A method and system for modeling a hydroelectric power generation system
By establishing a complete hydropower model based on hydropower reservoir data in the clean energy production simulation system, the problem that the existing system cannot accurately simulate the hydropower operation process is solved, and the accuracy and accuracy of the calculation of priority absorption of hydropower is achieved.
Patent Information
- Application Number
- CN201810554376.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-06-01
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2038-06-01
AI Technical Summary
The existing clean energy production simulation system cannot accurately simulate the hydropower operation process, which affects the accuracy of clean energy calculations. It is mainly because the hydropower model is relatively rough and the priority consumption calculation of hydropower is not possible.
By obtaining the data and differences of hydropower station reservoirs, different hydropower models are established, and combining electricity and electricity constraints, a complete hydropower model is constructed, including the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the reservoir when the maximum and minimum storage capacity limits are limited. The model, as well as the inlet flow, water consumption function and storage capacity water level function, realizes the calculation of priority consumption of water and electricity.
The accuracy of the hydropower model is improved, and the priority consumption calculation of hydropower can be accurately carried out, achieving accurate calculation results.
Smart Images

Figure CN108984825B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of electric power technology, and in particular relates to a hydropower generation system modeling method and system. Background Art
[0002] In recent years, with the rapid development of wind power, photovoltaic power and hydropower, it has become increasingly urgent to develop a clean energy production simulation system for the calculation of clean energy absorption capacity. The existing clean energy production simulation system is mainly used to calculate the priority absorption capacity of wind power and photovoltaic power, calculate the amount of wind and solar power abandoned in the planned level year, and propose control measures to reduce the level of wind and solar power abandoned. However, the hydropower model is relatively rough and cannot simulate the hydropower operation process, which affects the accuracy of clean energy calculation. In order to better calculate the clean energy absorption situation, it is urgent to establish a hydropower modeling method and system that adapts to the clean energy production simulation technology.
[0003] The existing hydropower modeling methods used in production simulation mainly consider the modeling of hydropower units and the establishment of the power and electricity balance relationship of hydropower units. There are few studies considering reservoir models, which makes it impossible for existing clean energy production simulation systems to perform hydropower priority consumption calculations, or the calculation results are inaccurate. Summary of the invention
[0004] In order to overcome the above-mentioned deficiencies of the prior art, the present invention proposes a hydropower system modeling method and system. The method and system take into account the integrity and diversity of the hydropower station reservoir data, establish different hydropower models, and combine power and electricity constraints to construct a complete hydropower model, thereby improving the availability of the hydropower model.
[0005] The solutions adopted to achieve the above objectives are:
[0006] A method for modeling a hydroelectric power generation system, wherein the improvement is:
[0007] Obtain data and differences of hydropower station reservoirs and build hydropower models.
[0008] The first preferred technical solution provided by the present invention is improved in that the step of obtaining the data and differences of the hydropower station reservoir and establishing the hydropower model comprises:
[0009] Establishing a hydropower model based on the outflow flow of the reservoir when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known;
[0010] A hydropower model based on water consumption rate is constructed using the known inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir.
[0011] The second preferred technical solution provided by the present invention is improved in that a hydropower model based on the outflow flow of the reservoir is established when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known, including:
[0012] The power P of hydropower unit n at time t is calculated as follows h (t,n):
[0013] P h (t,n)=f NHQ (R g (t,n),h g )(1)
[0014] The abandoned water power E is calculated as follows: h,c :
[0015] E h,c =f NHQ (R out (t,n)-R g,max ,h g )·ΔT(2)
[0016] Among them, f NHQ (R g ,h g ) is the NHQ function of the hydropower unit, R g (t,n) is the power generation flow of hydropower unit n at time t, h g is the generating head, R out (t,n) is the outflow rate of hydropower unit n at time t, R g,max is the maximum value of power generation flow, ΔT is the interval between time t and the previous time t-1;
[0017] Among them, R g (t,n) is calculated as follows:
[0018] R g (t,n)=min(R out (t,n),R g,max )(3)
[0019] 0<R out (t,n)<R out,max (4)
[0020] Among them, R out,max is the maximum outbound flow rate;
[0021] The storage capacity C(t,n) of hydropower unit n at time t is shown as follows:
[0022] C(t,n)=C(t-1,n)+R in (t,n) · ΔT-Rout (t,n)·ΔT(5)
[0023] C min <C(t,n)<C max (6)
[0024] Among them, C(t-1,n) is the storage capacity of hydropower unit n at the previous time t-1, R in (t,n) is the inflow flow of hydropower unit n at time t, C min is the minimum storage capacity limit, C max is the maximum storage capacity limit;
[0025] Power generation head h g Calculate as follows:
[0026] h g =f g (h)(7)
[0027] Among them, f g (h) is the water level head function; the water level h is calculated as follows:
[0028] h=f h (C(t,n))(8)
[0029] Among them, f h (C) is the water level storage capacity function.
