A bottom-enlarged pipe pile and its construction technology

By forming recesses and concave rings at the lower end of the steel pipe pile and the inner wall of the bottom end of the pile hole, filling and expanding the solidification material to form a multi-stage expanded pile end, the construction speed and bearing capacity of the steel pipe piles in soft soil areas are solved. The problem of insufficient improvements has improved the overall strength and pull-out resistance of the pile.

CN109972611BActive Publication Date: 2024-11-12BEIJING ZHONGYAN DADI TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201910395600.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-13
Publication Date
2024-11-12
Estimated Expiration
2039-05-13

AI Technical Summary

Technical Problem

In soft soil areas, the construction speed of steel pipe piles is slow and cumbersome, so it is impossible to improve the vertical bearing capacity of steel pipe piles, and the pile end cannot form an enlarged head, making it difficult to ensure the resistance and bearing capacity of piles on the side.

Method used

By forming an expanded recess and concave ring on the lower end of the steel pipe and the inner wall surface of the bottom end of the pile hole, the cured material and concrete are filled, and the pile pressing plate and inner pipe are used to cooperate, the cured material expands and hardens, forming a multi-stage diameter larger than that of the steel pipe. The bottom-expanded pile end is enhanced to enhance the bearing capacity of the pile end.

Benefits of technology

The overall strength and pull resistance of the pipe piles are improved, the bearing capacity at the pile end is enhanced, the construction process is simple, and the soil extrusion effect is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0002058068370000011
    Figure HDA0002058068370000011
  • Figure HDA0002058068370000021
    Figure HDA0002058068370000021
  • Figure HDA0002058068370000031
    Figure HDA0002058068370000031
Patent Text Reader

Abstract

The present invention discloses an expanded bottom type pipe pile and its construction process, which relates to the field of geotechnical engineering technology. It comprises a steel pipe, and an expanded concave portion and a concave ring are formed on the inner wall surface of the lower end of the steel pipe and the bottom end of the pile hole. The interior of the steel pipe and the expanded concave portion and the concave ring are filled with curing material and concrete in sequence from bottom to top. A pressure plate that can move up and down is provided on the top surface of the concrete. The top surface of the pressure plate is connected to an inner pipe, and the inner pipe is installed on a fixed bracket on a pile driver. The pile driver applies pressure to the concrete through the pressure plate at the lower end of the inner pipe, so that the curing material absorbs water and expands. After the curing material hardens, a multi-stage expanded bottom type pile end with a diameter larger than the steel pipe is formed at the bottom end of the pile hole. The problems of low pile end bearing capacity and construction process in the prior art can be effectively solved to improve the strength and pull-out resistance of the pile body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geotechnical engineering, and in particular to a bottom-enlarged pipe pile and a construction process thereof. Background Art

[0002] Bearing piles can transfer all or part of the load of a building to the underground soil layer with good bearing performance to meet the requirements of bearing capacity and settlement. With the rapid development of infrastructure implementation, pile types with higher bearing capacity and pile-making technology have been widely used. Bored piles and steel pipe piles are the two commonly used piles in the field of geotechnical engineering technology. During the construction of bored piles, steel cages must be placed. The construction process is complicated, the construction period is long, the cost is high, and it is easy to break piles or shrink necks. In addition, the bearing capacity of the bearing layer at the pile end is difficult to guarantee. In contrast, steel pipe piles can be directly pressed into the soil by a pile driver, and the steel pipe can be filled or not filled with concrete, which is convenient for construction. Therefore, steel pipe piles are widely used in geotechnical engineering technology due to their high bearing capacity, wide range of use and good stability. In soft soil areas, due to the characteristics of soft soil areas such as large porosity, high water content, and large settlement, steel pipe piles are all of equal cross-section straight type. The equal cross-section steel pipe piles have low lateral resistance around the piles, and the pile ends cannot form enlarged heads, making it difficult to ensure the pile side resistance and pile end bearing capacity. At present, the steel pipe pile ends have been improved with enlarged heads, but the steel pipe piles have problems such as being difficult to be driven into the soil layer during construction, slow construction speed, cumbersome construction, and inability to improve the vertical bearing capacity of the steel pipe piles.

