A bolted unit GRC curtain wall structure and its construction method

By adopting the bolting method of pre-embedded steel frame and connecting frame in the GRC curtain wall structure, the problems of complex installation and insufficient seismic performance are solved, efficient and reliable plate connection is achieved, and the installation efficiency and quality are improved.

CN110130551BActive Publication Date: 2024-10-18THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN201910388395.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-10
Publication Date
2024-10-18
Estimated Expiration
2039-05-10

AI Technical Summary

Technical Problem

During the installation process, the existing GRC curtain wall structure has problems such as complicated welding operations, low installation efficiency, and insufficient seismic resistance. Moreover, the connection parts of the traditional dry-hanging method are easily damaged, affecting the installation quality and efficiency.

Method used

The unit GRC curtain wall structure using the bolting method is used. By pre-embedding the steel frame on the back of the GRC curtain wall construction panel, combined with the cooperation of the connecting frame and the connecting seat, the bolted installation of the panels is realized, avoiding local damage caused by welding and traditional dry hanging methods. Forming a self-contained connection system, adjacent plates do not transmit load effects.

Benefits of technology

It improves the installation efficiency and quality, reduces the installation time, enhances the seismic performance, avoids local damage caused by welding and dry hanging methods, and achieves efficient and reliable connection of the panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110130551B_ABST
    Figure CN110130551B_ABST
Patent Text Reader

Abstract

The present invention discloses a bolt-joined unit GRC curtain wall structure and a construction method thereof, belonging to the technical field of building construction, including a main construction structure, a curtain wall frame and a GRC curtain wall construction panel, characterized in that a steel frame is pre-embedded on the back of the GRC curtain wall construction panel, a connecting frame is fixed to the steel frame, and the GRC curtain wall construction panel is connected and fixed to the curtain wall frame through the connecting frame; the curtain wall frame includes a crossbeam and a column, the column is fixed to the main construction structure through a pre-embedded connector, the crossbeam is horizontally arranged and fixed to the column, a connecting seat is arranged on the crossbeam, and the connecting frame is fixed to the connecting seat through a connecting bolt. The present invention adopts a bolt-joined installation system of the GRC curtain wall, each plate forms a self-contained connection system, adjacent plates do not transmit load, installation is convenient, the adjustment workload after the plate is mounted on the wall is small, the installation time can be effectively shortened, and the seismic performance is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a bolt-joined unit GRC curtain wall structure and a construction method thereof. Background Art

[0002] GRC is a fiber concrete composite material with alkali-resistant glass fiber reinforced material and cement mortar as the matrix material. GRC composite exterior wall panels are cast in place or prefabricated with the above materials to form curtain wall decorative panels for construction. It is a material that expresses the designer's imagination through mold shape, texture, texture and color. With the development of the economy, people's understanding of architectural aesthetics has gradually deepened. The visual impact of the appearance of buildings on people cannot be ignored. To a certain extent, it can reflect the cultural concept and economic level of a city.

[0003] GRC composite exterior wall panels have large specifications and sizes, rich surface shapes, light weight, and easy construction. They are particularly suitable for frame structure buildings, especially as non-load-bearing exterior wall panels in high-rise frame buildings. Summary of the invention

[0004] The technical task of the present invention is to provide a bolted unit GRC curtain wall structure and its construction method in view of the above shortcomings. Each plate forms its own connection system, and the adjacent plates do not transmit loads. The installation is convenient and the seismic performance is high.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] A bolted unit GRC curtain wall structure, comprising a main construction structure, a curtain wall frame and a GRC curtain wall construction panel, wherein a steel frame is pre-embedded on the back of the GRC curtain wall construction panel, a connecting frame is fixed to the steel frame, and the GRC curtain wall construction panel is connected and fixed to the curtain wall frame through the connecting frame;

[0007] The curtain wall frame includes beams and columns. The columns are fixed to the main construction structure through embedded connectors. The beams are horizontally arranged and fixed to the columns. A connecting seat is arranged on the beams. The connecting frame is fixed to the connecting seat through connecting bolts.

[0008] The GRC curtain wall construction panel is equipped with a connection frame by pre-embedded steel frame. A connection seat matching the GRC curtain wall construction panel is arranged on the curtain wall frame. The GRC curtain wall construction panel is bolted and installed by coordinating the connection frame and the connection seat. The installation is convenient and efficient. The adjustment workload is small after the panel is installed on the wall, and welding installation is avoided. Local damage to the grooved connection parts of the traditional dry hanging installation method is avoided, which can effectively improve the installation quality and efficiency.