[0030] The third preferred technical solution provided by the present invention is improved in that a hydropower model based on water consumption rate is established using the known inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir, including:
[0031] The amount of discarded water E is calculated as follows: h,c :
[0032] E h,c =P c (t,n)·ΔT(9)
[0033] Among them, P c (t,n) is the abandoned water power of hydropower unit n at time t, ΔT is the interval between time t and the previous time t-1;
[0034] The hydropower E of hydropower unit n at time t h (t,n) is shown in the following formula:
[0035] E h (t,n)=E h (t-1,n)+E in (t,n)-P h (t,n) · ΔT-P c(t,n)·ΔT(10)
[0036] E h The value range of (t,n) is as follows:
[0037] E min <E h (t,n)<E max (11)
[0038] The power generation power P of hydropower unit n at time t h The value range of (t,n) is as follows:
[0039] P h,min <P h (t,n)<P h,max (12)
[0040] Among them, E h (t-1,n) is the hydroelectric power of hydropower unit n at the previous time t-1, P h (t,n) is the power generation of hydropower unit n at time t, E min is the minimum value of hydropower electricity, E max is the maximum value of hydropower electricity, P h,min is the minimum value of the generated power, P h,max is the maximum value of the generated power;
[0041] The amount of water E entering the reservoir of hydropower unit n at time t in (t,n) is calculated as follows:
[0042] E in (t,n)=R in (t,n) / f c (h)(13)
[0043] Among them, R in (t,n) is the inflow of hydropower unit n at time t, h is the water level, f c (h) is the water consumption rate function related to the water level;
[0044] The water level h is calculated as follows:
[0045] h=f e (E h (t,n))(14)
[0046] Among them, f e (E h ) is the water level storage function, and the f e (E h ) is obtained by fitting the water level storage curve of the hydropower station;
[0047] When the hydropower station has no water level storage curve, f is calculated as follows: e (E h ) is the inverse function f e -1 (h):
[0048]
[0049] Among them, h0 is the initial value of water level, f cap (h) is the reservoir capacity and water level function.
[0050] The fourth preferred technical solution provided by the present invention is improved in that the hydropower model is constructed after analyzing the integrity and differences of the reservoir data of the hydropower station.
[0051] The fifth preferred technical solution provided by the present invention is improved in that, before analyzing the integrity and difference of the hydropower station reservoir data, the identification and repair of the hydropower station reservoir data includes:
[0052] Identify bad data and missing data in the hydropower station reservoir data based on statistical analysis of the autocorrelation characteristics of the hydropower station reservoir data time series;
[0053] The reservoir data of the hydropower station is processed based on the autoregressive moving average model to eliminate bad data and restore missing data.
[0054] The sixth preferred technical solution provided by the present invention is improved in that before identifying and repairing the reservoir data of the hydropower station,
[0055] Collect hydropower station reservoir data in time units of 15 minutes, 1 hour, 1 day or one month.
[0056] A hydroelectric power generation system modeling system, the improvement of which is that it comprises: a modeling module;
[0057] The modeling module is used to obtain the data and differences of the hydropower station reservoir and establish a hydropower model.
[0058] The seventh preferred technical solution provided by the present invention is improved in that the modeling module includes a first modeling subunit and a second modeling subunit;
[0059] The first modeling subunit is used to construct a hydropower model based on outflow when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity constraints are known;
[0060] The second modeling subunit is used to construct a hydropower model based on water consumption rate when the inflow flow, water consumption rate function, water level storage function and reservoir capacity water level function are known.