[0003] Currently, no effective solution has been proposed for the existing problems in the related technologies. Summary of the invention

[0004] The object of the present invention is to provide a bottom-enlarged pipe pile and a construction process thereof, so as to solve the above-mentioned problems existing in the prior art.

[0005] In order to achieve the above-mentioned purpose, the technical scheme adopted by the present invention is as follows: an expanded bottom type pipe pile, comprising a steel pipe, an expanded recess and a concave ring are formed on the inner wall surface of the lower end of the steel pipe and the bottom end of the pile hole, and the interior of the steel pipe and the expanded recess and the concave ring are filled with curing material and concrete in sequence from bottom to top, and a pressure plate that can move up and down is provided on the top surface of the concrete, and the top surface of the pressure plate is connected to an inner pipe, and the inner pipe is installed on a fixed bracket on a pile driver, and the pile driver applies pressure to the concrete through the pressure plate at the lower end of the inner pipe, so that the curing material absorbs water and expands, and after the curing material hardens, a multi-stage expanded bottom type pile end with a diameter larger than the steel pipe is formed at the bottom end of the pile hole.

[0006] Preferably, an expanded recess and a concave ring are formed on the inner wall surface of the lower end of the steel pipe and the bottom end of the pile hole. The expanded recess is formed at the lower end of the steel pipe in a plum blossom shape, and the expanded concave ring is formed at the bottom end of the pile hole in the shape of an annular groove.

[0007] Preferably, the interior of the steel pipe and the expanded concave portion and concave ring are filled with curing material and concrete in sequence from bottom to top.

[0008] Preferably, the solidified material extending from the concave portion at the lower end of the steel pipe and the concave ring at the bottom end of the pile hole bites the bearing layer into them.

[0009] Preferably, the top surface of the pressure plate is connected with an inner tube, the inner tube is mounted on a fixed bracket on the pile driver, and the pressure plate and the inner tube can move up and down in the steel pipe.

[0010] Preferably, the pile driver pushes the inner tube to make the pressure plate pressurize the concrete, thereby pressurizing the solidified material and acting on the bottom end of the pile hole to form an expanded bottom pile end with a diameter larger than the steel pipe.

[0011] A bottom-enlarged pipe pile and a construction process thereof, characterized in that the following steps are included:

[0012] S1, drilling hole: according to the location of the pile, the auger is accurately positioned at the pile hole, the steel pipe is placed by the auger, and the following pipe drilling method is adopted when drilling the hole. At the same time, the spiral blade rotates inside the steel pipe to dig to the predetermined depth;

[0013] S2, expanding the bottom of the pile end: after the auger drill reaches a predetermined depth, the expansion device extends a horizontal expansion drill bit, starts the auger drill, forms an expanded concave ring on the inner wall surface of the bottom end of the pile hole, the expansion device retracts the horizontal expansion drill bit, lifts the expansion device to the lower end of the steel pipe, and the expansion device extends the horizontal expansion drill bit again, squeezes the inner wall of the steel pipe through the horizontal drill bit, and forms an expanded concave portion on the inner wall surface;

[0014] S3, hole cleaning: after the concave part and the concave ring at the lower end of the steel pipe and the bottom end of the pile hole are formed, the hole is cleaned again by using an auger to clean the debris at the bottom of the hole;

[0015] S4, filling: concrete should be used as soon as it is mixed, and the curing material and concrete should be filled from the top of the inner tube to the inside of the steel tube and the expanded concave range from bottom to top, and the curing material is completely filled in the concave range and the concave ring;

[0016] S5, pressurization: while pouring materials, the inner tube is slowly lifted, and at the same time, the pile driver applies pressure to the concrete through the pressure plate on the inner tube, so that the solidified material expands, and after hardening, a multi-level expanded bottom pile end with a diameter larger than the steel tube is formed at the bottom of the pile hole;

[0017] S6, curing: After the concrete is poured, curing is carried out, waiting for the concrete to solidify and harden.

