A steel truss double-skin wall structure and construction method thereof

Through the combination of steel trusses and precast concrete slabs, the problems of complexity of formwork support and insufficient rigidity of steel truss structures in traditional construction are solved, and a high-strength, simplified construction-shaped steel truss double-leather wall structure is realized, which is suitable for high walls. Improve construction efficiency and safety.

CN109594688BActive Publication Date: 2024-11-29CHINA CONSTR FIRST DIV GROUP CONSTR & DEV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN201910041107.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-01-16
Publication Date
2024-11-29
Estimated Expiration
2039-01-16

AI Technical Summary

Technical Problem

The construction process complexity caused by supporting scaffolding and formwork in the traditional cast-in-place construction process, as well as the existing steel bar truss double-leather wall structure with no more than 4m, the overall stiffness and insufficient anti-concrete side pressure capability.

Method used

The double-leather wall structure of steel truss is adopted. By combining precast concrete slabs and steel trusses, it replaces traditional formwork to achieve a high-strength and high-stiff wall structure. It is suitable for walls above 1~13m and combined with casting of cast-in-place concrete layer , simplify construction technology and improve construction speed.

Benefits of technology

The self-weight of prefabricated components is reduced, the overall stiffness and resistance to side pressure is improved, the scope of structural application is expanded, the construction process is simplified, the transportation and pouring time is reduced, and the construction risks and costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109594688B_ABST
    Figure CN109594688B_ABST
Patent Text Reader

Abstract

A steel truss double-wall structure and a construction method thereof, comprising a main structure, a double-wall structural unit and a cast-in-place concrete layer; a group of double-wall structural units are spliced ​​and connected in the transverse direction; the cast-in-place concrete layer is cast in a group of double-wall structural units; the double-wall structural unit comprises a first precast concrete slab and a second precast concrete slab; a group of steel trusses are arranged between the first precast concrete slab and the second precast concrete slab and in parallel in the transverse direction; each steel truss is arranged along the vertical full length, the chord on one side of the steel truss is cast in the first precast concrete slab, and the chord on the other side of the steel truss is cast in the second precast concrete slab. The present invention simplifies the process of supporting scaffolding and formwork in the traditional cast-in-place process, saves labor and avoids the safety hazards caused by high formwork, and solves the technical problems of small thickness and height of existing steel truss double-wall, which does not exceed 4m, and low overall stiffness and ability to resist concrete lateral pressure of existing double-wall structures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building engineering structures, and in particular to a steel truss double-skin wall structure and a construction method thereof. Background Art