[0009] Preferably, the connection skeleton is a steel square frame, the steel skeleton is horizontally arranged, and one end of the steel skeleton is pre-embedded in the back of the GRC curtain wall construction panel, located at the upper part, lower part and both side edges of the GRC curtain wall construction panel corresponding to the steel square frame; the other end of the steel skeleton is welded and fixed to the corresponding steel square frame. The connection skeleton is fixed to the GRC curtain wall construction panel through the pre-embedded steel skeleton, and serves as the connection part of the GRC curtain wall construction panel, connecting and fixing the GRC curtain wall construction panel to the curtain wall keel.

[0010] Preferably, the connection frame is a square frame formed by welding four angle steels. The four angle steels are welded end to end to form a square frame, with their inner angle surfaces facing the inside of the square frame, and the connections between the two overlap and are welded. The steel frame is welded to the inner angle surfaces of the corresponding angle steels.

[0011] Preferably, a connecting bolt is vertically arranged on the top of the connecting frame, and a connecting and fixing seat is arranged on the bottom, and the connecting and fixing seat has a vertical connecting and fixing plate; the connecting seat comprises a bottom connecting plate and an upper connecting block, the bottom connecting plate is provided with a connecting hole matched with the connecting bolt, and the upper connecting block is provided with a connecting groove, and the connecting and fixing plate matches with the connecting groove to fix the connecting frame and the connecting seat;

[0012] The connection frame of each GRC curtain wall construction panel is fixed and positioned by two connection seats at the upper and lower parts thereof respectively. The connection frame is fixed to the connection seat at the upper part by connecting bolts and a bottom connection plate, and is fixed to the connection seat at the lower part by plugging and fixing the connection fixing seat with the upper connection block.

[0013] This enables the installation of the GRC curtain wall construction panel unit.

[0014] Preferably, the connection fixing seat is two sections of angle steel, which are evenly distributed at the bottom of the connection frame, one side of the angle steel is welded or bolted to the bottom of the connection frame, and the other side is the connection fixing plate. The connection seat is designed accordingly and fixed at a specific position of the beam, the connection groove on the connection seat matches the angle steel model, and the angle steel is plugged and fixed to the connection seat at the corresponding position to achieve installation and fixation of the lower part of the connection frame.

[0015] Preferably, the embedded connector includes a chemical anchor bolt, a hot-dip galvanized steel plate, a connecting plate and a connecting bolt. The hot-dip galvanized steel plate is fixed to the main construction structure by the chemical anchor bolt. The connecting plate is welded and fixed to the hot-dip galvanized steel plate. A connecting long hole is provided on the connecting plate. The column is fixed to the connecting plate by the connecting long hole and the connecting bolt. The installation position of the column can be adjusted and fixed by the long hole to achieve accurate installation of the column.

[0016] Furthermore, the columns are made of 100*50*4 hot-dip galvanized square steel pipes, and the crossbeams are made of 40*40*5 hot-dip galvanized angle steels. The crossbeams are horizontally arranged and welded and fixed to the columns.

[0017] Preferably, the panels of the GRC curtain wall construction panel are folded back on all sides and provided with overlapping decorative strips. When installed, inner groove decorative edges are formed between adjacent panels, and the panels are overlapped and sealed with sealant. The inner groove decorative edges can realize the self-contained connection system of each material panel, and adjacent panels do not transfer load.

[0018] The present invention also discloses a method for constructing a unit GRC curtain wall structure by bolting, wherein a steel bar skeleton is pre-embedded on the back of a GRC curtain wall construction panel, a connecting skeleton is welded and fixed around the steel bar skeleton, and bolt holes and fixing feet are provided on the connecting skeleton; the GRC curtain wall construction panel is fixed to the main structure through the curtain wall skeleton, and a connecting seat is provided on the curtain wall skeleton, and the connecting seat is provided with connecting bolt holes and connecting grooves matched with the fixing feet; during on-site installation, the GRC curtain wall construction panel is fixed to two connecting seats on its upper and lower sides through bolts and fixing feet;

[0019] The GRC curtain wall construction panels are folded back on all sides, and the panels overlap each other. Each panel forms its own connection system, and no load is transmitted between adjacent panels.

[0020] The GRC curtain wall construction panel is fixed to the two connecting seats on its upper and lower sides by bolts and fixing feet. One end of the connecting frame is fixed to the connecting seat by connecting bolts passing through the bolt holes on it and the connecting bolt holes on the connecting seat, and the other end is installed and fixed through its fixing feet and the connecting grooves on the connecting seat, thereby realizing the installation and fixation of the GRC curtain wall construction panel.

[0021] Specifically, the specific implementation of this method is as follows:

[0022] A. Measurement and laying out,

[0023] Lay out steel wires, determine the installation reference line of the curtain wall main keel, and inspect and align;

[0024] The construction layout worker first determines the reference axis and level point with the civil engineering, and lays out the position of each main keel according to the exterior curtain wall design plan, keel positioning diagram and reference point, re-measures the reference center line and horizontal line provided by the civil engineering, and lays out the steel wire after confirming that it is correct, determines the installation reference line of the curtain wall main keel, and uses the theodolite to detect and adjust;

[0025] B. Installation of connectors,

[0026] The connecting parts include chemical anchor bolts, hot-dip galvanized steel plates, connecting plates and connecting bolts. Long connecting holes are provided on the connecting plates. The connecting plates are welded and fixed to the hot-dip galvanized steel plates. The hot-dip galvanized steel plates are fixed to the corresponding main construction structure through chemical anchor bolts.

