Semi-submersible lifting platform auxiliary crane rest arm structure and lifting platform
The novel semi-submersible crane platform integrates two crane rest arms into a single unit using a triangular prism and reinforcement frame, addressing inefficiencies in deck space and material usage, enhancing material efficiency and reducing weight.
Patent Information
- Application Number
- CN201910442845.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-05-25
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2039-05-25
AI Technical Summary
Existing semi-submersible crane platforms face challenges in deck space utilization and material efficiency, where existing designs fail to integrate two crane systems efficiently, and existing solutions occupy significant deck space and increase design weight and material costs, and inefficiencies in integrating crane systems, and inefficiencies in integrating crane systems.
A novel semi-submersible crane platform auxiliary crane rest arm structure that integrates two crane rest arms into a single unit, reducing deck space and material usage by employing a triangular prism frame, reinforcement frame, and crane rest arm slots, connected by welding, with specific tube sizes and I-beam reinforcement.
The integrated crane rest arm structure reduces deck space occupation and material usage while maintaining functionality, achieving efficient use of deck space and material resources.
Smart Images

Figure CN110143530B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of marine lifting platforms, and in particular to a semi-submersible lifting platform auxiliary crane rest arm structure and a lifting platform. Background Art
[0002] Semi-submersible crane platforms are often equipped with one or more main cranes and an auxiliary crane. The auxiliary crane is often designed on the side of the main deck of the semi-submersible platform, and the base is designed to be a detachable structure to meet the needs of switching the working environment between port and starboard. In the past, in order to place the auxiliary crane boom, the semi-submersible crane platform usually designed two independent auxiliary crane rest arms. This solution seriously occupies the main deck area, and invisibly increases the design weight of the entire platform, and also wastes materials. Therefore, it is necessary to design a new auxiliary crane rest arm structure, which is not only used to meet the needs of the auxiliary crane switching operation between port and starboard, but also can reduce the occupied area of the main deck, reduce the platform design weight, and save materials. Summary of the invention
[0003] In order to solve the above defects in the prior art, the present invention provides a semi-submersible lifting platform auxiliary crane rest arm structure, which can accommodate two crane rest arms at the same time, while reducing the occupied area of the deck and saving materials.
[0004] A semi-submersible crane platform auxiliary crane rest arm structure, used for accommodating the auxiliary crane boom, comprises a triangular prism frame, a reinforcement frame and two crane rest arm slots from bottom to top, the triangular prism frame, the reinforcement frame and the crane rest arm slots are connected together by welding, and the triangular prism frame is welded on the deck; the triangular prism frame comprises three support columns composed of a plurality of main support circular tubes, the top of the support column is a triangular I-beam frame composed of three I-beams, a plurality of auxiliary support circular tubes are connected between every two of the support columns, the first auxiliary support circular tube is placed horizontally, and the second auxiliary support circular tube is at an angle to the horizontal plane; the reinforcement frame comprises a quadrilateral I-beam frame, a plurality of auxiliary support circular tubes are connected between the quadrilateral I-beam frame and the triangular I-beam frame; the two crane rest arm slots are located on both sides above the reinforcement frame, and are connected to the reinforcement frame and the three main support circular tubes through a plurality of auxiliary support circular tubes, and sleepers are arranged in the crane rest arm slots.
[0005] Preferably, the main supporting circular tube comprises a first main supporting circular tube with a size of Φ219.1 mm x 12.7 mm, a second main supporting circular tube with a size of Φ273 mm x 12.7 mm, and a third main supporting circular tube with a size of Φ355.6 mm x 17.48 mm.
[0006] Preferably, the size of the first auxiliary support circular tube is Φ168.3mmx10.97mm, and the size of the second auxiliary support circular tube is Φ141.3x9.52mm.
[0007] Preferably, the support column and the plurality of auxiliary support circular tubes are connected together by welding.
[0008] Preferably, two supporting I-beams are further provided in the quadrilateral I-beam frame to enhance the frame stress.
[0009] Preferably, the size of the I-beam is 200x12W / 250x15F.
[0010] The present application also provides a semi-submersible lifting platform, comprising the semi-submersible lifting platform auxiliary crane rest arm structure described in any of the above technical solutions.