[0018] The beneficial effects of the present invention are as follows: the expanded bottom pipe pile provided by the present invention is inserted into the foundation by cooperating with the steel pipe and the spiral drill, which can reduce the soil squeezing effect generated when the steel pipe is inserted; after the steel pipe is fully inserted into the foundation, a recess and a recessed ring are formed on the inner surface of the lower end of the steel pipe and the bottom end of the pile hole; by pouring solidifying material and concrete into the steel pipe, the solidifying material expands, and after hardening, it fills the recess and the recessed ring range on the inner surface of the lower end of the steel pipe and the bottom end of the pile hole; and multi-level expanded bottom pile ends with a diameter larger than the steel pipe are formed at the bottom end of the pile hole at predetermined intervals, which can enhance the integrity and strength of the pipe pile, effectively improve the bearing capacity and pull-out resistance of the pipe pile, and facilitate construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The following is a brief introduction to the drawings required for use in the embodiments to better understand the technical solutions in the embodiments of the present invention. It should be noted that the following drawings only show some examples of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 This is a structural diagram of the pipe pile pouring and pressurized concrete construction process according to the first embodiment of the present invention.

[0021] Figure 2 This is a structural diagram of the pipe pile hole construction process according to the first embodiment of the present invention.

[0022] Figure 3 This is a structural diagram of the pipe pile hole construction process according to the second embodiment of the present invention.

[0023] Figure 4 This is a structural diagram of the pipe pile hole construction process according to the third embodiment of the present invention.

[0024] Figure 5 It is a top view of the cross-section of the pipe pile AA of the present invention.

[0025] Figure 6 It is a top view of the cross-section of the pipe pile BB of the present invention.

[0026] In the figure, the meanings of the symbols are as follows:

[0027] Steel pipe 1, pile driver 2, fixed bracket 21, inner pipe 22, pressure plate 23, auger 3, spiral blade 31, diameter expansion device 32, diameter expansion drill bit 33, recess 4, recess ring 5, concrete 6, curing material 7, pile hole 8. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation methods described herein are only used to explain the present invention and are not used to limit the present invention.

[0029] Embodiment 1, as Figure 1 , Figure 2 As shown, an expanded bottom type pipe pile provided by an embodiment of the present invention comprises a steel pipe 1, an expanded concave portion 4 and a concave ring 5 are formed on the inner wall surface of the lower end of the steel pipe 1 and the bottom end of the pile hole 8, and the interior of the steel pipe 1 and the expanded concave portion 4 and the concave ring 5 are filled with curing material 7 and concrete 6 in sequence from bottom to top, and a pressure plate 23 movable up and down is provided on the top surface of the concrete 6, and an inner pipe 22 is connected to the top surface of the pressure plate 23, and the inner pipe 22 is installed on a fixed bracket of a pile driver 2, and the pile driver 2 applies pressure to the concrete 6 through the pressure plate 23 at the lower end of the inner pipe 22, so that the curing material 7 absorbs water and expands, and after the curing material 7 is hardened, a multi-stage expanded bottom type pile end with a diameter larger than that of the steel pipe 1 is formed at the bottom end of the pile hole 8.

[0030] In a specific embodiment of the present invention, Figure 5 , Figure 6 As shown, an expanded recess 4 and a concave ring 5 are formed on the inner wall surface of the lower end of the steel pipe 1 and the bottom end of the pile hole 8. The expanded recess 4 is formed at the lower end of the steel pipe 1 in a plum blossom shape, and the expanded concave ring 5 is formed at the bottom end of the pile hole 8 in the shape of an annular groove, wherein a plurality of recesses 4 can be provided according to the designed length of the steel pipe 1, and a plurality of circular concave rings 5 ​​can be provided according to the distance between the lower end of the steel pipe and the bottom of the pile hole 8.