[0027] When installing the connector, first temporarily fix it at the node position. After installing at least three adjacent vertical materials of the curtain wall, adjust the connector and pay attention to the leveling of adjacent vertical materials. The frame leveling can also be adjusted using the connector adjustment holes.

[0028] C. Column installation,

[0029] 1) Install according to the location of the line, starting from the bottom layer and then moving upward layer by layer;

[0030] 2) To ensure that the entire ramp facade is horizontal and vertical, and that the curtain wall facade is on the same vertical plane, first arrange the vertical steel wires at the corners, and the installation workers use the steel wires as a positioning reference to install the corner columns;

[0031] 3) When laying out the lines, first pop up the horizontal ink lines between the layers on the connecting parts according to the height dimensions of the construction diagram as the positioning reference line;

[0032] 4) Before installing the column, first check the straightness of the column by pulling it in. If it does not meet the requirements, it should be corrected before installation on the wall to control the error within the allowable range.

[0033] 5) When installing the column, first check whether the processing hole position of the main beam is correct according to the construction drawing, then connect the column and the connecting piece with bolts, adjust the verticality and horizontality of the column, and then tighten the nut. The front and rear position of the column is adjusted according to the long hole on the connecting piece. The upper and lower positions are adjusted according to the 20mm expansion joint of the square tube;

[0034] After the columns are in place, the installation inspection is carried out according to the steel wires arranged by the measurement team and the comprehensive construction drawings. After all dimensions meet the requirements, the steel keels are inspected for straightness to ensure the axis deviation of the steel keels. After the inspection is completed and qualified, the concealed project acceptance form is filled out and reported to the supervisor for acceptance. The installation size error of the entire wall column must be absorbed within the control size range, and the error number must not extend outward. The installation of each vertical keel is based on the steel wire close to the axis for grid inspection.

[0035] D. Beam installation;

[0036] 1) After the columns are installed, check the grid conditions. Install the beams only if they meet the specifications. Cut the beams according to the actual situation. The cutting size of the beams should be less than 3mm than the segmentation size. This makes installation more convenient during construction. Before installing the horizontal materials, install the angle code first.

[0037] 2) Installation of the crossbeam: Install it according to the horizontal horizontal line. After tightening all the crossbeams to 50%, adjust them according to the horizontal fish wire line to meet the requirements directly;

[0038] 3) The beam and the column are connected by welding. The welding operation must be standardized. All electric welding must be carried out according to the operating procedures. During the reinforcement, the welds must be checked at any time to see if they meet the requirements. After welding, the welding slag must be disposed of in time. At the same time, the operators must do a good job of protection and pay attention to fire prevention;

[0039] 4) Check and accept the welds; after the columns are reinforced, the welds should be checked for leaks or welds that do not meet the specifications. Most importantly, check for deformation. If the deformation is serious, reprocess it;

[0040] E. Installation of thermal insulation cotton,

[0041] Measure the size of the insulation cotton, cut and install it on the inside of the beam. Use wire mesh to seal the insulation cotton. Fill the gap between the main construction structure and the curtain wall keel with insulation cotton. The installation should be carried out on a sunny day and can be sealed in real time to avoid being wetted by rain. Use wire mesh to seal the insulation cotton to prevent it from falling into the room.

[0042] After the metal mesh is fixed, the thermal insulation cotton should be installed at the same time as the waterproof aluminum plate to avoid being wetted by water. The gap between the main structure and the frame should be filled with thermal insulation cotton to prevent the formation of a "cold bridge";

[0043] Thermal insulation cotton installation process: thermal insulation cotton size measurement → cutting according to size → placing metal mesh → fixing rock wool → inspection and repair → concealed acceptance;

[0044] F. GRC curtain wall construction panel installation,

[0045] 1) Installation of the connection seat: install the connection seat on the beam according to the designed position, and fix the connection seat to the beam through bolts; according to the position of the curtain wall grid line and the plate back bolt connection point, fix the connection seat to the beam through stainless steel self-tapping screws to support the back bolt hanger system used for dry hanging of GEC curtain wall construction panels. The stainless steel mother part and the angle steel connector are fixed with M8 stainless steel bolts;

[0046] 2) Position the lower part of the connection keel of the GRC curtain wall construction panel through the fixing groove on the connection seat, and connect and fix the upper part with the upper connection seat through the connection bolts; first carefully install the first row of panels on the bottom layer according to the curtain wall reference line, arrange them in sequence according to the layout diagram and the GRC panel numbering sequence, adjust the color difference of the GRC panels to be consistent, transport them to the construction site, and place them with square wood pads;

[0047] 3) Adjacent GRC curtain wall construction panels are overlapped with each other, and the overlaps are sealed with weather-resistant glue.