[0002] With the development of the information age, electronic products are becoming more and more abundant, and related industrial plants are constantly emerging; from the perspective of production technology, industrial plants require a large number of pools. In view of the functions and structural characteristics of the pools, their walls are relatively high and thick. According to the traditional cast-in-place process, it is necessary to set up formwork and support systems on both sides of the wall, and then pour concrete in the space formed by the formwork. Subsequent work and demolding can only be carried out after the concrete reaches a certain strength. Due to the relatively high height of the structural wall, the construction process will involve the problems of high formwork and segmented pouring construction and maintenance. In addition to the construction of industrial plant walls, underground retaining walls and underground integrated pipe corridors of industrial and civil buildings also have the above problems, and because the outer wall at the bottom of the foundation is located in an environment surrounded by the foundation, the erection and disassembly operations of the formwork and support are also restricted from the space. At present, in addition to the traditional cast-in-place process, the prefabricated assembly construction method can also be used, but in the above case, it will bring about the problem of overweight of prefabricated components and difficulty in waterproofing the joints between components. Existing public technologies include: solid prefabricated walls, steel truss double skin walls, and cast-in-place walls. Solid prefabricated walls, if applied to industrial plants or retaining walls, have very prominent disadvantages. Due to the high density of concrete, when the wall is high and thick, the use of solid prefabricated walls will cause the self-weight of the components to be too large, which will bring many inconveniences to production and construction; at the same time, the components are too large and too heavy, which will have an adverse effect on the transportation process. If the height of the steel truss double-skin wall exceeds 4m, the steel truss cage has low tensioning capacity and resistance, and the double-skin wall is prone to damage during installation. There are also strict requirements on the concrete pouring speed and the height of one-time pouring, which reduces the construction speed and is not suitable for industrial plant pools and retaining walls. When the cast-in-place construction process is adopted, scaffolding and formwork need to be set up on both sides of the wall at the construction site. Due to the special functional requirements of industrial plants, the wall height can reach more than 10m, so tall formwork needs to be set up. There are great safety risks in tall formwork projects, and special construction plans need to be formulated and expert discussions need to be conducted. The plan formulation and approval process is cumbersome; supports need to be set up on the back of the formwork on both sides. Due to the existence of the supports, the operating space on the construction site is greatly compressed; before cast-in-place construction, it is necessary to tie steel bars and support formwork on site, and the formwork needs to be removed after pouring. The above processes all require consideration of time and personnel investment, which is not conducive to cost and construction period control; at the same time, due to cast-in-place construction, it is inevitable to set up construction flow sections, which may lead to the formation of penetrating construction joints in the wall structure, and the existence of tension screws increases the risk of water leakage. In addition, the on-site formwork erection is greatly affected by the operator's skills and the construction environment, and the quality of formwork splicing is difficult to control. Summary of the invention

[0003] The purpose of the present invention is to provide a steel truss double-wall structure and a construction method thereof, in order to solve the technical problems that various construction procedures caused by the support of scaffolding and formwork in the traditional cast-in-place construction process, the existing steel truss double-wall has a small thickness and a height not exceeding 4m, and the overall rigidity of the existing double-wall structure and the ability to resist the lateral pressure of concrete are small.

[0004] In order to achieve the above object, the present invention adopts the following technical solution.

[0005] A steel truss double-wall structure comprises a main structure, double-wall structural units and a cast-in-place concrete layer; wherein, there is a group of double-wall structural units, which are spliced ​​and connected in the transverse direction; the cast-in-place concrete layer is cast in a group of double-wall structural units; the double-wall structural unit comprises a first precast concrete slab and a second precast concrete slab; the first precast concrete slab and the second precast concrete slab are arranged in parallel and spaced along the longitudinal direction; between the first precast concrete slab and the second precast concrete slab, a group of steel trusses are arranged in parallel and spaced along the transverse direction; wherein each steel truss is arranged along the vertical full length, and the chord on one side of the steel truss is cast in the first precast concrete slab, and the chord on the other side of the steel truss is cast in the second precast concrete slab; the cast-in-place concrete layer is cast in the gap between the first precast concrete slab and the second precast concrete slab.

[0006] Preferably, the height of the double-skin wall structure unit ranges from 1m to 15m, the width of the double-skin wall structure unit ranges from 1.5m to 4m, and the thickness of the double-skin wall structure unit ranges from 300mm to 1500mm.

[0007] Preferably, the top of the second precast concrete slab exceeds the top of the first precast concrete slab, and the length of the exceeding is 0 to 3000 mm.

[0008] Preferably, the first precast concrete slab and the second precast concrete slab are both provided with anti-cracking steel mesh and stress-bearing steel bars.

[0009] Preferably, a first notch is provided on one vertical side of the first precast concrete slab, and a first protrusion is provided on the other vertical side of the first precast concrete slab; a second notch is provided on one vertical side of the second precast concrete slab, and a second protrusion is provided on the other vertical side of the second precast concrete slab; and adjacent double-skin wall structural units are connected by tongue and groove.

[0010] Preferably, the top of the steel truss is flush with the top of the first precast concrete slab; and a lifting lug for lifting is provided on the top of the steel truss.

[0011] Preferably, the distance between two adjacent steel trusses is between 500 mm and 3000 mm.

[0012] A construction method for a steel truss double-skin wall structure comprises the following steps.