[0031] In a specific embodiment of the present invention, the interior of the steel pipe 1 and the expanded recessed portion 4 and the recessed ring 5 are filled with solidifying material 7 and concrete 6 in sequence from bottom to top, wherein the solidifying material 7 absorbs water to expand and has a higher bearing capacity after hardening.

[0032] In a specific embodiment of the present invention, the solidified material 7 extending from the concave portion 4 at the lower end of the steel pipe 1 and the concave ring 5 at the bottom end of the pile hole 8 bites the bearing layer into them, and the solidified material 7 forms the lower end of the steel pipe 1 and the bottom end of the pile hole 8 into a whole, so as to increase the overall stability of the pile end.

[0033] In a specific embodiment of the present invention, the top surface of the pressure plate 23 is connected to the inner tube 22, and the inner tube 22 is installed on the fixed bracket of the pile driver 2. The pressure plate 23 and the inner tube 22 can move up and down in the steel pipe 1, and the pressure plate 23 and the inner tube 22 can be fixedly connected by heat welding, threading, etc.

[0034] In a specific embodiment of the present invention, the pile driver 2 pushes the inner tube 22 to make the pressure plate 23 pressurize the concrete 6, thereby pressurizing the solidifying material 7, and acting on the bottom end of the pile hole 8 to form an expanded bottom pile end with a diameter larger than the steel pipe 1, thereby further improving the bearing capacity of the pile end and the pull-out resistance of the pile body.

[0035] A bottom-enlarged pipe pile and a construction process thereof, characterized in that the following steps are included:

[0036] S1, drilling hole: according to the positioning of the pile, the auger 3 is accurately positioned at the pile hole position, the steel pipe 1 is placed by the auger 3, and the following pipe drilling method is adopted when drilling the hole, and at the same time, the spiral blade 31 is rotated inside the steel pipe 1 to dig to a predetermined depth;

[0037] S2, expanding the bottom of the pile end: after the auger 3 drills to a predetermined depth, the auger 3 is started to form an expanded concave ring 5 on the inner wall surface of the bottom end of the pile hole 8 by extending the horizontal expanding drill bit 33 from the expanding device 32, and the expanding device 32 is retracted to the horizontal expanding drill bit 33, and the expanding device 32 is lifted to the lower end of the steel pipe 1, and the expanding device 32 extends the horizontal expanding drill bit 33 again, and the inner wall of the steel pipe 1 is squeezed by the horizontal drill bit 33 to form an expanded concave portion 4 on its inner wall surface;

[0038] S3, hole cleaning: after the concave portion 4 and the concave ring 5 at the lower end of the steel pipe 1 and the bottom end of the pile hole 8 are formed, the hole is cleaned again by using the spiral drilling machine 3 to clean the debris at the bottom of the hole;

[0039] S4, filling: Concrete 6 should be used as soon as it is mixed, and the curing material 7 and concrete 6 are filled in sequence from the top of the inner tube 22 to the inside of the steel tube 1 and the expanded concave portion 4 from bottom to top, wherein the curing material 7 is completely filled in the concave portion 4 and the concave ring 5;

[0040] S5, pressurization: while pouring, the inner tube 22 is slowly lifted, and at the same time, the pile driver 2 applies pressure to the concrete 6 through the pressure plate 23 on the inner tube 22, so that the solidified material 7 expands, and after hardening, a multi-stage expanded bottom pile end with a diameter larger than the steel tube 1 is formed at the bottom of the pile hole 8;

[0041] S6, curing: After the concrete 6 is poured, curing is performed to wait for the concrete 6 to solidify and harden.