[0048] After the board decoration construction is completed, after mutual inspection and self-inspection, the boards are cleaned, the finished products are protected, and a dedicated person is assigned to look after them. After all the sub-projects are constructed, cleaned, repaired, and finished, the completed sub-projects are promptly inspected and accepted.

[0049] Compared with the prior art, the bolted unit GRC curtain wall structure and its construction method of the present invention have the following beneficial effects:

[0050] The GRC curtain wall construction panel has a pre-buried frame behind it, replacing the traditional welding installation, which is easy to install. The GRC panels are factory-processed with high punching precision. The adjustment workload is small after the panels are installed on the wall, which can effectively shorten the installation time and improve the installation efficiency and quality.

[0051] GRC curtain wall construction panels are installed by bolting, which is reliable and can avoid on-site grooving during connection, reduce the disadvantages of local damage caused by grooving in the connection parts of the dry hanging method, and improve the seismic resistance of the panels;

[0052] The GRC curtain wall structure connection system is reliable. The GRC curtain wall construction panel adopts a concave decorative strip, which realizes that each panel has its own connection system and no load is transmitted between adjacent panels. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 It is a schematic diagram of the connection structure of the bolted unit GRC curtain wall structure of the present invention;

[0054] Figure 2 This is a side view of the GRC curtain wall construction panel

[0055] Figure 3 It is a flow chart of the construction method of the unit GRC curtain wall structure by the bolting method of the present invention.

[0056] In the figure, 1. main construction structure, 2. chemical anchor bolts, 3. hot-dip galvanized steel plate, 4. connecting plate, 5. connecting bolts, 6. columns, 7. beams, 8. connecting seats, 9. connecting grooves, 10. GRC curtain wall construction panels, 11. steel frame, 12. connecting frame, 13. connecting fixing plates, 14. weather-resistant sealant, 15. decorative strips, and 16. thermal insulation cotton. DETAILED DESCRIPTION

[0057] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0058] A bolted unit GRC curtain wall structure comprises a main construction structure 1, a curtain wall frame and a GRC curtain wall construction panel 10. A steel frame 11 is pre-embedded on the back of the GRC curtain wall construction panel 10. A connecting frame 12 is fixed to the steel frame 11. The GRC curtain wall construction panel 10 is connected and fixed to the curtain wall frame via the connecting frame 12.

[0059] The connection skeleton 12 is a steel square frame. The steel skeleton 11 is horizontally arranged, and one end of the steel skeleton 11 is pre-embedded in the back of the GRC curtain wall construction panel 10, located at the upper part, the lower part and the two side edges of the GRC curtain wall construction panel 10 corresponding to the steel square frame; the other end of the steel skeleton 11 is welded and fixed to the corresponding steel square frame. The connection skeleton 12 is fixed to the GRC curtain wall construction panel 10 through the pre-embedded steel skeleton 11, and as the connection part of the GRC curtain wall construction panel 10, the GRC curtain wall construction panel 10 is connected and fixed to the curtain wall keel. In this embodiment, the connection skeleton 12 is a square frame formed by welding four 40 series angle steels. The four angle steels are welded and fixed end to end to form a square frame, and the inner angle surfaces thereof face the inner side of the square frame, and the two connections are overlapped and welded and fixed. The steel skeleton 11 is welded and fixed to the inner angle surface of the angle steel at the corresponding position. The angle steel is pre-punched and drilled, and the plate is directly fixed to the curtain wall keel by bolts on site, saving installation time.

[0060] The curtain wall frame includes columns 6 and beams 7. The columns 6 are fixed to the main construction structure 1 through embedded connectors. The beams 7 are arranged horizontally and fixed to the columns 6. A connecting seat 8 is arranged on the beams 7. The connecting frame 12 is fixed to the connecting seat 8 through connecting bolts. The columns 6 are made of 100*50*4 hot-dip galvanized square steel pipes, and the beams 7 are made of 40*40*5 hot-dip galvanized angle steels. The beams 7 are arranged horizontally and fixed to the columns 6 by welding.

[0061] The embedded connector includes a chemical anchor bolt 2, a hot-dip galvanized steel plate 3, a connecting plate 4 and a connecting bolt 5. The hot-dip galvanized steel plate 3 is fixed to the main construction structure 1 by the chemical anchor bolt 2. The connecting plate 4 is welded and fixed to the hot-dip galvanized steel plate 3. A connecting long hole is provided on the connecting plate 4. The column 6 is fixed to the connecting plate 4 by the connecting long hole and the connecting bolt. The installation position of the column 6 can be adjusted and fixed by the long hole to achieve accurate installation of the column 6.