[0061] The eighth preferred technical solution provided by the present invention is improved in that an analysis module is used to analyze the integrity and diversity of the reservoir data of a hydropower station, and a hydropower modeling method is used to verify data requirements.
[0062] The ninth preferred technical solution provided by the present invention is improved in that the identification and repair module is used to identify and repair the reservoir data of the hydropower station, including:
[0063] Using an identification subunit to statistically analyze the autocorrelation characteristics of the hydropower station reservoir data time series, identifying bad data and missing data in the hydropower station reservoir data;
[0064] The repair subunit is used to process the reservoir data of the hydropower station based on the autoregressive moving average model, remove bad data and restore missing data.
[0065] The tenth preferred technical solution provided by the present invention is improved in that it further comprises: a data collection module;
[0066] The data collection module collects the hydropower station reservoir data in a period of 15 minutes, 1 hour, 1 day or one month.
[0067] Compared with the closest prior art, the present invention has the following beneficial effects:
[0068] The present invention establishes a hydropower model with a reservoir based on the reservoir data of a hydropower station, improves the accuracy of the hydropower model, can accurately perform hydropower priority consumption calculations, and achieves accurate calculation results. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] Figure 1 A schematic diagram of a hydroelectric power generation system modeling method provided by the present invention;
[0070] Figure 2 A detailed flow chart of a hydroelectric power generation system modeling method provided by the present invention;
[0071] Figure 3 A schematic diagram of the structure of a hydroelectric power generation system modeling system provided by the present invention. DETAILED DESCRIPTION
[0072] The specific implementation modes of the present invention are further described in detail below with reference to the accompanying drawings.
[0073] Embodiment 1:
[0074] A schematic flow chart of a hydropower system modeling method provided by the present invention is as follows: Figure 1 As shown, including:
[0075] Obtain data and differences of hydropower station reservoirs and build hydropower models.
[0076] Specifically, the process of hydropower system modeling method is as follows: Figure 2 As shown, including:
[0077] Step 1: Collect hydropower station reservoir data in time units of 15 minutes, 1 hour, 1 day or one month.
[0078] Grid dispatchers obtain several years of historical data on hydropower station reservoirs through the water situation system. The time resolution of the data can be 15 minutes, 1 hour, 1 day or one month.
[0079] Step 2: Identify and repair the hydropower station reservoir data, including:
[0080] Step 2-1: Identify bad data and missing data in the hydropower station reservoir data based on the statistical analysis of the autocorrelation characteristics of the hydropower station reservoir data time series;
[0081] Step 2-2: Process the hydropower station reservoir data based on the autoregressive moving average model to eliminate bad data and restore missing data.
[0082] Step 3: Analyze the integrity and diversity of the hydropower station reservoir data, that is, verify the data requirements based on the hydropower modeling method.
[0083] Because different hydropower models require different data, it is necessary to select one of the reservoir models based on the collected data. If the hydropower station reservoir data is complete, any hydropower model can be selected, which can be considered as a completeness check; but if the hydropower station reservoir data is incomplete, a matching model is selected based on the data, which can be considered as selecting a model based on the difference in data.
[0084] Step 4: Based on the acquired data and differences of the hydropower station reservoir, establish a hydropower model, including:
[0085] Step 4-1: When the NHQ function, water level storage capacity function, water level head function, and maximum and minimum storage capacity limits of the hydropower unit are known, a hydropower model based on the outflow flow is established, including:
[0086] 4-1-1 Calculate the power P of hydropower unit n at time t h (t,n):
[0087] P h (t,n)=f NHQ (R g (t,n),h g )(1)
[0088] Among them, f NHQ (R g ,h g ) is the NHQ function of the hydropower unit, R g(t,n) is the power generation flow of hydropower unit n at time t, h g For power generation head.