[0011] Compared with the existing crane resting arm, the advantages of the present invention are: the present invention integrates the original two independent crane resting arms into one crane resting arm, and places the crane resting arm in the common area of the turning radius of the left and right auxiliary cranes, which can meet the demand of placing the crane arm of the auxiliary crane during non-operating time on the port or starboard side, and at the same time reduces the occupied area of the main deck; since only one crane resting arm is used, materials are saved and weight is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a three-dimensional effect diagram of the rest arm structure of the auxiliary crane of the semi-submersible lifting platform according to an embodiment of the present invention;
[0013] Figure 2 for Figure 1 A top view of a triangular I-beam frame of the embodiment;
[0014] Figure 3 for Figure 1 A schematic diagram of a triangular prism frame structure of an embodiment of the invention;
[0015] Figure 4 for Figure 1 A side view of the reinforced frame and the crane rest arm slot in the embodiment;
[0016] Figure 5 It is a schematic diagram of a quadrilateral I-beam frame structure;
[0017] Description of reference numerals:
[0018] 1—crane rest arm slot, 11—main support circular tube, 101—first main support circular tube, 102—second main support circular tube, 103—third main support circular tube, 201—first auxiliary support circular tube, 202—second auxiliary support circular tube, 3—I-beam, 4—U-shaped slot, 5—sleeper, 6—triangular column frame, 601—triangular I-beam frame, 7—reinforced frame, 701—quadrilateral I-beam frame. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0020] Figure 1 The figure shows a three-dimensional rendering of the auxiliary crane rest arm structure of a semi-submersible crane platform. It is welded as a whole on the main deck, and includes three structures, namely a triangular prism frame 6, a reinforcement frame 7, and two crane rest arm slots 1. The triangular prism frame 6 is composed of three vertical support columns and a plane at the top of the support column. The support column is formed by connecting a number of main support circular tubes 11. The plane at the top of the support column is a triangular I-beam frame 601, which is formed by connecting three I-beams 3. There are auxiliary support circular tubes for reinforcement between every two support columns of the triangular prism frame 6, including a first auxiliary support circular tube 201 horizontal to the deck plane, and a second auxiliary support circular tube 202 inclined at a certain angle to the deck plane, as shown in FIG. Figure 3 shown.
[0021] The reinforcement frame 7 comprises a quadrilateral I-beam frame 701 located above the triangular I-beam frame 601 and a plurality of second auxiliary support circular tubes 202 connecting them. The reinforcement frame 7 can strongly support the crane rest arm slot 1 and the crane rest arm located therein.
[0022] Two crane rest arm slots 1 are provided above the reinforced frame 7 to meet the need of placing the crane arm of the auxiliary crane when the auxiliary crane is not in operation on the port or starboard side. Sleepers 5 are provided inside to protect the crane rest arm and the crane rest arm slot. The two crane rest arm slots 1 are symmetrically located on both sides of the reinforced frame 7, and are connected to the reinforced frame 7 through a plurality of auxiliary support circular tubes and three main support circular tubes 11. The auxiliary support circular tubes here all use obliquely placed second auxiliary support circular tubes 202.
[0023] Depend on Figure 4It can be seen that the main supporting circular tube at the bottom of the triangular prism frame 6 is thicker than the main supporting circular tube at the top. Preferably, the main supporting circular tubes include a first main supporting circular tube 101 with a size of Φ219.1mmx12.7mm, a second main supporting circular tube 102 with a size of Φ273mmx12.7mm, and a third main supporting circular tube 103 with a size of Φ355.6mmx17.48mm.
[0024] In some embodiments, the size of the first auxiliary support circular tube is Φ168.3 mm x 10.97 mm, and the size of the second auxiliary support circular tube is Φ141.3 mm x 9.52 mm.
[0025] In this embodiment, the dimensions of all I-beams 3 are 200x12W / 250x15F.
[0026] In some embodiments, two supporting I-beams 3 are also provided in the quadrilateral I-beam frame 701. Figure 5 As shown, to enhance frame stress.
[0027] The “connection” mentioned in this embodiment refers to connection by welding.
[0028] The present invention also provides a semi-submersible lifting platform, comprising the semi-submersible lifting platform auxiliary crane rest arm structure described in any one of the technical solutions in the above embodiments.
[0029] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above technical features.
Claims
1. A semi-submersible crane platform auxiliary crane rest arm structure, used to place the auxiliary crane boom, characterized by: From bottom to top, it includes a triangular prism frame, a reinforcement frame and two crane rest arm slots, the triangular prism frame, the reinforcement frame and the crane rest arm slots are connected together by welding, and the triangular prism frame is welded on the deck; the triangular prism frame includes three support columns composed of a plurality of main support circular tubes, the top of the support column is a triangular I-beam frame composed of three I-beams, and a plurality of auxiliary support circular tubes are connected between every two support columns, the first auxiliary support circular tube is placed horizontally, and the second auxiliary support circular tube is at an angle to the horizontal plane; the reinforcement frame includes a quadrilateral I-beam frame, and a plurality of auxiliary support circular tubes are connected between the quadrilateral I-beam frame and the triangular I-beam frame; the two crane rest arm slots are located on both sides above the reinforcement frame, and are connected to the reinforcement frame and the three main support circular tubes through a plurality of auxiliary support circular tubes, and sleepers are arranged in the crane rest arm slots; The support column and the plurality of auxiliary support circular tubes are connected together by welding; Two supporting I-beams are also arranged in the quadrilateral I-beam frame.
2. The semi-submersible lifting platform auxiliary crane rest arm structure according to claim 1 is characterized by: The main supporting circular tubes include a first main supporting circular tube with a size of Φ219.1 mm x 12.7 mm, a second main supporting circular tube with a size of Φ273 mm x 12.7 mm, and a third main supporting circular tube with a size of Φ355.6 mm x 17.48 mm.
3. The semi-submersible lifting platform auxiliary crane rest arm structure according to claim 1 is characterized by: The size of the first auxiliary support circular tube is Φ168.3mmx10.97mm, and the size of the second auxiliary support circular tube is Φ141.3mmx9.52mm.
4. A semi-submersible lifting platform, comprising the semi-submersible lifting platform auxiliary crane rest arm structure as described in any one of claims 1 to 3.