[0062] The top of the connecting frame 12 is vertically provided with connecting bolts, and the bottom is provided with a connecting and fixing seat, and the connecting and fixing seat has a vertical connecting and fixing plate 13. The connecting seat 8 includes a bottom connecting plate and an upper connecting block, and the bottom connecting plate is provided with connecting holes that match the connecting bolts, and the upper connecting block is provided with connecting grooves 9, and the connecting and fixing plate 13 cooperates with the connecting grooves 9 to fix the connecting frame 12 and the connecting seat 8. In this embodiment, the connecting and fixing seat is two sections of angle steel, and the two sections of angle steel are evenly distributed at the bottom of the connecting frame 12. One side of the angle steel is welded or bolted to the bottom of the connecting frame 12, and the other side is the connecting and fixing plate 13. The connecting seat 8 is designed accordingly and fixed to a specific position of the crossbeam 7. The connecting groove 9 on the connecting seat 8 matches the angle steel model, and the angle steel is plugged and fixed to the connecting seat 8 at the corresponding position to achieve the installation and fixation of the lower part of the connecting frame 12.

[0063] The connection frame 12 of each GRC curtain wall construction panel 10 is fixed and positioned by two connection seats 8 at the upper and lower parts thereof, and the connection frame 12 is fixed to the connection seat 8 at the upper part thereof by connection bolts and a bottom connection plate, and is fixed to the connection seat 8 at the lower part thereof by plugging and connecting with an upper connection block through a connection fixing seat, thereby realizing the installation of the GRC curtain wall construction panel unit.

[0064] The GRC curtain wall construction panel 10 has 50mm folded edges around the panels to form a 50mm overlap decorative strip 15. When installed, adjacent panels present inner groove decorative edges, and the panels overlap each other and are sealed with a weatherproof sealant 14. The inner groove decorative edges can realize a self-contained connection system for each material panel, and adjacent panels do not transfer load.

[0065] The GRC curtain wall construction panel 10 is provided with a connection frame 12 by means of a pre-embedded steel frame, and a connection seat 8 matching the GRC curtain wall construction panel 10 is provided on the curtain wall frame. The GRC curtain wall construction panel 10 is bolted and installed by the coordinated installation of the connection frame 12 and the connection seat 8. The installation is convenient and efficient, and the adjustment workload after the panel is mounted on the wall is small, and welding installation is avoided, and local damage to the grooves at the connection parts of the traditional dry hanging installation method is avoided, which can effectively improve the installation quality and installation efficiency.

[0066] A bolt-joined unit GRC curtain wall structure construction method comprises the following steps: pre-embedding a steel frame 11 on the back of a GRC curtain wall construction panel 10, welding and fixing a connecting frame 12 around the steel frame 11, and providing bolt holes and a connecting fixing plate 13 on the connecting frame 12; the GRC curtain wall construction panel 10 is fixed to a main construction structure 1 through the curtain wall frame, and a connecting seat 8 is provided on the curtain wall frame, and the connecting seat 8 is provided with connecting bolt holes and a connecting groove 9 matched with the connecting fixing plate 13; during on-site installation, the GRC curtain wall construction panel 10 is fixed to two connecting seats 8 on its upper and lower sides through bolts and the connecting fixing plate 13.

[0067] The GRC curtain wall construction panels have 50mm folded edges all around, and the panels overlap each other. Each panel forms its own connection system, and no load is transmitted between adjacent panels.

[0068] The GRC curtain wall construction panel 10 is fixed to the two connecting seats 8 on its upper and lower sides by bolts and connecting fixing plates 13. One end of the connecting frame 12 is fixed to the connecting seat 8 by connecting bolts passing through the bolt holes thereon and the connecting bolt holes on the connecting seat 8, and the other end is installed and fixed to the connecting groove 9 on the connecting seat 8 through its connecting fixing plate 13, thereby realizing the installation and fixation of the GRC curtain wall construction panel 10.

[0069] The construction process of the bolted unit GRC curtain wall structure is as follows:

[0070] 1. Preparation

[0071] Connection between dry hanging steel structure and walls, columns and beams:

[0072] In order to make the curtain wall steel keel installation have strong tensile and shear resistance, the spacing of embedded connectors is determined according to the actual height size of the structural frame beam, ring beam and lintel, but the horizontal spacing shall not be greater than 1.2m. The connection between the connector and the masonry adopts primary embedded parts or secondary embedded parts. The secondary embedded parts are connected to the concrete beams and columns with 4-M12 chemical anchor bolts. The embedded parts are made of 300×200×10 hot-dip galvanized steel plates, the vertical keel (column 6) is made of 100×50×4 hot-dip galvanized square steel pipes, and the horizontal keel (crossbeam 7) is made of 40×40×5 hot-dip galvanized angle steel. The crossbeam 7 is welded or surrounded by the column 6 according to the 10-grid layout of the GRC curtain wall construction panel, and all welds are painted with anti-rust paint twice.