[0013] Step 1: Prepare steel trusses.

[0014] Step 2: horizontally lay the anti-cracking steel mesh of the precast concrete slab on one side of the steel truss.

[0015] Step three, place the upper chord of the steel truss on the anti-crack steel mesh laid in step two, and connect it to the anti-crack steel mesh.

[0016] Step 4: pouring concrete of the precast concrete slab on this side to achieve the connection between the steel truss and the precast concrete slab.

[0017] Step 5: horizontally lay the anti-cracking steel mesh of the precast concrete slab on the other side of the steel truss.

[0018] Step six: After the concrete is cured and molded in step four, turn the component 180 degrees.

[0019] Step seven, place the lower chord of the steel truss on the anti-cracking steel mesh laid in step five, and connect it to the anti-cracking steel mesh.

[0020] Step eight, pouring concrete of the precast concrete slab on this side to achieve the connection between the steel truss and the precast concrete slab.

[0021] Step eight, concrete curing, molding, and demoulding, finally completing the production of the double-skin wall structural unit.

[0022] Step nine, transport the double-skin wall structure unit manufactured in step eight to the site, and hoist the double-skin wall structure unit into place.

[0023] Step 10: Temporarily fix the double wall structural unit to the main structure.

[0024] Step eleven: pouring concrete into the cavity in the double wall structural unit to form a cast-in-place concrete layer.

[0025] Step 12: After the concrete of the cast-in-place concrete layer solidifies, the double-skin wall structural unit is connected to the main structure as a whole.

[0026] Compared with the prior art, the present invention has the following characteristics and beneficial effects.

[0027] 1. The steel truss double-wall structure of the present invention utilizes prefabricated concrete slabs on both sides to replace the formwork in the cast-in-place construction process, and also saves various construction processes caused by the support of scaffolding and formwork. In addition, the prefabricated concrete slabs on both sides are connected by steel trusses in the present invention, which greatly reduces the self-weight of the prefabricated components and improves the overall rigidity of the components and the ability to resist the lateral pressure of concrete.

[0028] 2. The steel truss double-wall structure of the present invention utilizes steel trusses to connect prefabricated concrete slabs. This structure has high rigidity and strength, which is conducive to increasing the overall size of the double-wall structure and can expand the applicable scope of the double-wall structure to more than 13m, solving the technical problem that the existing steel truss double-wall structure has a small applicable scope and a height generally not exceeding 4m; through reasonable node structure, it can provide good overall stress performance and waterproof performance.

[0029] 3. The present invention adopts steel trusses to connect the precast concrete slabs on both sides, so the double-skin wall structure has a higher vertical bearing capacity and the ability to resist the lateral pressure of concrete pouring. The support-free precast beams and precast slabs can be directly placed on the top of the wall, and the wall and slab concrete can be poured together during construction, thereby simplifying the construction process, reducing the number of concrete pouring times, and improving the construction speed.

[0030] 4. The present invention proposes a design scheme for a steel truss double-wall structure, which centrally solves the problem of on-site scaffolding and formwork, eliminating a series of construction processes caused by supporting the formwork; at the same time, due to the light weight of the components, the transportation problem of the components is solved; due to the improved lateral pressure resistance, the problem of rapid concrete pouring is solved.

[0031] 5. The steel truss double-skin wall structure of the present invention is suitable for walls, pool side walls and retaining walls with a height of 1 to 13 meters or more, and because the stability and vertical bearing capacity of the steel truss double-skin wall structure are improved, the problem of vertical support of prefabricated wall panels is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0033] Figure 1 It is a schematic diagram of the three-dimensional structure of the double-skin wall structural unit in the present invention.

[0034] Figure 2 It is a structural schematic diagram of the connection between the second precast concrete slab and the steel truss in the present invention.

[0035] Figure 3 It is a structural schematic diagram of the connection between the second precast concrete slab and the steel truss in the present invention.