[0042] Embodiment 2, a bottom-enlarged pipe pile and its construction process, such as Figure 3As shown, its structure is similar to that of the first embodiment, and the main difference is that the expanded concave portion 4 and the concave ring 5 are formed on the inner wall surface of the lower end of the steel pipe 1 and the bottom end of the pile hole 8. In the present embodiment, during the expansion process of the pile end, the expansion device 32 extends the horizontal expansion drill bit 33, and the spiral drill 3 is started to form an expanded concave ring 5 on the inner wall surface of the bottom end of the pile hole 8. While slowly lifting the expansion device 32, the bottom end of the pile hole 8 is continuously expanded to the lower end of the steel pipe 1, and then the expansion device 32 retracts the horizontal expansion drill bit 33, and the expansion device 32 is lifted to the lower end of the steel pipe 1. The expansion device 32 extends the horizontal expansion drill bit 33 again, and the water The flat drill bit 33 squeezes the inner wall of the steel pipe 1 at a predetermined interval to form a multi-stage expanded recess 4 on the inner wall surface. The solidifying material 7 and the concrete 6 are filled in the steel pipe 1 and the expanded recess 4 and the recessed ring 5 from bottom to top, wherein the solidifying material 7 is completely filled in the recess 4 and the recessed ring 5. The pile driver 2 applies pressure to the concrete 6 through the pressure plate at the lower end of the inner pipe 22, and then applies pressure to the solidifying material 7. The pressure is applied while the material is poured, so that the solidifying material 7 absorbs water and expands, and has a higher bearing capacity. After hardening, it acts on the bottom of the pile hole 8 to form an expanded bottom pile end with a diameter larger than the steel pipe 1.

[0043] Embodiment 3, a bottom-enlarged pipe pile and its construction process, such as Figure 4 As shown, its structure is similar to that of the first and second embodiments, and the main difference is that the inner wall surface of the entire steel pipe 1 is squeezed at a predetermined interval to form a multi-stage expanded concave portion 4, so that the entire section of the pipe pile forms a convex portion and is tightly engaged with the surrounding soil to increase the lateral resistance around the pile, and a continuous concave ring 5 is formed on the inner wall surface of the bottom end of the pile hole 8. In this embodiment, during the expansion process of the pile end, the expansion device 32 extends the horizontal expansion drill bit 33, and the spiral drill 3 is started to form an expanded concave ring 5 on the inner wall surface of the bottom end of the pile hole 8. While slowly lifting the expansion device 32, the bottom end of the pile hole 8 is continuously expanded to the lower end of the steel pipe 1, and then the expansion device 32 retracts the horizontal expansion drill bit 33, and the expansion device 32 is lifted to the lower end of the steel pipe 1. The horizontal expansion drill bit 33 is extended from the position 32 again, and the inner wall of the steel pipe 1 is squeezed at a predetermined interval by the horizontal drill bit 33, and the squeezing direction of the expansion drill bit 33 is continuously adjusted to form a multi-stage staggered expansion concave portion 4 on the inner wall surface of the steel pipe 1, and the solidifying material 7 and the concrete 6 are sequentially filled from bottom to top inside the steel pipe 1 and within the expanded concave portion 4 and the concave ring 5, wherein the solidifying material 7 is completely filled within the concave portion 4 and the concave ring 5, and the pile driver 2 applies pressure to the concrete 6 through the pressure plate at the lower end of the inner pipe 22, and then applies pressure to the solidifying material 7, and the pressure is applied while the material is poured, so that the solidifying material 7 absorbs water and expands, and has a higher bearing capacity, and after hardening, acts on the bottom end of the pile hole 8 to form an expanded bottom pile end with a diameter larger than that of the steel pipe 1.

[0044] The above-described embodiments are preferred implementation modes of the present invention and are only used to facilitate the explanation of the present invention. They are not intended to limit the present invention in any form. It should be pointed out that a person skilled in the art may make some local improvements or modifications without departing from the principles of the present invention. Such improvements and modifications shall also be considered within the scope of protection of the present invention.

