A prefabricated integrated pipe gallery foundation leveling layer and construction method thereof

By setting up the foundation leveling layer of the prefabricated comprehensive pipe gallery on the basis of the pipe gallery, the problem of uneven foundation structure affecting assembly accuracy is solved, efficient and precise control of the pipe gallery support structure is achieved, and the construction process is simplified.

CN110004967BActive Publication Date: 2024-10-01XIAMEN CONSTRUCTION ENGINEERING CO LTD OF CHINA RAILWAY FIRST GROUP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910221247.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-03-22
Publication Date
2024-10-01
Estimated Expiration
2039-03-22

AI Technical Summary

Technical Problem

In the existing technology, the unevenness of the foundation structure affects the assembly accuracy of the pipe gallery and may cause structural stress concentration.

Method used

The basic leveling layer of the prefabricated comprehensive pipe gallery is adopted, including three pouring leveling structures and two grouting filling structures arranged in parallel along the extension direction of the pipe gallery to ensure that the flatness and height of the leveling layer are consistent, and during the assembly process Use lubricant and angle iron to control elevation error and friction.

Benefits of technology

It improves the assembly accuracy and efficiency of the pipe gallery, reduces structural stress concentration, simplifies the construction process, and reduces the difficulty of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110004967B_ABST
    Figure CN110004967B_ABST
Patent Text Reader

Abstract

The present invention relates to a prefabricated integrated pipe gallery foundation leveling layer and a construction method thereof, wherein the leveling layer is located between a base structure and a prefabricated integrated pipe gallery, and the leveling layer comprises three cast leveling structures and two grouting filling structures arranged in parallel along the extension direction of the pipe gallery, wherein the three cast leveling structures are respectively located at the left and right ends and the middle of the pipe gallery, and the two grouting filling structures are respectively located between the three cast leveling structures, and the cast leveling structure is highly consistent with the grouting filling structure. The prefabricated integrated pipe gallery foundation leveling layer provided by the present invention has a simple construction process and low operating difficulty, and by setting the leveling layer, the friction force of the pipe gallery segment when it is in place is reduced, so that it can quickly slide and adjust the plane position, thereby improving the assembly efficiency of the prefabricated pipe gallery, effectively controlling the flatness of the pipe gallery support structure, and improving the assembly accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of geotechnical engineering, and in particular to an assembled integrated pipe gallery foundation leveling layer and a construction method thereof. Background Art

[0002] In order to eliminate the "spider web in the sky" and "zipper on the road" phenomenon in the city and beautify the urban space, many cities in China have successively planned to build underground comprehensive pipe corridors to lay urban municipal public pipelines and improve the comprehensive carrying capacity of the city. The underground comprehensive pipe corridors are laid with pipelines and ancillary facilities for water supply, drainage, gas, heat, electricity, communications, radio and television, industry, etc. in the city, which are important infrastructure and "lifeline" to ensure the operation of the city.

[0003] The construction methods of urban underground comprehensive pipe corridors are mainly divided into open excavation construction and dark excavation construction. Open excavation construction can adopt open excavation cast-in-place construction method and open excavation prefabrication assembly construction method. Open excavation prefabrication assembly construction method is to prefabricate segments in a factory, transport them to the site, and then assemble several segments into an integral structure on the foundation cushion layer of the pipe corridor structure. Assembly can only be carried out after the foundation cushion layer is completed. The unevenness of the foundation cushion layer will affect the assembly accuracy above and may cause stress concentration in the structure. Summary of the invention

[0004] In view of the above-mentioned problems existing in the prior art, the present application provides a prefabricated integrated pipe gallery foundation leveling layer and a construction method thereof, so as to solve the problem in the prior art that the uneven foundation structure affects the pipe gallery assembly accuracy and causes structural stress concentration.

[0005] In order to achieve the above object, the present invention adopts the following technical scheme:

[0006] A foundation leveling layer for an assembled integrated pipe gallery, the leveling layer being located between a base structure and the prefabricated integrated pipe gallery, the leveling layer comprising three cast leveling structures and two grouting filling structures arranged in parallel along an extension direction of the pipe gallery, the three cast leveling structures being respectively located at the left and right ends and the middle of the pipe gallery, the two grouting filling structures being respectively located between the three cast leveling structures, and the cast leveling structure being highly consistent with the grouting filling structure.