[0073] Fastening requirements for dry hanging steel structure welding:

[0074] The height of the welding seam of all steel sections shall not exceed 6MM, and the length of the weld shall not be less than 50% of the circumference of the connecting section. The welding quality shall comply with the specifications for steel structure welding. All expansion bolt connection parts shall be equipped with spring anti-loosening pads and spot welded closed after adjustment and tightening.

[0075] 2. Measurement and setting out:

[0076] The construction layout worker first determines the reference axis and level point with the civil engineering. According to the exterior curtain wall design plan, the keel positioning diagram and the reference point, the position of each column 6 is laid out, and the reference center line and horizontal line provided by the civil engineering are re-measured. After being correct, the steel wire is laid out, the curtain wall main keel installation reference line is determined, and the theodolite is used for detection and adjustment.

[0077] 3. Installation of connectors:

[0078] Installation and adjustment of connectors: When installing connectors, first temporarily fix them at the node position. After at least three adjacent vertical materials of the curtain wall are installed, adjust the connectors and pay attention to the flatness of adjacent vertical materials (the frame leveling can also be adjusted using the connector adjustment holes).

[0079] 4. Column installation:

[0080] (1) The installation of the column 6 is carried out according to the position of the layout; the installation of the column 6 is generally started from the bottom layer and then moved upward layer by layer.

[0081] (2) To ensure that the entire ramp facade is horizontal and vertical and that the curtain wall facade is on the same vertical plane, first arrange the vertical steel wires at the corners, and the installation workers use the steel wires as a positioning reference to install the corner columns.

[0082] (3) Construction personnel of the layout team first draw horizontal ink lines between layers on the embedded parts according to the height dimensions of the construction drawings as positioning reference lines.

[0083] (4) Before installing the column 6, first check the straightness of the column 6 by pulling it in. If it does not meet the requirements, it is corrected and then installed on the wall to control the error within the allowable range.

[0084] (5) When installing the column 6, first check whether the processing hole position of the main beam is correct by referring to the construction drawing, then connect the column 6 to the connecting piece with bolts, adjust the verticality and horizontality of the column 6, and then tighten the nut. The front and rear position of the column 6 is adjusted according to the long hole on the connecting piece. The upper and lower positions are adjusted according to the 20mm expansion joint. Figure 1 shown.

[0085] (6) After the column 6 is in place, the installation inspection is carried out according to the steel wire arranged by the measurement team and the comprehensive construction drawing. After all dimensions meet the requirements, the straightness of the steel keel is checked to ensure the axis deviation of the steel keel.

[0086] (7) After the inspection is completed and qualified, fill out the hidden project acceptance form and submit it to the supervisor for acceptance.

[0087] (8) The installation size error of the entire wall column must be within the control size range, and the error number must not extend outward. The installation of each vertical keel shall be checked in sections based on the steel wire close to the axis.

[0088] 5. Installation of beams:

[0089] (1) After the column 6 is installed, check the grid conditions. If it meets the requirements of the specification, install the crossbeam 7. Cut the crossbeam 7 according to the actual situation. The cutting size of the crossbeam 7 should be less than the segmentation size by 3mm, so that the installation is more convenient during the construction process. Before installing the crossbeam, install the angle code first.

[0090] (2) The installation of the horizontal keel should be carried out according to the horizontal line. After all the horizontal materials are tightened to 50%, they can be adjusted according to the horizontal fishing line to meet the requirements directly.

[0091] (3) The crossbeam 7 and the column 6 are connected by welding. The welding operation must be standardized. All electric welding must be carried out according to the operating procedures. During the reinforcement, the welds must be checked at any time to see if they meet the requirements. After welding, the welding slag must be disposed of in time. At the same time, the operators must also do a good job of protection and pay attention to fire prevention.

[0092] (4) Acceptance: After the vertical beams are reinforced, the welds must be inspected to see if there are any leaks or welds that do not meet the specifications. Most importantly, check for any deformation. If the deformation is severe, reprocessing is required.

[0093] 6.Insulation cotton installation:

[0094] Insulation cotton installation process: measure the size of insulation cotton → cut according to size → place metal mesh → fix rock wool → check and repair → hidden acceptance.

[0095] Basic operating instructions:

[0096] (1) The insulation cotton 16 needs to be cut according to the thickness required by the design drawings and the width size measured on site, and then installed in the upper and lower crossbeam angles. The installation needs to be carried out on a sunny day and can be closed in real time to avoid being wet by rain. The insulation cotton 16 is then closed with a wire mesh to prevent the insulation cotton from falling into the room.