[0036] Figure 4 It is a schematic diagram of the side structure of the double-skin wall structural unit in the present invention.

[0037] Figure 5 It is a front structural schematic diagram of the medium-sized steel truss double-skin wall structure of the present invention.

[0038] Figure 6 It is a schematic diagram of the planar structure of the medium-sized steel truss double-skin wall structure of the present invention.

[0039] Figure numerals: 1-main structure, 2-double wall structural unit, 2.1-first precast concrete slab, 2.1.1-first notch, 2.1.2-first protrusion, 2.2-second precast concrete slab, 2.2.1-second notch, 2.2.2-second protrusion, 2.3-steel truss, 2.3.1-upper chord, 2.3.2-lower chord, 3-cast-in-place concrete layer, 4-hanging ear, 5-first connecting plate, 6-second connecting plate, 7-ground, 8-third connecting plate. DETAILED DESCRIPTION

[0040] like Figure 1-6 As shown, this steel truss double-wall structure includes a main structure 1, a double-wall structural unit 2 and a cast-in-place concrete layer 3; wherein, there is a group of double-wall structural units 2, which are spliced ​​and connected along the horizontal direction; the cast-in-place concrete layer 3 is cast in a group of double-wall structural units 2; the double-wall structural unit 2 includes a first precast concrete slab 2.1 and a second precast concrete slab 2.2; the first precast concrete slab 2.1 and the second precast concrete slab 2.2 are arranged in parallel and spaced along the longitudinal direction; between the first precast concrete slab 2.1 and the second precast concrete slab 2.2, a group of steel trusses 2.3 are arranged in parallel and spaced along the horizontal direction; wherein each steel truss 2.3 is arranged along the vertical full length, and the chord on one side of the steel truss 2.3 is cast in the first precast concrete slab 2.1, and the chord on the other side of the steel truss 2.3 is cast in the second precast concrete slab 2.2; the cast-in-place concrete layer 3 is cast in the gap between the first precast concrete slab 2.1 and the second precast concrete slab 2.2.

[0041] In this embodiment, the height range of the double-skin wall structure unit 2 is 1m to 15m, with a common height of 5m to 10m; the width of the double-skin wall structure unit 2 is between 1.5m and 4m, and the thickness of the double-skin wall structure unit 2 is between 300mm and 1500mm.

[0042] In this embodiment, the top of the second precast concrete slab 2.2 exceeds the top of the first precast concrete slab 2.1, and the length of the exceeding is 0 to 3000 mm.

[0043] In this embodiment, the first precast concrete slab 2.1 and the second precast concrete slab 2.2 are both provided with anti-cracking steel mesh and stress-bearing steel bars.

[0044] In this embodiment, a first notch 2.1.1 is provided on one vertical side of the first precast concrete slab 2.1, and a first protrusion 2.1.2 is provided on the other vertical side of the first precast concrete slab 2.1; a second notch 2.2.1 is provided on one vertical side of the second precast concrete slab 2.2, and a second protrusion 2.2.2 is provided on the other vertical side of the second precast concrete slab 2.2; adjacent double-skin wall structural units 2 are connected by tongue and groove.

[0045] In this embodiment, the double-skin wall structure units 2 are connected to each other through a first connecting plate 5; the first connecting plate 5 is arranged on the front and rear panel surfaces of the double-skin wall structure units 2, and is arranged at intervals along the joint seams between the double-skin wall structure units 2 and the double-skin wall structure units 2; the two ends of the first connecting plate 5 are respectively attached to the panel surfaces of two adjacent double-skin wall structure units 2 to connect the two double-skin wall structure units 2.

