid on the self-compacting concrete layer 302, wherein the width of the self-compacting concrete layer 302 is preferably smaller than the width of the steel fiber concrete layer 301, and along the transverse direction of the beam, the self-compacting concrete layer 302 is divided into two sections on the left and right to respectively install the prefabricated track plates 5. By sequentially casting the steel fiber concrete layer 301 and the self-compacting concrete layer 302 on the box top plate 101, on the one hand, the noise of the steel-concrete composite beam is effectively reduced, and on the other hand, the prefabricated track plate 5 can be better installed on the beam body. Further, as Figure 2-Figure 6 A shock-absorbing pad 4 is also provided on the top of the self-compacting concrete layer 302 to further reduce the noise of the steel-concrete composite beam. The elevated steel-concrete composite beam provided in this embodiment adopts a prefabricated track plate 5, which fully realizes the standardized design, factory production and assembly construction of the upper structure of the elevated section, thereby improving the construction efficiency.
[0047] The elevated steel-concrete composite beam provided in this embodiment is preferably used in the field of trams, and then, preferably, a contact network column base 12 is cast in the middle of the beam (between the above two sections of self-compacting concrete layers 302 / two groups of prefabricated rails) and a contact network column is installed on the contact network column base 12, and further preferably, embedded parts of the contact network column are embedded in the contact network column base 12. In addition, a communication cable channel base 10 is also installed on the box top plate 101, and the communication cable channel base 10 includes two groups and is distributed on the two lateral edges of the beam body along the transverse direction of the beam, and a steel railing 11 can also be provided on each communication cable channel base 10.
[0048] The construction process of the above-mentioned elevated steel-concrete composite beam is roughly as follows:
[0049] First, the separated steel box 1 and various cross-connecting plates and other steel components are manufactured modularly in the factory, wherein the separated steel box 1 is preferably manufactured in sections and pre-assembled in modules in the steel structure factory;
[0050] After being transported to the construction site, the bridge module is assembled, and the separated steel box 1, the cross-connecting plate, the cantilever 9 and the cantilever beam 8 are connected to form a complete bridge through high-strength bolts 7;
[0051] The communication cable channel base 10 of the bridge deck is installed. After the installation, the steel fiber concrete layer 301 and the self-compacting concrete layer 302 are poured on the top steel plate with shear keys 1011 reserved, and then the vibration-damping pads are laid on the self-compacting concrete layer 302. Then the prefabricated track slabs 5 transported to the construction site are installed on the vibration-damping pads, and finally the installation of the contact network column base 12, steel railings 11, channel plates and other track ancillary facilities is completed.
[0052] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. An elevated steel-concrete composite beam, characterized in that: It comprises two separate steel boxes, each of which comprises a box top plate, a box bottom plate and two web plates, the box top plate, the box bottom plate and the two web plates are connected to form a box structure, and a concrete layer is poured on each of the box top plates; The separate steel boxes are arranged in sequence along the transverse direction of the beam, and the top plates of the two separate steel boxes are abutted against each other to serve as a template for concrete pouring; The two separate steel boxes are connected by a cross-connection mechanism, and the cross-connection mechanism includes a plurality of cross-connection groups arranged in sequence along the longitudinal direction of the beam, and each of the cross-connection groups includes a plurality of cross-connection plates sequentially connected by splicing plates and bolts along the transverse direction of the beam, and each of the cross-connection plates is respectively connected to the box top plate of the corresponding separate steel box; The first and last two cross-connection plates of each cross-connection group are also respectively connected to the web plates of the corresponding separate steel boxes; Each of the cross-connection groups of the cross-connection mechanism includes two groups of beam end cross-connection groups respectively located at both ends of the beam, and the height of each cross-connection plate of the beam end cross-connection group is the same as the height of the web plate; the beam end cross-connection group is used to resist the torque of the bridge, transmit the torque and horizontal force to the support of the steel-concrete composite beam, and play a role of lateral support at the end of the bridge deck; Each of the cross-linking groups of the cross-linking mechanism includes a plurality of middle cross-linking groups located between the two ends of the beam, and the height of each cross-linking plate of each middle cross-linking group is less than the height of the web plate; the middle cross-linking group is used to: (1) prevent each separated steel box from tilting and becoming unstable; (2) play a role in load distribution so that each separated steel box is subjected to a more uniform force; (3) form a spatial truss with each separated steel box and the longitudinal connection system to resist horizontal loads; (4) position the separated steel box when the bridge is installed and erected; Each of the cross-linking groups of the cross-linking mechanism further includes a plurality of reinforcing cross-linking groups located between the two ends of the beam, and the height of each cross-linking plate of each reinforcing cross-linking group is the same as the height of the web plate; the reinforcing cross-linking group is used to: (1) resist the torque of the bridge and enhance the ability to resist torque in the mid-span; (2) enhance the anti-rolling ability of the separated steel box; (3) play a role in load distribution, so that each separated steel box is subjected to uniform force, and prevent the relative deformation between the separated steel boxes from being too large, which may cause the bridge deck to be subjected to unfavorable force; Along the longitudinal direction of the beam, there is at least one middle cross-connection group between every two adjacent reinforcement cross-connection groups; In the turnout section, each cross-connection group includes three cross-connection plates, and the two joints are close to the corresponding two separate steel boxes. The three cross-connection plates include two short connection plates and one long connection plate. The two short connection plates are welded to the corresponding two separate steel boxes, and the two ends of the long connection plate are spliced to the two short connection plates. In the standard beam section, each cross-connection group includes two cross-connection plates and the transverse length of the beam of the two cross-connection plates is the same. The joint of the two cross-connection plates is located in the middle of the two separate steel boxes and is the same as the spacing between the two separate steel boxes.
2. The elevated steel-concrete composite beam according to claim 1, characterized in that: Both lateral sides of the beam are provided with cantilever beams and cantilevers, wherein the cantilever beam is connected to the web and top plate of the adjacent separate steel box, and the cantilever is fixedly connected to the bottom of the top plate of the adjacent separate steel box. The cantilever is located on the outside of the cantilever beam along the transverse direction of the beam and the two are spliced by splicing plates and bolts.
3. The elevated steel-concrete composite beam according to claim 1, characterized in that: The concrete layer includes a cast-in-place steel fiber concrete layer, and a shear key connected to the steel fiber concrete is provided on the box top plate.
4. The elevated steel-concrete composite beam according to claim 3, characterized in that: The concrete layer also includes a self-compacting concrete layer cast on top of the cast-in-place steel fiber concrete layer, and a prefabricated track slab is laid on the self-compacting concrete layer.
Citation Information
Patent Citations
Secondary main beam composite beam bridge using prefabricated composite bridge deck slabs and construction method of secondary main beam composite beam bridge
CN106638254A
Fabricated steel bridge
CN108166371A
Overhead steel -concrete combined beam
CN208701485U
Prestressed composite beam bridge unit
KR200361049Y1