[0097] (2) Trial installation: Install the in-place insulation cotton 17 at the final location to check whether its size is appropriate.

[0098] (3) Check tools: Before formal installation, check whether the tools are in good condition. The tools mainly include electric drills, rivet pullers, and nail guns. Check whether these tools are in good condition and can be used normally.

[0099] Self-tapping screws: Choose appropriate self-tapping screws to fix the metal mesh to the column at the drilled holes.

[0100] (4) Insulation cotton installation method: After the metal mesh is fixed, the insulation cotton 16 should be installed at the same time as the waterproof aluminum plate is installed to avoid being wetted by water. The gap between the main construction structure 1 and the curtain wall keel is filled with insulation cotton to prevent the formation of a "cold bridge".

[0101] 7. GRC curtain wall construction panel installation

[0102] (1) Installation of angle steel connectors

[0103] According to the position of the curtain wall grid line and the back bolt connection point of the GRC curtain wall construction panel 10, the angle steel connector is fixed to the beam 7 through stainless steel self-tapping screws to support the back bolt hanger system used for GEC curtain wall dry hanging, and the stainless steel mother part and the angle steel connector are fixed through M8 stainless steel bolts.

[0104] (2) Plate installation:

[0105] The four bolt holes of the GRC curtain wall construction panel 10 are fixed to the curtain wall frame through M8 stainless steel bolts to form a unit. First, carefully install the first row of panels on the bottom layer according to the curtain wall surface reference line. Arrange them in sequence according to the layout diagram and the GRC panel numbering sequence, adjust the color difference of the GRC panels to be consistent, transport them to the construction site, and place them with square wood pads.

[0106] 8. Surface cleaning, finished product protection and acceptance

[0107] After the board decoration construction is completed, after mutual inspection and self-inspection, the boards are cleaned, the finished products are protected, and a dedicated person is assigned to look after them. After all the sub-projects are constructed, cleaned, repaired, and finished, the completed sub-projects are promptly inspected and accepted.

[0108] GRC surface quality inspection is shown in Table 8-1.

[0109] Table 8-1 Surface quality requirements per square meter of board

[0110] project quality 0.1~0.3mm wide scratch 8 strips are allowed if the length is less than 100mm Abrasions <![CDATA[Not greater than 500mm 2 >

[0111] Keel welding quality inspection is shown in Table 8-2

[0112] Table 8-2 Acceptance standards for keel welding engineering quality

[0113] Serial number project Acceptance Criteria Detection Methods 1 Surface flatness ≤5 Wire pulling inspection 2 Verticality of facade ≤10 Check with plumb line and square 3 Welding seam length ≥60 Check with a ruler 4 Welding seam height ≥5 Check with a ruler and a small hammer 5 Main keel spacing 60 Check with a tape measure

[0114] GRC installation quality inspection is shown in Table 8-3

[0115] Table 8-3 Quality acceptance standards for plate dry hanging projects:

[0116]

[0117]

[0118] Through the above specific implementations, those skilled in the art can easily implement the present invention. However, it should be understood that the present invention is not limited to the above specific implementations. On the basis of the disclosed implementations, those skilled in the art can arbitrarily combine different technical features to achieve different technical solutions.

[0119] Except for the technical features described in the specification, all other technical features are known technologies to those skilled in the art.

Claims

1. A bolted unit GRC curtain wall structure, including a main construction structure, a curtain wall frame and a GRC curtain wall construction panel, Features A steel frame is pre-embedded on the back of the GRC curtain wall construction panel, a connecting frame is fixed to the steel frame, and the GRC curtain wall construction panel is connected and fixed to the curtain wall frame through the connecting frame; The curtain wall frame includes a crossbeam and a column, the column is fixed to the main construction structure through a pre-buried connector, the crossbeam is horizontally arranged and fixed to the column, a connecting seat is arranged on the crossbeam, and the connecting frame is fixed to the connecting seat through connecting bolts; The connecting skeleton is a steel square frame, the steel skeleton is horizontally arranged, and one end of the steel skeleton is pre-buried in the back of the GRC curtain wall construction panel, located at the upper part, the lower part and both side edges of the GRC curtain wall construction panel corresponding to the steel square frame; the other end of the steel skeleton is welded and fixed to the corresponding steel square frame; The top of the connection frame is vertically provided with a connection bolt, and the bottom is provided with a connection fixing seat, and the connection fixing seat has a vertical connection fixing plate; the connection seat includes a bottom connection plate and an upper connection block, the bottom connection plate is provided with a connection hole matched with the connection bolt, and the upper connection block is provided with a connection groove, and the connection fixing plate is matched with the connection groove to fix the connection frame and the connection seat; The connection frame of each GRC curtain wall construction panel is fixed and positioned by two connection seats at the upper and lower parts thereof, and the connection frame is fixed to the connection seat at the upper part by connection bolts and the bottom connection plate, and is fixed to the connection seat at the lower part by the connection fixing seat and the upper connection block; The GRC curtain wall construction panel has edges folded back on all sides and provided with overlapping decorative strips. The panels are overlapped with each other and sealed with sealant. The connection frame is a square frame formed by welding four angle steels.