Claims

1. A bottom-enlarged pipe pile, characterized in that: The steel pipe, the lower end of the steel pipe and the inner wall surface of the bottom end of the pile hole are formed with an expanded concave portion and a concave ring, and the interior of the steel pipe and the expanded concave portion and the concave ring are filled with curing materials and concrete in sequence from bottom to top; After the spiral drill is used to drill to a predetermined depth, a horizontal expanding drill bit is extended from the expanding device, and the spiral drill is started to form an expanded concave ring on the inner wall surface of the bottom end of the pile hole. The expanding device retracts the horizontal expanding drill bit, and the expanding device is lifted to the lower end of the steel pipe. The expanding device extends the horizontal expanding drill bit again, and the inner wall of the steel pipe is squeezed by the horizontal drill bit to form an expanded concave portion on the inner wall surface; A pressure plate device with up and down movement is placed on the top surface of the concrete, the top surface of the pressure plate is connected to an inner tube, and the inner tube is installed on a fixed bracket on the pile driver. The pile driver applies pressure to the concrete through the pressure plate at the lower end of the inner tube, so that the solidifying material absorbs water and expands. After the solidifying material hardens, a multi-stage expanded bottom pile end with a diameter larger than the steel pipe is formed at the bottom of the pile hole; The lower end of the steel pipe forms an expanded concave portion in the shape of a plum blossom, and the bottom end of the pile hole forms an expanded concave ring in the shape of a circular groove.

2. The bottom-enlarged pipe pile according to claim 1, characterized in that: The solidified material extending from the concave portion at the lower end of the steel pipe and the concave ring at the bottom end of the pile hole bites the bearing layer into them.

3. The bottom-enlarged pipe pile according to claim 1, characterized in that: The top surface of the pressure plate is connected with an inner tube, and the inner tube is installed on a fixed bracket on the pile driver. The pressure plate and the inner tube can move up and down in the steel pipe.

4. The bottom-enlarged pipe pile according to claim 1, characterized in that: The pile driver pushes the inner tube to make the pressure plate pressurize the concrete, thereby pressurizing the solidified material and acting on the bottom end of the pile hole to form an expanded bottom pile end with a diameter larger than the steel pipe.

5. The construction process of a bottom-enlarged pipe pile according to claim 1, characterized in that: The following steps are involved: S1, drilling hole: according to the positioning of the pipe pile, the spiral drill is accurately positioned at the pile hole position, the steel pipe is placed by the spiral drill, and the following pipe drilling method is adopted when drilling the hole, and the spiral blade is rotated inside the steel pipe to dig to a predetermined depth; S2, expanding the bottom of the pile end: after the auger drill reaches a predetermined depth, the expansion device extends a horizontal expansion drill bit, starts the auger drill, forms an expanded concave ring on the inner wall surface of the bottom end of the pile hole, the expansion device retracts the horizontal expansion drill bit, lifts the expansion device to the lower end of the steel pipe, and the expansion device extends the horizontal expansion drill bit again, squeezes the inner wall of the steel pipe through the horizontal drill bit, and forms an expanded concave portion on the inner wall surface; S3, hole cleaning: after the concave part and the concave ring at the lower end of the steel pipe and the bottom end of the pile hole are formed, the hole is cleaned again by using an auger to clean the debris at the bottom of the hole; S4, filling: concrete should be used as soon as it is mixed, and the curing material and concrete should be filled from the top of the inner tube to the inside of the steel tube and the expanded concave range from bottom to top, and the curing material is completely filled in the concave range and the concave ring; S5, pressurization: while pouring materials, the inner tube is slowly lifted, and at the same time, the pile driver applies pressure to the concrete through the pressure plate on the inner tube, so that the solidified material expands, and after hardening, a multi-level expanded bottom pile end with a diameter larger than the steel tube is formed at the bottom of the pile hole; S6, curing: After the concrete is poured, curing is carried out, waiting for the concrete to solidify and harden.

Citation Information

Patent Citations

  • Static drill squeezed branch and pipe pile combined pile type and construction method thereof

    CN106759295A

  • Expanded-base tubular pile structure

    CN210315516U

  • Work execution method for steel pipe pile, and foundation structure using steel pipe pile

    JP2005083151A