[0089] R g (t,n) is calculated as follows:
[0090] R g (t,n)=min(R out (t,n),R g,max )(2)
[0091] 0<R out (t,n)<R out,max (3)
[0092] Among them, R out (t,n) is the outflow rate of hydropower unit n at time t, R g,max is the maximum power generation flow, R out,max is the maximum outbound flow rate;
[0093] 4-1-2 The storage capacity C(t,n) of hydropower unit n at time t is as follows:
[0094] C(t,n)=C(t-1,n)+R in (t,n) · ΔT-R out (t,n)·ΔT(4)
[0095] C min <C(t,n)<C max (5)
[0096] Among them, C(t-1,n) is the storage capacity of hydropower unit n at the previous time t-1, R in (t,n) is the inflow of hydropower unit n at time t, ΔT is the interval between time t and the previous time t-1, C min is the minimum storage capacity limit, C max is the maximum storage capacity limit;
[0097] 4-1-3 Power generation head h g Calculate as follows:
[0098] h g =f g (h)(6)
[0099] h=f h (C(t,n))(7)
[0100] Where h is the water level, f g (h) is the water level head function, f h (C) is the water level storage capacity function;
[0101] 4-1-4 Calculate the abandoned water power E as follows h,c :
[0102] E h,c =f NHQ (R out (t,n)-R g,max ,h g )·ΔT(8)
[0103] Step 4-2: When the reservoir inflow, water consumption rate function, water level storage function and reservoir capacity water level function are known, a hydropower model based on water consumption rate is established, including:
[0104] 4-2-1 Calculate the water supply E of hydropower unit n at time t as follows in (t,n):
[0105] E in (t,n)=R in (t,n) / f c (h)(9)
[0106] Among them, R in (t,n) is the inflow of hydropower unit n at time t, h is the water level, f c (h) is the water consumption rate function related to the water level;
[0107] 4-2-2 Power Constraints:
[0108] The hydropower E of hydropower unit n at time t h (t,n) is shown in the following formula:
[0109] E h (t,n)=E h (t-1,n)+E in (t,n)-P h (t,n) · ΔT-P c (t,n)·ΔT(10)
[0110] E h The value range of (t,n) is as follows:
[0111] E min <E h (t,n)<E max (11)
[0112] The power generation P of hydropower unit n at time t h The value range of (t,n) is as follows:
[0113] P h,min <P h (t,n)<P h,max (12)
[0114] Among them, E h (t-1,n) is the hydroelectric power of hydropower unit n at the previous time t-1, E min is the minimum value of hydropower electricity, E max is the maximum value of hydropower electricity, P h,min is the minimum value of the generated power, P h,max is the maximum value of the generated power, P c (t,n) is the abandoned water power of hydropower unit n at time t;
[0115] 4-2-3 The water level h is calculated as follows:
[0116] h=f e (E h (t,n))(13)
[0117] Among them, f e (E h ) is the water level storage function, which is generally obtained by fitting the water level storage curve of the hydropower station. For some hydropower stations without water level storage curves, it can be given by the following formula:
[0118]
[0119] Among them, f e -1 (h) is f e (E h ), f cap (h) is the reservoir capacity water level function, h0 is the initial value of the water level;
[0120] 4-2-4 Calculate the amount of abandoned water E according to the following formula h,c :
[0121] E h,c =P c (t,n)·ΔT(15)
[0122] Embodiment 2:
[0123] Based on the same inventive concept, the present invention also provides a hydropower system modeling system. Since the principles of these devices for solving technical problems are similar to the hydropower system modeling method, the repeated parts will not be repeated.
[0124] The modeling system is Figure 3 As shown, it includes: a modeling module;
[0125] The modeling module is used to obtain the data and differences of the hydropower station reservoir and establish a hydropower model.
[0126] Wherein, the modeling module includes a first modeling subunit and a second modeling subunit;
[0127] The first modeling subunit is used to construct a hydropower model based on outflow when the NHQ function, water level storage capacity function, water level head function, and maximum and minimum storage capacity constraints of the hydropower unit are known;
[0128] The second modeling subunit is used to construct a hydropower model based on water consumption rate when the inflow, water consumption rate function, water level storage function and reservoir capacity water level function are known.
[0129] Among them, the modeling system also includes: using an analysis module to analyze the integrity and differences of the hydropower station reservoir data.