[0007] Furthermore, the surface flatness of the casting and leveling structure is less than 1 mm.

[0008] Furthermore, the upper surface of the casting and leveling structure is coated with a lubricant.

[0009] Furthermore, the cross-section of the casting and leveling structure is rectangular.

[0010] Furthermore, a plurality of angle steels are provided on both sides of the casting and leveling structure along the extension direction of the pipe gallery, and the side width of the angle steels is consistent with the height of the casting and leveling structure.

[0011] Furthermore, the casting and leveling structure is a C20 fine stone concrete structure; and the grouting filling structure is an M45 cement slurry structure.

[0012] A construction method for a foundation leveling layer of an assembled integrated pipe gallery comprises the following steps:

[0013] Step 1: After the base structure is completed and reaches the designed strength, the leveling structure is cast on the base structure;

[0014] Step 2: After the cast leveling structure reaches a certain strength, the parts whose upper surface flatness does not meet the preset value are polished to ensure that the flatness of the upper surface of the cast leveling structure meets the design requirements;

[0015] Step 3: Assemble the pipe gallery segments;

[0016] Step 4: Grouting between the base structure and the main structure of the tunnel, and constructing the grouting filling structure.

[0017] Furthermore, before the construction and casting of the leveling structure in step 1, it also includes plane layout. According to the design of the prefabricated integrated pipeline corridor, the plane position is laid out using a total station, the center line and side lines of the pipeline corridor are laid out, and the plane position of the casting and leveling structure is popped out using an ink fountain line.

[0018] Furthermore, step 1 also includes installing shaping angle steels on the left and right sides of the casting and leveling structure along the longitudinal direction of the pipe gallery according to the plane position of the casting and leveling structure to control the elevation error of the casting and leveling structure.

[0019] Furthermore, after step 2 is completed, the step also includes applying a lubricant on the upper surface of the cast and leveling structure.

[0020] Compared with the prior art, the beneficial effects of the present invention are as follows: the construction process of the foundation leveling layer of the assembled integrated pipe gallery provided by the present invention is simple and the operation difficulty is low. By setting the leveling layer, the friction force of the pipe gallery segment when it is in place is reduced, so that it can quickly slide and adjust the plane position, thereby improving the assembly efficiency of the prefabricated pipe gallery, effectively controlling the flatness of the pipe gallery support structure, and improving the assembly accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of a prefabricated integrated pipe gallery foundation leveling layer and its upper and lower structures involved in a specific embodiment of the present invention;

[0022] Figure 2 for Figure 1 A magnified view of the local structure in

[0023] Figure 3The present invention is a top view of a foundation leveling layer of an assembled integrated pipe gallery according to a specific embodiment of the present invention.

[0024] In the figure:

[0025] 1-casting and leveling structure; 2-grouting filling structure; 3-prefabricated integrated pipeline corridor; 4-grouting hole; 5-cushion layer; 6-protective layer; 7-angle steel. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Embodiment 1

[0028] The present embodiment provides a foundation leveling layer for an assembled integrated pipe gallery, wherein the leveling layer is located between the base structure and the prefabricated integrated pipe gallery 3, and the leveling layer includes three cast leveling structures 1 and two grouting filling structures 2 arranged in parallel along the extension direction of the pipe gallery, wherein the three cast leveling structures 1 are respectively located at the left and right ends and the middle of the pipe gallery, and the two grouting filling structures 2 are respectively located between the three cast leveling structures 1, and the cast leveling structure 1 is highly consistent with the grouting filling structure 2.

[0029] The base structure described in this embodiment refers to the structure located under the pipe gallery in the prior art, generally including a cushion layer 5 and / or a waterproof layer and / or a protective layer 6. Preferably, the cushion layer 5 is cast by pumping C25 plain concrete, and the protective layer 6 is cast by casting C20 fine stone concrete.

[0030] This embodiment reduces the friction when the prefabricated integrated pipe gallery 3 is assembled into place by setting up a cast leveling structure 1 as a supporting structure for the splicing of the prefabricated integrated pipe gallery 3, so that it can quickly slide and adjust the plane position, thereby improving the assembly efficiency of the prefabricated integrated pipe gallery 3; and compared with the prior art that uses the entire plane as support, this application uses three cast leveling structures 1 as the supporting structure, which can conveniently control the flatness of the pipe gallery support structure and improve the assembly accuracy.