[0046] In this embodiment, the double-skin wall structure unit 2 is connected to the main structure 1 through a second connecting plate 6; the second connecting plate 6 is arranged on the front and rear panel surfaces of the double-skin wall structure unit 2, and is arranged at intervals along the joint seam between the double-skin wall structure unit 2 and the main structure 1; the horizontal cross-section of the second connecting plate 6 is L-shaped, including a horizontal edge and a vertical edge; wherein the horizontal edge of the second connecting plate 6 is tightly attached to the panel surface of the double-skin wall structure unit 2 on the corresponding side and is connected to the double-skin wall structure unit 2, and the vertical edge of the second connecting plate 6 is tightly attached to the longitudinal side surface of the main structure 1 and is connected to the main structure 1.

[0047] In this embodiment, the bottom of the double-skin wall structure unit 2 is connected to the ground 7 through a third connecting plate 8; the third connecting plate 8 is arranged on the front and rear panel surfaces of the double-skin wall structure unit 2, and is arranged at intervals along the joint seam between the double-skin wall structure unit 2 and the ground 7; the longitudinal section of the third connecting plate 8 is L-shaped, including a vertical side and a horizontal side; wherein the horizontal side of the third connecting plate 8 is tightly attached to the ground 7 and connected to the ground 7, and the vertical side of the third connecting plate 8 is tightly attached to the panel surface of the double-skin wall structure unit 2 and connected to the double-skin wall structure unit 2.

[0048] In this embodiment, the top of the steel truss 2.3 is flush with the top of the first precast concrete slab 2.1; and

[0049] A lifting lug 4 for lifting is provided on the top of the steel truss 2.3.

[0050] In this embodiment, the distance between two adjacent steel trusses 2.3 is between 500 mm and 3000 mm.

[0051] In this embodiment, the first precast concrete slab 2.1 and the second precast concrete slab 2.2 of the steel truss double-skin wall structure are cast into a whole with the upper chord 2.3.1 and the lower chord 2.3.2 on both sides of the steel truss 2.3 respectively; after the curing, molding, demoulding and other processes are completed, they are transported to the construction site for installation, and finally the cast-in-place concrete layer 3 is cast in the cavity formed by the precast concrete slabs on both sides, and connected with other precast components to form an integral structure.

[0052] The construction method of this steel truss double-skin wall structure includes the following steps.

[0053] Step 1: Prepare steel trusses 2.3.

[0054] Step 2: horizontally lay the anti-cracking steel mesh of the precast concrete slab on one side of the steel truss 2.3.

[0055] Step 3: Place the upper chord 2.3.1 of the steel truss 2.3 on the anti-cracking steel mesh laid in step 2 and connect it to the anti-cracking steel mesh.

[0056] Step 4: pouring concrete of the precast concrete slab on this side to achieve the connection between the steel truss 2.3 and the precast concrete slab.

[0057] Step 5: horizontally lay the anti-cracking steel mesh of the precast concrete slab on the other side of the steel truss 2.3.

[0058] Step six: After the concrete is cured and molded in step four, turn the component 180 degrees.

[0059] Step 7: Place the lower chord 2.3.2 of the steel truss 2.3 on the anti-cracking steel mesh laid in step 5 and connect it to the anti-cracking steel mesh.

[0060] Step eight, pouring concrete of the precast concrete slab on this side to achieve the connection between the steel truss 2.3 and the precast concrete slab.

[0061] Step eight, concrete curing, molding, and demoulding, and finally completing the production of the double-skin wall structural unit 2.

[0062] Step nine, transporting the double-skin wall structure unit 2 manufactured in step eight to the site, and hoisting the double-skin wall structure unit 2 into place.

[0063] Step ten: temporarily fix the double wall structure unit 2 to the main structure 1.

[0064] Step eleven: pouring concrete in the cavity of the double-wall structural unit 2 to form a cast-in-place concrete layer 3.

[0065] Step 12: After the concrete of the cast-in-place concrete layer 3 solidifies, the double-skin wall structural unit 2 is connected to the main structure 1 as a whole.

[0066] In this embodiment, in actual application, the double-skin wall structure unit 2 needs to be transported to the site, hoisted into place, and fixed with the help of certain connection measures. Finally, concrete is poured in the cavity formed by the precast concrete slabs on both sides of the steel truss 2.3, and connected with the main structure 1 to form the final overall structure.