2. A bolted unit GRC curtain wall structure according to claim 1, Features The connection fixing seat is two sections of angle steel, which are evenly distributed at the bottom of the connection frame. One side of the angle steel is fixed to the bottom of the connection frame, and the other side is the connection fixing plate.

3. The bolted unit GRC curtain wall structure according to claim 1, Features The embedded connecting parts include chemical anchors, hot-dip galvanized steel plates, connecting plates and connecting bolts. The hot-dip galvanized steel plates are fixed to the main construction structure by chemical anchors. The connecting plates are welded and fixed to the hot-dip galvanized steel plates. Long connecting holes are provided on the connecting plates. The columns are fixed to the connecting plates by the long connecting holes and connecting bolts.

4. A bolted unit GRC curtain wall structure according to claim 1 or 3, Features The crossbeam is arranged horizontally and is welded and fixed to the columns.

5. A bolted unit GRC curtain wall structure construction method, Features A steel bar frame is embedded on the back of the GRC curtain wall construction panel, and a connecting frame is welded and fixed around the steel bar frame, and bolt holes and fixing feet are provided on the connecting frame; the GRC curtain wall construction panel is fixed to the main structure through the curtain wall frame, and a connecting seat is provided on the curtain wall frame, and the connecting seat is provided with connecting bolt holes and connecting grooves matching with the fixing feet; during on-site installation, the GRC curtain wall construction panel is fixed to two connecting seats on its upper and lower sides through bolts and fixing feet; The GRC curtain wall construction panels are folded back on all sides, and the panels overlap each other. Each panel forms its own connection system, and the adjacent panels do not transfer loads. The GRC curtain wall construction panel is fixed to the two connecting seats on its upper and lower sides by bolts and fixing feet. One end of the connecting frame is fixed to the connecting seat by connecting bolts passing through the bolt holes on it and the connecting bolt holes on the connecting seat, and the other end is installed and fixed through its fixing feet and the connecting groove on the connecting seat, so as to realize the installation and fixation of the GRC curtain wall construction panel; The specific implementation of this method is as follows: A. Measurement and laying out, Lay out steel wires, determine the installation reference line of the curtain wall main keel, and inspect and align; B. Installation of connectors, The connecting parts include chemical anchor bolts, hot-dip galvanized steel plates, connecting plates and connecting bolts. Long connecting holes are provided on the connecting plates. The connecting plates are welded and fixed to the hot-dip galvanized steel plates. The hot-dip galvanized steel plates are fixed to the corresponding main construction structure through chemical anchor bolts. C. Column installation, 1) Install according to the location of the layout, starting from the bottom layer and then moving upward layer by layer; 2) Arrange the vertical steel wires at the corners, and the installation workers use the steel wires as the positioning reference to install the corner columns; 3) When laying out the lines, first pop up the horizontal ink lines between the layers on the connector according to the height dimensions of the construction diagram as the positioning reference line; 4) Check the straightness of the column before installing it on the wall to control the error within the allowable range; 5) Use bolts to connect the column and the connecting plate, adjust the verticality and horizontality of the column, and then tighten the nut. The front and rear positions of the column are adjusted according to the long holes on the connecting piece; D. Beam installation; 1) After the columns are installed, check the grid conditions. Install the beams only if they meet the specifications. Before installing the beams, install the angle brackets first. 2) The installation of the beam should be carried out according to the horizontal transverse line; 3) The beam and the column are connected by welding; 4) Inspect and accept the welds; E. Installation of thermal insulation cotton, The insulation cotton is measured in size, cut and installed on the inside of the beam. The insulation cotton is sealed with a wire mesh, and the gap between the main construction structure and the curtain wall keel is filled with insulation cotton; F. GRC curtain wall construction panel installation, 1) Installation of the connecting seat: install the connecting seat on the beam according to the designed position, and fix the connecting seat to the beam with bolts; 2) Position the lower part of the connection keel of the GRC curtain wall construction panel through the fixing groove on the connection seat, and connect and fix the upper part with the upper connection seat through the connecting bolts; 3) Adjacent GRC curtain wall construction panels are overlapped with each other, and the overlaps are sealed with weather-resistant glue.

Citation Information

Patent Citations

  • Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof

    CN101956438A

  • Construction method of back-bolt type dry hanging stone curtain wall

    CN102864934A

  • Installation method for super-large-area unit type slabstone curtain wall

    CN103806577A

  • External dry hanging stone curtain wall fixing device

    CN105569237A

  • Back-bolt type stone curtain wall structure

    CN108222343A