[0130] The modeling system further includes: using an identification and repair module to identify and repair the reservoir data of the hydropower station, including:
[0131] Using the identification subunit to statistically analyze the autocorrelation characteristics of the hydropower station reservoir data time series, the bad data and missing data in the hydropower station reservoir data are identified;
[0132] The repair subunit is used to process the hydropower station reservoir data based on the autoregressive moving average model to remove bad data and restore the missing data.
[0133] Among them, the modeling system also includes: a data collection module;
[0134] The data collection module collects hydropower station reservoir data in periods of 15 minutes, 1 hour, 1 day or one month.
[0135] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0136] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0137] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0138] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0139] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application rather than to limit its protection scope. Although the present application has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that after reading the present application, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the application, but these changes, modifications or equivalent substitutions are all within the protection scope of the claims to be approved.
Claims
1. A method for modeling a hydroelectric power system, Features: Obtain data and differences of hydropower station reservoirs and build hydropower models; The method of obtaining the data and differences of the hydropower station reservoir and establishing the hydropower model includes: Constructing the hydropower model after analyzing the integrity and differences of the hydropower station reservoir data; When the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known, a hydropower model based on the outflow of the reservoir is established when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known; When the inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir are known, a hydropower model based on water consumption rate is constructed using the known inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir; A hydropower model based on the outflow of the reservoir is established when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known, including: The power P of hydropower unit n at time t is calculated as follows h (t,n): P h (t,n)=f NHQ (R g (t,n),h g ) (1) The abandoned water power E is calculated as follows: h,c : E h,c =f NHQ (R out (t,n)-R g,max ,h g )·ΔT (2) Among them, f NHQ (R g ,h g ) is the NHQ function of the hydropower unit, R g (t,n) is the power generation flow of hydropower unit n at time t, h g is the generating head, R out (t,n) is the outflow rate of hydropower unit n at time t, R g,max is the maximum value of power generation flow, ΔT is the interval between time t and the previous time t-1; Among them, R g (t,n) is calculated as follows: R g (t,n)=min(R out (t,n),R g,max ) (3) 0<R out (t,n)<R out,max (4) Among them, R out,max is the maximum outbound flow rate; The storage capacity C(t,n) of hydropower unit n at time t is shown as follows: C(t,n)=C(t-1,n)+R in (t,n)·ΔT-R out (t,n)·ΔT (5) C min <C(t,n)<C max (6) Among them, C(t-1,n) is the storage capacity of hydropower unit n at the previous time t-1, R in (t,n) is the inflow flow of hydropower unit n at time t, C min is the minimum storage capacity limit, C max is the maximum storage capacity limit; Power generation head h g Calculate as follows: h g =f g (h) (7) Among them, f g (h) is the water level head function; the water level h is calculated as follows: h=f h (C(t,n)) (8) Among them, f h (C) is the water level storage capacity function.
2. The method according to claim 1, It is characterized in that Using the known inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir, a water consumption rate-based hydropower model is constructed, including: The amount of discarded water E is calculated as follows: h,c : E h,c =P c (t,n)·ΔT (9) Among them, P c (t,n) is the abandoned water power of hydropower unit n at time t, ΔT is the interval between time t and the previous time t-1; The hydropower E of hydropower unit n at time t h (t,n) is shown in the following formula: E h (t,n)=E h (t-1,n)+E in (t,n)-P h (t,n)·ΔT-P c (t,n)·ΔT (10) E h The value range of (t,n) is as follows: E min <E h (t,n)<E max (11) The power generation P of hydropower unit n at time t h The value range of (t,n) is as follows: P h,min <P h (t,n)<P h,max (12) Among them, E h (t-1,n) is the hydroelectric power of hydropower unit n at the previous time t-1, P h (t,n) is the power generation of hydropower unit n at time t, E min is the minimum value of hydropower electricity, E max is the maximum value of hydropower electricity, P h,min is the minimum value of the generated power, P h,max is the maximum value of the generated power; The amount of water E entering the reservoir of hydropower unit n at time t in (t,n) is calculated as follows: E in (t,n)=R in (t,n) / f c (h) (13) Among them, R in (t,n) is the inflow of hydropower unit n at time t, h is the water level, f c (h) is the water consumption rate function related to the water level; The water level h is calculated as follows: h=f e (E h (t,n)) (14) Among them, f e (E h ) is the water level storage function, and the f e (E h ) is obtained by fitting the water level storage curve of the hydropower station; When the hydropower station has no water level storage curve, f is calculated as follows: e (E h ) is the inverse function f e -1 (h): f e -1 (h)=f e -1 (h0)+(f cap (h)-f cap (h 0 )) / f c (h 0 ) (15) Among them, h 0 is the initial value of the water level of the reservoir, f cap (h) is the reservoir capacity and water level function.