[0067] In this embodiment, the entire structure of the steel truss double-skin wall structure is composed of precast concrete slabs on both sides and the middle steel truss 2.3; the precast concrete slabs on both sides are connected and fixed with the middle steel truss 2.3 by pouring concrete in the component factory; in actual on-site application, the precast concrete slabs on both sides replace the templates on both sides when pouring concrete, and the middle steel truss 2.3 plays two roles: before pouring concrete, supporting and fixing the precast concrete slabs on both sides to provide space for pouring concrete; when pouring concrete, the precast concrete slabs on both sides are tied together by the steel truss 2.3 to resist the lateral pressure when pouring the cast-in-place concrete layer 3; the main force-bearing steel bars and anti-cracking steel mesh of the wall are arranged in the first precast concrete slab 2.1 and the second precast concrete slab 2.2, which can avoid the on-site steel bar binding work.

[0068] In this embodiment, each steel truss double-skin wall structure adopts two steel trusses 2.3. During the transportation and installation stages, the prefabricated components can have sufficient rigidity and bearing capacity, are not easily deformed and damaged, and are easy to transport and install. During the production stage, the steel trusses 2.3 are produced and transported as single-piece trusses, which is convenient for transportation. During the production stage, temporary connectors are used to fix the steel trusses 2.3 to the prefabricated concrete slabs to form a stable structural system, which is convenient for positioning and pouring concrete, avoiding possible safety problems when pouring concrete with high formwork, as well as expansion and leakage of formwork.

[0069] In this embodiment, the precast concrete slabs on both sides can replace the formwork in the traditional cast-in-place process, especially in tall formwork projects, avoiding the design work of the formwork and its complex support system; in addition, since the precast concrete slabs on both sides form a whole with the cast-in-place structure after pouring, there is no need to remove the formwork, which saves the time for setting up and removing the formwork, and reduces the operation workload and difficulty of on-site workers; in addition, due to the presence of the precast concrete slabs on both sides, support can be provided for precast components such as slabs and beams, which can be poured at one time without waiting for the time for concrete pouring and curing, ensuring rapid connection between processes and shortening the construction period.

Claims

1. A steel truss double-wall structure, comprising a main structure (1), a double-wall structural unit (2) and a cast-in-place concrete layer (3); wherein: A group of double-skin wall structural units (2) are spliced ​​and connected in the transverse direction; the cast-in-place concrete layer (3) is cast in a group of double-skin wall structural units (2); the double-skin wall structural unit (2) comprises a first precast concrete slab (2.1) and a second precast concrete slab (2.2); the first precast concrete slab (2.1) and the second precast concrete slab (2.2) are arranged in parallel and spaced relation in the longitudinal direction; a group of steel trusses (2.3) are arranged in parallel and spaced relation in the transverse direction between the first precast concrete slab (2.1) and the second precast concrete slab (2.2); wherein each steel truss (2.3) is arranged in the vertical direction through the entire length, and the chord on one side of the steel truss (2.3) is cast. In the first precast concrete slab (2.1), the chord on the other side of the steel truss (2.3) is cast in the second precast concrete slab (2.2); anti-cracking steel mesh and stress-bearing steel bars are arranged in the first precast concrete slab (2.1) and the second precast concrete slab (2.2); the upper chord (2.3.1) of the steel truss (2.3) is connected to the anti-cracking steel mesh, and the lower chord (2.3.2) of the steel truss (2.3) is connected to the anti-cracking steel mesh; the cast-in-place concrete layer (3) is cast in the gap between the first precast concrete slab (2.1) and the second precast concrete slab (2.2); the height range of the double-skin wall structure unit (2) is 1m to 15m, and the double-skin wall structure unit (2) is 1m to 15m. The width of the element (2) is between 1.5m and 4m, and the thickness of the double-skin wall structural unit (2) is between 300mm and 1500mm; a first notch (2.1.1) is provided on one vertical side of the first precast concrete slab (2.1), and a first protrusion (2.1.2) is provided on the other vertical side of the first precast concrete slab (2.1); a second notch (2.2.1) is provided on one vertical side of the second precast concrete slab (2.2), and a second protrusion (2.2.2) is provided on the other vertical side of the second precast concrete slab (2.2); adjacent double-skin wall structural units (2) are connected by tongue and groove; the bottom of the double-skin wall structural unit (2) is connected to the ground (7). The third connecting plates (8) are connected between the double-skin wall structural unit (2) and the ground (7); the third connecting plates (8) are arranged on the front and rear plate surfaces of the double-skin wall structural unit (2), and are arranged at intervals along the joint between the double-skin wall structural unit (2) and the ground (7); the longitudinal section of the third connecting plate (8) is L-shaped, including a vertical side and a horizontal side; wherein the horizontal side of the third connecting plate (8) is closely attached to the ground (7) and connected to the ground (7), and the vertical side of the third connecting plate (8) is closely attached to the plate surface of the double-skin wall structural unit (2) and connected to the double-skin wall structural unit (2); the top of the second precast concrete plate (2.2) exceeds the top of the first precast concrete plate (2.1), and the length of the excess is 0 to 3000 mm.