[0031] In addition, preferably, in a specific embodiment of the present invention, the flatness of the upper surface of the casting and leveling structure 1 is less than 1 mm.

[0032] In addition, preferably, in a specific embodiment of the present invention, in order to further reduce the friction when the prefabricated integrated pipe gallery is assembled in place, the upper surface of the casting and leveling structure 1 is coated with a lubricant.

[0033] In addition, preferably, in a specific embodiment of the present invention, the cross section of the cast and leveling structure 1 is rectangular. Preferably, the cast and leveling structure 1 is 600 mm wide and 30 mm high.

[0034] In addition, preferably, in a specific embodiment of the present invention, a plurality of angle steels 7 are provided on both sides of the cast leveling structure 1 along the extension direction of the pipe gallery, and the side width of the angle steel 7 is consistent with the height of the cast leveling structure 1, so as to control the elevation error of the cast leveling structure 1. Preferably, the side width of both sides of the angle steel 7 is 30 mm and the length is 50 mm.

[0035] In addition, preferably, in a specific embodiment of the present invention, the casting and leveling structure 1 is a C20 fine stone concrete structure; and the grouting filling structure 2 is an M45 cement slurry structure.

[0036] Embodiment 2

[0037] This embodiment provides a construction method for a foundation leveling layer of an assembled integrated pipe gallery, which specifically includes the following steps:

[0038] Step 1: After the base structure is constructed and reaches the designed strength, a leveling structure 1 is constructed and cast on the base structure;

[0039] Step 2: After the cast leveling structure 1 reaches a certain strength, the portion whose upper surface flatness does not meet the preset value is polished to ensure that the flatness of the upper surface of the cast leveling structure 1 meets the design requirements;

[0040] Step 3: Assemble the pipe gallery segments;

[0041] Step 4: Grouting is performed between the base structure and the main structure of the pipe gallery to construct the grouting filling structure 2.

[0042] The base structure described in this embodiment refers to the structure located under the pipe gallery in the prior art, generally including a cushion layer 5 and / or a waterproof layer and / or a protective layer 6. Preferably, the cushion layer 5 is cast by pumping C25 plain concrete, and the protective layer 6 is cast by C20 fine stone concrete. Preferably, the construction method of the foundation leveling layer of the prefabricated integrated pipe gallery described in this embodiment takes 10m as a construction unit.

[0043] In addition, preferably, in a specific embodiment of the present invention, before the construction and casting of the leveling structure 1 in step 1, it also includes plane layout, and a total station is used to perform plane position layout according to the design of the prefabricated integrated pipeline corridor 3, and the center line and two side lines of the pipeline corridor are laid out, and the plane position of the casting and leveling structure 1 is popped out using an ink fountain line.

[0044] In addition, preferably, in a specific embodiment of the present invention, step 1 further comprises installing angle steels 7 on the left and right sides of the cast leveling structure 1 along the longitudinal direction of the pipe gallery according to the plane position of the cast leveling structure 1, so as to control the elevation error of the cast leveling structure 1. Preferably, the angle steels 7 are installed every 1m along the extension direction of the pipe gallery.

[0045] In addition, preferably, in a specific embodiment of the present invention, after the grinding in step 2 is completed, it also includes applying a lubricant on the upper surface of the cast and leveling structure 1 .

[0046] In addition, preferably, in a specific embodiment of the present invention, step 4: grouting between the base structure and the main structure of the pipe gallery, the specific steps of constructing the grouting filling structure 2 include:

[0047] (1) Formwork: When the foundation pit support design has internal support and a replacement support belt is required, the replacement support belt is used as the left and right side formwork of the grouting area of ​​the leveling layer; when the foundation pit support design has no internal support and no replacement support belt is required, the gap between the bottom of the side wall of the pipe gallery and the cast leveling structure 1 can be directly blocked with a grouting strip or cement mortar without leaving a grouting hole; the front and rear side formworks of the pipe gallery are made of bamboo plywood and grouting holes are reserved on the bamboo plywood; preferably, the horizontal distance between the front and rear side formworks and the pipe gallery is about 10 cm, and the front and rear side formworks are about 5 cm higher than the bottom plate of the pipe gallery to facilitate grouting construction;

[0048] (2) Mixing cement slurry: Determine the amount of cement and water according to the mix ratio, stir mechanically for 2 to 3 minutes until the mixture is uniform, and then continue stirring in the storage tank of the grouting pump to obtain the best fluidity;

[0049] (3) Grouting: Use pressure grouting to inject grout into the grouting holes 4 reserved at the bottom of the prefabricated integrated pipe gallery 3 until it overflows from the front and rear side templates; preferably, the grouting pressure is controlled to 0.8 MPa;

[0050] (4) Grouting hole plugging: Use C50P8 anti-seepage expansion concrete to plug the grouting hole 4 reserved at the bottom of the prefabricated integrated pipe gallery 3.