3. The method according to claim 1, It is characterized in that Before analyzing the integrity and differences of the hydropower station reservoir data, the identification and repair of the hydropower station reservoir data include: Identify bad data and missing data in the hydropower station reservoir data based on statistical analysis of the autocorrelation characteristics of the hydropower station reservoir data time series; The reservoir data of the hydropower station is processed based on the autoregressive moving average model to eliminate bad data and restore missing data.
4. The method according to claim 3, It is characterized in that Before identifying and repairing the hydropower station reservoir data, Collect hydropower station reservoir data in time units of 15 minutes, 1 hour, 1 day or one month.
5. A hydroelectric system modeling system, It is characterized in that include: Modeling module; The modeling module is used to obtain the data and differences of the hydropower station reservoir and establish a hydropower model; The modeling module includes a first modeling subunit and a second modeling subunit; Use the analysis module to analyze the integrity and differences of hydropower station reservoir data, and use the hydropower modeling method to verify data requirements; The first modeling subunit is used to construct a hydropower model based on outflow flow when the NHQ function, water level storage capacity function, water level head function, and maximum and minimum storage capacity limits of the hydropower unit are known; The second modeling subunit is used to construct a hydropower model based on water consumption rate when the inflow, water consumption rate function, water level storage function and reservoir capacity water level function of the reservoir are known; A hydropower model based on the outflow of the reservoir is established when the NHQ function of the hydropower unit, the water level storage capacity function, the water level head function, and the maximum and minimum storage capacity limits are known, including: The power P of hydropower unit n at time t is calculated as follows h (t,n): P h (t,n)=f NHQ (R g (t,n),h g ) (1) The abandoned water power E is calculated as follows: h,c : E h,c =f NHQ (R out (t,n)-R g,max ,h g )·ΔT (2) Among them, f NHQ (R g ,h g ) is the NHQ function of the hydropower unit, R g (t,n) is the power generation flow of hydropower unit n at time t, h g is the generating head, R out (t,n) is the outflow rate of hydropower unit n at time t, R g,max is the maximum value of power generation flow, ΔT is the interval between time t and the previous time t-1; Among them, R g (t,n) is calculated as follows: R g (t,n)=min(R out (t,n),R g,max ) (3) 0<R out (t,n)<R out,max (4) Among them, R out,max is the maximum outbound flow rate; The storage capacity C(t,n) of hydropower unit n at time t is shown as follows: C(t,n)=C(t-1,n)+R in (t,n)·ΔT-R out (t,n)·ΔT (5) C min <C(t,n)<C max (6) Among them, C(t-1,n) is the storage capacity of hydropower unit n at the previous time t-1, R in (t,n) is the inflow flow of hydropower unit n at time t, C min is the minimum storage capacity limit, C max is the maximum storage capacity limit; Power generation head h g Calculate as follows: h g =f g (h) (7) Among them, f g (h) is the water level head function; the water level h is calculated as follows: h=f h (C(t,n)) (8) Among them, f h (C) is the water level storage capacity function.
6. The modeling system according to claim 5, It is characterized in that Also includes: Use the identification and repair module to identify and repair hydropower station reservoir data, including: Using an identification subunit to statistically analyze the autocorrelation characteristics of the hydropower station reservoir data time series, identifying bad data and missing data in the hydropower station reservoir data; The repair subunit is used to process the reservoir data of the hydropower station based on the autoregressive moving average model, remove bad data and restore missing data.
7. The modeling system according to claim 6, It is characterized in that Also includes: Data collection module; The data collection module collects the hydropower station reservoir data in a period of 15 minutes, 1 hour, 1 day or one month.