2. The steel truss double wall structure according to claim 1 is characterized in that: The first precast concrete slab (2.1) and the second precast concrete slab (2.2) are both provided with anti-cracking steel mesh and stress-bearing steel bars.

3. The steel truss double wall structure according to claim 1 is characterized in that: The top of the steel truss (2.3) is flush with the top of the first precast concrete slab (2.1); and a lifting lug (4) for lifting is provided on the top of the steel truss (2.3).

4. The steel truss double wall structure according to claim 1, characterized in that: The distance between two adjacent steel trusses (2.3) is between 500 mm and 3000 mm.

5. A construction method of a steel truss double wall structure according to any one of claims 1 to 4, characterized in that: The steps include: Step 1, preparing the steel truss (2.3); Step 2, horizontally laying the anti-cracking steel mesh of the precast concrete slab on one side of the steel truss (2.3); Step 3: Place the upper chord (2.3.1) of the steel truss (2.3) on the anti-cracking steel mesh laid in step 2 and connect it to the anti-cracking steel mesh; Step 4: pouring concrete of the precast concrete slab on this side to achieve connection between the steel truss (2.3) and the precast concrete slab; Step 5, horizontally laying the anti-cracking steel mesh of the precast concrete slab on the other side of the steel truss (2.3); Step 6: After the concrete is cured and molded in step 4, the component is turned 180 degrees; Step 7: Place the lower chord (2.3.2) of the steel truss (2.3) on the anti-cracking steel mesh laid in step 5 and connect it to the anti-cracking steel mesh; Step eight, pouring concrete of the precast concrete slab on this side to achieve connection between the steel truss (2.3) and the precast concrete slab; Step 8: Curing and molding the concrete, and demoulding, to finally complete the production of the double-skin wall structural unit (2); Step nine, transporting the double-wall structure unit (2) manufactured in step eight to the site, and hoisting the double-wall structure unit (2) into place; Step 10, temporarily fixing the double wall structural unit (2) and the main structure (1); Step 11, pouring concrete into the cavity in the double-wall structural unit (2) to form a cast-in-place concrete layer (3); Step 12: After the concrete of the cast-in-place concrete layer (3) solidifies, the double-skin wall structural unit (2) and the main structure (1) are connected as a whole.

Citation Information

Patent Citations

  • Novel shear force wall

    CN205776903U

  • Profile steel truss double-wall structure

    CN209482535U

  • Structure and construction method of wall body, reinforcement unit and connecting metal fitting for wall body construction

    JP2018076652A

  • A twin wall structure using a PC panel and method for manufacturing of it

    KR1020170051018A