[0051] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.

Claims

1. A construction method for a foundation leveling layer of an assembled integrated pipe gallery, characterized in that: The following steps are involved: Step 1: After the base structure is constructed and reaches the designed strength, a leveling structure is constructed on the base structure, and the leveling structure is a C20 fine stone concrete structure; Step 2: After the cast leveling structure reaches a certain strength, the parts whose upper surface flatness does not meet the preset value are polished to ensure that the flatness of the upper surface of the cast leveling structure meets the design requirements; Step 3: Assemble the pipe gallery segments; Step 4: Grouting is performed between the base structure and the main structure of the pipe gallery to construct a grouting filling structure, wherein the grouting filling structure is an M45 cement slurry structure. The specific steps of constructing the grouting filling structure include: Formwork: When the foundation pit support design has internal support and needs to set up a replacement support belt, the replacement support belt will be used as the left and right side formwork of the leveling layer grouting area; when the foundation pit support design has no internal support and does not need to set up a replacement support belt, the gap between the bottom of the side wall of the corridor and the poured leveling structure is directly blocked with grouting strips or cement mortar without leaving grouting holes; the front and rear side formworks of the corridor are made of bamboo plywood and grouting holes are reserved on the bamboo plywood; Cement slurry mixing: Determine the amount of cement and water according to the mix ratio, stir mechanically for 2 to 3 minutes until the mixture is uniform, and then continue stirring in the storage tank of the grouting pump to obtain the best fluidity; Grouting: Use the pressure grouting method to inject grout into the reserved grouting holes at the bottom of the prefabricated integrated pipe gallery until it overflows from the front and rear side formworks; Grouting hole plugging: Use C50P8 anti-seepage expansion concrete to plug the grouting holes reserved at the bottom of the prefabricated integrated pipe gallery; Step 1 also includes installing shaped angle steels on the left and right sides of the casting and leveling structure along the longitudinal direction of the pipe gallery according to the plane position of the casting and leveling structure to control the elevation error of the casting and leveling structure. The width of both sides of the angle steel is 30 mm and the length is 50 mm. The angle steel is installed every 1 m along the extension direction of the pipe gallery. The casting and leveling structure is 600 mm wide and 30 mm high. Before the construction and pouring of the leveling structure in step 1, plane layout is also included. According to the design of the prefabricated integrated pipe gallery, the plane position layout is performed using a total station, the center line and the side lines of the pipe gallery are laid out, and the plane position of the pouring and leveling structure is popped out using an ink fountain line; After step 2 grinding is completed, it also includes applying lubricant to the upper surface of the cast and leveled structure; The leveling layer is located between the base structure and the prefabricated integrated pipe gallery. The leveling layer includes three cast leveling structures and two grouting filling structures arranged in parallel along the extension direction of the pipe gallery. The three cast leveling structures are respectively located at the left and right ends and the middle of the pipe gallery. The two grouting filling structures are respectively located between the three cast leveling structures. The cast leveling structure is highly consistent with the grouting filling structure. The cast leveling structure is a C20 fine stone concrete structure, and the grouting filling structure is an M45 cement slurry structure. The bottom of the pipe gallery is reserved for grouting of the grouting filling structure. The grouting holes are sealed with C50P8 anti-seepage expansive concrete, a plurality of angle steels are arranged on both sides of the cast leveling structure along the extension direction of the pipe gallery, the side width of the angle steel is consistent with the height of the cast leveling structure, the side width of the angle steels is 30mm and the length is 50mm, one angle steel is installed every 1m along the extension direction of the pipe gallery, the cast leveling structure is 600mm wide and 30mm high, the surface flatness of the cast leveling structure is less than 1mm, the upper surface of the cast leveling structure is coated with a lubricant, and the cross-section of the cast leveling structure is a rectangle.